SUBJECT:
NRC INSPECTION REPORT NO. 07200001/2023001 (DRSS)
GENERAL ELECTRIC-HITACHI MORRIS OPERATION FACILITY
Dear Anthony McFadden:
On February 9, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the General Electric-Hitachi Morris Operation Facility in Morris, Illinois. The purpose of the inspection was to determine whether activities authorized by the license were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with you and other members of your staff on February 9, 2024.
During the inspection period, the NRC inspectors reviewed the following aspects of onsite activities: design changes, radiation protection, emergency preparedness, maintenance and surveillances, environmental monitoring, and quality assurance. The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, reviewing work activities, and interviews with personnel.
Based on the results of this inspection, the NRC identified one Severity Level (SL) IV violation of NRC requirements. However, because of the very low safety significance and because the issue was entered into your corrective action program (CAP), the NRC is treating the issue as a Non-Cited Violation (NCV), in accordance with Section 2.3.2 of the NRC's Enforcement Policy.
No response is required for the NCV. However, if you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region III; and the Director, Office of Enforcement.
March 7, 2024 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Matthew C. Learn, Team Lead Decommissioning, Reactor, and ISFSI HP Branch Division of Radiological Safety and Security Docket No: 72-0001 License No: SNM-2500 Enclosure:
IR Nos. 07200001/2023001(DRSS)
cc w/encl: Distribution via LISTSERV Signed by Learn, Matthew on 03/07/24