GEH Report of Revised Vallecitos Nuclear Center (Vnc) Site Facility Physical Security Plan (PSP) Revision, Dated April 4, 2022, Revision 2 Issued January 18, 2023
ML24054A028
Person / Time
Site: 07000754, Vallecitos Nuclear Center
Issue date: 02/20/2024
From: Smyly J
GE Hitachi Nuclear Energy
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
M240020
Download: ML24054A028 (2)


Text

HITACHI Safeguards Information Notice to this Jetter contains GE Hitachi Nuclear Energy Safeguarded information to be withheld from public disclosure in accordance with 10 CFR 73.21. When separated from Safeguards Information enclosure(s), this document is decontrolled.

M240020 February 20, 2024 Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville MD, 20852 GE Hitachi Nuclear Energy Jeff Smyly Regulatory Compliance Manager 6705 Vallecitos Road Sunol, CA 94586 USA T925-918-6074 Jeffrey.Smyly@ge.com

Subject:

GEH Report of Revised Vallecitos Nuclear Center (VNC) Site Facility Physical Security Plan (PSP) Revision, dated April 4, 2022, Revision 2 Issued January 18, 2023

References:

1) NRG License R-33, Docket 05000073
2) NRC License SNM-960, Docket 07000754
3) N RC Confirmatory Order EA-14-144, 4/22/2015
4) Letter GEH to NRC, GEH Revised Vallecitos Nuclear Center (VNC) site Physical security Plan (PSP), 4/4/2022 (Agencywide Documents Access and Management System (ADAMS) No. ML22132A272, cover letter only)
5) Letter NRG to GEH, GE-Hitachi Nuclear Energy Americas LLC - Approval of the Revised Physical Security Plan for the Vallecitos Nuclear Center, 5/26/22 (ADAMS No. ML22144A196)

GE Hitachi Nuclear Energy Americas LLC (GEH) hereby submits this report pursuant to 1 0 CFR 50.54(p), informing the NRC of changes made the to the Vallecitos Nuclear Center (VNC) Site Physical Security Plan (PSP).

REIPORTIED CHANGE Due to changes associated with permanently ceasing operation of the Nuclear Test Reactor (NTR) on 12/21/2023, GEH has added controls changed the current VNC PSP to address transitioning the NTR to a 10 CFR Part 70, Category II quantity facility in compliance with 1 0 CFR 73.67(d). Per a completed 1 0CFR50.54(p) evaluation, there is no decrease in the safeguards effectiveness of the overall security plan.

The revised PSP is enclosed in Enclosure 1, which is prepared and marked in accordance with 1 0 CFR 73.22(d).

Please contact me if you have any questions regarding this matter.

Sincerely,

~lf°G(

Jeff Smyly, Manager VNC Regulatory Compliance

SoDI
Jl1>S 2D k!J z_ D
  • tJl~/J.
vt0SS

M240020 U.S. NRC February 5, 2024 Page 2 of 2 : VNC PSP Revision 2, 2/19/24 cc: NRC Region IV Administrator, Arlington, TX D. Hardesty, NRC NRR/DANU/UNPL (w/o enclosures)

0. Siurano-Perez, NRC NMSS/DFM/FFLB (w/o enclosures)