MONTHYEARML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23100A1072023-04-10010 April 2023 Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker ML23038A0192023-02-0606 February 2023 Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18243A5112018-08-28028 August 2018 Curtiss-Wright Nuclear Division - Senasys Selector Switch P/N 910CMC-5240X, Part 21 Notification ML17075A2782017-02-28028 February 2017 Part 21 - Potential Transducer Component Defect ML17006A0122016-12-22022 December 2016 Part 21 - Potential Transducer Component Defect ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML14265A0492014-09-12012 September 2014 Amendment to Part 21 Report from Abb, Inc Re Deviation of K-Line Circuit Secondary Close Latch (Event #50371) ML14237A1212014-08-15015 August 2014 Notification of Potential Part 21 Re Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch ML14113A3982014-04-17017 April 2014 Part 21 - Bearing Defect ML14079A3532014-03-17017 March 2014 Notification of Part 21 Re Bearing Defect ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations ML11251A1982011-09-0606 September 2011 Notification Under 10 CFR Part 21 on Certain Rosemount Model 1153 Series B, 1164 and 1154 Series H Pressure Transmitters, May Not Perform Their Intended Safety Function ML0932200662009-11-16016 November 2009 Part 21 Notification - Potential Failure in Emergency Diesel Generator Bearings ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0734402112007-12-0707 December 2007 Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters ML0727504702007-09-21021 September 2007 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0627702242006-09-27027 September 2006 Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves ML0626204942006-09-15015 September 2006 Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed ML0336503122003-12-26026 December 2003 Part 21 Report Regarding Failures of Abb Circuit Breakers Shipped to the Calvert Cliffs Plant ML0308404132003-03-14014 March 2003 Transmittal of 10 CFR Part 21 Report Regarding Failures of Abb Circuit Breakers 2024-09-06
[Table view] |
Text
1212212016 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 52458 Rep Org: ITT ENIDINE INC. Notification Date I Time: 12/22/2016 17:35 (EST)
Supplier: ITT ENIDINE INC. Event Date I Time: 11/02/2016 (EST)
Last Modification: 12/22/2016 Region: 1 Docket#:
City: WESTMINSTER Agreement State: Yes County: License#:
State: SC NRC Notified by: RAY SMITH Notifications: JAMES NOGGLE R1DO HQ Ops Officer: DONG HWA PARK GERALD MCCOY R2DO Emergency Class: NON EMERGENCY STEVE ORTH ' R3DO 10 CFR Section: MICHAEL HAY R4DO 21.21(d)(3)(i) DEFECTS AND NONCOMPLIANCE NMSS_EVENTS_NOTIFICATI EMAIL PART 21 MATERIALS PART 21/50.55 REACTORS PART 21 - POTENTIAL TRANSDUCER COMPONENT DEFECT The following information was received via fax:
"The ITT Conoflow models GT25CA 1826 and GT25CD1826 current to pressure (l/P) transducers produce a calibrated 3.0 to 15.0 psi output pressure from a 4.0 to 20.0 mA DC (input) signal. On November 2, 2016, a discovery was made of unqualified electrical component substitutions on the internal circuit board. Supplier and internal record reviews indicate these unqualified components were used as early as May 10, 2013, as the previously qualified PCB components are no longer available. Environmental qualification of the suspect circuit boards is planned for early 2017. If any component falls to meet requirements, nuclear facilities which use this product will be advised to examine their product for unqualified printed circuit boards via notification and visual references. Qualified replacement components will be provided to all affected customers.
"Customer Name I Item Number I No.: Units Calvert Cliffs Nuclear I GT25CD1826 I 30 Control Components Inc. I GT2SCD 1826 I 3 Duke Energy Carolinas LLC I GT25CA1826 I 8 Duke Energy Carolinas LLC I GTl:SCD1826 I 4 Enertech Curtiss-Wright I GT25CA1816 I 19 Enertech Curtiss-Wright I GT25CD1826 I 4 Ergytech Inc. I GT25CA1826 I 3 Ergytech Inc. I GT25CD1826 I 3 Gefran Benelux NV I GT25CD1826 I 2 Ontario Power Generation I GT25CD1826 I 31 SPX Flow Technology I GT25CA1826 I 2 Weir Valves & Controls UK I GT25CA1826 I 78"
1212212016 U.S. Nuclear Regulatory Commission Operations Center Event Report PaJ!e I