Category:License-Operator
MONTHYEARML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24082A2452024-03-22022 March 2024 Confirmation of Initial License Examination IR 05000263/20223012022-11-21021 November 2022 NRC Initial License Examination Report 05000263/2022301 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23011A3362022-11-10010 November 2022 Form 2.1-1 ML23012A1032022-11-10010 November 2022 Form 2.3-5 ML23012A0982022-11-10010 November 2022 Form 2.3-3 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23012A1652022-10-25025 October 2022 As-Administered Operating Test JPMs ML23012A1682022-10-25025 October 2022 As-Administered Written Examination and Answer Key ML23012A1692022-10-25025 October 2022 As-Administered Written Exam Reference Handouts ML23012A1662022-10-25025 October 2022 As-Administered Operating Test Scenarios ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A1392022-09-28028 September 2022 Proposed Written Examination ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A1432022-09-28028 September 2022 Form 3.3-1 Proposed Scenario Outlines ML23012A1372022-09-28028 September 2022 Form 3.3-2 Proposed Operating Test Simulator Scenario Guides ML23012A1342022-09-28028 September 2022 Proposed Admin Topics JPMs ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A1362022-09-28028 September 2022 Proposed Sim and Inplant System JPMs ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2152022-08-28028 August 2022 Form 3.2-1 ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A2162022-08-28028 August 2022 Form 3.2-2 ML23012A2222022-08-28028 August 2022 Form 4.1-1, Record of Rejected Knowledge and Abilities ML23018A1882022-08-28028 August 2022 OP Test Outline Issue Identified ML23012A2182022-08-28028 August 2022 Form 3.3-1 ML23012A2192022-08-28028 August 2022 Form 4.1-BWR and Common ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5762021-04-19019 April 2021 GFE Results, March 2021 ML21020A1002020-11-0303 November 2020 Initial License Exam Form ES-201-1 ML21013A5122020-11-0303 November 2020 Initial License Exam Outline Submittal Letter ML21020A1232020-11-0303 November 2020 Initial License Exam Outline Review Comments ML21019A5732020-11-0303 November 2020 Initial License Exam Administered Scenarios ML21020A1062020-11-0303 November 2020 Initial License Exam Form ES-403-1 ML21013A5422020-11-0303 November 2020 Initial License Exam Forms ES-301-2 ML21019A2202020-11-0303 November 2020 Initial License Exam Proposed Written Exam Key ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21020A1202020-11-0303 November 2020 Initial License Exam Forms ES-401-9 ML21013A5412020-11-0303 November 2020 Initial License Exam Forms ES-301-1 ML21013A5432020-11-0303 November 2020 Initial License Exam Forms ES-401-1 and 401-3 ML21020A1172020-11-0303 November 2020 Initial License Exam Forms ES-301-7 ML21013A5072020-11-0303 November 2020 Initial License Exam Forms ES-301-5 ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24082A2452024-03-22022 March 2024 Confirmation of Initial License Examination IR 05000263/20223012022-11-21021 November 2022 NRC Initial License Examination Report 05000263/2022301 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23011A3362022-11-10010 November 2022 Form 2.1-1 ML23012A1032022-11-10010 November 2022 Form 2.3-5 ML23012A0982022-11-10010 November 2022 Form 2.3-3 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23012A1692022-10-25025 October 2022 As-Administered Written Exam Reference Handouts ML23012A1662022-10-25025 October 2022 As-Administered Operating Test Scenarios ML23012A1652022-10-25025 October 2022 As-Administered Operating Test JPMs ML23012A1682022-10-25025 October 2022 As-Administered Written Examination and Answer Key ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A1372022-09-28028 September 2022 Form 3.3-2 Proposed Operating Test Simulator Scenario Guides ML23012A1362022-09-28028 September 2022 Proposed Sim and Inplant System JPMs ML23012A1342022-09-28028 September 2022 Proposed Admin Topics JPMs ML23012A1392022-09-28028 September 2022 Proposed Written Examination ML23012A1432022-09-28028 September 2022 Form 3.3-1 Proposed Scenario Outlines ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A2182022-08-28028 August 2022 Form 3.3-1 ML23012A2222022-08-28028 August 2022 Form 4.1-1, Record of Rejected Knowledge and Abilities ML23018A1882022-08-28028 August 2022 OP Test Outline Issue Identified ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A2192022-08-28028 August 2022 Form 4.1-BWR and Common ML23012A2162022-08-28028 August 2022 Form 3.2-2 ML23012A2152022-08-28028 August 2022 Form 3.2-1 ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21019A5722020-11-0303 November 2020 Initial License Exam Administered JPMs ML21020A1202020-11-0303 November 2020 Initial License Exam Forms ES-401-9 ML21019A5742020-11-0303 November 2020 Initial License Exam Administered Written Exam Key ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 ML21013A5412020-11-0303 November 2020 Initial License Exam Forms ES-301-1 ML21020A1232020-11-0303 November 2020 Initial License Exam Outline Review Comments ML21020A1172020-11-0303 November 2020 Initial License Exam Forms ES-301-7 ML21013A5452020-11-0303 November 2020 Initial License Exam Forms ES-D1 ML21019A5732020-11-0303 November 2020 Initial License Exam Administered Scenarios ML21019A2092020-11-0303 November 2020 Initial License Exam Proposed JPMs ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21019A2202020-11-0303 November 2020 Initial License Exam Proposed Written Exam Key ML21013A5422020-11-0303 November 2020 Initial License Exam Forms ES-301-2 ML21013A5122020-11-0303 November 2020 Initial License Exam Outline Submittal Letter ML21020A1022020-11-0303 November 2020 Initial License Exam Security Agreement Forms 2024-07-09
[Table view] |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: _Monticello Nuclear Generating Plant Date of Examination: _June 12, 2015 Examination Level: RO SRO Operating Test Number: _2015301__
Administrative Topic Type Describe activity to be performed (see Note) Code*
DETERMINING POWER REDUCTION BASED Conduct of Operations R, D ON DISCHARGE CANAL TEMP OVERTIME RESTRICTIONS/FATIGUE Conduct of Operations R, D, P MANAGEMENT Equipment Control S, N INDEPENDENT VERIFICATION OF HPCI MAIN STEAM LINE RAD MONITOR CHANNEL Radiation Control S, D CHECK Emergency n/a n/a Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility: _Monticello Nuclear Generating Plant_ Date of Examination: _June 12, 2015_
Examination Level: RO SRO Operating Test Number: _2015301__
Administrative Topic Type Describe activity to be performed (see Note) Code*
Conduct of Operations R, D CREW STAFFING DETERMINATION Conduct of Operations R, D, P SRO - NRC License Maintenance Responsibilities Equipment Control R, D SHUTDOWN RISK ASSESSMENT Radiation Control R, N EMERGENCY EXPOSURE CONTROL Emergency R, D EAL CLASSIFICATION Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)