3/20/2017, Meeting Slide Re. Palisades Nuclear Plant License Amendment Request; Application Meeting Cyber Security Plan Milestone 8 Implementation Schedule Change
ML17080A178
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/20/2017
From:
Entergy Nuclear Operations
To: Jennivine Rankin
Plant Licensing Branch III
Rankin J, NRR/DORL/LPL3, 415-1530
References
Download: ML17080A178 (7)


Text

Palisades Nuclear Plant (PNP)

License Amendment Request (LAR)

PreApplication Meeting Cyber Security Plan (CSP)

Milestone 8 (MS8)

Implementation Schedule Change March 20, 2017 Slide 1 of 7 1

Agenda

  • Introductions
  • Request / Need
  • Change Basis
  • License Change / Schedule
  • Questions Slide 2 of 7

Request / Need

  • Change CSP MS8 date from December 15, 2017 to May 31, 2020
  • Supports PNP Decommissioning Schedule

- Beyond Permanent Cessation of Power Operations

- Beyond All Fuel Removed from Reactor Vessel

- Beyond Minimal Risk of a Fuel Cladding Zirconium Fire

  • Allows prudent use of PNP resources on activities of higher nuclear safety significance Slide 3 of 7

Change Basis

  • Submittal of Certification for Permanent Cessation of Power Operations on October 1, 2018
  • Expect significant reduction in Critical Digital Assets post permanently defueled reactor
  • Similar to Palisades Amendment 259 CSP M8 Schedule Change to December 15, 2017 Slide 4 of 7

PNP CSP Status

  • CSP Milestones 1 through 7 have been completed
  • NRC inspection of Milestones 1 through 7 completed
  • Findings in NRC Milestones 1 through 7 inspection report closed by a NRC followup inspection Slide 5 of 7

License Change / Schedule

  • PNP License wording - Proposed Change

- The Palisades CSP was approved by License Amendment 243 as supplemented by changes approved by License Amendment Nos. 248, 253, 259, and XXX.

  • PNP LAR Timeline

- Plan to submit on March 30, 2017

- Request approval by December 15, 2017 Slide 6 of 7

QUESTIONS?