Proposed Tech Spec 3.4.5.2 Re RCS Operational Leakage,Making Emergency one-time Only Change to Allow Addl 72 H in Mode 2 While Trying to Find Source of RCS Leakage Which Began on 850711
ML17299A436
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 07/15/1985
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17299A434 List:
References
TAC-59245, NUDOCS 8507170236
Download: ML17299A436 (4)


Text

REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE L I G CO D T 0 FOR OPERATIO 3.4.5.2 Reactor Coolant System leakage shall be limited to:

a. No PRESSURE BOUNDARY LEAKAGE,
b. 1 gpm UNIDENTIFIED LEAKAGE,
c. 1 gpm total primary-to-secondary leakage through all steam generators, and 720 gallons per day through any one steam generator,
d. 10 gpm IDENTIPIED LEAKAGE from the Reactor Coolant System, and
e. 1 gpm leakage at a Reactor Coolant System pressure of 2250 + 20 psia from any Reactor Coolant System pressure isolation valve specified in Table 3.4-1.

APPLICABILITY: MODES 1, 2, 3, and 4 ACTION:

a. With any PRESSURE BOUNDARY LEAKAGE, be in at least HOT STANDBY within 6 hours and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With any Reactor Coolant System leakage greater than any one of the limits, excluding PRESSURE BOUNDARY LEAKAGE and leakage from REactor Coolant System pressure isolation valves, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

As a one time only extension, an additional 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is granted to cold shutdown by the issuance of this amendment. During this 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> if the unidentified leakage exceeds 2.0 gpm, an immediate cooldown will be initiated. The RCS leakage will be calculated at least once per eight hours during this 72-hour extension.

c. With any Reactor Coolant System pressure isolation valve leakage greater than the above limit, isolate the high presure portion of the affected system from the low pressure portion within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual or deactivated automatic valve, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
d. With RCS leakage alarmed and confirmed in a flow path with a no flow rate indicators, commence an RCS water inventory balance within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to determine the leak rate.

8507170236 8507i5.

PDR ADOCK 05000528I P PDR.

PALO VERDE - UNIT 1 3/4 4-19

4 P I I 4 4 W I

V J

il I P 1

n C

SURVEILLANCE RE UIREMENTS 4.4.5.2.1 Reactor Coolant System leakages shall be demonstrated to be within each of the above limits by:

Monitoring the containment atmosphere gaseous and particulate radioactivity monitor at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b. Monitoring the containment sump inventory and discharge at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

PALO VERDE UNIT 1 '/4 4-20