Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17355A3921999-07-27027 July 1999 Proposed Tech Specs 3.8.1.1,3.4.3 & 3.5.2,extending AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3041999-04-26026 April 1999 Proposed Tech Specs Deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2491999-03-0808 March 1999 Proposed Tech Specs Section 6.0,deleting Certain Requirements That Are Adequately Controlled by Existing Regulations,Other than 10CFR50.36 & TS ML17355A2411999-02-24024 February 1999 Proposed Tech Specs Page 3/4 7-15,removing Restrictions on Location at Which Temp of UHS May Be Monitored ML17354B1641998-10-27027 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor Position Into TS ML17354A8381998-03-12012 March 1998 Proposed Tech Specs Deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7801998-02-0202 February 1998 Proposed Tech Specs Re Diesel Fuel Storage Sys ML17354A7621998-01-0909 January 1998 Proposed Tech Specs Sections 5.3.1 & 6.9.1.7,,allowing Implementation of Zirlo Fuel Rod Cladding ML17354A7321997-12-0404 December 1997 Proposed Tech Specs Section 6.9.1.7, COLR, Clarifying References 4 & 6 by Adding Best Estimate LOCA to COLR & Documenting re-analysis Performed as Result of Revs to Large Break LOCA Methodology ML17354A6161997-08-27027 August 1997 Proposed Tech Specs Page 6.2,allowing Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4771997-04-24024 April 1997 Proposed Tech Specs Page 6-22 Re Large Break Loss of Coolant re-analysis ML17354A4221997-02-24024 February 1997 Proposed Tech Specs 6.9.1.7 Re COLR & Large Break Loss of Coolant Accident re-analysis ML17354A3741996-12-17017 December 1996 Proposed Tech Specs,Modifying TSs to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3521996-11-22022 November 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Sources & 3/4.8.1 Re AC Sources Operating Limiting Condition for Operation ML17354A2871996-10-0303 October 1996 Proposed Tech Specs Revising TS to Allow Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7991996-07-17017 July 1996 Proposed Tech Specs,Revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7111996-05-28028 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls. ML18008A0451996-05-10010 May 1996 Proposed Tech Specs Re Various Administrative Improvements ML17353A6781996-05-0909 May 1996 Proposed Tech Specs Re SBLOCA re-analysis ML17353A6521996-04-23023 April 1996 Proposed Tech Specs Re Accumulator Water Level & Pressure Channnel,Per NRC GL 93-05 ML17353A6581996-04-19019 April 1996 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6171996-03-21021 March 1996 Proposed Tech Specs,Revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6091996-03-20020 March 1996 Proposed TS 3/4.5.1,reflecting Removal of SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels ML17353A6001996-03-0505 March 1996 Proposed TS Sections 4.4.3.3 & 4.5.2,reducing Frequency of Surveillances & Insps in Accordance W/Gl 93-05,Items 6.6 & 7.5 ML17353A5031995-12-18018 December 1995 Proposed Tech Specs,Increasing Allowed Rated Thermal Power from 2,200 Mwt to 2,300 Mwt ML17353A4541995-11-22022 November 1995 Proposed Tech Specs Re Administrative Controls & Reviews ML17353A4511995-11-22022 November 1995 Proposed Tech Specs Pages 3/4 8-2 & 3/4 8-3 Re Edgs,Per GLs 93-05 & 94-01 ML17353A3971995-10-0404 October 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3831995-09-28028 September 1995 Proposed Tech Specs,Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3531995-09-11011 September 1995 Proposed Tech Specs Re Edgs,Change to Testing Requirements, Per GLs 93-05 & 94-01 ML17353A2831995-07-26026 July 1995 Proposed Tech Specs 4.1.3.1.2,4.6.5.1,4.4.6.2.2,4.10.1.2 & Table 4.3-3 to Reduce Frequency of Testing,Per GL 93-05 ML17353A2801995-07-26026 July 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentation ML17353A2761995-07-26026 July 1995 Proposed Tech Specs,Adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2731995-07-26026 July 1995 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2701995-07-26026 July 1995 Proposed Tech Specs Re Rod Misalignment Requirement for Movable Control Assemblies ML17353A2671995-07-26026 July 1995 Proposed Tech Specs for Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17353A2401995-06-19019 June 1995 Proposed Tech Specs Re TS SR 4.8.1.1.2.g.7 ML17352B1841995-05-23023 May 1995 Proposed Tech Specs Re Use of Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation ML20083R1291995-05-0505 May 1995 Proposed Tech Specs Re Implementation of Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17352B0881995-03-30030 March 1995 Proposed Tech Specs SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot-start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 & Associated Footnote for Performance of Subj 5-minute Test ML17352B0041995-01-17017 January 1995 Proposed Tech Specs 6.9.1.7, COLR, Including Ref to Topical Rept NF-TR-95-01 Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters ML17352A8341994-10-20020 October 1994 Proposed TS 3/4.7.1.1 & Associated Bases,Addressing Max Allowable Reactor Thermal Power Operation W/Inoperable MSSVs ML17352A8281994-10-20020 October 1994 Proposed Tech Specs 4.8.1.1.2e & 4.8.1.1.2f,addressing EDG Fuel Oil Testing & TS 3.8.1.1,addressing Required Action in Event Diesel Fuel Oil Does Not Meet Diesel Fuel Oil Testing Program Limits ML17352A8311994-10-20020 October 1994 Proposed Tech Specs 3/4.4.9.1,reflecting Removal of Schedule for Withdrawal of Rv Matl Specimens ML17352A8381994-10-20020 October 1994 Proposed Tech Specs,Allowing Containment Personnel Airlock Doors to Be Opened During Core Alterations & Movement of Irradiated Fuel in Containment,Provided Certain Conditions Met ML17352A7321994-07-19019 July 1994 Proposed TS 3/4.7.1 & Associated Bases Addressing Operation at Reduced Power Levels W/Inoperable Main Steam Safety Valves ML17352A7291994-07-19019 July 1994 Proposed Tech Specs 4.8.1.1.2e & 4.8.2.2.2f Re EDG Fuel Oil Testing Program ML17352A7241994-07-19019 July 1994 Proposed Tech Specs Adding Rod Bank Insertion Limits & K(Z) Curves to COLR ML17352A5471994-04-19019 April 1994 Proposed TS 4.0.5a Re ISI & Testing Programs ML17352A5441994-04-19019 April 1994 Proposed Tech Specs Changing Containment Spray Sys Surveillance Requirements 1999-07-27
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17355A3921999-07-27027 July 1999 Proposed Tech Specs 3.8.1.1,3.4.3 & 3.5.2,extending AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3581999-06-28028 June 1999 Cycle 18 Startup Rept. with 990628 Ltr ML17355A3041999-04-26026 April 1999 Proposed Tech Specs Deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2491999-03-0808 March 1999 Proposed Tech Specs Section 6.0,deleting Certain Requirements That Are Adequately Controlled by Existing Regulations,Other than 10CFR50.36 & TS ML17355A2411999-02-24024 February 1999 Proposed Tech Specs Page 3/4 7-15,removing Restrictions on Location at Which Temp of UHS May Be Monitored ML17355A2011999-01-25025 January 1999 Cycle 17 Startup Rept. with 990125 Ltr ML17354B1641998-10-27027 October 1998 Proposed Tech Specs Pages Re Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi-Discipline Supervisor Position Into TS ML20197C9661998-08-27027 August 1998 Rev 15 to Security Training & Qualification Plan ML17354A9471998-04-27027 April 1998 Rev 2 to Turkey Point Nuclear Plant Recovery Plan. ML17354A8381998-03-12012 March 1998 Proposed Tech Specs Deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7801998-02-0202 February 1998 Proposed Tech Specs Re Diesel Fuel Storage Sys ML17355A2711998-01-30030 January 1998 Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point Plant,Units 3 & 4. ML17354A7621998-01-0909 January 1998 Proposed Tech Specs Sections 5.3.1 & 6.9.1.7,,allowing Implementation of Zirlo Fuel Rod Cladding ML17354A7321997-12-0404 December 1997 Proposed Tech Specs Section 6.9.1.7, COLR, Clarifying References 4 & 6 by Adding Best Estimate LOCA to COLR & Documenting re-analysis Performed as Result of Revs to Large Break LOCA Methodology ML17354A6161997-08-27027 August 1997 Proposed Tech Specs Page 6.2,allowing Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4971997-05-0101 May 1997 Rev 1 to Turkey Point Nuclear Plant Recovery Plan. ML17354A4771997-04-24024 April 1997 Proposed Tech Specs Page 6-22 Re Large Break Loss of Coolant re-analysis ML17354A4221997-02-24024 February 1997 Proposed Tech Specs 6.9.1.7 Re COLR & Large Break Loss of Coolant Accident re-analysis ML17354A3741996-12-17017 December 1996 Proposed Tech Specs,Modifying TSs to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3521996-11-22022 November 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Sources & 3/4.8.1 Re AC Sources Operating Limiting Condition for Operation ML17354A2871996-10-0303 October 1996 Proposed Tech Specs Revising TS to Allow Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7991996-07-17017 July 1996 Proposed Tech Specs,Revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7111996-05-28028 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls. ML18008A0451996-05-10010 May 1996 Proposed Tech Specs Re Various Administrative Improvements ML17353A6781996-05-0909 May 1996 Proposed Tech Specs Re SBLOCA re-analysis ML17353A6521996-04-23023 April 1996 Proposed Tech Specs Re Accumulator Water Level & Pressure Channnel,Per NRC GL 93-05 ML17353A6581996-04-19019 April 1996 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6171996-03-21021 March 1996 Proposed Tech Specs,Revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6091996-03-20020 March 1996 Proposed TS 3/4.5.1,reflecting Removal of SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels ML17353A6001996-03-0505 March 1996 Proposed TS Sections 4.4.3.3 & 4.5.2,reducing Frequency of Surveillances & Insps in Accordance W/Gl 93-05,Items 6.6 & 7.5 ML17353A5801996-02-29029 February 1996 Plant Procedures & Training Matl Provided for Preparation of Licensing Exams for Reactor Operator Group Xvi & Senior Reactor Operator Upgrade. ML17353A6191996-02-15015 February 1996 Offsite Dose Calculation Manual for Gaseous & Liquid Effluents from Turkey Point Plant Units 3 & 4. ML17353A7631996-02-0808 February 1996 Conduct of Operations. ML17353A5031995-12-18018 December 1995 Proposed Tech Specs,Increasing Allowed Rated Thermal Power from 2,200 Mwt to 2,300 Mwt ML17353A4541995-11-22022 November 1995 Proposed Tech Specs Re Administrative Controls & Reviews ML17353A4511995-11-22022 November 1995 Proposed Tech Specs Pages 3/4 8-2 & 3/4 8-3 Re Edgs,Per GLs 93-05 & 94-01 ML17353A3971995-10-0404 October 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3831995-09-28028 September 1995 Proposed Tech Specs,Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3531995-09-11011 September 1995 Proposed Tech Specs Re Edgs,Change to Testing Requirements, Per GLs 93-05 & 94-01 ML17353A7641995-08-23023 August 1995 Emergency & Off-normal Operating Procedure Usage. ML17353A2831995-07-26026 July 1995 Proposed Tech Specs 4.1.3.1.2,4.6.5.1,4.4.6.2.2,4.10.1.2 & Table 4.3-3 to Reduce Frequency of Testing,Per GL 93-05 ML17353A2801995-07-26026 July 1995 Proposed Tech Specs,Modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentation ML17353A2761995-07-26026 July 1995 Proposed Tech Specs,Adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2731995-07-26026 July 1995 Proposed Tech Specs,Revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2701995-07-26026 July 1995 Proposed Tech Specs Re Rod Misalignment Requirement for Movable Control Assemblies ML17353A2671995-07-26026 July 1995 Proposed Tech Specs for Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17353A2401995-06-19019 June 1995 Proposed Tech Specs Re TS SR 4.8.1.1.2.g.7 ML17352B1841995-05-23023 May 1995 Proposed Tech Specs Re Use of Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation ML20083R1291995-05-0505 May 1995 Proposed Tech Specs Re Implementation of Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17352B0881995-03-30030 March 1995 Proposed Tech Specs SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot-start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 & Associated Footnote for Performance of Subj 5-minute Test 1999-07-27
[Table view] |
Text
TABLE OF CONTENTS Section Title ~Pa e TECHNICAL SPECIFICATIONS 1.0 DEFINITIONS l-l 1.1 Safety Limits l-l 1.2 Limiting Safety System Settings 1-1 1.3 Limiting Conditions for Operation l-l 1.0 Operable l-l 1.5 Containment Integrity 1-2 1.6 Protective Instrumentation Logic 1-2 1.7 Instrumentation Surveillance 1-3 1.8 (Oeleted) 1-3 Action 1-0 1.9 1.10 Core Alteration '%
1.1 1 Rated Power 1-s 1.12 Thermal Power lw 1.13 Design Power I-0 1.10 Oose Equivalent I-131 1-5 1.15 Power Tilt 1-5 1.16 Interim Limits 1-6 1.17 Low Power Physics Tests 1-6 1.18 Engineered Safety Featur es 1-6 1.19 Reactor Protection System 1-6 1.20 Safety Related Systems and Components 1-6 1.21 Per Annum 1-6 1.22 Reactor Coolant System Pressure Boundary Integrity 1-6 1.23 Coolant Loop 1-7 1.20 E-Average Oisintegration Energy 1.25 Gas Decay Tank System 1-8 1.26 Ventilation Exhaust Treatment System 1-8 1.27 Process Control Program (PCP) 1-8 1.28 Offsite Dose Calculation Vlanual (OOCM) 1-8 1.29 Dose Equivalent I-131 1-8 1.30 Purge-Purging 1-9 1.31 'enting 1-9 1.32 Site Boundary 1-9 1.33 Unrestricted Area 1-9.
1.30 Member(s) of the Public 1-9 1.35 Heavy Loads 1-9 1.36 Operational Modes 1-9 2.0 SAFETY LIMITS AND LIMITINGSAFETY SYSTEM SETTINGS 2.1-1 2.1 Safety Limit, Reactor Core 2.1-1 2.2 Safety Limit, Reactor Coolant System Pressure 2.2-1 2.3 Limiting Safety System Setting, Protective Instrumentation 2.3-1 3.0 LIMITING CONDITIONS FOR OPERATION 3.0-1 3.1 Reactor Coolant System 3.1-1 Operational Components 3.1-1 Pressure-Temperature Limits 3.1-2 Leakage 3.1-3 Maximufn Reactor Coolant Activity 3.1%
Reactor Coolant Chemistry 3.1-6 DNB Parameters 3.1-7 85ff2i 851 125 02bb o 5000250 Amendment Nos. and PDR ADOCY PDR P
LIST OF TABLES Table Title 1.1 Operational Modes 3.5-1 Instrument Operating Conditions for Reactor Trip 3.5-2 Engineering Safety Features Actuation 3.5-3 Instrument Operating Conditions for Isolation Functions
- 3. 5-0 Engineered Safety Feature Set Points 3.13-1 Oeleted 3.10-1 Fire Detection System 3.17-1 Spent Fuel Burnup Requirements for Storage in Region II of the Spent Fuel Pit 0.1-1 Minimum Frequencies for Checks, Calibrations and Test of Instrument Channels 0.1-2 Minimum Frequencies for Equipment and Sampling Tests 0.?-I Reactor Coolant System In-Service Inspection Schedule 0.12-1 Operational Environmental Radiological Surveillance Program 0.12-2 Operational Environmental Radiological Surveillance Program .
Types of Analysis 6.2-1 Operating Personnel Amendment Nos. and
1.9 ACTION ACTION shall be that part of a Technical Specification which prescribes remedial measures required under designated.conditons.
1.10 CORE ALTERATION CORE ALTERATION shall be the movement or manipulation of any component within the reactor pressure vessel with the vessel head removed and fuel in the vessel.
Suspension of CORE ALTERATION shall not preclude completion of movement of a component to a safe conservative position.
1.11 RATED POWER (R.P.)
Rated power is the licensed steady state reactor core thermal power output of 2200 M'Vt.
1.12 THERMAL POWER Thermal power is the total core heat transferred from the fuel to the coolant.
1.13 DESIGN POWER Design power is the steady state reactor thermal output of 2300 MIVt.
Amendment Nos. and
SNUBBERS 3.13.1 - All safety related snubbers shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3, and 0.,'MODES 5 and 6 for snubbers located on systems required OPERABLE in those MODES.
ACTION:
With one or more safety related snubbers inoperable, within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s:
- 1) replace or restore the inoperable snubber(s) to OPERABLE status AND
- 2) perform an evaluation per T.S. 0.10.l.e on the attached component(s) OR
- 3) declare the attached system inoperable and follow the appropriate ACTION statements for that system.
3.13-1 Amendment Nos. and
SNUBBERS
@10.1 Each safety related snubber shall be demonstrated OPERABLE by performance of the following augmented in-service inspection program.
- a. Ins tion T As used in this specification, type of snubber shall mean snubbers of the same design and manufacturer, irrespective of capacity.
- b. Visual Ins tions Snubbers may be categorized as inaccessible or accessible during reactor operation. Each of these groups (inaccessible and accessible) may be inspected independently according to the schedule below. The first inservice visual inspection of each type of snubber shall be performed after 0 months but within l0 months of commencing POWER OPERATION and shall include all snubbers. If all snubbers of each type (on any system) are found OPERABLE during the first inservice visual inspection, the second inservice visual inspection (of that system) shall be performed at the first refueling outage. Otherwise, subsequent visual inspections (of a given system) shall be performed in accordance with the following schedule:
Number Inoperable Snubbers of Each Subsequent Visual T e (on an s stem) er Insoection Period er ~Jnit Inspection Period+PI 0 18 months+ 25%
1 12 months+ 25%
2 6 months+25%
3,0 120 days+ 25%
5,6,7 62 days+25%
8 or more 31 days+ 25%
~ The inspection interval for each type of snubber (on a given system) shall not be legthened more than one step at a time unless a generic problem has been identified and corrected; in that event the inspection interval may be lengthened one step the first time and two steps thereafter if no inoperable snubbers of that type are found (on that system).
// The provisions of T.S. 0.0.1 are not applicable.
0.10-1 Amendment Nos. and
- c. Visual Ins ction Acce tance Criteria Visual inspections shall verify (1) that there are no visible indications of damage or impaired OPERABILITY, (2) attachments to the foundation or supporting structure are secure, and (3) fasteners for attachment of the snubber to the component and to the snubber anchorage are secure. Snubbers which appear inoperable as a result of visual inspections may be determined OPERABLE for the purpose of establishing the next visual inspection interval, oroviding that (I) the cause of the rejection is clearly established and remedied for that particular snubber and for other snubbers that may be generically susceptible; and (2) the affected snubber is functionally tested in the as-found condition and determined OPERABLE per Specification 0.10.l.f.
- d. Functional Tests For each unit, during refueling shutdown, a representative sample (1096 of the total number of safety related snubbers for the respective unit identified by site records) shall be functionally tested either in place or in a bench test.
For each snubber of a type that does not meet the functional test acceptance criteria of Specification 0.10.l.f, an additional 10% of that type of snubber shall be functionally tested until no more failures are found or until all snubbers of that type on that unit have been functionally tested.
The representative sample selected for functional testing shall include the various configurations, operating environments and the range of size and capacity of snubbers. At least 2596 of the snubbers in the representative sample shall include snubbers from the following categories:
- 1. Snubbers within 5 feet of heavy equipment (ex. valves, pumps, turbines, motors, etc.).
- 2. Snubbers within.l0 feet of the discharge from a safety relief valve.
0;10-2 Amendment Nos. and
Snubbers identified by site records as "Especially Difficult to Remove" or in "High Radiation Zones During Shutdown" shall also be included in the representative sample. +
In addition to the regular sample, snubbers which failed the previous functional test shall be retested during the next test period. If a spare snubber has been installed in place of a failed snubber, then both the failed snubber (if it is repaired and installed in another position) and the spare snubber shall be retested. Test results of these snubbers may not be included for the re-sampling.
- e. Functional Test Failure Anal sis An engineering evaluation shall be made of each failure to meet the functional test acceptance criteria to determine the cause of the failure.
The results of this evaluation shall be used, if applicable, in selecting snubbers to be tested in an effort to determine the OPERABILITY of other snubbers irrespective of type which may be subject to the same failure mode.
If any snubber selected for functional testing either fails to activate or fails to move, i.e., frozen in place, the cause will be evaluated under the provisions of 10 CFR Part 21.
Should the results of the evaluation indicate that the failure was caused by either manufacturer or design deficiency, further action shall be taken, if needed, based on manufacturer or engineering recommendations.
For the-snubber(s) found inoperable, an evaluation shall be performed on the components to which the inoperable snubber(s) are attached. The purpose of this evaluation shall be to determine if the components to which the inoperable snubber(s) are attached were adversely affected by the inoperability of the snubber(s) in order to ensure that the component remains capable of meeting the designed service.
+ Permanent or other exemptions from functional testing for individual snubbers in these categories may be granted by the Commission only if a justifiable basis for exemption is presented and/or snubber lift destructive testing was performed to qualify snubber OPERABILITY for all design conditions at either the completion of their fabrication or at a subsequent date.
0.10-3 Amendment Nos. and
- f. Mechanical Snubbers Functional Test Acce tance Criteria The mechanical snubber functional test shall verify that:
- 1. The force required to initiate or maintain motion of the snubber is within the specified range in both directions of travel.
- 2. Activation (restraining action) is achieved within the specified range of velocity or acceleration in both tension and compression.
- 3. Snubber release rate, where required, is within the specified range in compression or tension.
(
- g. Snubber Service Life Monitor A record of the service life of each snubber, the date at which the designated service life commences and the installation and maintenance records on which the designated service life is based shall be maintained as required by Specification 6.10.2.m.
Concurrent with the first inservice visual inspection and during refueling shutdown thereafter, the installation and maintenance records for each safety related snubber as identified by site records shall be reviewed to verify that the indicated service life has not been exceeded or will not be exceeded prior to the next scheduled snubber service life review. If the indicated service life will be exceeded prior to the next scheduled snubber service life review, the snubber service life shall be reevaluated or the snubber shall be replaced or reconditioned so as to extend its service life beyond the date of the next scheduled service life review. This reevaluation, replacement or reconditioning shall be indicated in the records.
0.10-4 Amendment Nos.
0 0 Records of meetings of the PNSC and the CNRB.
- l. Records for Environmental Qualification which are covered under the provisions of paragraph 6.13.
- m. Records of the service lives of all snubbers required by Specification 3.13 including the date of which the service life commences and associated installation and maintenance records.
- n. Annual Radiological Environmental Monitoring Reports and records of analyses transmitted to the licensee which are used to prepare the Annual Radiological Environmental Monitoring Report.
RADIATIONPROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.
HIGH RADIATIONAREA 6.12.1 In lieu of the "control device" or "alarm signal" required by paragraph 20.203(c)(2) of 10 CFR 20:
- a. Each High Radiation Area in which the intensity of radiation is greater than 100 mRem/hr but less than 1000 mRem/hr shall be barricaded and conspicuously posted as a High Radiation Area and entrance thereto shall be controlled by issuance of a Radiation )Vork Permit and any individual or group of individuals permitted to enter such areas shall be provided with a radiation monitoring device which continuously indicates the radiation dose rate in the area.
- b. Each High Radiation Area in which the intensity of radiation is greater than 1000 mRem/hr shall be subject to the provisions of 6.12.1(a) above, and in addition locked doors shall be provided to prevent unauthorized entry into such areas and the keys shall be maintained under administrative control.
6-29 Amendment Nos. and
I
~ ~.e
~
P