|
---|
Category:Inspection Plan
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) IR 05000390/20230062024-02-28028 February 2024 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - Report 05000390/2023006 and 05000391/2023006 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request IR 05000390/20220062023-03-0101 March 2023 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2022006 and 05000391/2022006 ML22327A1902022-11-28028 November 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000390 2023403; 05000391 2023403 ML22250A4852022-09-0707 September 2022 Requalification Program Inspection IR 05000390/20220052022-08-31031 August 2022 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2022005 and 05000391/2022005 - Final IR 05000390/20210062022-03-0202 March 2022 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 (Report No. 05000390/2021006 and 05000391/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar IR 05000390/20200062021-03-0303 March 2021 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2020006 and 05000391/2020006 ML20338A3202020-12-0303 December 2020 Notification of an NRC Fire Protection Team Inspection (NRC Inspection Report 05000390/2021011 and 05000391/2021011) and Request for Information ML20268B8672020-09-24024 September 2020 Document Request for Watts Bar Nuclear Plant Radiation Protection Inspection Inspection Report 2020-04 ML20253A1782020-09-0909 September 2020 Emergency Preparedness Program Inspection Request for Information IR 05000390/20200052020-08-31031 August 2020 Assessment Followup Letter and Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2020005 and 05000391/2020005 ML20266G4592020-08-14014 August 2020 Notification of Inspection and Request for Information IR 05000390/20190062020-03-0303 March 2020 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - NRC Report 05000390/2019006 and 05000391/2019006 ML20028D4882019-12-0202 December 2019 Notification of Inspection and Request for Information IR 05000390/20180062019-03-0404 March 2019 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2018006 and 05000391/2018006 ML19063B8992019-02-28028 February 2019 ISI Sgisi RFI 2019002 Combined ML18282A4462018-10-0909 October 2018 Emergency Preparedness Program Inspection Request for Information ML18215A1362018-08-0202 August 2018 Radiation Safety Baseline Inspection RFI 2018003 Public ML18191B2472018-07-10010 July 2018 Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000390/2018011 and 05000391/2018011 ML18187A0142018-07-0303 July 2018 RP Inspection Document Request - August 2018 ML18059A1502018-02-28028 February 2018 EOC Assessment Letter ML17271A0052017-09-21021 September 2017 Notification of Inspection and Request for Information ML17142A1862017-05-19019 May 2017 Emergency Preparedness Inspection and Request for Information Dated: May 19, 2017 IR 05000390/20160062017-03-0101 March 2017 Annual Assessment Letter for Watts Bar Nuclear Plant, NRC Inspection Report 05000390/2016006 and 05000391/2016006 ML17059C9572017-02-23023 February 2017 Notification of Inspection and Request for Information IR 05000391/20166112016-08-31031 August 2016 Mid-Cycle Assessment Letter - Watts Bar Nuclear Plant Unit 2 (NRC Inspection Report 05000391/2016611) IR 05000390/20160052016-08-31031 August 2016 Mid Cycle Assessment Letter for Watts Barr Nuclear Plant Unit 1, NRC Inspection Report 05000390/2016005 ML16062A2862016-03-0202 March 2016 Annual Assessment Letter IR 05000391/20166072016-03-0202 March 2016 End-Of-Cycle Assessment Letter - Watts Bar, Unit 2 (NRC Inspection Report 05000391/2016607) IR 05000391/20156062015-09-0101 September 2015 Mid-Cycle Assessment Letter - Watts Bar Nuclear Plant Unit 2 (NRC Inspection Report 05000391/2015606) IR 05000390/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for the Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 005000390/2015005 IR 05000390/20140012015-03-0404 March 2015 Annual Assessment Letter for Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 05000390/2014001 IR 05000391/20156012015-02-27027 February 2015 End-Of-Cycle Assessment Letter - Watts Bar Nuclear Plant, Unit 2 (NRC Inspection Report 05000391/2015601) IR 05000391/20146062014-09-0303 September 2014 Mid-Cycle Assessment Letter Watts Bar Nuclear Plant, Unit 2 (NRC Inspection Report 05000391/2014606) ML14245A1232014-09-0202 September 2014 Mid-Cycle Letter ML14125A0452014-05-0505 May 2014 Plant, Notification of Inspection and Request for Information IR 05000390/20130012014-03-0404 March 2014 Annual Assessment Letter Watts Bar Nuclear Plant Unit 1 (Report 05000390/2013001) IR 05000391/20136062013-09-0303 September 2013 Mid-Cycle Assessment Letter - Watts Bar Nuclear Plant Unit 2 (NRC Inspection Report 05000391/2013606) ML13246A1912013-09-0303 September 2013 Mid Cycle Assessment Letter ML13123A2732013-05-0303 May 2013 Ti 2515-182 Phase 1 RFI - MSC IR 05000390/20136012013-03-0404 March 2013 Annual Assessment Letter for Watts Bar Nuclear Plant Unit 2 (IR 05000390-13-601) IR 05000390/20120012013-03-0404 March 2013 Annual Assessment Letter for Watts Bar Nuclear Plant Unit 1 (Report 05000390/2012001) ML12248A1022012-09-0404 September 2012 Mid Cycle Assessment Letter Watts Bar 2012 IR 05000390/20120062012-09-0404 September 2012 Mid Cycle Assessment Letter Watts Bar 2012 ML12065A3502012-03-0505 March 2012 Inspection/Activity Plan, 03/01/2012 - 06/30/2013 2024-02-28
[Table view] Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE N.E., SUITE 1200 ATLANTA, GEORGIA 30303-1200 March 4, 2019 Mr. Joseph Vice President, Nuclear Regulatory and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A Chattanooga, TN 37402-2801 SUBJECT: ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 - REPORT 05000390/2018006 AND 05000391/2018006
Dear Mr. Shea:
The NRC has completed its end-of-cycle performance assessment of the Watts Bar Nuclear Plant Units 1 and 2, reviewing performance indicators (Pis), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Watts Bar Nuclear Plant, Unit 1 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and.all Pis were within the expected range (i.e., Green}.
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC determined the performance at Watts Bar Nuclear Plant, Unit 2 during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRC's ROP Action Matrix. This conclusion was based on one Pl, Unplanned Scrams per 7000 Critical hours, in the Initiating Events cornerstone, crossing the White threshold in the second quarter of 2018. On December 14, 2018, the NRC completed a supplemental inspection using Inspection Procedure (IP) 95001, "Supplemental Inspection Response to Action Matrix Column 2 Inputs." Based on the results*of this inspection and that the Pl has returned to Green in the fourth quarter of CY 2018, the NRC determined that Watts Bar Unit 2 returned to the *
Licensee Response Column (Column 1) for the first quarter of CY 2019 after a Regulatory Performance Meeting was conducted on January 30, 2019, and the assessment follow-up letter for Watts Bar Unit 2 was issued on February 4, 2019.
Although plant performance for Unit 1 was within the Licensee Response Column and the plant performance for Unit 2 was within the Regulatory Response Column, the NRC has not yet finalized the significance of Apparent Violation 05000390,391/2019501-01, "Failure to Maintain the Effectiveness of the Emergency Plan and a Standard Emergency Classification Scheme Which Included Facility Effluent Parameters." The final safety significance determination may affect the NRC's assessment of plant performance and the enclosed inspection plan. Specifically, if the NRC determines that the significance of the finding is white, Unit 1 will
J.Shea 2 return to the Regulatory Response Column with Unit 2 and additional inspection of the finding will be planned.
In assessment letter dated August 31, 2018, titled Assessment Follow-up Letter and Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 (Reports 05000390, 05000391/2018005) (ML18242A458), the NRC opened a cross-cutting issue (CCI) with the aspect of Safety Conscious Work Environment (SCWE) and identified the closure criteria for the Chilling Effect Letter (CEL) and CCI. The NRC recognizes that TVA has made efforts to improve this area. The NRC will continue to monitor your staff's effort and progress in addressing the CCI by our resident inspectors, follow-up SCWE, and/or Pl&R inspections.
The enclosed inspection plan lists the inspections scheduled through December 31, 2020. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspectior, plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113,
"Recommendations for Modifying the Reactor Oversight Process Engineering Inspections"). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In addition to the ROP baseline inspections, we also plan on conducting infrequently performed inspections which include Initial License Examination, Safety Conscious Work Environment and Confirmatory Orders follow-up inspections. The NRC will be in contact with your staff to schedule completion of Temporary Instruction (Tl) 2515/194, "Inspection of the Licensee's Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01 )." The NRC intends to complete this inspection in 2019.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, and Requests for Withholding."
J.Shea 3 Please contact Omar Lopez-Santiago at (404) 997-4703 with any questions you may have regarding this letter.
Sincerely,
/RA/
Joel T. Munday, Director Division of Reactor Projects Docket Nos.: 50-390, 50-391 License Nos.: NPF-90, NPF-96 Enclosure:
Watts Bar Inspection/Activity Plan (03/01/2019-12/31/2020)
cc Distribution via ListServ
ML19063D287 OFFICE RII:DRP RII:DRP RII:DRP RII:DRP RII: DRP NAME WDeschaine SNinh AMasters MCrespo JMunday DATE 2/26/2019 2/ 26 /2019 2/20/2019 2/26/2019 2/28/2019 I I
IP 22 Inspection Activity Plan Report Watts Bar 03/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count FORCE-ON-FORCE PLANNING AND EXERCISE 6 1,2 02/25/2019 03/01/2019 IP 71130.03 000735 Contingency R_esponse - Force-On-Force Testing 1, 2 03/18/2019 03/22/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing UNIT 2 IN-SERVICE INSPECTION +SG 2 1, 2 04/22/2019 04/26/2019 IP 71111.08P 000702 lnservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 1 2 1, 2 04/22/2019 04/26/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/22/2019 04/26/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/22/2019 04/26/2019 IP 71124.03. 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/22/2019 04/26/2019 IP 71124.04 000728 Occupational Dose Assessment 1, 2 04/22/2019 04/26/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation RP OCCUPATIONAL RAD SAEFETV BASELINE INSPECTION - WEEK 2 3 1, 2 05/06/2019 05/10/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 05/06/2019 05/10/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 05/06/2019 05/10/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/06/2019 05/10/2019 IP 71124.04 000728 Occupational Dose Assessment 1, 2 05/06/2019 05/10/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation SECURITY BASELINE INSPECTION 1, 2 06/03/2019 06/07/2019 IP 71130.02 000734 Access Control 1, 2 06/03/2019 06/ 07/2019 IP 71151 001338 Performance Indicator Verification WATTS BAR INITIAL LICENSE EXAM 3 1, 2 07/08/2019 07/12/2019 ov 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 08/12/2019 08/16/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2 08/12/2019 08/16/2019 IP71111.21M 000713 Design Bases Assurance Inspection (Teams)
1, 2 08/26/2019 08/30/2019 IP 71111.21M 000713 Design Bases Assurance Inspection [ earns)
SCWE AND CONFIRMATORY ORDERS FOLLOWUP INSPECTIONS 2 1, 2 09/09/201.9 09/13/2019 IP 92702 000238 Followup on Corrective Actions For Violations And Deviations 1, 2 09/09/2019 09/13/2019 IP 93100 000921 Safety-Conscious Work Environment Issue of Concern Followup This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.
2/25/2019 7:22:13 AM Enclosure
IP 22 Inspection Activity Pian Report Watts Bar 03/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count EMERGENCY PREPAREDNESS EXERCISE 6 1, 2 11/04/2019 11/08/2019 IP 71114.01 000716 Exercise Evaluation 1, 2 11/04/2019 11/08/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 11/04/2019 11/08/2019 IP 71114.08 000723 Exercise Evaluation U Scenario Review 1. 2 11/04/2019 11/08/2019 IP 71151 001397 Performance Indicator Verification CYBER SECURITY 4 1, 2 11/18/2019 11/22/2019 IP 71130.10P 000741 Cyber Security 1, 2 12/02/2019 12/06/2019 IP 71130.10P 000741 Cyber Security TVA CORPORATE OFFICE FFD/AA/SGI INSPECTION 2 1, 2 01/06/2020 01/10/2020 IP 71130.01 000733 Access Authorization 1, 2 01/06/2020 01/10/2020 IP 71130.06 000738 Protection of Safeguards Information 1, 2 01/06/2020 01/10/2020 IP 71130.08 000740 Fitness For Duty Prog ram SECURITY BASELINE INSPECTION 1, 2 02/24/2020 02/28/2020 IP 71130.01 000733 Access Authorization 1, 2 02/24/2020 02/28/2020 IP 71130.06 000738 Protection of Safeguards Information 1, 2 02/24/2020 02/28/2020 IP 71130.08 000740 Fitness For Duty Prog ram UNIT 1 IN-SERVICE INSPECTION 1 03/23/2020 03/27/2020 IP 71111.08P 000702 lnservice Inspection Activities (PWRJ SECURITY BASELINE INSPECTION 1, 2 06/15/2020 06/19/2020 IP 71130.02 000734 Access Control 1, 2 06/15/2020 06/19/2020 IP 71151 001338 Performance Indicator Verification WATTS BAR INITIAL L.CENSE EXAM 4 1, 2 07/20/2020 07/24/2020 ov 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 08/24/2020 09/11/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
RP PUBLIC RAD SAFETY BASELINE 2 1, 2 08/10/2020 08/14/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 08/10/2020 08/14/ 2020 IP 71124.07 000731 Radiological Environmental Monitoring Program DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 3 1, 2 09/21/2020 09/25/2020 IP 71111.21 N 000714 Design Bases Assurance Inspection (Programs)
This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.
2/25/2019 7:22:13 AM
IP 22 Inspection Activity Plan Report Watts Bar 03/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 3 1, 2 10/05/2020 10/09/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
UNIT 2 IN-SERVICE INSPECTION +SG 2 2 10/26/2020 10/30/2020 IP 71111.08P 000702 lnservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD HAZARDS & TRANSPORTATION BASELINE INSPECTION 2 1, 2 10/26/2020 10/30/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/26/2020 10/30/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Trans ortation WATTS BAR REQUAL INSPECTION 2 1, 2 11/02/2020 11/06/2020 IP71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Biennial SECURITY BASELINE INSPECTION 2 1, 2 11/02/2020 11/06/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 11/02/2020 11/06/2020 IP 71130.07 000739 Security Training 1, 2 11/02/2020 11/06/2020 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.
2/25/2019 7:22:13 AM