UNITED STATES NUCLEAR REGULATORY COMMISSION ber 3, 2013

SUBJECT:

MID-CYCLE ASSESSMENT LETTER - WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013606)

Dear Mr. Skaggs:

On August 12, 2013, the U. S. Nuclear Regulatory Commission (NRC) staff completed its performance review of the Watts Bar Nuclear Plant (WBN) Unit 2 construction project. Our technical staff reviewed inspection results for the period from July 1, 2012, through June 30, 2013. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

During the most recent quarter the NRC identified three violations associated with your commercial grade dedication program that were characterized as a Severity Level III problem in accordance with the NRCs Enforcement Policy and assessed a $70,000 Civil Penalty. These violations are described in Inspection Report 05000391/2013614, dated June 18, 2013 (ADAMS Accession Number ML13169A030). Consistent with the guidance in Inspection Manual Chapter 2517, Watts Bar 2 Construction Inspection Program, which defines a Severity Level III violation as a significant performance issue, the NRC plans to increase inspections for WBN Unit 2. Specifically, the NRC plans to perform an additional inspection using the guidance in Inspection Procedure 92702, Follow-up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders and Alternate Dispute Resolution Confirmatory Orders. This inspection will review your corrective actions to these violations to verify that your commercial grade dedication program is in compliance with regulations and that the corrective actions were adequate to prevent recurrence. Because planning for this inspection is continuing, we have not yet scheduled the inspection. Once the date for this inspection date is identified, we will inform your staff.

During the first three quarters of the assessment period, and in the 4th quarter with the exception noted above, WBN Unit 2 construction activities were generally conducted in a manner that complied with the Commissions rules and regulations, the conditions of your construction permit, and the Unit 2 regulatory framework commitments. Overall, the corrective action program implementation activities, including initiation, classification, disposition, and trending were deemed satisfactory. This overall conclusion was based on the results of the annual Problem Identification and Resolution (PI&R) team inspection, focus sample PI&R inspections, and the ongoing assessment of your corrective action program as part of routine inspections.

No Substantive Cross-Cutting Issues were identified during this period. The NRC staff expended a large effort toward the WBN Unit 2 project during the 12-month Mid-Cycle Assessment period. Specifically, the Region II office has spent over 12,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> performing inspections, assessments, public meetings, allegation follow-up, and inspection program support for WBN Unit 2. The NRC staff anticipates this level of effort will increase over the next 12-month assessment cycle as WBN Unit 2 construction activities continue and pre-operational testing is performed on additional safety-related systems.

As a result of reviewing your construction schedule and through interaction with your staff, the enclosed inspection plan contains those projected inspection activities that we have currently identified. Many of the inspections listed in the enclosed inspection plan were scheduled based on information your staff provided to the NRC. This information involved dates for completion of construction activities that would be subject to the corresponding NRC inspections. Therefore, it is crucial that you keep us apprised of any changes to the scheduled completion dates, in order to maintain our inspection plan current. As additional details of your project schedule become available, we will plan other inspections specified in IMC 2517. Your staff will be given ample notification of changes to upcoming inspection activities or newly identified inspections as they become finalized in order to allow for the resolution of any scheduling conflicts and personnel availability. Routine inspections performed by the resident staff are not listed on the inspection plan due to their ongoing and continuous nature.

As you begin preoperational testing, the NRC will implement IMC 2313, Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase. We have not listed preoperational testing inspections in the enclosed inspection plan due to likelihood that the inspection dates will changes as adjustments to your preoperational testing schedule occur.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Robert Haag at (404)

997-4446 with any questions you may have regarding this letter or our planned inspections.

Sincerely,

/RA/

Joel T. Munday, Director Division of Construction Projects Docket No. 50-391 Construction Permit No: CPPR-92 Enclosure:

Watts Bar Unit 2 Inspection Plan cc w/encl: (See next page)

ML13246A462 __ SUNSI REVIEW COMPLETE OFFICE RII:DCP RII: DCP RII: DCP SIGNATURE CJE JBB5 RCH NAME C Even J. Baptist R. Haag DATE 09/02/2013 09/02/2013 08/28/2013 E-MAIL COPY? YES NO cc w/encl:

Mr. Gordon P. Arent Mr. R. R. Baron, Senior Manager Senior Manager, Licensing Nuclear Construction Quality Assurance WBN Unit Two WBN Unit Two Watts Bar Nuclear Plant Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 P.O. Box 2000 Spring City, Tennessee 37381 Spring City, Tennessee 37381 Mr. O. J. Zeringue, General Manager Mr. Joseph Shea, Vice President Engineering and Construction Nuclear Licensing WBN Unit Two Tennessee Valley Authority Watts Bar Nuclear Plant 1101 Market Street Tennessee Valley Authority 3R Lookout Place P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, Tennessee 37381 Mr. E. J. Vigluicci Mr. R. A. Hruby, General Manager Assistant General Counsel Technical Services Tennessee Valley Authority WBN Unit Two 400 West Summit Hill Drive Watts Bar Nuclear Plant 6A West Tower Tennessee Valley Authority Knoxville, Tennessee 37402 P.O. Box 2000 Spring City Tennessee 37381 Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Ms. Donna Guinn, Manager Health & Conservation Licensing and Industry Affairs Division of Radiological Health WBN Nuclear Plant 3rd Floor, L&C Annex Tennessee Valley Authority 401 Church Street P.O. Box 2000 Nashville, TN 37243-1532 Spring City, Tennessee 37381 Mr. T. P. Cleary Mr. Preston D. Swafford Site Vice President Chief Nuclear Officer Watts Bar Nuclear Plant and Executive Vice President Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 1101 Market Place Spring City, Tennessee 37381 3R Lookout Place Chattanooga, Tennessee 37402-2801 County Mayor P.O. Box 156 County Executive Decatur, Tennessee 37322 375 Church Street Suite 215 Ms. Ann P. Harris Dayton, Tennessee 37321 Public 341 Swing Loop Mr. Dave Gronek Rockwood, TN 37854 Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 cc email distribution w/encl:

Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar Unit 2 Licensing Tennessee Valley Authority Electronic Mail Distribution

Letter to Michael from Joel T. Munday dated September 3, 2013.

SUBJECT: MID-CYCLE ASSESSMENT LETTER - WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013606)

Distribution w/encl:

Region II Regional Coordinator, OEDO (J. Cassidy)

J. Quichocho, NRR J. Poole, NRR A. Hon, NRR M. Miller, RII S. Shaeffer, RII DRP T. Nazario, RII Watts Bar Unit 2 SRI R. Lewis, RUU Watts Bar Unit 2 RI E. Patterson, RII, WBN Unit 2, RI R. Monk, RII Watts Bar Unit 1 SRI C. Evans, RII ConE_Resource@nrc.gov PUBLIC

Watts Bar Unit 2 Inspection Plan 54 Items Type Item # Title Scheduled Inspection TI 2512/022 Fire Protection corrective action program (CAP) 09/09/2013 TMI I.D.1 Control Room Design Review 09/09/2013 TMI II.K.3.5 Auto trip of reactor coolant pumps: 09/09/2013 a) propose mods; b) modify VIO 87-05-01 Failure to consider vendor requirements in design 09/09/2013 of hydrogen analyzer system/failure to specify classes of cleanness in specifications or drawings CDR 89-05 Failure of auxiliary feedwater (AFW) steam 09/09/2013 generator level controllers BL 79-27 Loss of non-Class 1E I&C power system 09/16/2013 bus during operation CDR 86-21 Non-quality assurance data used in calculations 09/16/2013 for cable tray and conduit loading TI 2512/028 QA Records CAP 09/23/2013 TI 2515/120 Multi-Plant Action Item A-22, Station Blackout Rule 09/30/2013 TI 2512/021 Equipment Seismic CAP 10/07/2013 BL 85-01 Steam Binding of Auxiliary Feedwater pumps 10/07/2013 TI 2515/69 Steam Binding of Auxiliary Feedwater 10/07/2013 Pumps BL 85-01 QA Inspection - Team Inspection 10/21/2013 IP 49053 Employee Concerns Program 11/04/2013 OTHER Hist. Review Historical Part 21's 11/04/2013 Part 21's IFI 86-14-05 Analysis of QC inspected spring nuts 11/04/2013 Enclosure

Type Item # Title Scheduled Inspection TI 2512/037 Master Fuse List SP 11/18/2013 GL 06-02 Grid reliability and impact on plant risk 11/18/2013 and operability of offsite power TI 2515/165 Offsite power and impact on plant risk 11/18/2013 CDR 85-37 AMP PID G terminal lugs 11/18/2013 SER SSER Verify commitment completion and 11/18/2013 App HH review electrical design calculations Item 7 BL 76-02 Relay coil failures 01/20/2014 TI 2500/20, R2 ATWS rule, GL 83-28 & 85-06 01/20/2014 SER SSER TVA stated, "Post modification testing will be 01/20/2014 App HH performed to verify design change corrects Item 64 Eagle 21, Rack 2 RTD accuracy issue prior to WBN U2 fuel load." This issue is open pending NRC review of testing results (Section 7.2.1.1)

Engineering Field Change Control Inspection 01/27/2014 Team Inspection TMI I.C.1 Short term accident and procedure review 02/01/2014 TI 2515/142 Draindown during shutdown and 02/03/2014 common-mode failure (GL 98-02)

GL 98-02 Loss of Reactor Coolant Inventory and Associated 02/03/2014 Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition Problem Identification and Resolution 02/17/2014 Inspection - Team Inspection CDR 86-08 Incorrect tubing configuration on containment 02/24/2014 isolation valves (CIV) actuators BL 03-02 Leakage from reactor pressure vessel lower 03/03/2014 head penetrations and reactor coolant pressure boundary integrity (PWRs)

TMI II.D.1 Relief and safety valve test requirements 03/03/2014 TI 2512/017 Cable Tray and Supports CAP 03/24/2014 TMI II.D.3 Valve position indication 03/24/2014

Type Item # Title Scheduled Inspection TMI II.E.3.1 Emergency power for pressurizer heaters 03/24/2014 CDR 89-06 Inadequate qualification of cable tray 03/24/2014 supports & fittings SER SSER Verify completion of design change notification 03/24/2014 App HH of 125V dc vital battery system prior to issuance Item 33 of Unit 2 OL (Section 8.3.2.3)

TI 2512/036 Environmental Qualification SP 04/21/2014 BL 80-04 Analysis of PWR main steam line 04/21/2014 break with continuous feedwater addition TMI II.E.1.2 Auxiliary feedwater system initiation and flow 04/21/2014 TI 2515/87 MPA A-17: RG 1.97 04/21/2014 CDR 87-10 Failure of Category "C" devices may 04/21/2014 adversely affect Category "A" devices TI 2512/026 Instrument Lines CAP 05/05/2014 CDR 86-11 Lack of thermal qualification for 05/05/2014 Systems 43 & 90 piping CDR 86-24 Inadequate flexibility of instrument tubing attached 05/05/2014 to steel containment vessel GL 89-19 Request for actions related to resolution of 05/19/2014 unresolved safety issue A-47, Safety implication of control systems in LWR nuclear power plants, pursuant to 10CFR50.54(f)

GL 96-01 Testing of safety-related circuits 05/19/2014 TI 2515/139 GL 96-01, Testing of safety-related logics circuits 05/19/2014 CDR 95-05 Loose connections found in vendor wire 05/19/2014 safety-related panels BL 88-11 Pressurizer surge line thermal stratification 07/07/2014 TMI II.K.1.10 Operability status 07/07/2014 TMI II.K.3.10 Applicant's proposed anticipatory trip at high power 07/07/2014 TI 2515/65, R2 TMI action plan requirement follow-up 08/01/2014

Type Item # Title Scheduled Inspection URI 87-19-06 Nonsafety-related cable in close proximity to 08/25/2014 safety-related cable in electrical panels Acronyms Used in Enclosure BL Bulletin CDR construction deficiency report GL Generic Letter IFI inspector followup item IP inspection procedure SER safety evaluation report TI temporary instruction TMI three mile island URI unresolved item VIO violation