MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) IR 05000390/20230062024-02-28028 February 2024 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - Report 05000390/2023006 and 05000391/2023006 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request IR 05000390/20220062023-03-0101 March 2023 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2022006 and 05000391/2022006 IR 05000390/20234032022-11-28028 November 2022 – Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000390 2023403; 05000391 2023403 ML22250A4852022-09-0707 September 2022 Requalification Program Inspection IR 05000390/20220052022-08-31031 August 2022 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2022005 and 05000391/2022005 - Final IR 05000390/20210062022-03-0202 March 2022 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 (Report No. 05000390/2021006 and 05000391/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar IR 05000390/20200062021-03-0303 March 2021 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2020006 and 05000391/2020006 ML20338A3202020-12-0303 December 2020 Notification of an NRC Fire Protection Team Inspection (NRC Inspection Report 05000390/2021011 and 05000391/2021011) and Request for Information ML20268B8672020-09-24024 September 2020 Document Request for Watts Bar Nuclear Plant Radiation Protection Inspection Inspection Report 2020-04 ML20253A1782020-09-0909 September 2020 Emergency Preparedness Program Inspection Request for Information IR 05000390/20200052020-08-31031 August 2020 Assessment Followup Letter and Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2020005 and 05000391/2020005 ML20266G4592020-08-14014 August 2020 Notification of Inspection and Request for Information IR 05000390/20190062020-03-0303 March 2020 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - NRC Report 05000390/2019006 and 05000391/2019006 ML20028D4882019-12-0202 December 2019 Notification of Inspection and Request for Information IR 05000390/20180062019-03-0404 March 2019 Annual Assessment Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2018006 and 05000391/2018006 ML19063B8992019-02-28028 February 2019 ISI Sgisi RFI 2019002 Combined ML18282A4462018-10-0909 October 2018 Emergency Preparedness Program Inspection Request for Information ML18215A1362018-08-0202 August 2018 Radiation Safety Baseline Inspection RFI 2018003 Public ML18191B2472018-07-10010 July 2018 Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000390/2018011 and 05000391/2018011 ML18187A0142018-07-0303 July 2018 RP Inspection Document Request - August 2018 ML18059A1502018-02-28028 February 2018 EOC Assessment Letter ML17271A0052017-09-21021 September 2017 Notification of Inspection and Request for Information ML17142A1862017-05-19019 May 2017 Emergency Preparedness Inspection and Request for Information Dated: May 19, 2017 IR 05000390/20160062017-03-0101 March 2017 Annual Assessment Letter for Watts Bar Nuclear Plant, NRC Inspection Report 05000390/2016006 and 05000391/2016006 ML17059C9572017-02-23023 February 2017 Notification of Inspection and Request for Information IR 05000391/20166112016-08-31031 August 2016 Mid-Cycle Assessment Letter - Watts Bar Nuclear Plant Unit 2 (NRC Inspection Report 05000391/2016611) IR 05000390/20160052016-08-31031 August 2016 Mid Cycle Assessment Letter for Watts Barr Nuclear Plant Unit 1, NRC Inspection Report 05000390/2016005 ML16062A2862016-03-0202 March 2016 Annual Assessment Letter IR 05000391/20166072016-03-0202 March 2016 End-Of-Cycle Assessment Letter - Watts Bar, Unit 2 (NRC Inspection Report 05000391/2016607) IR 05000391/20156062015-09-0101 September 2015 Mid-Cycle Assessment Letter - Watts Bar Nuclear Plant Unit 2 (NRC Inspection Report 05000391/2015606) IR 05000390/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for the Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 005000390/2015005 IR 05000390/20140012015-03-0404 March 2015 Annual Assessment Letter for Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 05000390/2014001 IR 05000391/20156012015-02-27027 February 2015 End-Of-Cycle Assessment Letter - Watts Bar Nuclear Plant, Unit 2 (NRC Inspection Report 05000391/2015601) IR 05000391/20146062014-09-0303 September 2014 Mid-Cycle Assessment Letter Watts Bar Nuclear Plant, Unit 2 (NRC Inspection Report 05000391/2014606) ML14245A1232014-09-0202 September 2014 Mid-Cycle Letter ML14125A0452014-05-0505 May 2014 Plant, Notification of Inspection and Request for Information IR 05000390/20130012014-03-0404 March 2014 Annual Assessment Letter Watts Bar Nuclear Plant Unit 1 (Report 05000390/2013001) IR 05000391/20136062013-09-0303 September 2013 Mid-Cycle Assessment Letter - Watts Bar Nuclear Plant Unit 2 (NRC Inspection Report 05000391/2013606) ML13246A1912013-09-0303 September 2013 Mid Cycle Assessment Letter ML13123A2732013-05-0303 May 2013 Ti 2515-182 Phase 1 RFI - MSC IR 05000390/20136012013-03-0404 March 2013 Annual Assessment Letter for Watts Bar Nuclear Plant Unit 2 (IR 05000390-13-601) IR 05000390/20120012013-03-0404 March 2013 Annual Assessment Letter for Watts Bar Nuclear Plant Unit 1 (Report 05000390/2012001) ML12248A1022012-09-0404 September 2012 Mid Cycle Assessment Letter Watts Bar 2012 IR 05000390/20120062012-09-0404 September 2012 Mid Cycle Assessment Letter Watts Bar 2012 ML12065A3502012-03-0505 March 2012 Inspection/Activity Plan, 03/01/2012 - 06/30/2013 2024-02-28
[Table view] Category:Letter
MONTHYEARCNL-24-080, Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011)2024-11-20020 November 2024 Response to Request for Additional Information Regarding Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-19-011) IR 05000390/20240032024-11-13013 November 2024 Integrated Inspection Report 05000390/2024003, 05000391/2024003 & 07201048/2024001 CNL-24-021, Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020)2024-11-12012 November 2024 Application to Revise Technical Specification Limiting Condition of Operation 3.5.2, ECCS – Operating, Note 1 to Include Residual Heat Removal Pump Flow Paths (SQN-TS-23-04 and WBN-TS-23-020) CNL-24-014, License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22)2024-11-0404 November 2024 License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22) CNL-24-064, Response to Request for Additional Information Regarding the Watts Bar Nuclear Plant, Unit 2 Steam Generator Tube Inspection Report for U2R52024-11-0404 November 2024 Response to Request for Additional Information Regarding the Watts Bar Nuclear Plant, Unit 2 Steam Generator Tube Inspection Report for U2R5 IR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ber 3, 2013
SUBJECT:
MID-CYCLE ASSESSMENT LETTER - WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013606)
Dear Mr. Skaggs:
On August 12, 2013, the U. S. Nuclear Regulatory Commission (NRC) staff completed its performance review of the Watts Bar Nuclear Plant (WBN) Unit 2 construction project. Our technical staff reviewed inspection results for the period from July 1, 2012, through June 30, 2013. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
During the most recent quarter the NRC identified three violations associated with your commercial grade dedication program that were characterized as a Severity Level III problem in accordance with the NRCs Enforcement Policy and assessed a $70,000 Civil Penalty. These violations are described in Inspection Report 05000391/2013614, dated June 18, 2013 (ADAMS Accession Number ML13169A030). Consistent with the guidance in Inspection Manual Chapter 2517, Watts Bar 2 Construction Inspection Program, which defines a Severity Level III violation as a significant performance issue, the NRC plans to increase inspections for WBN Unit 2. Specifically, the NRC plans to perform an additional inspection using the guidance in Inspection Procedure 92702, Follow-up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders and Alternate Dispute Resolution Confirmatory Orders. This inspection will review your corrective actions to these violations to verify that your commercial grade dedication program is in compliance with regulations and that the corrective actions were adequate to prevent recurrence. Because planning for this inspection is continuing, we have not yet scheduled the inspection. Once the date for this inspection date is identified, we will inform your staff.
During the first three quarters of the assessment period, and in the 4th quarter with the exception noted above, WBN Unit 2 construction activities were generally conducted in a manner that complied with the Commissions rules and regulations, the conditions of your construction permit, and the Unit 2 regulatory framework commitments. Overall, the corrective action program implementation activities, including initiation, classification, disposition, and trending were deemed satisfactory. This overall conclusion was based on the results of the annual Problem Identification and Resolution (PI&R) team inspection, focus sample PI&R inspections, and the ongoing assessment of your corrective action program as part of routine inspections.
No Substantive Cross-Cutting Issues were identified during this period. The NRC staff expended a large effort toward the WBN Unit 2 project during the 12-month Mid-Cycle Assessment period. Specifically, the Region II office has spent over 12,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> performing inspections, assessments, public meetings, allegation follow-up, and inspection program support for WBN Unit 2. The NRC staff anticipates this level of effort will increase over the next 12-month assessment cycle as WBN Unit 2 construction activities continue and pre-operational testing is performed on additional safety-related systems.
As a result of reviewing your construction schedule and through interaction with your staff, the enclosed inspection plan contains those projected inspection activities that we have currently identified. Many of the inspections listed in the enclosed inspection plan were scheduled based on information your staff provided to the NRC. This information involved dates for completion of construction activities that would be subject to the corresponding NRC inspections. Therefore, it is crucial that you keep us apprised of any changes to the scheduled completion dates, in order to maintain our inspection plan current. As additional details of your project schedule become available, we will plan other inspections specified in IMC 2517. Your staff will be given ample notification of changes to upcoming inspection activities or newly identified inspections as they become finalized in order to allow for the resolution of any scheduling conflicts and personnel availability. Routine inspections performed by the resident staff are not listed on the inspection plan due to their ongoing and continuous nature.
As you begin preoperational testing, the NRC will implement IMC 2313, Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase. We have not listed preoperational testing inspections in the enclosed inspection plan due to likelihood that the inspection dates will changes as adjustments to your preoperational testing schedule occur.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Robert Haag at (404)
997-4446 with any questions you may have regarding this letter or our planned inspections.
Sincerely,
/RA/
Joel T. Munday, Director Division of Construction Projects Docket No. 50-391 Construction Permit No: CPPR-92 Enclosure:
Watts Bar Unit 2 Inspection Plan cc w/encl: (See next page)
ML13246A462 __ SUNSI REVIEW COMPLETE OFFICE RII:DCP RII: DCP RII: DCP SIGNATURE CJE JBB5 RCH NAME C Even J. Baptist R. Haag DATE 09/02/2013 09/02/2013 08/28/2013 E-MAIL COPY? YES NO cc w/encl:
Mr. Gordon P. Arent Mr. R. R. Baron, Senior Manager Senior Manager, Licensing Nuclear Construction Quality Assurance WBN Unit Two WBN Unit Two Watts Bar Nuclear Plant Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 P.O. Box 2000 Spring City, Tennessee 37381 Spring City, Tennessee 37381 Mr. O. J. Zeringue, General Manager Mr. Joseph Shea, Vice President Engineering and Construction Nuclear Licensing WBN Unit Two Tennessee Valley Authority Watts Bar Nuclear Plant 1101 Market Street Tennessee Valley Authority 3R Lookout Place P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, Tennessee 37381 Mr. E. J. Vigluicci Mr. R. A. Hruby, General Manager Assistant General Counsel Technical Services Tennessee Valley Authority WBN Unit Two 400 West Summit Hill Drive Watts Bar Nuclear Plant 6A West Tower Tennessee Valley Authority Knoxville, Tennessee 37402 P.O. Box 2000 Spring City Tennessee 37381 Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Ms. Donna Guinn, Manager Health & Conservation Licensing and Industry Affairs Division of Radiological Health WBN Nuclear Plant 3rd Floor, L&C Annex Tennessee Valley Authority 401 Church Street P.O. Box 2000 Nashville, TN 37243-1532 Spring City, Tennessee 37381 Mr. T. P. Cleary Mr. Preston D. Swafford Site Vice President Chief Nuclear Officer Watts Bar Nuclear Plant and Executive Vice President Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 1101 Market Place Spring City, Tennessee 37381 3R Lookout Place Chattanooga, Tennessee 37402-2801 County Mayor P.O. Box 156 County Executive Decatur, Tennessee 37322 375 Church Street Suite 215 Ms. Ann P. Harris Dayton, Tennessee 37321 Public 341 Swing Loop Mr. Dave Gronek Rockwood, TN 37854 Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 cc email distribution w/encl:
Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar Unit 2 Licensing Tennessee Valley Authority Electronic Mail Distribution
Letter to Michael from Joel T. Munday dated September 3, 2013.
SUBJECT: MID-CYCLE ASSESSMENT LETTER - WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013606)
Distribution w/encl:
Region II Regional Coordinator, OEDO (J. Cassidy)
J. Quichocho, NRR J. Poole, NRR A. Hon, NRR M. Miller, RII S. Shaeffer, RII DRP T. Nazario, RII Watts Bar Unit 2 SRI R. Lewis, RUU Watts Bar Unit 2 RI E. Patterson, RII, WBN Unit 2, RI R. Monk, RII Watts Bar Unit 1 SRI C. Evans, RII ConE_Resource@nrc.gov PUBLIC
Watts Bar Unit 2 Inspection Plan 54 Items Type Item # Title Scheduled Inspection TI 2512/022 Fire Protection corrective action program (CAP) 09/09/2013 TMI I.D.1 Control Room Design Review 09/09/2013 TMI II.K.3.5 Auto trip of reactor coolant pumps: 09/09/2013 a) propose mods; b) modify VIO 87-05-01 Failure to consider vendor requirements in design 09/09/2013 of hydrogen analyzer system/failure to specify classes of cleanness in specifications or drawings CDR 89-05 Failure of auxiliary feedwater (AFW) steam 09/09/2013 generator level controllers BL 79-27 Loss of non-Class 1E I&C power system 09/16/2013 bus during operation CDR 86-21 Non-quality assurance data used in calculations 09/16/2013 for cable tray and conduit loading TI 2512/028 QA Records CAP 09/23/2013 TI 2515/120 Multi-Plant Action Item A-22, Station Blackout Rule 09/30/2013 TI 2512/021 Equipment Seismic CAP 10/07/2013 BL 85-01 Steam Binding of Auxiliary Feedwater pumps 10/07/2013 TI 2515/69 Steam Binding of Auxiliary Feedwater 10/07/2013 Pumps BL 85-01 QA Inspection - Team Inspection 10/21/2013 IP 49053 Employee Concerns Program 11/04/2013 OTHER Hist. Review Historical Part 21's 11/04/2013 Part 21's IFI 86-14-05 Analysis of QC inspected spring nuts 11/04/2013 Enclosure
Type Item # Title Scheduled Inspection TI 2512/037 Master Fuse List SP 11/18/2013 GL 06-02 Grid reliability and impact on plant risk 11/18/2013 and operability of offsite power TI 2515/165 Offsite power and impact on plant risk 11/18/2013 CDR 85-37 AMP PID G terminal lugs 11/18/2013 SER SSER Verify commitment completion and 11/18/2013 App HH review electrical design calculations Item 7 BL 76-02 Relay coil failures 01/20/2014 TI 2500/20, R2 ATWS rule, GL 83-28 & 85-06 01/20/2014 SER SSER TVA stated, "Post modification testing will be 01/20/2014 App HH performed to verify design change corrects Item 64 Eagle 21, Rack 2 RTD accuracy issue prior to WBN U2 fuel load." This issue is open pending NRC review of testing results (Section 7.2.1.1)
Engineering Field Change Control Inspection 01/27/2014 Team Inspection TMI I.C.1 Short term accident and procedure review 02/01/2014 TI 2515/142 Draindown during shutdown and 02/03/2014 common-mode failure (GL 98-02)
GL 98-02 Loss of Reactor Coolant Inventory and Associated 02/03/2014 Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition Problem Identification and Resolution 02/17/2014 Inspection - Team Inspection CDR 86-08 Incorrect tubing configuration on containment 02/24/2014 isolation valves (CIV) actuators BL 03-02 Leakage from reactor pressure vessel lower 03/03/2014 head penetrations and reactor coolant pressure boundary integrity (PWRs)
TMI II.D.1 Relief and safety valve test requirements 03/03/2014 TI 2512/017 Cable Tray and Supports CAP 03/24/2014 TMI II.D.3 Valve position indication 03/24/2014
Type Item # Title Scheduled Inspection TMI II.E.3.1 Emergency power for pressurizer heaters 03/24/2014 CDR 89-06 Inadequate qualification of cable tray 03/24/2014 supports & fittings SER SSER Verify completion of design change notification 03/24/2014 App HH of 125V dc vital battery system prior to issuance Item 33 of Unit 2 OL (Section 8.3.2.3)
TI 2512/036 Environmental Qualification SP 04/21/2014 BL 80-04 Analysis of PWR main steam line 04/21/2014 break with continuous feedwater addition TMI II.E.1.2 Auxiliary feedwater system initiation and flow 04/21/2014 TI 2515/87 MPA A-17: RG 1.97 04/21/2014 CDR 87-10 Failure of Category "C" devices may 04/21/2014 adversely affect Category "A" devices TI 2512/026 Instrument Lines CAP 05/05/2014 CDR 86-11 Lack of thermal qualification for 05/05/2014 Systems 43 & 90 piping CDR 86-24 Inadequate flexibility of instrument tubing attached 05/05/2014 to steel containment vessel GL 89-19 Request for actions related to resolution of 05/19/2014 unresolved safety issue A-47, Safety implication of control systems in LWR nuclear power plants, pursuant to 10CFR50.54(f)
GL 96-01 Testing of safety-related circuits 05/19/2014 TI 2515/139 GL 96-01, Testing of safety-related logics circuits 05/19/2014 CDR 95-05 Loose connections found in vendor wire 05/19/2014 safety-related panels BL 88-11 Pressurizer surge line thermal stratification 07/07/2014 TMI II.K.1.10 Operability status 07/07/2014 TMI II.K.3.10 Applicant's proposed anticipatory trip at high power 07/07/2014 TI 2515/65, R2 TMI action plan requirement follow-up 08/01/2014
Type Item # Title Scheduled Inspection URI 87-19-06 Nonsafety-related cable in close proximity to 08/25/2014 safety-related cable in electrical panels Acronyms Used in Enclosure BL Bulletin CDR construction deficiency report GL Generic Letter IFI inspector followup item IP inspection procedure SER safety evaluation report TI temporary instruction TMI three mile island URI unresolved item VIO violation