MONTHYEARNLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays ML19295D7322019-10-11011 October 2019 Engine Systems, Inc. Report No. 10CFR21-0125, Rev. 1 - Signal Converter Transmitter ML19219A1522019-07-22022 July 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0125, Rev. 0, Signal Converter Transmitter P/N SCT/4-20MA/4-20MA/24DC/-LIM-TA(DCM) ML19207A0562019-07-19019 July 2019 Engine Systems, Inc. - Part 21 Report 10CFR21-0125, Rev. 0, for a 10CFR21 Reportable Notification on a Signal Converter Transmitter ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19165A0272019-06-0505 June 2019 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0125-INT, Rev. 0 ML19168A0122019-05-31031 May 2019 Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18087A0032018-03-21021 March 2018 Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML18079A0142018-03-0606 March 2018 Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17114A0702017-04-13013 April 2017 Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards ML17090A3972017-03-28028 March 2017 Part-21 Notification - Willful Misconduct and Falsification of Records ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14134A1212014-05-0909 May 2014 Notification of Potential Part 21 - Potential Defect in General Electric Type CR120AD Control Relays W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation2014-04-11011 April 2014 Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation ML14101A3432014-04-10010 April 2014 Notification of Part 21 - Potential Defect in General Electric Type CR120 AD Control Relays ML14094A4452014-04-0101 April 2014 Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems ML14069A4682014-03-0202 March 2014 Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13073A1072013-03-12012 March 2013 Notification of Potential Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13024A0302013-01-0909 January 2013 MPR Associates Inc., Interim Report in Accordance with 10 CFR Part 21 ML13010A5182013-01-0909 January 2013 Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12342A3732012-12-0606 December 2012 Notification of Potential Part 21 Report Re ESI Refurbished Emergency Diesel Generator Cylinder Head with Foreign Material in Intake Port ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12045A5272012-02-0303 February 2012 Part 21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR-0104, Rev. 0, NPPD Fuel Hose, P/N 2-01H-050-003 ML12038A0292012-02-0303 February 2012 Part 21 Report- Foreign Material Found in Emergency Diesel Generator High Pressure Fuel Hose ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld 2023-09-06
[Table view] |
Text
ENGINE SYSTEMS, INC.
175 Freight Road Telephone: 252/977-2720 Rocky Mount, NC 27804 Fax: 252/446-1134 June 5, 2019 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
1OCFR21 Reporting of Defects and Non-Compliance -
Engine Systems, Inc. Report No. 10CFR21-0125-INT, Rev. 0 Signal Converter Transmitter P/N SGT/4-20MA/4-20MA/24DC/-LIM-TA[DCM]
Dear Sir:
The enclosed report addresses an on-going evaluation regarding a signal converter transmitter, P/N SCT/4-20MA/4-20MA/24DC/-LIM-TA[DCM].
The evaluation is expected to be completed no later than July 31, 2019.
r Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134) within 10 working days after receipt.
Yours very truly, ENGINE SYSTEMS, INC.
Susan Woolard Document Control Coordinator Please let us know if ANY of your mailing information changes - name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above.
RECEIVED:- --------
93 DATE:
Quality Performance With Pride
,
ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount. NC 27804 Telephone: 252/977-2720 Fax: 252/446-1134 Report No. 10CFR21-0125-INT Rev. 0: 06/05/19
- INTERIM REPORT 1OCFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: Signal Converter Transmitter P/N SCT/4-20MA/4-20MA/24DC/-LIM-TA[DCM]
SYSTEM: Steam Turbine Control CONCLUSION: Not yet completed Prepared By: --,,=-
~
~+---t=N\/\-"'..*'"--'-
Engineering Manager
Reviewed By:---~-/~*_,__ _._~--------- Date: 6 /r/11 Quality Assurance Manager Quality Performance With Pride
- Report No. 1OCFR21-0125-INT Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 06/05/19 Initial issue.
J '
Report No. 1OCFR21-0125-INT
- ' Revision: 0 Date: 06/05/19 Page: 1 of 1 COMPONENT:
Signal converter transmitter, P/N SCT/4-20MA/4-20MA/240C/-LIM-TA[OCM]
PURPOSE:,
This interim report is issued because Engine Systems, Inc. (ESI) has not been able to complete the evaluation of a failure within the 60-day requirement of 1OCFR21.21. The evaluation is expected to be completed no later than July 31, 2019.
SUMMARY
ESI was notified on April 6, 2019 of a fault within the RCIC turbine control system supplied to Cooper Nuclear Station. The turbine control displayed a loss of remote speed input alarm ("Remote Spd Input Failed") indicative of a loss of the 4-20mA input signal. Troubleshooting performed by the site determined the cause was most likely due to the signal converter (also called signal conditioner) or associated power supply. The signal converter is used to sense the customer's remote speed setpoint 4-20 mA input signal and convert the signal to an isolated 4-20 mA output signal which is transmitted to the turbine control. The transmitter includes a limiting function where if the input signal is below 4 mA, the minimum output is limited to 2. 7 mA and if the input signal is above 20 mA, the maximum output is limited to 21.3 mA. The power supply is used to step down system voltage from nominal 120 voe to 24 voe to power the current loop.
ESI has performed testing on both the signal converter and power supply. To date, the power supply has tested satisfactorily with no anomalies or indications of failure. Initial testing of the signal converter found the device to produce an output current approximately proportional to the input; however, when attempts were made to adjust the device it was determined the converter could not be adjusted. Subsequent internal inspection revealed an overheated resistor. The converter is currently at the manufacturer's facility for more detailed analysis.
Since the signal converter transmits the customer's remote speed setpoint input to the turbine control, operability of the device is critical to operation of the RCIC turbine control system. Therefore, a failure of the signal converter would adversely affect the RGIC turbine control system and thus may affect the safe shutdown of the reactor.
ESI is in the process of performing-additional testing and analysis at the manufacturer's facility. ESI is unable to complete an evaluation within the 60-day requirement.
EXTENT OF CONDITION/ INTERIM CONTAINMENT ESI has supplied this component to one customer, Cooper Nuclear Station. Qty 2 signal converters were purchased for this batch, one for the customer and the other was used as a destructive test specimen. Therefore, there are no additional components from this same lot in safety-related applications. ESI will withhold shipment of any signal converters until the evaluation is complete.
ES! Sales C-of-C Mfg Serial End User End User P.O. Qty Order Date Number Cooper Nuclear Station Contract 09-69A 8001553 1 09/28/2015 2379741 (supplied through Dresser-Rand) 200441 (D-R)
Note: The signal converter was installed in a control panel assembly P/N 8001553-01 (qty 1 per panel).