ML19249B282
From kanterella
Revision as of 07:16, 8 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML19249B282 | |
Person / Time | |
---|---|
Site: | 05000599, 05000600 |
Issue date: | 08/24/1979 |
From: | Reed C COMMONWEALTH EDISON CO. |
To: | Harold Denton Office of Nuclear Reactor Regulation |
Shared Package | |
ML19249B283 | List: |
References | |
NUDOCS 7909040231 | |
Download: ML19249B282 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML19332D9781989-11-18018 November 1989
[Table view]Advises That Author Has No Knowledge of Licensee Intention to Cancel Plant.W/Certificate of Svc.Served on 891130 ML20024D5801983-08-0101 August 1983 Submits Quarterly Status Rept.Projected Inservice Dates for Units 1 & 2 Remain 2000 & 2001,respectively.Circumstances Re Possible Withdrawal of One Prospective Joint Owner Have Not Changed Significantly.Related Correspondence ML20073S1531983-05-0202 May 1983 Provides Quarterly Status Rept on Developments.Projected Inservice Dates Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001 ML20028G2321983-02-0101 February 1983 Submits Quarterly Status Rept on Proceeding Per ASLB Request.Projected Inservice Date Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001.Related Correspondence ML20027D5181982-11-0101 November 1982 Provides Quarterly Status Rept on Developments in Proceeding.No Matl Changes Occurred Since 820730 Ltr. Projected Inservice Dates Modified.Circumstances Re Possible Withdrawal of Joint Owner Unchanged.Related Correspondence ML20058G7081982-07-28028 July 1982 Requests Hearings Be Deferred Until Const Plans Are More Certain in Response to ASLB 820707 Memorandum & Order. Deferral Would Not Prejudice Rights of Parties.Related Correspondence ML20040F5081982-02-0101 February 1982 Advises of Const Completion Date Change from 1993 & 1994 to 1999 & 2000 for Units 1 & 2,respectively,due to Changes in Load Growth Projections.Site Review Requested to Establish Acceptability of Site & fossil-fired Station ML20002A9231980-12-0101 December 1980 Responds to NRC 790402 & 801009 Requests for Info Re Project Status & Plans for Updating Antitrust Info.Units Scheduled for Svc in 1993 & 1994.Antitrust Info Will Be Updated at Least 9 Months Prior to PSAR or Environ Rept Filing ML19343A5651980-11-0303 November 1980 Notifies That Review of Preliminary Geologic Data & Field Insp Shows Carroll County Site Adequate for Const of Nuclear Facility ML19323G1041980-05-23023 May 1980 Forwards Affidavit Certifying Distribution of Site Suitability - Site Safety Rept,Amend 2,re CP & Early Site Review Application,Per Encl 4 of Rc Deyoung 790404 Ltr ML19320C3041980-05-23023 May 1980 Forwards Affidavit of Svc for Distribution of Site Suitability Environ Rept,Revision 3,Suppl 2,in Response to NRC 790404 Request ML19323C9731980-05-13013 May 1980 Forwards Amend 2 to Site Suitability & Site Safety Rept Portion of Application for CP & Early Site Review,In Response to NRC 800206 Request ML19323D7221980-04-22022 April 1980 Forwards CA Baskerville 800414 Memo Re Informal Discussion During 791005 Site Visit.Hypothetical Question Re Potential Hazardous Leakage Problem,Previously Deleted,Should Now Be Reconsidered ML19322E7271980-03-28028 March 1980 Requests Addl 45 Days to Submit Responses to 800206 Ltr Re Site Suitability Environ & Safety Repts ML19344D3181980-02-27027 February 1980 Forwards Application for CP & Early Site Review,Site Suitability/Site Safety Rept & Environ Rept Per 800117 Request.W/O Encls ML19294B1391980-02-19019 February 1980 Notifies That T Gilbert,Argonne Natl Lab,Requested Addl Archaeological Info Which Has Been Transmitted.Info Should Be Withheld (Ref 10CFR2.790) ML19257C7891980-01-22022 January 1980 Submits Addl Info Requested at 791206 Site Visit by SA Curtis Re Plum Grove Archaeological Site Survey Conducted in 1974.Updated Site Map & Carroll County Literature Forwarded Under Separate Cover ML19290C3161980-01-10010 January 1980 Responds to NRC 791228 Request Re Reliability Issues Associated W/Facility.Submits Questions to Be Used in Evaluating Bulk Power Transmission Facilities & in Supplementing Chapter 9 of Facility Environ Review ML19257A5791980-01-0404 January 1980 Responds to NRC 791114 Ltr Requesting Info on Endangered Species That Might Be Affected by Plant Const.No Designated Critical Habitat in Project Area.In Bat,Bald Eagle & Higgins Eye Pearly Mussel within Project Range ML19270H8081979-12-28028 December 1979 Requests Addl Info Re Total Length & Average Width of New Transmission Line right-of-way for Carroll County.Info Required to Complete Environ Statement Fact Sheet Needed for Cost/Benefit Analysis ML19211C0731979-12-20020 December 1979 Draws Attention to 791207 ALAB-573 Re Author Position That Jo Daviess County Amended Contention Iii(G) Constitutes Challenge to 10CFR50,App 1 ML19256F9011979-12-0505 December 1979 Notifies That Site Suitability - Site Safety Rept & Site Suitability - Environ Rept Will Be Updated & Forwarded to ASLB in Response to 791204 Telcon ML19256G4641979-11-26026 November 1979 Forwards Certificate of Svc for State of Il 791121 Motion for Reconsideration ML19209B7111979-10-0404 October 1979 Discusses Review of Suppl 2 to Environ Rept for Six Archeological Sites to Be Impacted by Facility Const. Evaluation & Mitigation Plan Should Be Coordinated W/Il Historic Preservation Officer ML19254D1851979-09-0707 September 1979 Forwards,Per D Goddard Request,Comm Ed 790627 Ltr Announcing Delay Until 1990 & 1991 in Fuel Load Dates.Change in Schedule Is Caused by TMI-2 Accident Procedures & Reflected in Aug 1979 Carroll County Site Suitability Repts ML19249C1271979-08-31031 August 1979 Forwards Affidavit Stating That Distribution of Applicant Site Suitability Environ Rept,Suppl 2,has Been Made Per Encl 3 of NRC 790404 Ltr ML19249B2821979-08-24024 August 1979 Forwards Suppl 2 to Site Suitability Environ Rept Re Amend to Application for CP & Early Site Review.Revises Chapter 1, Need for Power, to Reflect Revised Schedules for Facilities & Includes Other Text Corrections ML19208D2101979-08-15015 August 1979 Forwards T Kelsay & s Bloomberg 790618 Ltr Opposing Const of Nuclear Plant.Requests Comment ML19242C4581979-07-25025 July 1979 Notifies of Placement on Direct Distribution List ML19242C4391979-07-25025 July 1979 Notifies of Placement on Direct Distribution List ML19208B3801979-07-12012 July 1979 Notifies That J Dubert of IA Socialist Party Will Represent Party in Intervention Proceedings ML19247B2221979-07-0606 July 1979 Forwards J Runyon,E Gogel & Citizens Against Nuclear Power Petition for Intervention Re CP & Early Site Review ML19208B4921979-07-0303 July 1979 Requests Permission to Testify at CP & Early Site Review Hearing ML19259C8181979-07-0303 July 1979 Requests to Speak at Facility Hearings as Individual Petitioner ML19224C9961979-07-0202 July 1979 Forwards Affidavit Certifying That Site Suitability - Environ Rept,Suppl 1 Was Distributed on 790702 ML19248D8121979-06-29029 June 1979 Requests to Make Limited Appearance at Hearing Re Licensee Application for CP ML19275A0221979-06-29029 June 1979 Requests Opportunity to Testify Before NRC at Upcoming Early Site Review Hearing ML19241A6021979-06-27027 June 1979 Submits Revised Schedule for Fuel Loading Dates Due to Impact of TMI Incident ML19246A7231979-06-27027 June 1979 Requests Opportunity to Review & Comment on Application for CP & Early Site Review ML19207C4351979-06-25025 June 1979 Forwards Ja Grivetti 790604 Ltr & Putnam County,Il Petition Opposing Const of Facility.Requests Status Rept on Project. Petition Not Encl ML19275A0181979-06-23023 June 1979 Requests Permission to Make Limited Appearance Statement at Early Site Review Hearing ML19270H2951979-06-22022 June 1979 Forwards Suppl 1 to Site Suitability - Environ Rept, Constituting Amend to Application for CP & Early Site Review ML19270H0241979-06-19019 June 1979 Discusses Transmittal of Info Re Site suitability-environ Rept,Questions 361.1d & 361.1-1,in Response to NRC 790404 Request ML19270H0051979-06-18018 June 1979 Submits Addl Info Re Site Suitability,In Response to NRC 790404 Request ML19247A8471979-06-15015 June 1979 Requests Copy of State of Il Petition to Intervene ML19263E3631979-06-0808 June 1979 Forwards Addl Info to Site Suitability/Environ Rept. Suggested Area May Contain Archaeological Sites ML19263E3701979-06-0606 June 1979 Notifies That Miles Quadrangle Topographical Map,Referred to in 790511 Ltr,Is No Longer Available.Area in Vicinity of Proposed Facility Will Be Included in Green Island Quadrangle 7.5-minute Map ML19270G5431979-06-0606 June 1979 Forwards Thermal Mapping of Blowdown Discharge & Cooling Water Intake & Blowdown Discharge Study, in Response to NRC 790404 Ltr ML19289F3541979-05-30030 May 1979 Notifies That Refs Requested in 790404 Ltr Have Been Sent Under Separate Cover to GL Montent at Anl ML19270G4521979-05-25025 May 1979 Forwards Responses to 790404 Questions & Revised Portions of Text Referenced in Responses.Responses & Revision of Site Suitability Er to Be Distributed by First Week of June,1979. W/O Encl 1989-11-18 Category:INCOMING CORRESPONDENCE MONTHYEARML19332D9781989-11-18018 November 1989
[Table view]Advises That Author Has No Knowledge of Licensee Intention to Cancel Plant.W/Certificate of Svc.Served on 891130 ML20024D5801983-08-0101 August 1983 Submits Quarterly Status Rept.Projected Inservice Dates for Units 1 & 2 Remain 2000 & 2001,respectively.Circumstances Re Possible Withdrawal of One Prospective Joint Owner Have Not Changed Significantly.Related Correspondence ML20073S1531983-05-0202 May 1983 Provides Quarterly Status Rept on Developments.Projected Inservice Dates Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001 ML20028G2321983-02-0101 February 1983 Submits Quarterly Status Rept on Proceeding Per ASLB Request.Projected Inservice Date Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001.Related Correspondence ML20027D5181982-11-0101 November 1982 Provides Quarterly Status Rept on Developments in Proceeding.No Matl Changes Occurred Since 820730 Ltr. Projected Inservice Dates Modified.Circumstances Re Possible Withdrawal of Joint Owner Unchanged.Related Correspondence ML20058G7081982-07-28028 July 1982 Requests Hearings Be Deferred Until Const Plans Are More Certain in Response to ASLB 820707 Memorandum & Order. Deferral Would Not Prejudice Rights of Parties.Related Correspondence ML20040F5081982-02-0101 February 1982 Advises of Const Completion Date Change from 1993 & 1994 to 1999 & 2000 for Units 1 & 2,respectively,due to Changes in Load Growth Projections.Site Review Requested to Establish Acceptability of Site & fossil-fired Station ML20002A9231980-12-0101 December 1980 Responds to NRC 790402 & 801009 Requests for Info Re Project Status & Plans for Updating Antitrust Info.Units Scheduled for Svc in 1993 & 1994.Antitrust Info Will Be Updated at Least 9 Months Prior to PSAR or Environ Rept Filing ML19343A5651980-11-0303 November 1980 Notifies That Review of Preliminary Geologic Data & Field Insp Shows Carroll County Site Adequate for Const of Nuclear Facility ML19323G1041980-05-23023 May 1980 Forwards Affidavit Certifying Distribution of Site Suitability - Site Safety Rept,Amend 2,re CP & Early Site Review Application,Per Encl 4 of Rc Deyoung 790404 Ltr ML19320C3041980-05-23023 May 1980 Forwards Affidavit of Svc for Distribution of Site Suitability Environ Rept,Revision 3,Suppl 2,in Response to NRC 790404 Request ML19323C9731980-05-13013 May 1980 Forwards Amend 2 to Site Suitability & Site Safety Rept Portion of Application for CP & Early Site Review,In Response to NRC 800206 Request ML19323D7221980-04-22022 April 1980 Forwards CA Baskerville 800414 Memo Re Informal Discussion During 791005 Site Visit.Hypothetical Question Re Potential Hazardous Leakage Problem,Previously Deleted,Should Now Be Reconsidered ML19322E7271980-03-28028 March 1980 Requests Addl 45 Days to Submit Responses to 800206 Ltr Re Site Suitability Environ & Safety Repts ML19294B1391980-02-19019 February 1980 Notifies That T Gilbert,Argonne Natl Lab,Requested Addl Archaeological Info Which Has Been Transmitted.Info Should Be Withheld (Ref 10CFR2.790) ML19257C7891980-01-22022 January 1980 Submits Addl Info Requested at 791206 Site Visit by SA Curtis Re Plum Grove Archaeological Site Survey Conducted in 1974.Updated Site Map & Carroll County Literature Forwarded Under Separate Cover ML19290C3161980-01-10010 January 1980 Responds to NRC 791228 Request Re Reliability Issues Associated W/Facility.Submits Questions to Be Used in Evaluating Bulk Power Transmission Facilities & in Supplementing Chapter 9 of Facility Environ Review ML19257A5791980-01-0404 January 1980 Responds to NRC 791114 Ltr Requesting Info on Endangered Species That Might Be Affected by Plant Const.No Designated Critical Habitat in Project Area.In Bat,Bald Eagle & Higgins Eye Pearly Mussel within Project Range ML19270H8081979-12-28028 December 1979 Requests Addl Info Re Total Length & Average Width of New Transmission Line right-of-way for Carroll County.Info Required to Complete Environ Statement Fact Sheet Needed for Cost/Benefit Analysis ML19211C0731979-12-20020 December 1979 Draws Attention to 791207 ALAB-573 Re Author Position That Jo Daviess County Amended Contention Iii(G) Constitutes Challenge to 10CFR50,App 1 ML19256F9011979-12-0505 December 1979 Notifies That Site Suitability - Site Safety Rept & Site Suitability - Environ Rept Will Be Updated & Forwarded to ASLB in Response to 791204 Telcon ML19256G4641979-11-26026 November 1979 Forwards Certificate of Svc for State of Il 791121 Motion for Reconsideration ML19254D1851979-09-0707 September 1979 Forwards,Per D Goddard Request,Comm Ed 790627 Ltr Announcing Delay Until 1990 & 1991 in Fuel Load Dates.Change in Schedule Is Caused by TMI-2 Accident Procedures & Reflected in Aug 1979 Carroll County Site Suitability Repts ML19249C1271979-08-31031 August 1979 Forwards Affidavit Stating That Distribution of Applicant Site Suitability Environ Rept,Suppl 2,has Been Made Per Encl 3 of NRC 790404 Ltr ML19249B2821979-08-24024 August 1979 Forwards Suppl 2 to Site Suitability Environ Rept Re Amend to Application for CP & Early Site Review.Revises Chapter 1, Need for Power, to Reflect Revised Schedules for Facilities & Includes Other Text Corrections ML19208D2101979-08-15015 August 1979 Forwards T Kelsay & s Bloomberg 790618 Ltr Opposing Const of Nuclear Plant.Requests Comment ML19208B3801979-07-12012 July 1979 Notifies That J Dubert of IA Socialist Party Will Represent Party in Intervention Proceedings ML19247B2221979-07-0606 July 1979 Forwards J Runyon,E Gogel & Citizens Against Nuclear Power Petition for Intervention Re CP & Early Site Review ML19208B4921979-07-0303 July 1979 Requests Permission to Testify at CP & Early Site Review Hearing ML19259C8181979-07-0303 July 1979 Requests to Speak at Facility Hearings as Individual Petitioner ML19224C9961979-07-0202 July 1979 Forwards Affidavit Certifying That Site Suitability - Environ Rept,Suppl 1 Was Distributed on 790702 ML19248D8121979-06-29029 June 1979 Requests to Make Limited Appearance at Hearing Re Licensee Application for CP ML19275A0221979-06-29029 June 1979 Requests Opportunity to Testify Before NRC at Upcoming Early Site Review Hearing ML19246A7231979-06-27027 June 1979 Requests Opportunity to Review & Comment on Application for CP & Early Site Review ML19241A6021979-06-27027 June 1979 Submits Revised Schedule for Fuel Loading Dates Due to Impact of TMI Incident ML19207C4351979-06-25025 June 1979 Forwards Ja Grivetti 790604 Ltr & Putnam County,Il Petition Opposing Const of Facility.Requests Status Rept on Project. Petition Not Encl ML19275A0181979-06-23023 June 1979 Requests Permission to Make Limited Appearance Statement at Early Site Review Hearing ML19270H2951979-06-22022 June 1979 Forwards Suppl 1 to Site Suitability - Environ Rept, Constituting Amend to Application for CP & Early Site Review ML19270H0241979-06-19019 June 1979 Discusses Transmittal of Info Re Site suitability-environ Rept,Questions 361.1d & 361.1-1,in Response to NRC 790404 Request ML19270H0051979-06-18018 June 1979 Submits Addl Info Re Site Suitability,In Response to NRC 790404 Request ML19247A8471979-06-15015 June 1979 Requests Copy of State of Il Petition to Intervene ML19270G5431979-06-0606 June 1979 Forwards Thermal Mapping of Blowdown Discharge & Cooling Water Intake & Blowdown Discharge Study, in Response to NRC 790404 Ltr ML19263E3701979-06-0606 June 1979 Notifies That Miles Quadrangle Topographical Map,Referred to in 790511 Ltr,Is No Longer Available.Area in Vicinity of Proposed Facility Will Be Included in Green Island Quadrangle 7.5-minute Map ML19289F3541979-05-30030 May 1979 Notifies That Refs Requested in 790404 Ltr Have Been Sent Under Separate Cover to GL Montent at Anl ML19270G4521979-05-25025 May 1979 Forwards Responses to 790404 Questions & Revised Portions of Text Referenced in Responses.Responses & Revision of Site Suitability Er to Be Distributed by First Week of June,1979. W/O Encl ML19270G4171979-05-23023 May 1979 Responds to Request for Comments on Environ Rept & Site Safety Rept.Neither Rept Received ML19269D3121979-05-22022 May 1979 Forwards Data Sources Index Map Per NRC 790404 Request.Map Will Be Included in Response to Question 361.1 ML19269E8321979-05-22022 May 1979 Requests Limited Appearance at Hearing Re Plant Const ML19269E8371979-05-22022 May 1979 Requests Limited Appearance at First Public Hearing Re Proposed Plant ML19320D7231977-04-27027 April 1977 Summarizes Veiws on Early Site Review Proposed Regulations. Supports Idea in General But Opposes Application to Reprocessing Facilities & Expresses Concerns Re Certain Technical Issues.Certificate of Svc Encl 1989-11-18 Category:UTILITY TO NRC MONTHYEARML20040F5081982-02-0101 February 1982
[Table view]Advises of Const Completion Date Change from 1993 & 1994 to 1999 & 2000 for Units 1 & 2,respectively,due to Changes in Load Growth Projections.Site Review Requested to Establish Acceptability of Site & fossil-fired Station ML20002A9231980-12-0101 December 1980 Responds to NRC 790402 & 801009 Requests for Info Re Project Status & Plans for Updating Antitrust Info.Units Scheduled for Svc in 1993 & 1994.Antitrust Info Will Be Updated at Least 9 Months Prior to PSAR or Environ Rept Filing ML19323G1041980-05-23023 May 1980 Forwards Affidavit Certifying Distribution of Site Suitability - Site Safety Rept,Amend 2,re CP & Early Site Review Application,Per Encl 4 of Rc Deyoung 790404 Ltr ML19320C3041980-05-23023 May 1980 Forwards Affidavit of Svc for Distribution of Site Suitability Environ Rept,Revision 3,Suppl 2,in Response to NRC 790404 Request ML19323C9731980-05-13013 May 1980 Forwards Amend 2 to Site Suitability & Site Safety Rept Portion of Application for CP & Early Site Review,In Response to NRC 800206 Request ML19322E7271980-03-28028 March 1980 Requests Addl 45 Days to Submit Responses to 800206 Ltr Re Site Suitability Environ & Safety Repts ML19294B1391980-02-19019 February 1980 Notifies That T Gilbert,Argonne Natl Lab,Requested Addl Archaeological Info Which Has Been Transmitted.Info Should Be Withheld (Ref 10CFR2.790) ML19257C7891980-01-22022 January 1980 Submits Addl Info Requested at 791206 Site Visit by SA Curtis Re Plum Grove Archaeological Site Survey Conducted in 1974.Updated Site Map & Carroll County Literature Forwarded Under Separate Cover ML19249C1271979-08-31031 August 1979 Forwards Affidavit Stating That Distribution of Applicant Site Suitability Environ Rept,Suppl 2,has Been Made Per Encl 3 of NRC 790404 Ltr ML19249B2821979-08-24024 August 1979 Forwards Suppl 2 to Site Suitability Environ Rept Re Amend to Application for CP & Early Site Review.Revises Chapter 1, Need for Power, to Reflect Revised Schedules for Facilities & Includes Other Text Corrections ML19224C9961979-07-0202 July 1979 Forwards Affidavit Certifying That Site Suitability - Environ Rept,Suppl 1 Was Distributed on 790702 ML19241A6021979-06-27027 June 1979 Submits Revised Schedule for Fuel Loading Dates Due to Impact of TMI Incident ML19270H2951979-06-22022 June 1979 Forwards Suppl 1 to Site Suitability - Environ Rept, Constituting Amend to Application for CP & Early Site Review ML19270H0241979-06-19019 June 1979 Discusses Transmittal of Info Re Site suitability-environ Rept,Questions 361.1d & 361.1-1,in Response to NRC 790404 Request ML19270H0051979-06-18018 June 1979 Submits Addl Info Re Site Suitability,In Response to NRC 790404 Request ML19270G5431979-06-0606 June 1979 Forwards Thermal Mapping of Blowdown Discharge & Cooling Water Intake & Blowdown Discharge Study, in Response to NRC 790404 Ltr ML19263E3701979-06-0606 June 1979 Notifies That Miles Quadrangle Topographical Map,Referred to in 790511 Ltr,Is No Longer Available.Area in Vicinity of Proposed Facility Will Be Included in Green Island Quadrangle 7.5-minute Map ML19289F3541979-05-30030 May 1979 Notifies That Refs Requested in 790404 Ltr Have Been Sent Under Separate Cover to GL Montent at Anl ML19270G4521979-05-25025 May 1979 Forwards Responses to 790404 Questions & Revised Portions of Text Referenced in Responses.Responses & Revision of Site Suitability Er to Be Distributed by First Week of June,1979. W/O Encl ML19269D3121979-05-22022 May 1979 Forwards Data Sources Index Map Per NRC 790404 Request.Map Will Be Included in Response to Question 361.1 1982-02-01 |