Forwards,Per D Goddard Request,Comm Ed 790627 Ltr Announcing Delay Until 1990 & 1991 in Fuel Load Dates.Change in Schedule Is Caused by TMI-2 Accident Procedures & Reflected in Aug 1979 Carroll County Site Suitability Repts
ML19254D185
Person / Time
Site: 05000599, 05000600
Issue date: 09/07/1979
From: Steptoe P
ISHAM, LINCOLN & BEALE
To: Bright G, Holton R, Wolf J
AFFILIATION NOT ASSIGNED, Atomic Safety and Licensing Board Panel, Oregon State University, CORVALLIS, OR
References
NUDOCS 7910220480
Download: ML19254D185 (1)


Text

' **

  • REL'sTD COI..

'~

.D ISHAM. LINCOLN & BEALE I . , . .m f git.4 COUN0ELORS AT t.AW h oNC reRsf NarsoNa6 *LaZA FORTV *S CCCNC ,LQCR h a.== CMicaco. illinois 60603 e.. - .

.. g . ecec.-cNe sia.s s ,so o retcc 2-sa a

.. . . . : , c , ..e c

    1. ..."" September 7, 1979 5

, ' ',', ,,' ",Tg ," "

/ *a S w N G'C N. 3 0,20036

' % gs.:p ' mes ess erso John F. Wolf, Esq., Chairman Dr. Robert L. Holton 3409 Shepherd Street School of Oceanography Chery Chase, Maryland 20015 Oregon State University Corvallis, Oregon 97331 Mr. Glenn O. Bright --

Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Members of Board:

Dick Goddard, of the NRC's Office of the Executive Legal Director, asked me to send you the attached letter dated June 27, 1979 in which Com.onwealth Edison Ccmpany announced a two year delay in the Fuel Load Dates for Carroll County Units 1 and 2 until 1990 and 1991. This enange in schedule is attributed to anticipated delays in the NRC Staff review process caused by Three Mile Island.

This change is also reflected in Revision 42 to the Carroll County Site Suitability reports which was mailed to you in August, 1979.

Commonwealth Edison still intends to proceed as expeditiously as possible with its Early Site Review application for Carroll County.

Sinc - ly yours, b

'l y

' fl L

' 'v,h f ,/ %

Phi.;.19 P. St tce PPS/kb ENC.

CC: Service List e 3 C i.

(

!JJ 701022 0 f fro

Commonwealth Edison Cra Nst Na:,onal P'a:3 Cmcago imnc !

,%D

~

Address Recly 'o Post Cfhcie SSET CO.9j D Chicago. Ilhrers 60690 0/itp.,,k N

, Os 0't s June 27, 1979  :.9 D l, QQ Dh Mr. Har ld R. Danten, Director k so toy #

, p#u.# Q # ,,,

Office of Nuclear Reactor Regulation . .)

U.S. Mucl:ar Regulatory Commiscion N #

Cb e Wachingten, D.C. 20555

Subject:

Carroll County Station Units 1 and 2 -

Change in Fucl Load Oate rtC Docket Noc. S50-509 and S50-600 Ocar Mr. Denton:

Cn May 24, 1979, the Nuclear Regulatcry Commission (SiRC) cominciencro approved your plan (SCCY-79-314 dated eny 19, 1979) for an interim reorgani::ation of the EJC Staff to deal uith the impacts of the Three Mile Island (T:rf) Incidenc.

In this plan, cc:: onwealth Edison Company's construction permit review for Carroll County Station Un ts 1 and 2 han heen costponed although the early cito review ef fort will contintm.

Mr. Roger ecyd, Director of Project Management, indicated that optimistically the revinv of Cnwoll County c"n begin again in early 1981. M though one caction of the plan, SECY-79-344, states that the carroll County reviw would be delayed by twelvo (12) months, there is no bani, for this st.ite-ment. However, Cc=onwealth Edison ' c analynic indicates that Carroll County's licensing del,y will result ' n a two year 121'y in the fuel load datcc.

The table in .Tttachment I chows the originni and revised licencing review schedules. The two ycer delay results from the following two considerationn. First, it app 7 ara that due to the impacts of TMI, the PSAR docheting will ba delayed by one year. Second, Carroll County was originally intended to be reviewed under TUa:G-0292, "Muclear ?cuer ? lent Licensing:

Cpportunities for Improvement," which involved werking meetinga between the applicant and the MRC Staff before the PS?=2 was docketed. These working meetings wculd expedite the review by reducing the timo required frc= dccheting of the FS.in until a conctruction permit is issued. Mr. 2cyd indicated that once the Cnrroll County revia recumes, it would be unraalistic to believe the revicw could be conducted under nn expedited procccc.

I 2 256

NEC Docket 2:os. S50-59?

350-600 lir . Itarold R. Centon: June 27, 1979 Therefore, the normal revin'< process is assumed with a three year timo period between docketing of the PSAR to SCR. 'This assungtion adds an additional year to the fuel load dates.

Thus, the fuel load. dates have been changed to the following:

Original Revised Station Fuel Load Dates Fuel Load Dates _

carroll County Unit 1 April 1988 April 1990 Carroll County Unit 2 April 1989 April 1991 o! case address any questions that you might have to this offico, very truly yours, (Signed) CORDELL REED Cordell Recd Assistant Vice-Presider attach =cnt g eo 2 257

~

Commonwealth Edison NRC Docket Nos. 550-593 S50-600 ATTACH'4ENT I CARROLL COUNTY STATION LICENSING REVIDI SCHEDULE Carroll County Oricinal Schedule Revised Schedule Submit PSAR January 1980 January 1981 Docket PSAR April 1980 April 1981 Construction Permit April 1982 April 1984 i

Fuel Load April 1988 April 1990 l

-i w Y  %

w. . -p csuu~-

ll c( so

.k SEP 10 ./ \S7.3 Y e.~ * % < - S) w .w .

C61 j 4, =

2 258

.