Forwards,Per D Goddard Request,Comm Ed 790627 Ltr Announcing Delay Until 1990 & 1991 in Fuel Load Dates.Change in Schedule Is Caused by TMI-2 Accident Procedures & Reflected in Aug 1979 Carroll County Site Suitability ReptsML19254D185 |
Person / Time |
---|
Site: |
05000599, 05000600 |
---|
Issue date: |
09/07/1979 |
---|
From: |
Steptoe P ISHAM, LINCOLN & BEALE |
---|
To: |
Bright G, Holton R, Wolf J AFFILIATION NOT ASSIGNED, Atomic Safety and Licensing Board Panel, Oregon State University, CORVALLIS, OR |
---|
References |
---|
NUDOCS 7910220480 |
Download: ML19254D185 (1) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML19332D9781989-11-18018 November 1989 Advises That Author Has No Knowledge of Licensee Intention to Cancel Plant.W/Certificate of Svc.Served on 891130 ML20024D5801983-08-0101 August 1983 Submits Quarterly Status Rept.Projected Inservice Dates for Units 1 & 2 Remain 2000 & 2001,respectively.Circumstances Re Possible Withdrawal of One Prospective Joint Owner Have Not Changed Significantly.Related Correspondence ML20073S1531983-05-0202 May 1983 Provides Quarterly Status Rept on Developments.Projected Inservice Dates Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001 ML20028G2321983-02-0101 February 1983 Submits Quarterly Status Rept on Proceeding Per ASLB Request.Projected Inservice Date Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001.Related Correspondence ML20027D5181982-11-0101 November 1982 Provides Quarterly Status Rept on Developments in Proceeding.No Matl Changes Occurred Since 820730 Ltr. Projected Inservice Dates Modified.Circumstances Re Possible Withdrawal of Joint Owner Unchanged.Related Correspondence ML20058G7081982-07-28028 July 1982 Requests Hearings Be Deferred Until Const Plans Are More Certain in Response to ASLB 820707 Memorandum & Order. Deferral Would Not Prejudice Rights of Parties.Related Correspondence ML20040F5081982-02-0101 February 1982 Advises of Const Completion Date Change from 1993 & 1994 to 1999 & 2000 for Units 1 & 2,respectively,due to Changes in Load Growth Projections.Site Review Requested to Establish Acceptability of Site & fossil-fired Station ML20002A9231980-12-0101 December 1980 Responds to NRC 790402 & 801009 Requests for Info Re Project Status & Plans for Updating Antitrust Info.Units Scheduled for Svc in 1993 & 1994.Antitrust Info Will Be Updated at Least 9 Months Prior to PSAR or Environ Rept Filing ML19343A5651980-11-0303 November 1980 Notifies That Review of Preliminary Geologic Data & Field Insp Shows Carroll County Site Adequate for Const of Nuclear Facility ML19323G1041980-05-23023 May 1980 Forwards Affidavit Certifying Distribution of Site Suitability - Site Safety Rept,Amend 2,re CP & Early Site Review Application,Per Encl 4 of Rc Deyoung 790404 Ltr ML19320C3041980-05-23023 May 1980 Forwards Affidavit of Svc for Distribution of Site Suitability Environ Rept,Revision 3,Suppl 2,in Response to NRC 790404 Request ML19323C9731980-05-13013 May 1980 Forwards Amend 2 to Site Suitability & Site Safety Rept Portion of Application for CP & Early Site Review,In Response to NRC 800206 Request ML19323D7221980-04-22022 April 1980 Forwards CA Baskerville 800414 Memo Re Informal Discussion During 791005 Site Visit.Hypothetical Question Re Potential Hazardous Leakage Problem,Previously Deleted,Should Now Be Reconsidered ML19322E7271980-03-28028 March 1980 Requests Addl 45 Days to Submit Responses to 800206 Ltr Re Site Suitability Environ & Safety Repts ML19344D3181980-02-27027 February 1980 Forwards Application for CP & Early Site Review,Site Suitability/Site Safety Rept & Environ Rept Per 800117 Request.W/O Encls ML19294B1391980-02-19019 February 1980 Notifies That T Gilbert,Argonne Natl Lab,Requested Addl Archaeological Info Which Has Been Transmitted.Info Should Be Withheld (Ref 10CFR2.790) ML19257C7891980-01-22022 January 1980 Submits Addl Info Requested at 791206 Site Visit by SA Curtis Re Plum Grove Archaeological Site Survey Conducted in 1974.Updated Site Map & Carroll County Literature Forwarded Under Separate Cover ML19290C3161980-01-10010 January 1980 Responds to NRC 791228 Request Re Reliability Issues Associated W/Facility.Submits Questions to Be Used in Evaluating Bulk Power Transmission Facilities & in Supplementing Chapter 9 of Facility Environ Review ML19257A5791980-01-0404 January 1980 Responds to NRC 791114 Ltr Requesting Info on Endangered Species That Might Be Affected by Plant Const.No Designated Critical Habitat in Project Area.In Bat,Bald Eagle & Higgins Eye Pearly Mussel within Project Range ML19270H8081979-12-28028 December 1979 Requests Addl Info Re Total Length & Average Width of New Transmission Line right-of-way for Carroll County.Info Required to Complete Environ Statement Fact Sheet Needed for Cost/Benefit Analysis ML19211C0731979-12-20020 December 1979 Draws Attention to 791207 ALAB-573 Re Author Position That Jo Daviess County Amended Contention Iii(G) Constitutes Challenge to 10CFR50,App 1 ML19256F9011979-12-0505 December 1979 Notifies That Site Suitability - Site Safety Rept & Site Suitability - Environ Rept Will Be Updated & Forwarded to ASLB in Response to 791204 Telcon ML19256G4641979-11-26026 November 1979 Forwards Certificate of Svc for State of Il 791121 Motion for Reconsideration ML19209B7111979-10-0404 October 1979 Discusses Review of Suppl 2 to Environ Rept for Six Archeological Sites to Be Impacted by Facility Const. Evaluation & Mitigation Plan Should Be Coordinated W/Il Historic Preservation Officer ML19254D1851979-09-0707 September 1979 Forwards,Per D Goddard Request,Comm Ed 790627 Ltr Announcing Delay Until 1990 & 1991 in Fuel Load Dates.Change in Schedule Is Caused by TMI-2 Accident Procedures & Reflected in Aug 1979 Carroll County Site Suitability Repts ML19249C1271979-08-31031 August 1979 Forwards Affidavit Stating That Distribution of Applicant Site Suitability Environ Rept,Suppl 2,has Been Made Per Encl 3 of NRC 790404 Ltr ML19249B2821979-08-24024 August 1979 Forwards Suppl 2 to Site Suitability Environ Rept Re Amend to Application for CP & Early Site Review.Revises Chapter 1, Need for Power, to Reflect Revised Schedules for Facilities & Includes Other Text Corrections ML19208D2101979-08-15015 August 1979 Forwards T Kelsay & s Bloomberg 790618 Ltr Opposing Const of Nuclear Plant.Requests Comment ML19242C4581979-07-25025 July 1979 Notifies of Placement on Direct Distribution List ML19242C4391979-07-25025 July 1979 Notifies of Placement on Direct Distribution List ML19208B3801979-07-12012 July 1979 Notifies That J Dubert of IA Socialist Party Will Represent Party in Intervention Proceedings ML19247B2221979-07-0606 July 1979 Forwards J Runyon,E Gogel & Citizens Against Nuclear Power Petition for Intervention Re CP & Early Site Review ML19208B4921979-07-0303 July 1979 Requests Permission to Testify at CP & Early Site Review Hearing ML19259C8181979-07-0303 July 1979 Requests to Speak at Facility Hearings as Individual Petitioner ML19224C9961979-07-0202 July 1979 Forwards Affidavit Certifying That Site Suitability - Environ Rept,Suppl 1 Was Distributed on 790702 ML19248D8121979-06-29029 June 1979 Requests to Make Limited Appearance at Hearing Re Licensee Application for CP ML19275A0221979-06-29029 June 1979 Requests Opportunity to Testify Before NRC at Upcoming Early Site Review Hearing ML19241A6021979-06-27027 June 1979 Submits Revised Schedule for Fuel Loading Dates Due to Impact of TMI Incident ML19246A7231979-06-27027 June 1979 Requests Opportunity to Review & Comment on Application for CP & Early Site Review ML19207C4351979-06-25025 June 1979 Forwards Ja Grivetti 790604 Ltr & Putnam County,Il Petition Opposing Const of Facility.Requests Status Rept on Project. Petition Not Encl ML19275A0181979-06-23023 June 1979 Requests Permission to Make Limited Appearance Statement at Early Site Review Hearing ML19270H2951979-06-22022 June 1979 Forwards Suppl 1 to Site Suitability - Environ Rept, Constituting Amend to Application for CP & Early Site Review ML19270H0241979-06-19019 June 1979 Discusses Transmittal of Info Re Site suitability-environ Rept,Questions 361.1d & 361.1-1,in Response to NRC 790404 Request ML19270H0051979-06-18018 June 1979 Submits Addl Info Re Site Suitability,In Response to NRC 790404 Request ML19247A8471979-06-15015 June 1979 Requests Copy of State of Il Petition to Intervene ML19263E3631979-06-0808 June 1979 Forwards Addl Info to Site Suitability/Environ Rept. Suggested Area May Contain Archaeological Sites ML19263E3701979-06-0606 June 1979 Notifies That Miles Quadrangle Topographical Map,Referred to in 790511 Ltr,Is No Longer Available.Area in Vicinity of Proposed Facility Will Be Included in Green Island Quadrangle 7.5-minute Map ML19270G5431979-06-0606 June 1979 Forwards Thermal Mapping of Blowdown Discharge & Cooling Water Intake & Blowdown Discharge Study, in Response to NRC 790404 Ltr ML19289F3541979-05-30030 May 1979 Notifies That Refs Requested in 790404 Ltr Have Been Sent Under Separate Cover to GL Montent at Anl ML19270G4521979-05-25025 May 1979 Forwards Responses to 790404 Questions & Revised Portions of Text Referenced in Responses.Responses & Revision of Site Suitability Er to Be Distributed by First Week of June,1979. W/O Encl 1989-11-18
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML19332D9781989-11-18018 November 1989 Advises That Author Has No Knowledge of Licensee Intention to Cancel Plant.W/Certificate of Svc.Served on 891130 ML20024D5801983-08-0101 August 1983 Submits Quarterly Status Rept.Projected Inservice Dates for Units 1 & 2 Remain 2000 & 2001,respectively.Circumstances Re Possible Withdrawal of One Prospective Joint Owner Have Not Changed Significantly.Related Correspondence ML20073S1531983-05-0202 May 1983 Provides Quarterly Status Rept on Developments.Projected Inservice Dates Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001 ML20028G2321983-02-0101 February 1983 Submits Quarterly Status Rept on Proceeding Per ASLB Request.Projected Inservice Date Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001.Related Correspondence ML20027D5181982-11-0101 November 1982 Provides Quarterly Status Rept on Developments in Proceeding.No Matl Changes Occurred Since 820730 Ltr. Projected Inservice Dates Modified.Circumstances Re Possible Withdrawal of Joint Owner Unchanged.Related Correspondence ML20058G7081982-07-28028 July 1982 Requests Hearings Be Deferred Until Const Plans Are More Certain in Response to ASLB 820707 Memorandum & Order. Deferral Would Not Prejudice Rights of Parties.Related Correspondence ML20040F5081982-02-0101 February 1982 Advises of Const Completion Date Change from 1993 & 1994 to 1999 & 2000 for Units 1 & 2,respectively,due to Changes in Load Growth Projections.Site Review Requested to Establish Acceptability of Site & fossil-fired Station ML20002A9231980-12-0101 December 1980 Responds to NRC 790402 & 801009 Requests for Info Re Project Status & Plans for Updating Antitrust Info.Units Scheduled for Svc in 1993 & 1994.Antitrust Info Will Be Updated at Least 9 Months Prior to PSAR or Environ Rept Filing ML19343A5651980-11-0303 November 1980 Notifies That Review of Preliminary Geologic Data & Field Insp Shows Carroll County Site Adequate for Const of Nuclear Facility ML19323G1041980-05-23023 May 1980 Forwards Affidavit Certifying Distribution of Site Suitability - Site Safety Rept,Amend 2,re CP & Early Site Review Application,Per Encl 4 of Rc Deyoung 790404 Ltr ML19320C3041980-05-23023 May 1980 Forwards Affidavit of Svc for Distribution of Site Suitability Environ Rept,Revision 3,Suppl 2,in Response to NRC 790404 Request ML19323C9731980-05-13013 May 1980 Forwards Amend 2 to Site Suitability & Site Safety Rept Portion of Application for CP & Early Site Review,In Response to NRC 800206 Request ML19323D7221980-04-22022 April 1980 Forwards CA Baskerville 800414 Memo Re Informal Discussion During 791005 Site Visit.Hypothetical Question Re Potential Hazardous Leakage Problem,Previously Deleted,Should Now Be Reconsidered ML19322E7271980-03-28028 March 1980 Requests Addl 45 Days to Submit Responses to 800206 Ltr Re Site Suitability Environ & Safety Repts ML19294B1391980-02-19019 February 1980 Notifies That T Gilbert,Argonne Natl Lab,Requested Addl Archaeological Info Which Has Been Transmitted.Info Should Be Withheld (Ref 10CFR2.790) ML19257C7891980-01-22022 January 1980 Submits Addl Info Requested at 791206 Site Visit by SA Curtis Re Plum Grove Archaeological Site Survey Conducted in 1974.Updated Site Map & Carroll County Literature Forwarded Under Separate Cover ML19290C3161980-01-10010 January 1980 Responds to NRC 791228 Request Re Reliability Issues Associated W/Facility.Submits Questions to Be Used in Evaluating Bulk Power Transmission Facilities & in Supplementing Chapter 9 of Facility Environ Review ML19257A5791980-01-0404 January 1980 Responds to NRC 791114 Ltr Requesting Info on Endangered Species That Might Be Affected by Plant Const.No Designated Critical Habitat in Project Area.In Bat,Bald Eagle & Higgins Eye Pearly Mussel within Project Range ML19270H8081979-12-28028 December 1979 Requests Addl Info Re Total Length & Average Width of New Transmission Line right-of-way for Carroll County.Info Required to Complete Environ Statement Fact Sheet Needed for Cost/Benefit Analysis ML19211C0731979-12-20020 December 1979 Draws Attention to 791207 ALAB-573 Re Author Position That Jo Daviess County Amended Contention Iii(G) Constitutes Challenge to 10CFR50,App 1 ML19256F9011979-12-0505 December 1979 Notifies That Site Suitability - Site Safety Rept & Site Suitability - Environ Rept Will Be Updated & Forwarded to ASLB in Response to 791204 Telcon ML19256G4641979-11-26026 November 1979 Forwards Certificate of Svc for State of Il 791121 Motion for Reconsideration ML19254D1851979-09-0707 September 1979 Forwards,Per D Goddard Request,Comm Ed 790627 Ltr Announcing Delay Until 1990 & 1991 in Fuel Load Dates.Change in Schedule Is Caused by TMI-2 Accident Procedures & Reflected in Aug 1979 Carroll County Site Suitability Repts ML19249C1271979-08-31031 August 1979 Forwards Affidavit Stating That Distribution of Applicant Site Suitability Environ Rept,Suppl 2,has Been Made Per Encl 3 of NRC 790404 Ltr ML19249B2821979-08-24024 August 1979 Forwards Suppl 2 to Site Suitability Environ Rept Re Amend to Application for CP & Early Site Review.Revises Chapter 1, Need for Power, to Reflect Revised Schedules for Facilities & Includes Other Text Corrections ML19208D2101979-08-15015 August 1979 Forwards T Kelsay & s Bloomberg 790618 Ltr Opposing Const of Nuclear Plant.Requests Comment ML19208B3801979-07-12012 July 1979 Notifies That J Dubert of IA Socialist Party Will Represent Party in Intervention Proceedings ML19247B2221979-07-0606 July 1979 Forwards J Runyon,E Gogel & Citizens Against Nuclear Power Petition for Intervention Re CP & Early Site Review ML19208B4921979-07-0303 July 1979 Requests Permission to Testify at CP & Early Site Review Hearing ML19259C8181979-07-0303 July 1979 Requests to Speak at Facility Hearings as Individual Petitioner ML19224C9961979-07-0202 July 1979 Forwards Affidavit Certifying That Site Suitability - Environ Rept,Suppl 1 Was Distributed on 790702 ML19248D8121979-06-29029 June 1979 Requests to Make Limited Appearance at Hearing Re Licensee Application for CP ML19275A0221979-06-29029 June 1979 Requests Opportunity to Testify Before NRC at Upcoming Early Site Review Hearing ML19246A7231979-06-27027 June 1979 Requests Opportunity to Review & Comment on Application for CP & Early Site Review ML19241A6021979-06-27027 June 1979 Submits Revised Schedule for Fuel Loading Dates Due to Impact of TMI Incident ML19207C4351979-06-25025 June 1979 Forwards Ja Grivetti 790604 Ltr & Putnam County,Il Petition Opposing Const of Facility.Requests Status Rept on Project. Petition Not Encl ML19275A0181979-06-23023 June 1979 Requests Permission to Make Limited Appearance Statement at Early Site Review Hearing ML19270H2951979-06-22022 June 1979 Forwards Suppl 1 to Site Suitability - Environ Rept, Constituting Amend to Application for CP & Early Site Review ML19270H0241979-06-19019 June 1979 Discusses Transmittal of Info Re Site suitability-environ Rept,Questions 361.1d & 361.1-1,in Response to NRC 790404 Request ML19270H0051979-06-18018 June 1979 Submits Addl Info Re Site Suitability,In Response to NRC 790404 Request ML19247A8471979-06-15015 June 1979 Requests Copy of State of Il Petition to Intervene ML19270G5431979-06-0606 June 1979 Forwards Thermal Mapping of Blowdown Discharge & Cooling Water Intake & Blowdown Discharge Study, in Response to NRC 790404 Ltr ML19263E3701979-06-0606 June 1979 Notifies That Miles Quadrangle Topographical Map,Referred to in 790511 Ltr,Is No Longer Available.Area in Vicinity of Proposed Facility Will Be Included in Green Island Quadrangle 7.5-minute Map ML19289F3541979-05-30030 May 1979 Notifies That Refs Requested in 790404 Ltr Have Been Sent Under Separate Cover to GL Montent at Anl ML19270G4521979-05-25025 May 1979 Forwards Responses to 790404 Questions & Revised Portions of Text Referenced in Responses.Responses & Revision of Site Suitability Er to Be Distributed by First Week of June,1979. W/O Encl ML19270G4171979-05-23023 May 1979 Responds to Request for Comments on Environ Rept & Site Safety Rept.Neither Rept Received ML19269D3121979-05-22022 May 1979 Forwards Data Sources Index Map Per NRC 790404 Request.Map Will Be Included in Response to Question 361.1 ML19269E8321979-05-22022 May 1979 Requests Limited Appearance at Hearing Re Plant Const ML19269E8371979-05-22022 May 1979 Requests Limited Appearance at First Public Hearing Re Proposed Plant ML19320D7231977-04-27027 April 1977 Summarizes Veiws on Early Site Review Proposed Regulations. Supports Idea in General But Opposes Application to Reprocessing Facilities & Expresses Concerns Re Certain Technical Issues.Certificate of Svc Encl 1989-11-18
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20024D5801983-08-0101 August 1983 Submits Quarterly Status Rept.Projected Inservice Dates for Units 1 & 2 Remain 2000 & 2001,respectively.Circumstances Re Possible Withdrawal of One Prospective Joint Owner Have Not Changed Significantly.Related Correspondence ML20073S1531983-05-0202 May 1983 Provides Quarterly Status Rept on Developments.Projected Inservice Dates Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001 ML20028G2321983-02-0101 February 1983 Submits Quarterly Status Rept on Proceeding Per ASLB Request.Projected Inservice Date Revised for Unit 1 from 1999 to 2000 & for Unit 2 from 2000 to 2001.Related Correspondence ML20027D5181982-11-0101 November 1982 Provides Quarterly Status Rept on Developments in Proceeding.No Matl Changes Occurred Since 820730 Ltr. Projected Inservice Dates Modified.Circumstances Re Possible Withdrawal of Joint Owner Unchanged.Related Correspondence ML20058G7081982-07-28028 July 1982 Requests Hearings Be Deferred Until Const Plans Are More Certain in Response to ASLB 820707 Memorandum & Order. Deferral Would Not Prejudice Rights of Parties.Related Correspondence ML19211C0731979-12-20020 December 1979 Draws Attention to 791207 ALAB-573 Re Author Position That Jo Daviess County Amended Contention Iii(G) Constitutes Challenge to 10CFR50,App 1 ML19256F9011979-12-0505 December 1979 Notifies That Site Suitability - Site Safety Rept & Site Suitability - Environ Rept Will Be Updated & Forwarded to ASLB in Response to 791204 Telcon ML19254D1851979-09-0707 September 1979 Forwards,Per D Goddard Request,Comm Ed 790627 Ltr Announcing Delay Until 1990 & 1991 in Fuel Load Dates.Change in Schedule Is Caused by TMI-2 Accident Procedures & Reflected in Aug 1979 Carroll County Site Suitability Repts ML19247B2221979-07-0606 July 1979 Forwards J Runyon,E Gogel & Citizens Against Nuclear Power Petition for Intervention Re CP & Early Site Review 1983-08-01
[Table view] |
Text
' **
'~
.D ISHAM. LINCOLN & BEALE I . , . .m f git.4 COUN0ELORS AT t.AW h oNC reRsf NarsoNa6 *LaZA FORTV *S CCCNC ,LQCR h a.== CMicaco. illinois 60603 e.. - .
.. g . ecec.-cNe sia.s s ,so o retcc 2-sa a
.. . . . : , c , ..e c
- ..."" September 7, 1979 5
, ' ',', ,,' ",Tg ," "
/ *a S w N G'C N. 3 0,20036
' % gs.:p ' mes ess erso John F. Wolf, Esq., Chairman Dr. Robert L. Holton 3409 Shepherd Street School of Oceanography Chery Chase, Maryland 20015 Oregon State University Corvallis, Oregon 97331 Mr. Glenn O. Bright --
Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Members of Board:
Dick Goddard, of the NRC's Office of the Executive Legal Director, asked me to send you the attached letter dated June 27, 1979 in which Com.onwealth Edison Ccmpany announced a two year delay in the Fuel Load Dates for Carroll County Units 1 and 2 until 1990 and 1991. This enange in schedule is attributed to anticipated delays in the NRC Staff review process caused by Three Mile Island.
This change is also reflected in Revision 42 to the Carroll County Site Suitability reports which was mailed to you in August, 1979.
Commonwealth Edison still intends to proceed as expeditiously as possible with its Early Site Review application for Carroll County.
Sinc - ly yours, b
'l y
' fl L
' 'v,h f ,/ %
Phi.;.19 P. St tce PPS/kb ENC.
CC: Service List e 3 C i.
(
!JJ 701022 0 f fro
Commonwealth Edison Cra Nst Na:,onal P'a:3 Cmcago imnc !
,%D
~
Address Recly 'o Post Cfhcie SSET CO.9j D Chicago. Ilhrers 60690 0/itp.,,k N
, Os 0't s June 27, 1979 :.9 D l, QQ Dh Mr. Har ld R. Danten, Director k so toy #
, p#u.# Q # ,,,
Office of Nuclear Reactor Regulation . .)
U.S. Mucl:ar Regulatory Commiscion N #
Cb e Wachingten, D.C. 20555
Subject:
Carroll County Station Units 1 and 2 -
Change in Fucl Load Oate rtC Docket Noc. S50-509 and S50-600 Ocar Mr. Denton:
Cn May 24, 1979, the Nuclear Regulatcry Commission (SiRC) cominciencro approved your plan (SCCY-79-314 dated eny 19, 1979) for an interim reorgani::ation of the EJC Staff to deal uith the impacts of the Three Mile Island (T:rf) Incidenc.
In this plan, cc:: onwealth Edison Company's construction permit review for Carroll County Station Un ts 1 and 2 han heen costponed although the early cito review ef fort will contintm.
Mr. Roger ecyd, Director of Project Management, indicated that optimistically the revinv of Cnwoll County c"n begin again in early 1981. M though one caction of the plan, SECY-79-344, states that the carroll County reviw would be delayed by twelvo (12) months, there is no bani, for this st.ite-ment. However, Cc=onwealth Edison ' c analynic indicates that Carroll County's licensing del,y will result ' n a two year 121'y in the fuel load datcc.
The table in .Tttachment I chows the originni and revised licencing review schedules. The two ycer delay results from the following two considerationn. First, it app 7 ara that due to the impacts of TMI, the PSAR docheting will ba delayed by one year. Second, Carroll County was originally intended to be reviewed under TUa:G-0292, "Muclear ?cuer ? lent Licensing:
Cpportunities for Improvement," which involved werking meetinga between the applicant and the MRC Staff before the PS?=2 was docketed. These working meetings wculd expedite the review by reducing the timo required frc= dccheting of the FS.in until a conctruction permit is issued. Mr. 2cyd indicated that once the Cnrroll County revia recumes, it would be unraalistic to believe the revicw could be conducted under nn expedited procccc.
I 2 256
NEC Docket 2:os. S50-59?
350-600 lir . Itarold R. Centon: June 27, 1979 Therefore, the normal revin'< process is assumed with a three year timo period between docketing of the PSAR to SCR. 'This assungtion adds an additional year to the fuel load dates.
Thus, the fuel load. dates have been changed to the following:
Original Revised Station Fuel Load Dates Fuel Load Dates _
carroll County Unit 1 April 1988 April 1990 Carroll County Unit 2 April 1989 April 1991 o! case address any questions that you might have to this offico, very truly yours, (Signed) CORDELL REED Cordell Recd Assistant Vice-Presider attach =cnt g eo 2 257
~
Commonwealth Edison NRC Docket Nos. 550-593 S50-600 ATTACH'4ENT I CARROLL COUNTY STATION LICENSING REVIDI SCHEDULE Carroll County Oricinal Schedule Revised Schedule Submit PSAR January 1980 January 1981 Docket PSAR April 1980 April 1981 Construction Permit April 1982 April 1984 i
Fuel Load April 1988 April 1990 l
-i w Y %
- w. . -p csuu~-
ll c( so
.k SEP 10 ./ \S7.3 Y e.~ * % < - S) w .w .
C61 j 4, =
2 258
.