ML061380509

From kanterella
Revision as of 18:55, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
05/24/2006 Forthcoming Meeting with Omaha Public Power District (OPPD) to Discuss Design Calculations for the Auxiliary Building
ML061380509
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/18/2006
From: Wang A
Plant Licensing Branch III-2
To: Terao D
Plant Licensing Branch III-2
Wang A, NRR/DLPM, 415-1445
References
Download: ML061380509 (4)


Text

May 18, 2006MEMORANDUM TO:David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor LicensingFROM:Alan B. Wang, Project Manager/RA/Plant Licensing Branch IVDivision of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH OMAHA PUBLIC POWER DISTRICT(OPPD)DATE & TIME:Wednesday, May 24, 2006 1:00 p.m. - 3:30 p.m. LOCATION:U.S. Nuclear Regulatory CommissionOne White Flint North 11555 Rockville Pike, Room O-4B4Rockville, Maryl and 20852PURPOSE:OPPD will discuss the design calculations for the auxiliary building (seeattached agenda).CATEGORY 1: *This is a Category 1 Meeting. The public is invited to observe thismeeting and will have one or more opportunities to communicate withthe NRC after the business portion, but before the meeting is adjour ned. PARTICIPANTS:Participants from the NRC include members of the Office of NuclearReactor Regulation (NRR).NRC OPPDR. KarasS. AndersenJ. MaG. Cavanaugh S. SamaddarB. Van Sant, et al.

D. Terao A. Wang, et al.Docket No. 50-285

Enclosure:

Agenda (ADAMS Accession No. ML061380509) cc w/encl: See next page MEETING CONTACT:Alan B. Wang, NRR301-415-1445 abw@nrc.gov

  • Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings,"(67 FR 36920), May 28, 2002

ML061380509) cc w/encl: See next page MEETING CONTACT:Alan B. Wang, NRR301-415-1445 abw@nrc.gov

  • Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings," (67 FR 36920), May 28, 2002 DISTRIBUTION
PUBLIC LPLIV ReadingSSamaddar, NRR/ADESRidsNrrAdro (BBoger)RidsNrrPMAWangRidsOgcRpRidsNrrDorl (CHaney/CHolden)RidsNrrLALFeizollahiRidsAcrsAcnwMailCenter RidsNrrDorlLpl4 (DTerao)RidsNrrAdro RJasinski, NRRRidsOpaMailSO'Connor, EDO RIVRidsRgn4MailCenter (DGraves)

RKaras, NRR/ADESJMa, NRR/ADESPMNSReceptionist (OWFN/TWFN) (HARD COPY)ADAMS ACCESSION NUMBER: ML061380509NRC-001OFFICENRR/LPL4/PMNRR/LPL4/LANRR/LPL4/BCNRR/DORL/DNAMEAWangLFeizollahiDTeraoCHaney DATE5/18/065/18/065/18/065/18/06 MEETING AGENDAOMAHA PUBLIC POWER DISTRICT FORT CALHOUN AUXILIARY BUILDINGMAY 24, 20061:00 pmIntroduction1:10 pmDiscussion of Auxiliary Building Design 3:00 pm Conclusion and Staff Comments3:30 pm Public Comments April 2006Ft. Calhoun Station, Unit 1 cc:Winston & Strawn ATTN: James R. Curtiss, Esq.

1700 K Street, N.W.

Washington, DC 20006-3817ChairmanWashington County Board of Supervisors

P.O. Box 466 Blair, NE 68008Mr. John Hanna, Resident InspectorU.S. Nuclear Regulatory Commission

P.O. Box 310 Fort Calhoun, NE 68023Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007Mr. David J. Bannister, ManagerFort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant

P.O. Box 550 Fort Calhoun, NE 68023-0550Mr. Joe L. McManisManager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550Mr. Daniel K. McGheeBureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319Mr. R. T. RidenoureVice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 550 Fort Calhoun, Nebraska 68023-0550