Letter Sequence RAI |
---|
|
|
MONTHYEARML0719703582007-08-0202 August 2007 RAI, Request to Modify UFSAR Related to Internal Flooding Design Basis Project stage: RAI ML0731801322007-11-15015 November 2007 Notice of Meeting with Dominion Energy Kewaunee, Inc., Concerning the Current License Amendment Application Regarding Internal Flooding at the Kewaunee Power Station Project stage: Meeting ML0803500532008-02-0101 February 2008 Response to NRC Questions Regarding License Amendment Request 215, Modification of Internal Flooding Design Basis. Project stage: Request ML0807103992008-03-10010 March 2008 Response to NRC Supplemental Questions Regarding License Amendment Request 215, Modification of Internal Flooding Design Basis. Project stage: Supplement ML0807701792008-03-28028 March 2008 Issuance of Amendments Licensing Basis Design Criteria Associated with Internal Flooding Project stage: Approval ML0812206282008-05-0707 May 2008 Correction to Facility Operating License Page Issued in Conjunction with Amd. No. 197 Project stage: Other 2008-02-01
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000305/20240032024-11-0606 November 2024 NRC Inspection Report No. 05000305/2024003 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24136A1952024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24130A0022024-05-0909 May 2024 Summary of Facility Changes, Tests and Experiments and Commitment Changes IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24101A0422024-04-22022 April 2024 Solutions Inc. – Exemption from Select Requirements of 10 CFR Part 73 ((Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24106A0492024-04-15015 April 2024 2023 Annual Radioactive Effluent Release Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML24079A0162024-03-19019 March 2024 Annual Property Insurance Status Report ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24061A0202024-02-15015 February 2024 (Ksp) ISFSI, Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 6 ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23066A3232023-03-0707 March 2023 Energysolutions, LLC, Notification of Closing of Transaction ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) – Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commission’S Analysis of Dominion Energy Kewaunee‘S Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 ML24061A0182022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Pla11, Training and Qualification Plan and Safeguards Contingency Plan Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc 2024-09-18
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23222A1532023-08-29029 August 2023 Solutions Restore Enclosure RAI 1 - Final ML22032A3252022-02-0202 February 2022 Enclosure - Request for Additional Information ML21257A0682021-09-30030 September 2021 Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendments ML21257A0692021-09-30030 September 2021 Enclosure - Request for Additional Information - Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendment ML20050E1012020-02-21021 February 2020 Letter-RAI 1 - MAGNASTOR-Kewaunee Exemption with Enclosure ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A1562016-02-10010 February 2016 Request for Additional Information for Kewaunee Power Station License Amendment Request for Emergency Plan Changes ML14115A0412014-08-14014 August 2014 Request for Additional Information, License Amendment Request to Revise Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML12138A0072012-05-15015 May 2012 NRR E-mail Capture - ME7110 Scvb Draft RAI Set Adoption of TSTF-51 & TSTF- 448, as Part of Chi-over-Q Action ML12118A4652012-04-26026 April 2012 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Addtional Information - Replacement Draft Items.2012/04/26 NRR E-mail Capture - FW: ME8460 (Successor to ME8205) - ML12115A0752012-04-23023 April 2012 NRR E-mail Capture - ME8460 (Successor to ME8205) - Kewaunee Power Station - 10 CFR 50.46, 30-Day Response - Request for Additional Information - Replacement Draft Items ML12093A4812012-04-0202 April 2012 RAI - Kewaunee Relief Requests Under TAC ME7378 ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12066A0082012-03-0202 March 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request- Chi-over-Q - Aadb Request for Additional ML12023A0572012-01-13013 January 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Ahpb Request for Additional Information (RAI) - Firm RAI Items ML12023A0472012-01-0909 January 2012 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Ahpb Request for Additional Information (RAI) ML11339A0012011-12-0101 December 2011 NRR E-mail Capture - ME7110 Kewaunee Amendment Request Re_ Chi-over-Q - Eicb Request for Additional Information (RAI) ML1106303592011-03-0707 March 2011 Request for Additional Information Related to License Amendment Request for Approval of Cyber Security Plan ML1036305892011-01-0606 January 2011 Request for Additional Information, Kewaunee Power Station Relief Request No. RR-2-2, Steam Generator Large-Bore Snubber Inspection and Testing for Fourth 10-Year Interval ML1028102572010-10-0505 October 2010 Attachment: ME4011 Request for Additional Information (RAI) ML1024402012010-09-16016 September 2010 08/31/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the U.S. Nuclear Regulatory Commission Concerning a Draft Request for Additional Information Pertaining to the Kewaunee Power Station License Renewal A ML1023901982010-09-16016 September 2010 08/26/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and NRC Concerning a D-RAI Pertaining to the Kewaunee Power Station License Renewal Application ML1025003572010-09-10010 September 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1014103222010-05-27027 May 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1009503792010-04-14014 April 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application ML1006903992010-03-11011 March 2010 Request for Additional Information for the Review of the Kewaunee Power Station, License Renewal Application ML1007003002010-03-11011 March 2010 Draft RAI Re. Use of TSTF-490-A in Kewaunee'S ITS Conversion ML0935003062010-01-0404 January 2010 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - AMRs ML0933104432009-12-16016 December 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - AMRs ML0932400952009-12-0303 December 2009 Request for Additional Information for the Review of the Kewaunee License Renewal Application - Aging Management Review/Aging Management Program ML0918908362009-11-20020 November 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application ML0928702112009-10-14014 October 2009 Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02 ML0923900632009-10-13013 October 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Aging Management Review Results ML0921205462009-08-28028 August 2009 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application - Aging Management Review Results ML0920400062009-08-14014 August 2009 RAI, Regarding Response to Generic Letter 2004-02 (Tac No. MC4691) ML0920902962009-07-27027 July 2009 Response to Request for Additional Information for Inservice Inspection Program Fourth Ten-year Interval Proposed Alternative No. RR-1-11 ML0920802542009-07-27027 July 2009 E-mail 7/27/09 Re Kewaunee Request for Information ML0918805552009-07-16016 July 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Structures Scoping/Fire Protection ML0918109582009-07-13013 July 2009 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application - Aging Management Programs ML0918900172009-07-10010 July 2009 RAI Regarding the Environmental Review of the License Renewal Application for Kewaunee Power Station ML0911903892009-07-0707 July 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Leak-Before-Break ML0918311242009-07-0202 July 2009 Request a Conference Call to Discuss an Open Issue in the Draft Safety Evaluation Regarding Fire Protection for Extended Power Uprate ML0917406492009-06-22022 June 2009 Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps ML0911201992009-04-30030 April 2009 RAI, Review of the License Renewal Application - Scoping & Screening Methodology ML0907607862009-04-0303 April 2009 License Renewal Application Review, Request for Additional Information - Balance of Plant Scoping and Screening 2023-09-21
[Table view] |
Text
August 2, 2007Mr. David A. ChristianSenior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
KEWAUNEE POWER STATION - REQUEST FOR ADDITIONALINFORMATION RELATED TO INTERNAL FLOODING DESIGN-BASIS (TAC NO. MD0511)
Dear Mr. Christian:
By letter to the Nuclear Regulatory Commission (NRC) dated March 17, 2006, Dominion EnergyKewaunee, Inc. (DEK), submitted a request to modify the Kewaunee Power Station Updated Final Safety Analysis Report to add new design criteria associated with internal flooding analyses (License Amendment Request No. 215). By letter dated April 17, 2007, DEK provided a response to an NRC request for additional information (RAI) dated November 17, 2006.The NRC staff is reviewing your submittals and has determined that additional information isrequired to complete the review. The specific information requested is addressed in the enclosure to this letter. The NRC staff has discussed the enclosed RAI with Mr. Dave Sommers and other members of your staff. Subsequently, your staff indicated that a response to this RAI would be submitted within 45 days of receipt of this letter. If circumstances result in the need to revise the requested response date, please contact me at(301) 415-4041.Sincerely,/RA/Patrick D. Milano, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-305
Enclosure:
Request for Additional Informationcc w/encl: See next page
ML071970358OFFICELPL3-1/PMLPL3-1/LADSS/SBPBDE/EMCBLPL3-1/BC(A)NAMEPMilanoTHarrisSGardocki for JSegalaKManolyTTateDATE08/02/0708/02/0707/24/0707/25/0708/2/07 Kewaunee Power Station cc:
Resident Inspectors OfficeU.S. Nuclear Regulatory Commission N490 Hwy 42 Kewaunee, WI 54216-9510Regional Administrator, Region IIIU.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351Ms. Leslie N. HartzDominion Energy Kewaunee, Inc.
Kewaunee Power Station N 490 Highway 42 Kewaunee, WI 54216Mr. Chris L. FunderburkDirector, Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711Mr. Thomas L. BreeneDominon Energy Kewaunee, Inc.
Kewaunee Power Station N490 Highway 42 Kewaunee, WI 54216Ms. Lillian M. Cuoco, Esq.Senior Counsel Dominion Resources Services, Inc.
Millstone Power Station Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385 ENCLOSUREREQUEST FOR ADDITIONAL INFORMATIONKEWAUNEE POWER STATIONDOCKET NO. 50-305In reviewing the Dominion Energy Kewaunee, Inc.'s submittals dated March 17, 2006, and April 17, 2007, related to internal flooding analyses for the Kewaunee Power Station, the Nuclear Regulatory Commission (NRC) staff has determined that the following information is needed in order to complete its review:1.Since any non Category I (seismic) equipment may break during an safe shutdownearthquake (SSE), is this considered in the flooding analysis? Please explain the basis.2.Why are Class II and III* structures, sy stems and components (SSC), which aredesigned to withstand Uniform Building Code loads, not to be considered as a potential flooding source? Provide the percentage of Class II, III and III* piping systems, whosefailure could impact the function of safety-related equipment, that have been evaluated for design-basis earthquake (DBE) loads.3.Item (d) in Section B.11.2 specifies operator actions. Please provide more specificcriteria for defining operator actions. For example, please provide information regarding the criteria for evaluating operator actions as described in American National Standards Institute/American Nuclear Society 58.8, "Time Response Design Criteria for Safety Related Operator Actions." 4.The application states that specific evaluations for the Class II and III piping insafeguard alley and the auxiliary building, are capable of withstanding the effects of a DBE without failure. Discuss these evaluations. Does this mean that all pipe/tanks in these areas will remain intact after an SSE? 5.Please discuss the use of the Section III Code for evaluation for level D loading andAmerican Society of Mechanical EngineersSection III, Appendix F. Provide the loadcombinations and stress allowable equations that were used to evaluate Class II, III andIII* piping systems for DBE loads. 6.Please explain why the Itemized Flood Guidelines sent to licensees in early 1970's arenot included in the Flooding Design Criteria.7.Please clarify whether your proposed internal flooding evaluation criteria will apply(1) only in the analysis of ruptures caused by seismic events, or (2) in the analysis of ruptures caused by any unspecified mechanism (e.g., seismic, random, corrosion, etc.). 8.The NRC staff has identified the following two examples where postulated failures ofseismically-qualified piping systems had been discussed with respect to flooding effects: A. By letter dated November 7, 1972, Kewaunee responded to an oral NRC staffrequest to address random pipe breaks in systems containing high-energy fluids.
Sections I through III of the enclosure to that letter provided analyses ofpostulated breaks in the main steam and main feedwater piping within the auxiliary building, and Section IV of that enclosure described analyses of miscellaneous piping systems. The analyses of miscellaneous piping systemsincluded evaluations of potential flooding effects from failures of the service water, component cooling, demineralized water, reactor makeup water system, waste disposal and spent fuel pool cooling. For these evaluations, the licensee determined that either the system has too low a volume to endanger engineered safety features or the rate of rise of water level was low enough to allow operator action before affecting safeguards equipment. B. In a letter to Wisconsin Public Service Corporation from the Atomic EnergyCommission (AEC) staff dated September 23, 1971, the AEC staff asked a question (Kewaunee Final Safety Analysis Report (FSAR) Question 8.16) regarding the potential failure of service water piping in proximity to the emergency diesel generator rooms. This question requested that Kewaunee provide an analysis of the effect of a rupture of one of the service water lines on the emergency power systems. The response to FSAR Question 8.16 was included with Amendment No. 13 to the Application for Construction Permit and Operating License for the Kewaunee Power Station, issued December 15, 1971.
The response stated that the rupture of a service water pipe in an emergency diesel generator room could result in loss of the generator or safeguards electrical bus in that room. In addition, the response stated that operation of service water valves from the control room would isolate the break and, if required, operators would realign service water supplies through intact piping. The proposed changes to the internal flooding evaluation criteria appear to focus on postulatedfailures of non-seismic piping and tanks. Please discuss how the above licensing basis information has been incorporated into the proposed evaluation criteria for internal flooding.