NMP2 JPM #S-1 1 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title: Place RCS HPU Subloop In Service And Reset FCV Lockout Revision: NRC 2008 Task Number: N2-202001-01001 N2-202001-01023 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature: Date:
NMP2 JPM #S-1 2 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
- 1. Reset to IC 181 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
- Self-verification shall be demonstrated. 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 1. N2-OP-29, Rev 12, Sect. E.1.0 2. NUREG K/A 202002 A4.02 Tools and Equipment:
- 1. None Task Standard:
Hydraulic Power Unit "A" has been placed in service with Subloop 2 is in "LEAD" operation. FCV A motion inhibit is reset and all P602 annunciators associated with FCV A are clear.
NMP2 JPM #S-2 3 October 2008 Initial Conditions:
- 1. The plant is operating at rated power. 2. Recirc FCV HPU "A" tripped due to a hot oil condition 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago. 3. HPU "A" hot oil condition is now cleared, oil temperature is 100
°F and the HPU is ready to be placed in service. 4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting.
Initiating cue:
"(Operator's name), Place HPU "A" Subloop 2 in operation and reset the flow control valve lockup per N2-OP-29, Section E.1.0."
Performance Steps Standard Grade 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
- 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-OP-29 obtained. Precautions & limitations reviewed & section E.1.0 referenced. Sat/Unsat 3. NOTE: The LOOP A(B) HYDR FLUID OUTSIDE ISOL valves may be closed, to reduce flow control valve from drifting closed during an HPU/Control System failure. They can be left closed until after their HPU is restored to operation.
CAUTION: IF a standby HPU Subloop remains pressurized (greater than 500 psig) when removed from service and is restarted without the other subloop in operation, this could cause RECIRC FCV motion. This should be avoided. Reviews Note and Caution Sat/Unsat 4. For the HPU being started, perform the following:
- IF any of the following conditions exist, isolate 2RCS*SOV65A(B), Reviews Procedure Step Sat/Unsat NMP2 JPM #S-2 4 October 2008 Performance Steps Standard Grade 2RCS*SOV66A(B), 2RCS*SOV67A(B),
2RCS*SOV68A(B), for the affected HPU by taking the LOOP A(B) HYDR FLUID OUTSIDE ISOL switch to CLOSE: o Unexpected pressure (greater than 400 psig) WHILE the subloop is in standby o Associated solenoid valve 2RCS-SOV106A(B) OR 2RCS- SOV107A(B) is known to be sticking partially open OR is NOT able to be over-ridden WHILE the solenoid coils are de-energized o It is known that EITHER "OPERATE" OR "ISOLATE" coil is burned out o FUSE BLOWN indicator is lit on the Modicon I/O module inside panel 2CEC-PNL634 at any of the following:
Subloop A1 - MTBA-2, west panel, left column, 2nd from top (total of 8) Subloop A2 - MTBA-10, west panel, right column, 2nd from top (total of 8) Subloop B1 - MTBB-2, east panel, left column, 2nd from top (total of 8) Subloop B2 - MTBB-10, east panel, right column,2nd from top (total of 8)
Cue: Valves were previously closed. None of these conditions currently exist
- 5. IF the HPU has been idle for less than 2 hours OR controls on the HPU have NOT been repositioned since the last shutdown, perform the following:
NMP2 JPM #S-2 5 October 2008 Performance Steps Standard Grade Cue/Note: Initial Conditions state that one hour has elapsed
- a. Verify open 2RCS-V2011A(B) AND V2011C(D), Return Filter Isolation.
Cue: 2RCS-V2011A and V2011C are open.
- b. Continue at Step E.1.14.
Dispatches operator to verify local valve positions.
Continues to step E.1.14
Sat/Unsat
Sat/Unsat 6. At 2CEC-PNL634 (South), Rack 1 for HPU A AND Rack 2 for HPU B, NEST 5, CARD 1, (R/C/L, labeled B35- K686A(B)) verify the red indicating lights for Channel 1 and 2 are NOT lit.
IF lit depress the reset pushbuttons.
Cue: Red indicating lights for Channel 1 and 2 are extinguished.
Verifies red indicating lights are NOT lit Sat/Unsat
- 7. Momentarily depress BOTH READY pushbuttons Verify the following:
o READY light illuminates.
o MAINTENANCE light extinguishes.
o Annunciator 602103(104), RECIRC FCV A(B) BACKUP HYDR INOPERABLE clears.
Depresses BOTH READY pushbuttons
Verifies lights and annunciator Pass/Fail
Sat/Unsat 8. Unless isolated per Step E.1.1.1 verify the following valves open:
o 2RCS*SOV65A(B) o 2RCS*SOV66A(B) o 2RCS*SOV67A(B) o 2RCS*SOV68A(B)
Note: Not isolated per E1.1.1 At P602, opens valves using LOOP A HYDR FLUID OUTSIDE ISOL switch. Observes green "closed" lights extinguish and the red "open" lights are lit for the four outside isolation valves. Pass/Fail
NMP2 JPM #S-2 6 October 2008 Performance Steps Standard Grade 9. NOTE: Step 1.17 does not apply if I&C is to use the Standby Unit (SBU) at 2CEC-PNL634 to reduce % SERVO ERROR to zero or have verified that the signal to the servo valve is approximately zero.
Cue: If asked, I&C will NOT be using SBU to reduce % SERVO ERROR.
Using 2RCS-HC1603A(B), RECIRC LOOP A(B) FLOW CONTROL at 2CEC*PNL602, reduce % SERVO ERROR to zero.
NOTE: Failure to zero the % SERVO ERROR will result in an unplanned reactivity transient, as the FCV opens.
Reads Note
At P602, Reduces % SERVO ERROR to ZERO using Loop A controller Sat/Unsat
Pass/Fail
- 10. Decide which subloop is to control the actuator AND depress its PUMP/FAN MTR RUN pushbutton.
Verify the following:
- PUMP/FAN MTR STOP light extinguishes.
- PUMP/FAN MTR RUN light illuminates.
- PRESSURIZED light illuminates OR 2RCS-PI1001A(B)-1(2) locally indicates 1850-1950 psi.
- Annunciator 602101(102), RECIRC FCV A(B) HYDRAULICS INOPERABLE clears.
Depresses PUMP/FAN MTR RUN pushbutton for HPU "A", Subloop 2
Verifies indications Pass/Fail
Sat/Unsat 11. At 2CEC*PNL602, verify:
NMP2 JPM #S-2 7 October 2008 Performance Steps Standard Grade
- Annunciator 602111(112), RECIRC FCV A(B) HYDRAULICS MAINT REQ'D cleared.
- Annunciator 602103(104), RECIRC FCV A(B) BACK UP HYDR INOPERABLE cleared.
- Annunciator 602127(128), DRYWELL HIGH PRESSURE SWITCH A(B) TEST POSITION cleared.
- Annunciator 602133(134), DRYWELL HIGH PRESSURE SYSTEM A(B) INTERLOCK cleared.
- Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT, in alarm condition.
Verifies annunciators clear, with the exception of 602105 Sat/Unsat 12. Depress the applicable FCV MOTION INHIBIT RESET pushbutton at 2CEC*PNL602:
Verify the following:
- LEAD subloop OPERATIONAL light illuminated
- Annunciator 602105(106), RECIRC FCV A(B) MOTION INHIBIT extinguishes.
Depresses FCV MOTION INHIBIT RESET pushbutton Verifies light illuminated and annunciator clear
Pass/Fail Sat/Unsat 13. Report completion. Report completion. Sat/Unsat TERMINATING CUE: Hydraulic Power Unit "A" Subloop 2 is in "operation" and FCV A motion inhibit is reset with all annunciators associated with FCV A cleared.
RECORD STOP TIME
NMP2 JPM #S-2 8 October 2008 Initial Conditions:
- 1. The plant is operating at rated power. 2. Recirc FCV HPU "A" tripped due to a hot oil condition 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago. 3. HPU "A" hot oil condition is now cleared, oil temperature is 100
°F and the HPU is ready to be placed in service. 4. LOOP A HYDR FLUID OUTSIDE ISOL valves are closed to reduce flow control valve drifting.
Initiating cue:
"(Operator's name), Place HPU "A" Subloop 2 in operation and reset the flow control valve lockup per N2-OP-29, Section E.1.0."
NMP2 JPM #S-2 9 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Shifting Feedwater Pumps at Power65% power when 2 pumps are in service Revision:
NRC 2008 Task Number: N2-259001-01004 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date
Performer: (RO/SRO) Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:
YES Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail
NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #S-2 10 October 2008 Evaluator Signature: Date:
NMP2 JPM #S-2 11 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
- 2. Reset to IC ????-182 3. 65% Power with malfunction FW10C preset.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
- Self-verification shall be demonstrated. 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 3. N2-OP-3, Rev 21, Sect. F.13.0 4. NUREG K/A 259001 A4.02 3.7 Tools and Equipment:
- 1. None Task Standard:
NMP2 JPM #S-2 12 October 2008 "C" Feedwater Pump is in service and level is under control in the normal band via MANUAL controller operation. "A" Feedwater Pump is secured with LV10A in manual and closed.
NMP2 2008 JPM #S-3 13 October 2008 Initial Conditions:
- 5. The plant is operating at 65% power. 6. "C" Feedwater Pump "C" is ready to be placed in service. 7. Pre-start checks are complete.
Initiating cue:
"(Operator's name), Place "C" Feedwater Pump in service, and rRemove "A" Feedwater Pump "A" from service and place Feedwater Pump "C" in service, IAW N, per N2-OP-3, Section F.13.0".
Performance Steps Standard Grade 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
- 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-OP-3 obtained. Precautions & limitations reviewed & section F.13.0 referenced. Sat/Unsat 3. NOTES:
- 1. All actions in this Subsection are performed at 2CEC*PNL851 and PNL603 unless otherwise noted. 2. Shifting Feedwater Pumps will be performed at approximately 65% power by securing one pump and starting the standby.
- 3. IF re-starting 2FWS-P1A (B,C) from operating temperatures (D.4.0), Electrical Maintenance should perform an inspection of windings at first opportunity. 4. Feedwater minimum flow setpoint will be lowered to 4 Kgpm for all three Feedwater Pumps and then restored to 8 Kgpm after pump swap(s) are complete. 5. Fourth Point Heater Drain Pumps may remain pumping forward during this evolution if Reads notes. Obtains Key 18 Sat/Unsat NMP2 2008 JPM #S-3 14 October 2008 Performance Steps Standard Grade feedwater heater level controllers are stable at 65%
power, with the permission of the Shift Manager. 6. Steps 13.1 AND 13.2 may be performed simultaneously.
- 7. The following step requires key # 18 from the SM key locker.
CAUTION Throughout this section if a plant casualty occurs such that Feedwater Pumps will remain on minimum flow for greater than 15 minutes, Reactor Power should be immediately reduced below 55% AND Feedwater Pump minimum flow should be returned to 8 Kgpm on all three Feedwater Pumps.
- 4. Adjust ALL three Feedwater Pump minimum flow valve setpoints as follows:
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68A, RX FD WTR P1A RECIRC controller, to 4 Kgpm.
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68B, RX FD WTR P1B RECIRC controller, to 4 Kgpm.
At 2CEC-PNL827, verify in auto AND lower tape setting for 2CNM-HIC68C, RX FD WTR P1C RECIRC controller, to 4 Kgpm. CUE: Min flow valve setpoints for all three feedwater pumps are set at 4 Kgpm.
Dispatches operator to Aadjust s setpoints of all 3 minimum flow valves.
Pass/FailSat/Unsat 5. Perform pre-start checks locally for the associated Feedwater pump to be started ONLY per step F.13.2.1 through F.13.2.7.
NOTE: Pre-Start checks are complete Reviews step Sat/Unsat NMP2 2008 JPM #S-3 15 October 2008 Performance Steps Standard Grade 6. Using N2-OP-101D, verify Reactor power has been reduced 65%. NOTE: Power is at 65%. Rated MWth is 3467 and 65% power is 2253 MWth.
Reviews step and determines power is at 65% Sat/Unsat 7. Secure one of the two operating Feedwater Pumps 2FWS-P1A (B,C) as follows:
Depress Manual (M) pushbutton on 2FWS-LV10A (B,C) controller.
DURING this evolution, verify that the remaining level control valve 2FWS- LV10B (C,A) maintains desired water level.
Depresses M pushbutton on 2FWS-LV10A controller 2FWS-HIC1010A and yellow M light is lit.
Verifies remaining LCV maintains level on an on-going basis during evolution.
Pass/Fail
Sat/Unsat 8. Slowly close 2FWS-LV10A (B,C) to the 2 to 4% valve position by using the slow CLOSE detent pushbutton on 2FWS- LV10A (B,C) controller.
Locates Using 2FWS-HIC1010A slow detent close PBpushbutton and , depresses until about 2-4% shown. Pass/Fail 9. Close 2FWS-LV10A (B,C) to the 0% valve position by depressing the fast CLOSE detent pushbutton on 2FWS- LV10A (B,C) controller.
Using 2FWS-HIC1010A fast detent close pushbutton, Locates fast close PB and depresses until 0% shown. Pass/Fail
- 10. Secure 2FWS-P1A (B,C), REACTOR FW PMP 1A (B,C), by placing its control switch to Normal-After-STOP (Green flagged).
Places FW Pump "A" in green flagged position Pass/Fail 11. Verify 2FWL-P2A (B,C), AUX LUBE OIL PMP 2A (B,C), auto starts.
Determines Aux Lube Oil Pump starts by observing AUX LUBE OIL PMP 2A red light ON. Sat/Unsat 12. Confirm 2FWR-FV2A (B,C), REACTOR FD P1A (B,C) RECIRC VLV, closes immediately.
Determines valve closes by observing REACTOR FD P1A RECIRC VLV POSN meter indication goes to 0% VALVE POSITION. Sat/Unsat NMP2 2008 JPM #S-3 16 October 2008 Performance Steps Standard Grade 13. At 2FWS-P1A (B,C), place the Auxiliary Lube Oil Pump control switch 2FWL-LCS752 (753, 754) to START AND verify 2FWL-P2A (B,C) remains running.
BOOTH OPERATOR: Activate remote to start aux oil pump.
Dispatches operator to Pplaces Aux Lube Oil Pump control switch to START, determines pump remains running Pass/FailSat/Unsat 14. IF 2FWS-P1A (B,C) is being placed in standby, open 2FWS-V25A (B,C) FD WTR PUMP 1A (B,C) WRMUP LN ISOLATION.
CUE: If directed, report 2FWS-V25A is open.
Dispatches operator to Oopen s warmup line isolation.
Pass/FailSat/Unsat 15. NOTE: The following step requires key # 18 from the SM key locker.
IF the plant will remain at 65 % power for more than a shift, adjust ALL Feedwater Pump minimum flow valve setpoints as follows:
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 8 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 8 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 8 k gpm.
CUE: The Unit plant will remain at 65%
power for LESS than a shift. Determines step is N/A 16. NOTE: The following step will be performed prior to starting the standby feed pump. Determines Step is N/A NMP2 2008 JPM #S-3 17 October 2008 Performance Steps Standard Grade Perform Feedwater Pump Warmup for the pump being started per subsection F.14.0. CUE: Another Operator has performed the warmup
NOTE: Min flow valve setpoints are at 4 Kgpm from previous steps.
- 17. Adjust ALL three Feedwater Pump minimum flow valve setpoints as follows:
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68A, RX FD WTR P1A RECIRC controller to 4 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68B, RX FD WTR P1B RECIRC controller to 4 k gpm.
At 2CEC-PNL827, verify in auto AND raise tape setting for 1CNM-HIC68C, RX FD WTR P1C RECIRC controller to 4 k gpm.
Adjusts all 3 controllers Pass/FailSat/Unsat 18. Start the stand by Feedwater Pump 2FWS-P1A (B,C) as follows:
Verify open 2FWS-MOV47A (B,C), REACTOR FW PMP 1A (B,C) DISCH BLOCK VLV.
Verifies Discharge Block Valve is open by observing REACTOR FW PMP 1C DISCH BLOCK VLV FWS-MOV47C red light is ON and green light is OFF. Pass/Fail
Sat/Unsat 19. IF applicable, verify open 2FWS-V103A (B), FEEDWATER PUMP 1A (B) LOW FLOW LINE ISOL.
Determines valve is openstep is NA, since Feedwater Pump C is being started. Sat/Unsat NMP2 2008 JPM #S-3 18 October 2008 Performance Steps Standard Grade 20. IF required, start the standby Condensate pump by placing 2CNM- P1A (B,C) control switch in Normal-After-START (Red-flagged).
Note: NOT required, since all Condensate Pumps are running.
Determines three Condensate Pumps running. Sat/Unsat 21. Verify sufficient Condensate Iron Prefilters are in service to support the maximum expected Condensate System flow rate. Refer to N2-OP-5A, Attachment 1.
CUE: If asked, Ssufficient Iron Prefilters are in service
Determines sufficient Condensate Iron Prefilters are in service Sat/Unsat 22. NOTE: Nine Condensate Demineralizers in service is the preferred lineup in the next step.
Verify at least eight Condensate Demineralizers are in service in accordance with N2-OP-5.
CUE: 8Nine demineralizers are in service
Dispatches operator to determine at least eight demineralizers are in service. Sat/Unsat 23. IF all three Heater Drain pumps are NOT pumping forward, start the standby Condensate Booster pump as follows:
Using 2CNM-PI39A (B,C), locally confirm condensate booster pump suction pressure is > 150 psig.
Start 2CNM-P2A (B,C), CONDENSATE BOOSTER PMP 2A (B,C), by placing the control switch to Normal-After-START (Red-flagged).
At 2CNM-P2A (B,C), place the Auxiliary Lube Oil Pump control switch 2CNO- LCS706 (707, 708) to AUTO AND verify 2CNO-P2A (B,C) stops. Determines step is N/A because heater drain pumps are pumping forward. Sat/Unsat NMP2 2008 JPM #S-3 19 October 2008 Performance Steps Standard Grade CUE: Heater Drain Pumps are pumping forward
- 24. For the Feedwater pump to be started, verify the level controllers are in Manual (M) AND valve positions are at 0%
open. Determines that controller 2FWS-HIC-1010C is in manual by observing yellow M light is lit and % VALVE POSITION metervalve position i indicates 0.
Pass/FailSat/Unsat 25. CAUTION The next two steps shall be performed concurrently.
IF feedwater pump suction pressure drops to 220 psig, start the third Condensate Booster pump if NOT already operating.
Reviews Caution Sat/Unsat 26. NOTE: IF 2FWS-P1C is selected to start, the preferable power supply is from 2NPS-SWG003 if 2FWS-P1A will be left running, or 2NPS-SWG001 if 2FWS-P1B is to be left running.
Start 2FWS-P1A (B,C) REACTOR FD P1A (B,C), by placing the control switch to Normal-After-Start (red flagged).
NOTE: Since 2FWS-P1B is to be left running, the preferable power supply for 2FWS-P1C is 2NPS-SWG001.
Rotates control switch REACTOR FW PMP 1C FROM BUS 001 FWS-P1C to red flagged position.
Pass/Fail
- 27. Confirm 2FWR-FV2A (B,C), REACTOR FD P1A (B,C) RECIRC VLV, starts to open. Determines valve starts to openDetermines valve starts to open by observing REACTOR FD P1C RECIRC VLV POSN meter indication goes past 15% VALVE POSITION. Sat/Unsat 28. WHEN 2FWR-FV2A (B,C) is 15% open, confirm 2FWS-P1A (B,C) starts.
When REACTOR FD P1C RECIRC VLV POSN meter indication goes past 15% VALVE POSITION, observe pump start by observing red light and ammeter FWS-P1C BUS 001 CURRENT indication.Verifies valve position and pump start Sat/Unsat NMP2 2008 JPM #S-3 20 October 2008 Performance Steps Standard Grade 29. Using 2CNM-FI68A (B,C), RX FD WTR P1A (B,C) FLOW meter, confirm 2FWS-P1A (B,C) flow is approximately 4000 gpm.
Determines flow on 2CNM-FI68C, RX FD WTR P1C FLOW meter is about 4000 gpm Sat/Unsat 30. NOTES: 1. The following two steps are performed locally at the associated Feedwater pump just started.
Place the Auxiliary Lube Oil Pump control switch 2FWL-LCS752 (753, 754) to AUTO AND verify 2FWL-P2A (B,C) stops.
Reviews notes
Places Aux Lube Oil Pump Control Switch in AUTO and verifies pump stops
Pass/FailSat/Unsat 31. Close 2FWS-V25A (B,C), FD WTR PUMP 1A (B,C) WRMUP LN ISOLATION.
CUE: If asked, report 2FWS-V25C is closed.
Dispatches operator to Ccloses warmup line isolation. Pass/FailSat/Unsat NOTES: 1. When opening 2FWS-LV10A (B,C) from a fully shut position, the initial 2 seconds of valve open signal serve only to "wake up" the control circuit computer with no additional action. Pressing the valve open push button for an additional 10 seconds in manual slow detent (2% position per second) serves to take the control circuit from the minus (-) 20% position to the 0% position PRIOR to any actual valve position indicator movement taking place.
- 2. Once the LV10 valve circuitry reaches the 0% position, the first 1.5% to 2% of the valve stroke, as indicated by the position indicator, is used to release the seating force held Reviews Notes and Caution Sat/Unsat NMP2 2008 JPM #S-3 21 October 2008 Performance Steps Standard Grade by the compression of the SB spring. Therefore, the valve stem will not be lifted to establish flow until approximately 2% valve indication is reached. Reactor water level should be closely monitored during this evolution.
CAUTION The fast detent position (20% position per second) should NOT be used to take the control circuit from the minus (-
-) 20% to 0% position as the LV10 will likely open beyond the desired position as the valve can only physically open at 6% per second, and will continue to open once the operator releases the open pushbutton if the demand signal is beyond the 0% position until valve position "catches up" to the circuit controller demand.
- 32. Throttle open 2FWS-LV10A (B,C), Feedwater Pump 1A (B,C) Level Control Valve, by using the OPEN detent pushbutton on 2FWS-LV10A (B,C) controller.
Throttles LCV by depressing the OPEN pushbuttonOPEN detent pushbutton for controller 2FWS-HIC-1010C and observes % VALVE POSITION meter. Pass/Fail 33. Verify 2FWS-LV10B (C,A) closes gradually as 2FWS-LV10A (B,C) slowly opens.
Determines valve is closing by observing % VALVE POSITION meter for 2FWS-LV10B. Sat/Unsat 34. Continue to slowly open 2FWS-LV10A (B,C) UNTIL the input signal (vertical) AND output signal (horizontal) read the same on 2FWS-LV10A (B,C) controller.
Adjusts position using 2FWS-HIC-1010C until vertical and horizontal signals are equal. Pass/Fail 35. Place 2FWS-LV10A (B,C) in Auto by momentarily depressing the Auto (A) pushbutton on 2FWS-LV10A (B,C) controller.
Booth Operator: Insert MMalfunction (or preset) FW10C is preset and when AUTO Depresses 2FWS-HIC-1010C AUTO pushbutton and observe green AUTO light is lit. Pass/Fail NMP2 2008 JPM #S-3 22 October 2008 Performance Steps Standard Grade pushbutton is depressed, the malfunction becomes effective causing LV10C to go full open.
As FWS-LV10C opens due to failure, FW flow and RPV water level will rise. Annunciator 603139 REACTOR WATER LEVEL HIGH/LOW alarms.
Observe and report 2FWS-LV10C is opening unexpectedly. Sat/Unsat 36. Auto controller fails requiring manual control Recognizes controller failure and takes returns 2FWS-HIC-1010C to manual control using controller pushbutton IAW per N2-SOP-6 and stabilize RPV level to avoid Level 3 and Level 8 protective functions. Pass/Fail 37. Report status to CRS Status reported Sat/Unsat TERMINATING CUE: JPM is complete when level is being controlled manually in the normal band (between the low and high water level alarm setpoints).
RECORD STOP TIME
NMP2 2008 JPM #S-3 23 October 2008 Initial Conditions:
- 1. The plant is operating at 65% power. 2. "C" Feedwater Pump is ready to be placed in service. 3. Pre-start checks are complete.
Initiating cue:
"(Operator's name), Remove Feedwater Pump "A" from service and place Feedwater Pump "C" in service, per N2-OP-3, Section F.13.0Place "C" Feedwater Pump in service, and remove "A" Feedwater Pump from service, IAW N2-OP-3, Section 13.0"
NMP2 2008 JPM #S-3 24 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Initiate RCIC and Respond To Overspeed Trip (Alternate) Revision: NRC 2008 Task Number: N2-217000-01048 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date
Performer: (RO/SRO)
Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator
Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: YES
Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail
NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature: Date:
NMP2 2008 JPM #S-3 25 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
- 1. Reset to IC 183 Post Scram 2. Set remote RC01, RCIC Mech OS Trip to actuate when zarctum1 (RCIC speed) > 0.5 (3000 rpm) Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
- Self-verification shall be demonstrated. 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 1. N2-OP-35 2. N2-ARP-01 601305
- 3. NUREG K/A 217000 A4.02 Tools and Equipment:
- 1. None Task Standard: RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602.
NMP2 2008 JPM #S-3 26 October 2008 Initial Conditions: 1. The plant has experienced a reactor scram and loss of feedwater. 2. N2-EOP-RPV is being implemented.
Initiating cue: "(Operator's name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches". Performance Steps Standard Grade 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
- 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-EOP-HC-2 Attachment 5, Automatic RCIC Injection is obtained/referenced. Sat/Unsat
- 3. ARM and DEPRESS RCIC MANUAL INITIATION pushbutton. ARM and DEPRESS RCIC MANUAL INITIATION pushbutton. Pass/Fail 4. Verify system startup
When 2ICS*MOV120 Steam Admission Valve opens, turbine speed and pump discharge pressure rise.
When turbine speed exceeds 3000 RPM, 2ICS*MOV150 Trip Throttle Valve closes due to unexpected overspeed trip. GLAND SEAL SYSTEM AIR COMPRESSOR starts. Red light ON. Green light OFF.
ICS*MOV116 Cooling Water MOV opens. Red light ON. Green light OFF. ICS*MOV120 Steam opens. Red light ON. Green light OFF.
ICS*MOV126 opens. Red light ON. Green light OFF.
Sat/Unsat Sat/Unsat
Sat/Unsat Sat/Unsat
- 5. Observes RCIC Turbine trip Cue: When informed of RCIC Turbine trip, instruct candidate to "Reset the RCIC Turbine from P601 and reestablish injection to the RPV" Observes Annunciators 601305 lit.
Observes TURBINE TRIPPED amber postage stamp lit.
Recognizes RCIC Turbine tripped Reports RCIC Turbine Tripped to SM Sat/Unsat Sat/Unsat
Sat/Unsat Sat/Unsat NMP2 2008 JPM #S-3 27 October 2008 Performance Steps Standard Grade Cue: If directed to investigate, report overspeed trip mechanism is tripped.
Dispatches operator to RCIC Room to investigate.
Sat/Unsat 6. Reset ICS*MOV150 at P601 per N2-OP-35 H.1.0, RCIC Turbine Reset.
- 7. Verify cause is understood and corrected.
- 8. Places ICS*MOV150 switch to CLOSED until BOTH valve positions indicate valve is closed
- 9. Verify turbine speed is less than 3500 RPM.
- 10. IF RCIC turbine tripped on overspeed OR was locally tripped. Locally reset trip mechanism. BOOTH OPERATOR: REMOTE RC01 to RESET.
CUE: Report trip mechanism is reset.
Verify cause is understood and corrected.
Places ICS*MOV150 switch to CLOSED until BOTH valve positions indicate valve is closed.(P601)
Observes ICS*MOV150 Green light ON (P601 Apron)
Observes ICS*MOV150 Red light OFF (P601 Apron)
Observes Trip/Throttle valve Green light ON (P601 verical)
Observes Trip/Throttle valve Red light OFF (P601 vertical)
Verify turbine speed is less than 3500 RPM.
Directs operator to locally reset the overspeed trip mechanism. Sat/Unsat
Pass/Fail
Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat
Sat/Unsat
Sat/Unsat
- 11. IF an initiation signal is sealed in, perform the following:
- a. Throttle open ICS*MOV150 Places ICS*MOV150 switch to OPEN (P601)
Pass/Fail
NMP2 2008 JPM #S-3 28 October 2008 Performance Steps Standard Grade Observes ICS*MOV150 Green light OFF (P601 Apron)
Observes ICS*MOV150 Red light ON (P601 Apron)
Observes Trip/Throttle valve Green light OFF (P601 verical)
Observes Trip/Throttle valve Red light ON (P601 vertical) Sat/Unsat
Sat/Unsat Sat/Unsat
Sat/Unsat
- b. At 2ICS*MOV150, verify proper latching of the latch lever and trip hook. CUE: Report trip mechanism is properly latched.
Directs operator to verify proper latching. Sat/Unsat c. Verify RCIC restarts Observe turbine speed and pump discharge pressure are rising. Sat/Unsat 12. Establish RPV Injection Places ICS*MOV126 switch to OPEN (P601)
When RCIC flow is > 220 gpm, observe ICS*MOV143 Min Flow closes. When RCIC discharge pressure > reactor pressure, ICS*MOV156 and 157 Injection Check Valves open.
RCIC Injection controlled at 600 gpm. Pass/Fail Sat/Unsat Sat/Unsat
Sat/Unsat 13. Report completion. Report RCIC injecting. Sat/Unsat TERMINATING CUE: RCIC Trip/Throttle valve (2ICS*MOV150) is reset and injection established from P602.
RECORD STOP TIME
NMP2 JPM #S-4 29 October 2008 Initial Conditions:
- 1. The plant has experienced a reactor scram and loss of feedwater. 2. N2-EOP-RPV is being implemented.
Initiating cue:
"(Operator's name), Initiate RCIC and maintain RPV water level between 160 inches and 200 inches".
NMP2 JPM #S-4 30 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title: Shift RBCLCW and TBCLCW Pumps Revision: NRC 2008 Task Number: N2-SOP-14-01001 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date
Performer: (RO/SRO) Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:
YES Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #S-4 31 October 2008 Evaluator Signature: Date:
NMP2 JPM #S-4 32 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
- 4. Reset to IC 184 5. Remote CW-27 103.9 oF, triggered from stopping CCS-P1A Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
- Self-verification shall be demonstrated. 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 5. N2-OP-13, Rev 07 6. N2-OP-14, Rev 05 7. ARP 601244
- 8. NUREG K/A 400000 A4.01 Tools and Equipment:
- 1. None NMP2 JPM #S-4 33 October 2008 Task Standard:
RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually.
NMP2 JPM #S-5 34 October 2008 Initial Conditions:
- 8. The plant is operating at full power.
Initiating cue:
"(Operator's name), shift running RBCLCW Pumps from "A" to "C", then shift running TBCLCW Pumps from "A" to "C" to support equipment rotation".
Performance Steps Standard Grade 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
- 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-OP-13 & N2-OP-14 obtained. Precautions & limitations reviewed Sat/Unsat 3. For the Main CCP pump to be started, verify the pump casing is free of air as follows:
Uncap AND throttle open 2CCP-V195 (V196, V197), P1A (B,C) VENT. WHEN a steady stream of water is observed, close AND recap 2CCP-V195 (V196, V197). CUE: Checked by local operator Ensures checked by local operator Sat/Unsat 4. For the Main CCP pump to be started, at panel 2CEC*P601, start 2CCP-P1A (B,C), PMP 1A (B,C), by placing control switch in Normal-After-START (red flagged).
Note: The applicant will check board indications for amps and discharge pressure Places control switch in red flagged position Pass/Fail 5. Confirm normal operating indications in accordance with Subsection F.1.0.
Ensures checked by local operator Sat/Unsat NMP2 JPM #S-5 35 October 2008 Performance Steps Standard Grade CUE: Local indications are normal
- 6. At 2CEC*PNL601, secure 2CCP-P1A (B,C), PMP 1A (B,C), by placing control switch in Normal-After-STOP. (Green flagged)
Places control switch in green flagged position Pass/Fail 7. IF required, place 2CCP-P1A (B,C) control switch in PULL TO LOCK.
May request required status Sat/Unsat 8. Confirm normal operating indications in accordance with Subsection F.1.0.
CUE: Another operator will check local indications Ensures local checks are made Sat/Unsat Examiner Note: The applicant will now refer to N2-OP-14 for TBCLCW operations NOTES: 1. CCS system flow of greater than 8000 gpm requires more than one heat exchanger in service.
- 2. Actions in this Subsection are performed at 2CEC*PNL601 unless otherwise specified.
- 9. IF time permits, perform the following:
Dispatch an Operator to the pump to perform prestart inspection AND observe pump during start.
For the pump to be started, close 2CCS-V303A(B,C), TBCLC PUMP 1A(B,C) STOP CHECK.
CUE: Pre-start checks complete; the stop-check valve is CLOSED Dispatched operator or determines task has been performed Sat/Unsat NMP2 JPM #S-5 36 October 2008 Performance Steps Standard Grade 10. Start 2CCS-P1A(B,C), PMP 1A(B,C), by placing the control switch to Normal-After-START (red flagged).
Places control switch in red flagged position Pass/Fail 11. Slowly open 2CCS-V303A(B,C).
CUE: Valve has been opened Directs local operator to open valve Sat/Unsat 12. Confirm normal operating indications in accordance with Subsection F.1.0.
CUE: Local indications are normal Ensures checked by local operator Sat/Unsat 13. NOTES:
- 1. Actions in this Subsection are performed at 2CEC*PNL601 unless otherwise specified.
- 2. CCS Pump runout is 8,500 gpm. If system flow is greater than 8,000 gpm for one pump operations or 16,000 gpm for two pump operations, then starting an additional pump increases the probability of damaging tube vibrations in the CCS heat exchangers. Three CCS pump operation shall be avoided unless shifting of pumps is required.
Confirm the CCS pump is NOT required for CCS System flow as follows:
Computer Point CCSFA01 Number of Running Pumps 1,000 - 8,200 GPM 1 8,200 - 16,400 GPM 2 Checks indications Sat/Unsat 14. NOTE: 2CCS-V303A (B,C) is located at 2CCS-P1A (B,C) on TB Elev 250 Southwest.
Close 2CCS-V303A (B,C), TBCLC PUMP 1A (B,C) STOP CHECK.
Cue: Valve is closed Directs a local operator to close valve Sat/Unsat
NMP2 JPM #S-5 37 October 2008 Performance Steps Standard Grade 15. Secure 2CCS-P1A (B,C), PMP 1A (B,C), by placing the control switch in Normal-After-STOP. (Green flagged)
Booth Operator: Malfunction to fail temperature controller REMOTE CW-27 103.9 oF when CCS-P1A is stopped. Places control switch in green flagged position Pass/Fail
- 16. IF required, place 2CCS-P1A (B,C) control switch in PULL TO LOCK.
May request required status of control switch Sat/Unsat
- 17. Confirm normal operating indications for the running CCS Pump(s) in accordance with Subsection F.1.0.
Ensures checked by local operator Sat/Unsat Examiner Note: Applicant will respond to annunciator 601244 and Computer Point CCSTC04 for TBCLCW HX DISCH TEMP
- 18. Determines temp controller is failed and refers to ARP 601244 Determines ARP 601244 actions apply Sat/Unsat 19. Places 2CCS-TIK104 in "M" Manual Places controller TBCLC HEAT EXCHANGER TEMP CONTROLLER 2CCS-TIK104 in "M" Manual by depressing M button. Pass/Fail 20. Manually controls temperature Adjusts temperature downward to approximately 85
°F (80 to 95), indicated on TBCLC HEAT EXCHANGER TEMP CONTROLLER 2CCS-TIK104 Pass/Fail 21. Report status to CRS
Report status. Sat/Unsat TERMINATING CUE: RBCLCW and TBCLCW pumps are swapped and temperature is being controlled manually.
RECORD STOP TIME
NMP2 JPM #S-5 38 October 2008 Initial Conditions:
- 1. The plant is operating at full power.
Initiating cue:
"(Operator's name), shift running RBCLCW Pumps from "A" to "C", then shift running TBCLCW Pumps from "A" to "C" to support equipment rotation".
NMP2 JPM #S-5 39 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Depressurize the RPV to the Main Condenser Revision: NRC 2008
Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task:
YES Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #S-5 40 October 2008 Evaluator Signature: Date:
NMP2 JPM #S-5 41 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
- Self-verification shall be demonstrated. 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 1. None Task Standard:
NMP2 JPM #S-5 42 October 2008 RPV is depressurizing to Main Condenser using Bypass Valves or Drain valves NMP2 2008 ML083650061.doc 43 October 2008 Initial Conditions:
- 9. A LOCA has occurred and an RPV Blowdown was required 10. Only 5 SRVs could be opened 11. EOP-6, Attachment 18 is in progress.
Initiating cue:
"(Operator's name), Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser Performance Steps Standard Grade 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
- 2. Obtain a copy of the reference procedure and review/utilize the correct section. EOP-6, Attachment 18 obtained. Sat/Unsat 3. IF a LOCA signal is present OR expected, using PA235 key, place the following LOCA override switches to OVERRIDE: (2CEC*PNL851)
LOCA OVERRIDE VLV IAS*SOV184 Annunciators 601517 and 601519 alarms when switches are placed in OVERRIDE.
Determines LOCA is present.
Using key, places switch in OVERRIDE Using key, places switch in OVERRIDE Sat/Unsat Sat/Unsat
Sat/Unsat
- 4. Verify open the following valves (2CEC*PNL851)
IAS*SOV166, PRIMARY CNTMT OUTBD ISOL VLV TO SRV IAS*SOV184, PRIMARY CNTMT INBD ISOL VLV TO SRV
Open IAS*SON166 and observe red light ON and green light OFF.
Open IAS*SON184 and observe red light ON and green light OFF.
Sat/Unsat Sat/Unsat NMP2 2008 ML083650061.doc 44 October 2008 Performance Steps Standard Grade 5. Record differential pressure across the MSIVs using C33-R605 on 2CEC*PNL603 AND one or more of the following Trip Units:
B22-N676A, STM LINE PRESS LO (2CEC*PNL609)
B22-N676C, STM LINE PRESS LO (2CEC*PNL609)
B22-N676B, STM LINE PRESS LO (2CEC*PNL611)
B22-N676D, STM LINE PRESS LO (2CEC*PNL611)
Note: PNL609 trip units are not within the scope of simulation.
CUE: Differential Pressure is <150 psid Determines differential pressure is within 150 psid. Sat/Unsat 6. IF differential pressure across the MSIVs is > 150 psid, open at least one pair of MSIVs by performing N2-OP-1, Section H.4.0 AND THEN continue at Step 3.1.7 N/A, differential pressure across the MSIVs is < 150 psid Determines step is N/A, based on differential pressure. Sat/Unsat 7. IF differential pressure across the MSIVs is < 150 psid, open at least one pair of MSIVs as follows:
N/A, a pair of MSIVs will be opened per N2-OP-1, Section H.4.0
Verify MSIV isolation signals reset by performing the following: (2CEC*PNL602)
Place control switches for the following to CLOSE:
- MSS*AOV6A, MSIV
- MSS*AOV6B, MSIV
Places all eight MSIV control switches in CLOSE Sat\Unsat NMP2 2008 ML083650061.doc 45 October 2008 Performance Steps Standard Grade
- MSS*AOV6C, MSIV
- MSS*AOV6D, MSIV
- MSS*AOV7A, MSIV
- MSS*AOV7B, MSIV
- MSS*AOV7C, MSIV
- 9. Depress pushbutton B22H-S32, OUTBD ISOL LOGIC RESET Depresses pushbutton Sat\Unsat 10. Open one pair of MSIVs as follows: (2CEC*PNL602)
Place the control switch for ANY outboard MSIV to AUTO Place the control switch for the corresponding inboard MSIV to AUTO.
Examiner Note: Applicant must continue in procedure because MSIVs will not open Places control switches for one pair of MSIVs to AUTO. MSIVs will not open Sat/Unsat
- 11. IF a pair of MSIVs can NOT be opened, align steam line drains to depressurize the RPV as follows:
N/A, a pair of MSIVs are open
Verify open MSS*MOV207, INSIDE MSIVS UPSTREAM DRAIN VLV. (2CEC-PNL824)
Verify open MSS*MOV111, MAIN STM LINE DRAIN ISOL VLV. (2CEC*PNL602)
Opens MSS*MOV207 and observe red light ON and green light OFF.
Opens MSS*MOV111 and observe red light ON and green light OFF.
Pass/Fail
Pass/Fail
NMP2 2008 ML083650061.doc 46 October 2008 Performance Steps Standard Grade 12. NOTE: A CAT 60 key may be required for entry to 2EHS*MCC102.
Place 2EHS*MCC102-7A, 2MSS*MOV112 MAIN STEAM LINE DRAIN OUTBD to ON (Aux Bay-North El 240) BOOTH OPERATOR: Enter Remote MS05B, 2MSS*MOV112 APP R CKT BKR, CLOSE
CUE: Report the breaker is closed and alarm circuit is enabled.
Place 2EHS*MCC102-7A, ALARM CIRCUIT control switch to ENABLE Verify open 2MSS*MOV112 (2CEC*PNL602)
Verify open MSS-MOV187, MAIN STM LINE PRESS EQL/WARMING (2CEC*PNL602)
Directs operator to locally close 2EHS*MCC102-7A AND place alarm circuit to enable.
Open 2MSS*MOV112 and observe red light ON and green light OFF.
Open 2MSS-MOV187 and observe red light ON and green light OFF.
Sat/Unsat
Pass/Fail Pass/Fail 13. Using BYPASS VALVE OPENING JACK SELECTOR, depress AND hold the INCREASE pushbutton UNTIL bypass valves are full open (2CEC*PNL851)
N/A, Turbine Bypass Valves will NOT open Depresses and holds to attempt to open bypasses Pass/Fail/NA 14. IF Bypass Valves are unavailable, verify open as many of the following steam line drains as possible to depressurize the RPV to the condenser:
N/A, Turbine Bypass Valves are available
Open Turbine Stop Valve Drains (2CEC-PNL824):
MSS-MOV21A, TURBINE STOP VLV MSV3 DRAIN VLV Performs if bypass valves would not open Pass/Fail/NA NMP2 2008 ML083650061.doc 47 October 2008 Performance Steps Standard Grade MSS-MOV21B, TURBINE STOP VLV MSV4 DRAIN VLV
MSS-MOV21C, TURBINE STOP VLV MSV1 DRAIN VLV MSS-MOV21D, TURBINE STOP VLV MSV2 DRAIN VLV Examiner Note: Step only performed if bypass valves could not be opened. Degrading vacuum may have caused closure
- 15. Open MSS-MOV147, TURBINE CONTROL VLVS DRAIN VLV (2CEC-PNL824)
Performs if bypass valves did not open Pass/Fail/NA 16. Open Main Steam Line Drains (2CEC- PNL824):
MSS-AOV191, MAIN STM LINE HEADER DRAIN VLV MSS-AOV194, MAIN STM LINE HEADER DRAIN VLV
MSS-AOV203, MAIN STM LINE HEADER DRAIN VLV MSS-AOV205, MAIN STM LINE HEADER DRAIN VLV
MSS-AOV209, MAIN STM LINE HEADER DRAIN VLV MSS-AOV87A MSL A LOW POINT DRAIN VALVE MSS-AOV87B MSL B LOW POINT DRAIN VALVE
MSS-AOV87C MSL C LOW POINT DRAIN VALVE MSS-AOV87D MSL D LOW POINT DRAIN VALVE
Performs if bypass valves did not open Pass/Fail/
NA NMP2 2008 ML083650061.doc 48 October 2008 Performance Steps Standard Grade MSS-AOV88A MSL DRAIN HEADER ISOL VALVE
MSS-A0V88B MSL DRAIN HEADER ISOL VALVE
- 17. Open MSL Drain Orifice Bypass (2CEC-PNL824):
MSS-AOV85A, MAIN STM LINE DRAIN VLV MSS-AOV85B, MAIN STM LINE DRAIN VLV MSS-AOV85C, MAIN STM LINE DRAIN VLV MSS-AOV85D, MAIN STM LINE DRAIN VLV Performs if bypass valves did not open Pass/Fail/
NA TERMINATING CUE: RPV is depressurizing to Main Condenser via Bypass valves or Drain valves RECORD STOP TIME
NMP2 2008 ML083650061.doc 49 October 2008 Initial Conditions:
- 12. A LOCA has occurred and an RPV Blowdown was required 13. Only 5 SRVs could be opened 14. N2-EOP-6, Attachment 18 is in progress.
Initiating cue:
Continue in N2-EOP-6, Attachment 18 at step 3.1.2 and depressurize the RPV to the Main Condenser
NMP2 2008 ML083650061.doc 50 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Energize Reserve Station Transformer 1B and NPS-SWG003. Revision: NRC 2008 Task Number: N2-262000-01002, N2-SOP-03-01001
Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date
Performer: (RO/SRO) Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator
Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail
NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature: Date:
NMP2 2008 ML083650061.doc 51 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
Reset to IC 186 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
- Self-verification shall be demonstrated. 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 4. N2-SOP-03 Tools and Equipment:
- 1. None Task Standard:
Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003.
NMP2 2008 ML083650061.doc 52 October 2008
NMP2 2008 ML083650061.doc 53 October 2008 Initial Conditions: 3. The plant experienced a Loss of Line 6. 4. The plant was manually scrammed. 5. Immediate and Subsequent Actions of N2-SOP-3 are complete. 6. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete. 7. Power has been restored to Line 6 and Power Control has verified its reliability.
- 8. Ask the operator for any questions.
Initiating cue: " (Operator's name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3. Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3."
Performance Steps Standard Grade 12. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
- 13. Obtain a copy of the reference procedure and review/utilize the correct section. N2-SOP-3 obtained. Precautions & Limitations are reviewed and Attachment 1 Section 1.7 referenced. Sat/Unsat 14. Review Attachment 1 Section 1.7 Power Restoration to determine applicable Attachment to Energize Reserve Transformer 1B Per step 1.7.2, determines performance of Attachment 6 is required. Sat/Unsat 4. At Panel 808 (CB 288'), verify reset 86-2SPRY01 (RES STA SER XFMR 1B PRIM PROT LO RELAY).
Cue: If asked, inform the candidate that 86-SPRY01 is reset. Verifies 86 device is reset Sat/Unsat
Cue: If asked, inform the candidate that 86-SPRZ08 is reset. Verifies 86 device is reset Sat/Unsat
- 6. Determine step 6.2 is N/A Marks N/A block for step 6.2 Sat/Unsat
- 7. Determine section 6.3 is applicable Carries out the actions of section 6.3 Sat/Unsat NMP2 2008 ML083650061.doc 54 October 2008 Performance Steps Standard Grade 8. Close MDS2 - (115 KV MOD SWITCH 63) LINE 6. Places MDS2 control switch to CLOSE Observes MDS2 red light - ON Observes MDS2 green light - OFF Pass/Fail Sat/Unsat Sat/Unsat
Places MDS4 control switch from PULL-TO-LOCK to NORMAL-AFTER-OPEN Places MDS4 control switch to CLOSE Observes MDS4 red light - ON Observes MDS4 green light - OFF Pass/Fail Pass/Fail Sat/Unsat Sat/Unsat The following annunciators clear with no required action: 852421 "MOT Operator CKT 2YUC-MDS4" 852435 "RES STA SER XFMER 1B Loss of Voltage"
- 10. IF required, place in Normal-After-Trip 2NPS-SWG003-1. Places 3-1 control switch from PULL-TO-LOCK to NORMAL-AFTER-TRIP. Observes 3-1 green light - ON Pass/Fail Sat/Unsat
- 11. Return to Attachment 1 Section 1.7. Per step 1.7.8, determines performance of Attachment 7 is required. Sat/Unsat 12. Step 7.1 Prerequisites
Cue: If asked, 7.1.4 lockouts have been verified reset. Step 7.1, Prerequisites, are completed 12. Determines section 7.2 is applicable Carries out the actions of section 7.2 Sat/Unsat 13. Place 3-14 in Pull-to-Lock. Places 3-14 control switch in PULL-TO-LOCK Observes 3-14 green/red lights - OFF Pass/Fail Sat/Unsat The following annunciator clears with no required action: 852560 "13.8KV Bus NPS003 ACB 3-1/14/16 Auto Trip/FTC
- 14. Place the SYNC switch to ON (SYNCHRONIZE RES STA SVCE XFMR 1B). Rotates the SYNC switch to ON Pass/Fail NMP2 2008 ML083650061.doc 55 October 2008 Performance Steps Standard Grade 15. Close 3-1. Rotates 3-1 control switch to CLOSE Observes 3-1 red light - ON Observes 3-1 green light - OFF Pass/Fail Sat/Unsat Sat/Unsat Numerous annuciators clear. Numerous annunciators alarm. Numerous annunciators reflash. None of these requires action.
- 16. Place the SYNC switch to OFF. Rotates the SYNC switch to OFF Pass/Fail
- 17. Close 13-6. Rotates 13-6 control switch from PULL-TO-LOCK to NORMAL-AFTER-TRIP. Observes 13-6 green light - ON Rotates 13-6 control switch to CLOSE Observes 13-6 red light - ON Observes 13-6 green light - OFF Pass/Fail Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat The following annunciator clears with no required action: 852527 "4KV Bus NNS 013 Undervoltage"
- 18. Return to Attachment 1 Section 1.7. Per step 1.7.10, determines performance of Attachment 9 is required. Sat/Unsat 19. Step 9.1 Prerequisites Cue: If asked, 9.1.4 lockout is verified reset. Step 9.1, Prerequisites, are completed
- 20. Determines section 9.2 is applicable Carries out the actions of section 7.2 Sat/Unsat 21. Verify closed 3-6. Rotates 3-6 control switch from PULL-TO-LOCK to NORMAL-AFTER-TRIP. Observes 3-6 green light - ON Rotates 3-6 control switch to CLOSE Observes 3-6 red light - ON Observes 3-6 green light - OFF Pass/Fail
Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat
- 22. Close 15-3 Rotates 15-3 control switch from PULL-TO-LOCK to NORMAL-AFTER-TRIP. Observes 15-3 green light - ON Rotates 15-3 control switch to CLOSE Pass/Fail Sat/Unsat Pass/Fail
NMP2 2008 ML083650061.doc 56 October 2008 Performance Steps Standard Grade Observes 15-3 red light - ON Observes 15-3 green light - OFF Sat/Unsat Sat/Unsat
- 23. Reports that Reserve Station Transformer 1B is energized from Line 6, and 2NPS-SWG003 & NNS-SWG013 are energized from Reserve Station Transformer 1B Cue: Acknowledge report.
TERMINATING CUE: Reserve Transformer 1B energized from Line 6. NPS-SWG003 energized from Reserve Transformer 1B. NNS-SWG013 and NNS-SWG015 energized from NPS-SWG003.
RECORD STOP TIME
NMP2 JPM #S-7 57 October 2008 Initial Conditions:
- 1. The plant experienced a Loss of Line 6. 2. The plant was manually scrammed. 3. Immediate and Subsequent Actions of N2-SOP-3 are complete. 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
- 5. Power has been restored to Line 6 and Power Control has verified its reliability. 6. Ask the operator for any questions.
Initiating cue:
RO- " (Operator's name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.7 Power Restoration."
NMP2 JPM #S-7 58 October 2008 Initial Conditions:
- 1. The plant experienced a Loss of Line 6. 2. The plant was manually scrammed. 3. Immediate and Subsequent Actions of N2-SOP-3 are complete. 4. Fault Identification and Isolation per Attachment 1 Section 1.6 are complete.
- 5. Power has been restored to Line 6 and Power Control has verified its reliability. 6. Ask the operator for any questions.
Initiating cue: " (Operator's name), Energize Reserve Station Transformer 1B from Line 6 per N2-SOP-3.
Then restore power to 2NPS-SWG003 from Transformer 1B, NNS-SWG013 and NNS-SWG015 from 2NPS-SWG003 per N2-SOP-3."
Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.
NMP2 JPM #S-7 59 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Initiate Suppression Chamber Cooling And Spray using RHS "A" Revision: NRC 2008
Task Number: N2-205000-01013 Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #S-7 60 October 2008 Evaluator Signature: Date:
NMP2 JPM #S-7 61 October 2008 Recommended Start Location:
Simulator Simulator Set-up:
- 8. Reset to IC 187 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
- Self-verification shall be demonstrated. 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 1. None Task Standard:
NMP2 JPM #S-7 62 October 2008 Suppression Pool Cooling & Spray initiated using RHS "A" NMP2 JPM #P-1 63 October 2008 Initial Conditions:
- 15. A Small Break LOCA has occurred. 16. Primary Containment Control EOP has been entered.
Initiating cue:
"(Operator's name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22".
Performance Steps Standard Grade 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
- 2. Obtain a copy of the reference procedure and review/utilize the correct section. EOP-6, Attachment 22 obtained. Step 3.1 identified Sat/Unsat 3. Start Suppression Chamber Spray:
N/A, Suppression Chamber Spray is NOT required IF Drywell Sprays are required concurrently with Suppression Chamber Sprays, perform Subsection 3.2 N/A, Drywell Spray is NOT required
Suppression Chamber Spray using RHS A. (2CEC*PNL601)
N/A, RHS A will NOT be used
Determines Suppression Chamber Spray is required
Determines step N/A
Determines step to be used
Sat/Unsat
- 4. IF a LOCA signal is present AND suppression chamber spray operation is directed WITH drywell pressure less than 1.68 psig, perform the following to bypass the high drywell pressure interlock for 2RHS*MOV33A:
Determines bypass not required because DWP is >1.68 psig. Sat/Unsat NMP2 JPM #P-1 64 October 2008 Performance Steps Standard Grade N/A, high drywell pressure interlock will NOT be bypassed NOTE: A L660 key may be needed to gain entry to 2CEC*PNL629.
Remove relay E12A-K108A in 2CEC*PNL629, Bay B (Figure 22-4)
Install EOP Jumper #42 on terminal points BBB-49 AND AA-119 in 2CEC*PNL629, Bay B (Figure 22-4)
Deliver relay E12A-K108A to SM
- 5. NOTE: Verifying SWP*MOV90A open may be delayed until after sprays are in service. This step is NOT sequence critical.
Verify open SWP*MOV90A, HEAT EXCHANGER 1A, SVCE WTR INLET VLV Open SWP*MOV90A, HEAT EXCHANGER 1A, SVCE WTR INLET VLV Pass/Fail/NA 6. Verify closed AND IF possible overridden, RHS*MOV24A, LPCI A INJECTION VLV Failure to override injection valve closed can result in pump runout, if the valve auto opens with FV38A open during Suppression Pool Cooling operation.
Determines valve is closed by green light ON and red light OFF indication.
Places control switch to CLOSE to obtain the amber override light lit. Sat/Unsat Pass/Fail
- 7. Verify running RHS*P1A, PMP 1A Determines pump is running by red light ON, green light OFF OR motor amps indication. Sat/Unsat
- 8. IF operation in Containment Spray mode AND a trip of 2RHS*P1A occurs, perform emergency refill per Section 3.3 Determines step N/A Sat/Unsat 9. Open RHS*MOV33A, OUTLET TO Open RHS*MOV33A, OUTLET TO Pass/Fail NMP2 JPM #P-1 65 October 2008 Performance Steps Standard Grade SUPPR POOL SPRAY SUPPR POOL SPRAY 10. Verify 450 gpm on SUPPR SPRAY HEADER FLOW. (2RHS*FI64A)
Determines flow is acceptable Sat/Unsat 11. IF Suppression Pool Cooling is directed, throttle open RHS*FV38A, RETURN TO SUPPR POOL COOLING to establish a flow of approximately 7450 gpm (E12-R603A)
N/A, Suppression Pool Cooling was NOT directed Throttle open RHS*FV38A, RETURN TO SUPPR POOL COOLING to attain desired flow rate (7400 to 7500 gpm). Pass/Fail 12. Verify RHS*MOV4A, PMP 1A MINIMUM FLOW VLV position as follows:
IF RHS A is in Suppression Pool Cooling/Spray, verify closed 2RHS*MOV4A OR IF RHS A is in Suppression Chamber Spray ONLY, verify open RHS*MOV4A
Verifies RHS*MOV4A, PMP 1A MINIMUM FLOW VLV valve is closed by green light ON and red light OFF indication. Sat/Unsat 13. Verify open SWP*MOV90A, HEAT EXCHANGER 1A, SVCE WTR INLET VLV
Verify open SWP*MOV90A, HEAT EXCHANGER 1A, SVCE WTR INLET VLV by red light ON and green light OFF indication.
If valve was previously opened, this is not a critical step.
Pass/Fail/NA 14. NOTE: Post LOCA, in order to supply greater than 2000 gpm SWP to RHR Heat Exchangers with less than 5 SWP pumps in service it may be necessary to isolate Turbine Bldg. loads IAW N2-OP-31 Section H.12.0.
Throttle open SWP*MOV33A, HEAT EXCHANGER 1A SVCE WTR OUTLET VLV to establish Service Water flow to RHR Heat Exchanger 1A NOT to exceed 7400 gpm. (E12-R602A)
Throttles open SWP*MOV33A, HEAT EXCHANGER 1A SVCE WTR OUTLET VLV and verifies flow remains less than 7400 GPM
Pass/Fail
NMP2 JPM #P-1 66 October 2008 Performance Steps Standard Grade 15. NOTE: 2RHS*MOV8A is interlocked in the open position for 10 minutes following a Division I ECCS initiation.
WHEN possible, close RHS*MOV8A, HEAT EXCHANGER 1A INLET BYPASS VLV
If possible, close RHS*MOV8A, HEAT EXCHANGER 1A INLET BYPASS VLVOR determines step is N/A
Sat/Unsat/
NA 16. Report completion. Report completion. Sat/Unsat TERMINATING CUE: Suppression Pool Cooling and Spray is in operation RECORD STOP TIME
NMP2 JPM #P-1 67 October 2008 Initial Conditions:
- 1. A Small Break LOCA has occurred. 2. Primary Containment Control EOP has been entered.
Initiating cue:
"(Operator's name), Place RHR Loop A in Suppression Pool Cooling and Spray operation per N2-EOP-6, Attachment 22".
NMP2 JPM #P-1 68 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title: Align Service Water to SFC Heat Exchanger 1A Revision: NRC 2008 Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date
Performer: (RO/SRO) Trainer/Evaluator:
Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #P-1 69 October 2008 Evaluator Signature: Date:
NMP2 JPM #P-1 70 October 2008 Recommended Start Location:
Plant Simulator Set-up:
- 9. NA Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
- Self-verification shall be demonstrated. 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 13. N2-SOP-38, Rev 04 14. NUREG K/A 233000 K1.02 Tools and Equipment:
- 1. None Task Standard:
NMP2 JPM #P-1 71 October 2008 Service Water is aligned to SFC 1A NMP2 JPM #P-2 72 October 2008 Initial Conditions:
- 17. The Control Room has been evacuated 18. A loss of Spent Fuel Pool Cooling has occurred
Initiating cue:
"(Operator's name), Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, ".
Performance Steps Standard Grade 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
- 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-SOP-38 obtained. Sat/Unsat 3. Obtain SM permission to supply Service Water Cooling to SFC Heat Exchanger 1A
UNLESS directed otherwise by the SM, verify Chemistry has sampled (C1) the CCP system AND sample results meet SPDES AND ODCM requirements for discharge
N/A, the SM directs sampling to be performed later CUE: SM has granted permission and Chemistry sample is satisfactory Requests SM permission Sat/Unsat 4. In the Division I Switchgear Room, place the following breakers in OFF:
2EHS*MCC103-4A, CL LOOP CLG WTR TO SFP CLG HE A SPLY V 2CCP*MOV14A 2EHS*MCC103-4B, CL LOOP CLG WTR FR SFP CLG HE A RTN V 2CCP*MOV18A Locates breaker and places in OFF
Locates breaker and places in OFF Pass/Fail
Pass/Fail NMP2 JPM #P-2 73 October 2008 Performance Steps Standard Grade 5. In North Aux Bay Elev 240, place the following breakers in OFF:
2EHS*MCC102-2A, SWP TO SPENT FUEL POOL HE 2SWP*MOV17A 2EHS*MCC102-2B, SWP FROM SPENT FUEL POOL HE 2SWP*MOV18A
Locates breaker and places in OFF Locates breaker and places in OFF
Pass/Fail Pass/Fail
- 6. NOTE: 2CCP*MOV14A and MOV18A are located on RB Elev 215 outside the 2SFC*E1A Room.
Manually close the following valves:
2CCP*MOV14A, SFC HEAT EXCHANGER RBCLC INLET 2CCP*MOV18A, SFC HEAT EXCHANGER RBCLC OUTLET
Locates and closes valve Locates and closes valve
Pass/Fail Pass/Fail 7. NOTE: 2SWP*MOV17A and MOV18A are located on RB Elev 196 by the North stairwell.
Manually open the following valves:
2SWP*MOV17A, SFC HEAT EXCHANGER SERVICE WTR INLET
2SWP*MOV18A, SFC HEAT EXCHANGER SERVICE WTR OUTLET Locates and manually opens valve
Locates and manually opens valve
Pass/Fail
Pass/Fail 8. Throttle 2CCP*V12, SFC HX 1A OUTLET ISOL, to maintain Spent Fuel Pool temperature 80 - 100° o F CUE/NOTE: The applicant should state that temperature can be monitored at_______. Provide feedback that the appropriate temperature has been reached once satisfied that the appropriate location to monitor Throttles valve while monitoring temperatures until desired range is reached until desired temperature is reached Pass/Fail NMP2 JPM #P-2 74 October 2008 Performance Steps Standard Grade temperature has been determined
- 9. IF not previously done, contact Chemistry to sample the CCP System AND determine if sample meets requirements for discharge Examiner Note: JPM may be terminated at this point Requests Chemistry provide sample Sat/Unsat TERMINATING CUE: Service Water is providing cooling to SFC Heat Exchanger 1A RECORD STOP TIME
NMP2 JPM #P-2 75 October 2008 Initial Conditions:
- 1. The Control Room has been evacuated 2. A loss of Spent Fuel Pool cooling has occurred
Initiating cue:
Align Service Water to SFC Heat Exchanger 1A per N2-SOP-38, Attachment 5
NMP2 JPM #P-2 76 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Isolating An HCU With Cooling Water Flow Revision: NRC 2008
Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) Trainer/Evaluator:
Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #P-2 77 October 2008 Evaluator Signature: Date:
NMP2 JPM #P-2 78 October 2008 Recommended Start Location:
Plant Simulator Set-up:
- 10. NA Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
- Self-verification shall be demonstrated. 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 15. N2-OP-30, Rev 14 16. NUREG K/A 201001 A1.06 Tools and Equipment:
- 1. None Task Standard:
NMP2 JPM #P-2 79 October 2008 HCU 34-23 is isolated with cooling water maintained.
NMP2 JPM #P-3 80 October 2008 Initial Conditions:
- 19. HCU 34-23 was declared inoperable and must be isolated for maintenance.
Initiating cue:
"(Operator's name), Isolate HCU 34-23 WITH cooling water per N2-OP-30".
Performance Steps Standard Grade 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
- 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-OP-30 obtained. Section F.8.2 identified for use Sat/Unsat 3. IF an RDS Pump is in service, verify 79 HCUs are isolated.
CUE: NO other HCUs are isolated Determines criteria is met Sat/Unsat
- 4. Close 2RDS*V101, (34-23) Insert Isolation.
Locates and closes valve Pass/Fail 5. Close 2RDS*V102, (34-23) Withdraw Isolation.
Locates and closes valve Pass/Fail 6. Close 2RDS-V113, (34-23) Charging Water Isolation.
Locates and closes valve Pass/Fail 7. CAUTION Rx water will drain out of 2RDS*V107 if a Reactor Scram occurs.
ATTACH drain line to HCU at 2RDS*V107, (34-23) Accumulator Locates and attaches drain line Sat/Unsat NMP2 JPM #P-3 81 October 2008 Performance Steps Standard Grade Drain AND route to floor/equipment drain. (Lubricant use N/A for Swagelok Fittings)
- 8. Slowly open 2RDS*V107 (34-23) to depressurize accumulator.
Opens valve and observes accumulator pressure lowering Pass/Fail 9. Close 2RDS*V107 (34-23).
Locates and closes valve Pass/Fail 10. Open 2RDS*V107 (34-23) one turn.
Locates and opens valve Pass/Fail 11. Close 2RDS-V103, (34-23) Drive Water Isolation.
Locates and closes valve Pass/Fail
- 12. Close 2RDS-V105, (34-23) Exhaust Water Isolation.
Locates and closes valve Pass/Fail
- 13. Open 2RDS*V101, (34-23) Insert Isolation.
Locates and opens valve Pass/Fail 14. If the HCU is to have maintenance OR is to be out of service for an extended period of time perform the following:
Close 2RDS*V111, (34-23) Gas Accumulator Charging Valve.
Locates and closes valve Pass/Fail 15. Using two wrenches, slowly loosen AND remove the cap from connector P6.
Loosens and removes cap from connector Sat/Unsat 16. Connect nitrogen charging rig.
Connects rig Sat/Unsat NMP2 JPM #P-3 82 October 2008 Performance Steps Standard Grade 17. Open 2RDS*V111, (34-23) AND, utilizing the nitrogen charging rig vent valve, slowly bleed off nitrogen.
Locates and opens valve Pass/Fail 18. Verify Nitrogen pressure on the accumulator pressure gauge is at 0 psig.
Verifies pressure is 0 Sat/Unsat 19. Disconnect charging rig.
Disconnects rig Sat/Unsat 20. NOTE: While torquing cap, use a wrench on P6 connector to prevent connector movement at instrument block. Apply thin coat of Nickel NEVER SEEZ on P6 connector threads, THEN reinstall the cap AND torque the cap to 150-200 in-lbs.
Reinstalls Cap Sat/Unsat TERMINATING CUE: HCU 34-23 is isolated with cooling water maintained and charging rig has been disconnected.
RECORD STOP TIME
NMP2 JPM #P-3 83 October 2008 Initial Conditions:
- 1. HCU 34-23 was declared inoperable and must be isolated for maintenance.
Initiating cue:
Isolate HCU 34-23 WITH cooling water per N2-OP-30
NMP2 JPM #P-3 84 October 2008 Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE Title: Off Gas Recovery After Automatic Shutdown Revision: NRC 2008
Task Number:
Approvals:
NA EXAMINATION SECURITY General Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO) Trainer/Evaluator:
Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:
JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
NMP2 JPM #P-3 85 October 2008 Evaluator Signature: Date:
NMP2 JPM #P-3 86 October 2008 Recommended Start Location:
Plant Simulator Set-up:
- 11. NA Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*". 2. During Evaluated JPM:
- Self-verification shall be demonstrated. 3. During Training JPM:
- Self-verification shall be demonstrated.
- No other verification shall be demonstrated.
References:
- 17. N2-OP-42, Rev 09 18. NUREG K/A 271000 A1.08 Tools and Equipment:
- 1. None Task Standard:
NMP2 JPM #P-3 87 October 2008 Off Gas system operating in a stable manner NMP2 JPM #P-3 88 October 2008 Initial Conditions:
- 20. The plant is operating at 30% power. 21. OffGas has automatically shut down 22. Recombiner temperature is 390
°F 23. H2 concentration is 1%
- 24. The Off Gas High Radiation trip has NOT occurred Initiating cue:
"(Operator's name), Recover Off Gas after an automatic shutdown per N2-OP-42, Step H.1.5.4
Performance Steps Standard Grade 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary Proper communications used for repeat back (GAP-OPS-O1) Sat/Unsat RECORD START TIME
- 2. Obtain a copy of the reference procedure and review/utilize the correct section. N2-OP-42 obtained. Section 1.0 identified for use Sat/Unsat Note: Action begins at procedure step 1.5.4
- 3. Reset the Offgas circuits by depressing AND releasing the following RESET pushbuttons:
RESET RE13A&B red pushbutton RESET SYSTEM A black pushbutton RESET SYSTEM B black pushbutton
RESET VAC PUMP VP-1A black pushbutton RESET VAC PUMP VP-1B black pushbutton Resets pushbuttons identified Pass/Fail 4. Open 2OFG-LV20A(B), CONDENSER 1A(B) LEVEL CONTROLLER, to allow process flow to recycle back to the Main Condenser.
Opens level controller Pass/Fail NMP2 JPM #P-3 89 October 2008 Performance Steps Standard Grade 5. Open 2OFG-AOV1A(B), PREHTR E1A(B) INLET ISOL, by placing the control switch to STARTUP.
Locates and opens valve Pass/Fail 6. Verify open 2OFG-AOV103, OFFGAS EXHAUST TO MAIN STACK.
Determines valve is open Sat/Unsat 7. NOTE: When both 2OFG-AOV1A and AOV1B are open, 2CCS-MOV45A and MOV45B will each automatically open to mid position. If only 2OFG-AOV1A(B) is open, the associated 2CCS- MOV45A(B) will automatically open fully. The valves are located in the OFG Bldg El 261' Hallway.
Locally, verify 2CCS-MOV45A(B), OFFGAS CONDENSER 1A(B) OUTLET ISOLATION, is in the proper position.
CUE: Isolation is in the proper position Determines valve in proper position Sat/Unsat 8. Verify one Dryer is in service with its associated valve control switch in OPEN (2OFG-AOV4A/5A, 4B/5B, 4C/5C). Determines one dryer is in service and associated switch in OPEN Sat/Unsat 9. IF required, start 2OFG-P1A AND P1B, VACUUM PUMP VP-1A(B).
Locates and places control switch in START Pass/Fail 10. WHEN recombination is occurring, as indicated by OFG Recombiner temperature rising, place 2OFG- LV20A(B) control switch in AUTO.
CUE: Temperature is slowly rising Determines temperature rising. Places control switch in AUTO Pass/Fail 11. Open 2OFG-AOV11A(B), Places control switch to STARTUP and Pass/Fail NMP2 JPM #P-3 90 October 2008 Performance Steps Standard Grade CONDENSER 1A(B) OUTLET ISOLATION, by placing the control switch to STARTUP.
observes valve open 12. WHEN the OFG System stabilizes, perform the following:
Push the RESET SYSTEM A(B) pushbutton.
Return the Recombiner Train Isolation AOV control switches to AUTO.
CUE: System has stabilized Determines system stable. Locates and pushes SYSTEM RESET button and returns AOV control switches to AUTO Pass/Fail TERMINATING CUE: When Off Gas system is operating and stable, this JPM is complete RECORD STOP TIME
NMP2 JPM #P-3 91 October 2008 Initial Conditions:
- 1. The plant is operating at 30% power. 2. OffGas has automatically shut down 3. Recombiner temperature is 390
°F 4. H2 concentration is 1%
- 5. The Off Gas High Radiation trip has NOT occurred Initiating cue:
"(Operator's name), Recover Off Gas after an automatic shutdown IAW N2-OP-42, Step 1.5.4