ML083110465

From kanterella
Jump to navigation Jump to search

Final Outlines (Folder 3)
ML083110465
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/23/2008
From:
Nine Mile Point
To: D'Antonio J
Operations Branch I
Hansell S
Shared Package
ML082520049 List:
References
50-410/08-303, ES-301, ES-301-2, TAC U01778 50-410/08-303
Download: ML083110465 (4)


Text

ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2 Facility:

NMP2 RETAKE Date of Examination:

October 2008 Exam Level (circle one):

SRO Operating Test No.:

1 Control Room Systems@ (8 for RO; 2 or 3 for SRO-U, including 1 ESF)

System I JPM Title S-1 Recirc Flow Control/ Place RCS HPU Subloop in service, reset FCV lockout The candidate will place an HPU in service and reset the FCV lockout following a hot oil condition.

WA 202002 A4.02 2.8/2.8 N2-0P-29 Section E.l.O S-2 Feedwater/ Shifting Feedwater Pumps at Power The candidate will shift Feedwater pumps at 65% power and respond to a controller failure.

WA 259001 A4.02 3.9/3.7 N2-0P-3 Section F.13.0 S-3 Reactor Core Isolation Cooling/ Initiate RCX And Respond to Overspeed Trip The candidate will initiate RCIC. RCIC turbine will trip on overspeed during startup. Turbine must be reset and injection to the RPV re-established.

WA 217000 A4.02 3.9/3.9 N2-0P-35 H.l.O; ARP 601305 S-4 TBCLCW/RBCLCW/ Rotate In-Service Equipment The candidate will perform a routine equipment rotation for the TBCLCW & RBCLCW systems and respond to a temperature controller failure.

WA 400000 A4.01 3.1/3.0 N2-OP-13, 14; ARP 601244 S-5 Main Steam/ Depressurizing the RPV to the Main Condenser The candidate will depressurize the RPV to the Main Condenser to facilitate an RPV Blowdown. The MSlVs will not open requiring additional actions to depressurize.

AC Electrical/ Energize Reserve Station XFRMR from Line 6 and energize NPS-SWG003 from Reserve Station XFRMR 1B The candidate will energize Reserve Station XFRMR from line 6 and energize NPS-SWG003 from Reserve Station XFRMR 1 B.

WA 239001 A4.09 3.9/3.9 N2-EOP-6, Att. 18 S-6 WA 262001 A2.07 3.0/3.2 N2-SOP-3 (NRC 2005)

S-7 RHR/ Suppression Pool Cooling and Spray using RHS A The candidate will align RHS A to for Suppression Pool Cooling and Spray.

WA 219001 A4.01 3.813.7 N2-EOP-6 Att.22 Type Code*

N.A.S Safety Function 1

2 4

8 3

6 5

I I

j NUREG-1021, Revision 9 Page 1 of 2

ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2 In-Plant Systems@ (3 for RO; 3 or 2 for SRO-U)

P-I RBCLC SWlAligning Service Water to SFC Heat Exchanger 1A The candidate will align Service Water to Spent Fuel Pool Heat Exchanger 1A WA 29501 8 AA1.01 3.3/3.4 N2-SOP-38 Att.5, Section 1.O P-2 Control Rod Drive/ Isolate an HCU 34-23 with Cooling Water The candidate will isolate an inoperable HCU maintaining cooling water available.

WA 201 001 A I.06 3.413.4 Offgas/ Offgas Recovery After Automatic Shutdown The candidate will respond to an automatic Offgas isolation and recover the system.

WA 271000 A1.08 3.1/3.1 N2-OP-313 Section F.8.2 P-3 N2-0P-42, Section H.l.O a

1 9

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power I Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (S)imulator (R)CA Criteria for RO I SRO-I I SRO-U 4-6 14-6 12-3 91 a i 4 1 1 ~ 1 1 L 1 1 1 1 1 1

- 2 1 2 1 1 3 I 3 I 2 (randomly selected)

,I/ 1 1 1 NUREG-I 021, Revision 9 Page 2 of 2

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

N MP2-NRC Examination Level: RO fl SRO Administrative Topic TY Pe Code*

Date of Examination: 10/08 Operating Test Number:

1 Describe activity to be performed DETERMINE PERSONNEL OVERTIME AVAILABILITY Given a list of personnel and their previous work hours, determine who is available for overtime and why others are not available based on Tech Spec and administrative req u iremeri ts.

2.1.5 (3.9) Ability to use procedures related to shift staffing, such as minimum crew requirements, overtime limitations, etc.

GAP-FFD-02 ASSESS REPORTABILITY REQUIREMENTS FOR TRANSIENT PLANT CONDITIONS Given a series of plant events, determine the verbal reporting requiremerits per 1 OCFR50.72.

2.1.1 8 (3.0:) Ability to make accurate/ clear and concise logs/

records/ status boards/ and reports.

1 OCFR50.72, NUREG 1022 REV 2 OFFSITE DOSE CALCULATION MANUAL (ODCM)

ASSESSMENT FOR INOPERABLE EQUIPMENT Given conditions related to requirements within the ODCM and must determine the applicable actions.

2.2.38 (4.5) Knowledge of conditions and limitations in the facility license.

ODCM RADIOLOGICAL REQUIREMENTS RELATED TO OPERATOR INSPECTION OF HIGH RAD AREAS.

Given radiological conditions related to an area to be inspected as shown on a survey map, and other applicable conditions such as the RWP, ensure the appropriate radiological aspects of the job are met prior to performance of the inspection.

2.3.12 (3.7) Knowledge of radiological principles related to licensed oPerator duties.

Last printed 9/23/2008 10:55:00 AM Page 1 of 2

Emergency Plan GAP-RPP-01; 3.5, 3.6, 3.7, GAP-RPP-02; 3.1, 3,3, GAP-RPP-08; 3.2,3.3, U2 HIGH RAD AREA INSPECTIONS CLASSIFY EMERGENCY EVENT AND PERFORM PARS Given plant conditions at an existing Site Area Emergency, determine the plant conditions now meet General Emergency conditions. fieclassify the event and determine PARS, based on conditions provided. (Time Critical) NRC 2002 SRO JPM A4 2.4.44 (4.4) Knowledge of emergency plan protective action recommendations.

EAL Matrix, EPP-08 NOTE:

All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (53 for ROs; 5 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (21)

(P)revious 2 exams (51; randomly selected)

Last printed 9/23/2008 10:55:00 AM Page 2 of 2