Kewaunne Power Station, Response to NRC Inspection Report 05000305-13-504 Request
ML13322A416
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/07/2013
From: Jordan A
Dominion, Dominion Energy Kewaunee
To:
Document Control Desk, NRC/RGN-III
References
Download: ML13322A416 (2)


See also: IR 05000305/2013504

Text

Dominion Energy Kewaunee, Inc. 4D minion N490 Hwy 42, Kewaunee, WI 54216 Web Address: www.dom.com

NOV 0 7 2013 ATTN: Document Control Desk Serial No.13-239 U. S. Nuclear Regulatory

Commission

LIC/RR/R0 Washington, DC 20555-0001

Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION INSPECTION

REPORT 0500030512013504 -RESPONSE

TO NRC REQUEST On January 24, 2013, the Nuclear Regulatory

Commission (NRC) issued an inspection

report for the Kewaunee Power Station (KPS) (Reference

1) indicating

a preliminary

significance

determination

for a White finding. On April 4, 2013, the NRC issued the final significance

determination

for a White finding and notice of violation (Reference

2).The April 4, 2013 letter (Reference

2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting

a supplemental

inspection

using Inspection

Procedure

95001, "Inspection

for One or Two White Inputs in a Strategic

Performance

Area," when NRC has been notified by DEK of its readiness

for the inspection.

On May 31, 2013, the NRC issued a letter describing

the termination

of the Reactor Oversight

Process for KPS and commencement

of the Decommissioning

Power Reactor Inspection

Program (Reference

3). In that letter the NRC states that it will conduct the inspection

for the Emergency

Preparedness

White finding using Inspection

Procedure

92702, "Follow-Up

on Corrective

Actions for Violations

and Deviations," to verify appropriate

corrective

actions are being implemented

instead of using Inspection

Procedure

95001.DEK has undertaken

the steps necessary

to assure that the cause evaluation

and corrective

actions are of sufficient

scope and breadth to address the identified

performance

deficiencies.

DEK requests the NRC perform the inspection

identified

in Reference

3 starting on or after November 12, 2013.If you have questions

or require additional

information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.

Very truly yours, Site Vi e resident, Kewaunee Power Station

Serial No.13-239 Page 2 of 2 References:

1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC

Emergency

Preparedness

Inspection

Report 05000305/2012503;

Preliminary

White Finding," dated January 24, 2013. (ADAMS Accession

No. ML13024A422)

2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance

Determination

of A White Finding With Proposed Followup and Notice of Violation;

NRC Inspection

Report No. 05000305/2013504;

Kewaunee Power Station," dated April 4, 2013. (ADAMS Accession

No. ML13094A270)

3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination

Of Reactor Oversight

Process For Kewaunee Power Station And Commencement

Of Decommissioning

Inspection

Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375)

Commitments

made by this letter: NONE cc: Regional Administrator, Region III U. S. Nuclear Regulatory

Commission

2443 Warrenville

Road Suite 210 Lisle, IL 60532-4352

Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory

Commission

One White Flint North, Mail Stop 08-Dl 5 11555 Rockville

Pike Rockville, MD 20852-2738

NRC Senior Resident Inspector Kewaunee Power Station