MONTHYEARML24292A1832024-10-30030 October 2024 Summary of Meeting with Tennessee Valley Authority, October 16, 2024, to Discuss Proposed License Amendment Regarding Implementation of an Online Monitoring Methodology ML24269A0062024-10-0303 October 2024 Correction to Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the TVA Nuclear Quality Assurance Plan ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24228A2652024-08-20020 August 2024 Summary of Public Pre-Submittal Meeting with Tennessee Valley Authority Regarding a Future Sequoyah Nuclear Plant and Watts Bar Nuclear Plant LAR Related to TS 3.5.2. ECCS - Operating ML24221A0132024-08-19019 August 2024 July 10, 2024, Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24173A2122024-06-27027 June 2024 Summary of Public Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request Regarding Adoption of TSTF-276-A, Revision 2 to Clarify Requirements for Diesel Generator Testing ML24158A3002024-06-11011 June 2024 Summary of May 6, 2024, Public Meeting with Tennessee Valley Authority to Discuss the Potential for a License Amendment Request Regarding the Control Room Envelope and Selective Use of an Alternative Source Term ML24089A0712024-04-0101 April 2024 3/20/24 & 3/27/24 2023 TVA Public Annual Assessment Meeting Summary ML24057A0582024-02-27027 February 2024 Summary of February 15, 2024, Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23265A1512023-09-28028 September 2023 Summary of September 12, 2023, Partially Closed Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML23198A3102023-07-20020 July 2023 July 10, 2023, Summary of Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML23068A1532023-03-16016 March 2023 Summary of February 22, 2023, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request to Increase Allowable Number of Tritium Producing Burnable Absorber Rods at Watts Bar Nuclear Plant, Units 1 and 2 ML23055A4562023-03-0909 March 2023 Summary of February 15, 2023, Public Meeting with Tennessee Valley Authority Regarding Proposed Expedited License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML22329A1382022-12-0505 December 2022 Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22104A2252022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22042B3262022-02-14014 February 2022 Summary of February 8, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed License Amendment Request to Revise the Allowable Value for Trip of Turbine-Driven Main Feedwater Pump at Watts Bar Nuclear Plant, Unit 1 ML22025A3112022-02-0909 February 2022 Summary of January 19, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed Schedule for Development of a License Amendment Request for Increased Tritium Production ML21349A3642022-01-0404 January 2022 Summary of December 14, 2021, Teleconference with Tennessee Valley Authority Regarding a Proposed Change to the Capsule Withdrawal Schedule for Watts Bar Nuclear Plant, Unit 2 ML21279A0902021-11-0303 November 2021 Summary of Conference Calls Regarding the Fall 2021, Mid-Cycle Steam Generator Tube Inspections ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21253A0872021-09-15015 September 2021 Summary of August 19, 2021, Partially Closed Meeting with Tennessee Valley Authority to Discuss Mid-Cycle Outage Contingencies for Watts Bar Nuclear Plant, Unit 2 ML21245A4252021-09-15015 September 2021 Summary of August 19, 2021, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to the Watts Bar Nuclear Plant, Units 1 and 2 ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21120A2192021-05-0404 May 2021 April 28,2021, Summary of Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Remove from Technical Specifications Redundant Units of Measurement for Control ML21099A2072021-04-13013 April 2021 Summary of April 7, 2021, Meeting with Tennessee Valley Authority Related to a Planned Relief Request from ASME Code Testing Requirements ML21060B0532021-03-0303 March 2021 Summary of February 11, 2021, Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2, to Apply a Temperature Adjusted Steam Generator Tube Flaw Growth Rate Methodology ML21033A5952021-02-23023 February 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar Nuclear Plant, Unit 2 Steam Generator Replacement ML20351A4212021-01-19019 January 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar, Unit 2, Steam Generator Replacement ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20351A2192021-01-11011 January 2021 Summary of Conference Calls Regarding the Fall 2020 Steam Generator Tube Inspections ML20337A0402020-12-15015 December 2020 Summary of November 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification 5.9.9, Steam Generator Tube Inspection Report ML20323A0662020-11-27027 November 2020 Summary of October 28, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML20244A1892020-09-11011 September 2020 Summary of Teleconference Call with Tennessee Valley Authority Regarding a Proposed Change to the Containment Leakage Rate Testing Program ML20233A8352020-08-25025 August 2020 Summary of August 11, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20213C7112020-08-25025 August 2020 Summary of July 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned Alternative Request for Watts Bar Nuclear Plant, Unit 1 ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20211L8222020-08-10010 August 2020 Summary of Teleconference Call with the Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20150A4162020-06-24024 June 2020 Summary of May 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20153A3622020-06-22022 June 2020 Summary of May 27, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20135H2702020-05-28028 May 2020 Summary of May 5, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20143A1692020-05-28028 May 2020 Summary of May 14, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20034F5232020-02-12012 February 2020 Summary of Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 2024-09-23
[Table view] |
Text
LICENSEE:
FACILITY:
SUBJECT:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 17, 2015 Tennessee Valley Authority Watts Bar Nuclear Plant, Units 1 and 2
SUMMARY
OF AUGUST 26, 2015, MEETING WITH THE TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT DUAL UNIT FIRE PROTECTION REPORT AUDIT CLOSURE On August 26, 2015, a Category 1 public meeting with the Tennessee Valley Authority (TVA, the licensee) was held at the U.S. Nuclear Regulatory Commission (NRC) Headquarters, One White Flint North, 11555 Rockville Pike, Rockville Maryland, to discuss the review of the dual unit fire protection report (FPR) review for the Watts Bar Nuclear Plant (WBN), Units 1 and 2. A list of attendees is enclosed.
By letter dated June 24, 2015, TVA submitted the As-Constructed FPR for both units at WBN (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15175A508).
To facilitate the NRC staff's review, the audit process was used to resolve questions about the FPR and corresponding license conditions.
During the audit process, changes to the submitted FPR were made. The purpose of the August 26, 2015, public meeting was for TVA to present the change pages to the FPR that will be submitted as a supplement to the June 24, 2015, submittal.
During the meeting, TVA went over each of the proposed changes to the FPR, referencing a handout that contained "change bars" in the margin to indicate edits made to the FPR. It was noted by the licensee that Part V of the handout did not contain change bars but was changed in its entirety.
TV A's presentation is available in ADAMS at Accession No. ML15244B383.
The FPR handout is available in ADAMS at Accession No. ML15244B377.
In addition to the proposed changes, TVA committed to a number of validations to the FPR, which have been captured in Enclosure
- 2. For WBN, Unit 1, TVA submitted an amendment to the license to incorporate two corresponding license conditions relevant to the dual unit FPR and fire protection panel requirements.
TVA noted that a supplement for the Unit 1 amendment will be submitted to clarify the numbering scheme for the license conditions.
At the conclusion of the meeting, TVA indicated that it would submit a revised FPR to the NRC staff for review by the end of the week. The review schedule is contingent on TVA providing a timely and thorough final FPR. The staff's review of the FPR will be documented in the final supplement to the safety evaluation report, which would be issued concurrently with the facility operating license for WBN, Unit 2, should one be issued. Members of the public were not in attendance.
Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
Docket Nos. 50-390 and 50-391
Enclosures:
- 1. List of Attendees Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
- 2. Table Validations for TVA Fire Protection Report dated June 24, 2015 cc w/enclosures:
Distribution via Listserv LIST OF ATTENDEES AUGUST 26. 2015. MEETING WITH THE TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT DUAL UNIT FIRE PROTECTION REPORT AUDIT CLOSURE NAME TITLE ORGANIZATION U.S. Nuclear Regulatory Commission James Trapp Acting Deputy Director (NRC)/Office of Nuclear Reactor Regulation (NRR)/Division of Operating Reactor Licensing (DORL) Samson Lee Deputy Director NRC/NRR/Division of Risk Assessment (DRA) Joseph Giitter Director NRC/NRR/DRA Alex Klein Branch Chief NRC/NRR/DRA/AFPB (Fire Protection Branch) Daniel Frumkin Senior Fire Protection NRC/NRR/DRA/AFPB Engineer Charles Moulton Fire Protection Engineer NRC/NRR/DRA/AFPB Angela Wu Fire Protection Engineer NRC/NRR/DRA/AFPB David Jones Senior Fire Protection Region II/Division of Reactor Inspector Safety/Engineering Branch 2 Justin Poole Senior Project Manager NRR/DORL/Watts Bar Special Projects Branch (LPWB) Enclosure 1 NAME TITLE ORGANIZATION Jeanne Dion Project Manager NRR/DORL/LPWB Joseph Shea Vice President Nuclear Tennessee Valley Authority (TVA) Licensing Paul Simmons VP Nuclear WBN Unit 2 TVA Jim Polickoski WBN Fire Protection TVA Martin Bryan WBN Licensing TVA William Crouch* Engineering TVA Charles Brush* Engineering Engineering Planning and Management, Inc. (TVA Contractor)
John Pangle* Engineering TVA *participated by telephone Discussion Item Page Environmental V-7 Factors MCR V-12 Abandonment Actions Evaluations Fire Detection X-53 Monitoring Panel Design Code and Standards Watts Bar, Unit 2 -Fire Protection Report Public Meeting \Nednesday,August26,2015 9:00 A.M. -12:00 P.M. Validations for TVA Fire Protection Report dated June 24, 2015 Section Initial Language Change "The 100 12ercent time margin or Delete: Section 12erformance time 12lus uncertainty
- "100 percent" 2.1.2.2, allowances from paragraph
- "or performance time Part b. 2.1.2.1.A and 2.1.2.1.B above plus uncertainty" ensures adequate time to reach the control location and perform the action." "In the event the AF\N system does Insert: Section not automatically actuate, actions 2.3 are performed in the 12lant within 1 O * "demonstrated to be minutes to ensure the system is completed" running and injecting to the steam generators." "For additional information refer to TV A will look into the correct Code Unit 1 License Condition 2.1 and letter for the license Section Unit 2 License Condition
- 2. C(9) condition 1213 which state .. " Final Language "The time margin allowances from paragraph 2.1.2.1.A and 2.1.2.1.B above ensures adequate time to reach the control location and perform the action." "In the event the AF\N system does not automatically actuate, actions are performed in the 12lant demonstrated to be com12leted within 10 minutes to ensure the system is running and injecting to the steam generators." TBD Enclosure 2 Discussion Item Page Section Initial Language Change Final Language "For additional information refer to TVA will look into the correct TBD Fire Detection X-55 Code Unit 1 License Condition 2.1 and letter for the license Monitoring Panel Section Unit 2 License Condition 2.C(9) condition Design Code and 2023 which state .. " Standards "The Fire Hazards Analysis shows Delete entire sentence No sentence RB Hatch Room 11-100 ----that these rooms which are not Surveillance accessible during normal Qlant Frequency and oQerations have such limited fire Comp Actions hazards that no alternate comQensato[Y actions are reguired nor are Qractical and there is no reduction in nuclear safety or the first safe shutdown caQability of the Qlant." Other Items Discussion Page Section Comments Item The language should already read: Defining 111-6 Section "spurious" vs. 3.2 "The SI function's design basis includes events in which the RCS pressure boundary is ruptured." "inadvertent" SI Confirmed in the meeting (Bill on the phone) that Reference 4.2.17 is the 65 Calculation.
Reference V-13 Section 4.2.17 2.3.2 Members of the public were not in attendance.
Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-2048 or Justin.Poole@nrc.gov.
IRA! Justin C. Poole, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390 and 50-391
Enclosures:
- 1. List of Attendees
- 2. Table Validations for TVA Fire Protection Report dated June 24, 2015 cc w/enclosures:
Distribution via Listserv DISTRIBUTION:
PUBLIC LPWB R/F RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsRgn2MailCenter Resource DFrumkin, NRR RidsNrrPMWattsBar2 Resource RidsNrrPMWattsBar1 Resource RidsNrrDorllp_WB Resource RidsNrrLABClayton Resource TWertz, NRR CMoulton, NRR RidsNrrDra Resource RidsNrrDorl Resource AWu, NRR CRosales-Cooper, OEDO RidsNrrDraAfpb Resource DJones, RGN-11 ADAMS Accession No.: ML152448388 (Package)
Meeting Summary ML152448371 Meetinq Notice ML 1 21 4 d ML 152 B d ML152448383 5 5A4 8 Han outs 44 377 an OFFICE DORL/LPWBPM DORL/LPWB/LA DRNAFPB DORL/LPWB/BC JDion BClayton NAME (LRonewicz for) AKlein JQuichocho DATE 9/1/15 9/1/15 9/14/15 9/17/15 OFFICE DORL/LPWB/PM NAME JPoole DATE 9/17/15 OFFICIAL RECORD COPY