MONTHYEARNRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter NRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary 2024-03-18
[Table view] |
Text
September 25,201 2 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 NRC 2012-0076 TS 5.6.8 Point Beach Nuclear Plant, Units 1 Docket 50-266 Renewed License No. DPR-24 Response to Request for Additional Information Fall 201 1 Unit I (U1 R33) Steam Generator Tube lnspection Report
References:
(1) NextEra Energy Point Beach, LLC letter to NRC, dated May 29, 2012, Fall 201 1 Unit 1 (U1 R33) Steam Generator Tube lnspection Report (MLI 21 50A287) (2) NRC letter to NextEra Energy Point Beach, LLC, dated August 28,2012, Point Beach Nuclear Plant, Unit 1 - Request for Additional lnformation Regarding the Fall 201 1 Steam Generator Tube Inservice lnspection Report (TAC No. ME8780) (MLl2234A460)
NextEra Energy Point Beach, LLC (NextEra) submitted the Fall 201 1 Unit 1 (U1 R33) Steam Generator Tube lnspection Report via Reference (1) documenting the scope and results of the inspection per prescribed Technical Specification Reporting Requirements. The NRC Staff has determined additional information (Reference
- 2) is required to enable continued review of the Reference (1) report. Enclosure 1 provides the NextEra response to the NRC Staff's request for additional information.
This letter contains no new Regulatory Commitments and no revisions to existing Regulatory Commitments.
Very truly yours, NextEra Energy Point Beach, LLC James Costedio + V Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 ENCLOSURE I NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 REACTOR VESSEL INTERNALS INSPECTION PLAN RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION The NRC Staff determined that additional information is required (Reference
- 1) to enable the continued review of the Point Beach Nuclear Plant (PBNP) Fall 201 1 Unit 1 (Ul R33) Steam Generator Tube Inspection Report (Reference 2). The following information is provided by NextEra Energy Point Beach, LLC (NextEra) in response to the NRC Staff's request.
RAI I - It was indicated that the secondary-side inspections showed "no significant degradation. " Please discuss the results of the secondary-side inspections, including clarifying whether any degradation was observed.
NextEra Response The general area of the steam drum was inspected following the modifications made in support of an extended power uprate (EPU). The mid and lower decks of the steam drums were inspected for a baseline. The internal feedring, J-nozzles, and thermal sleeve were inspected.
The secondary moisture separators, primary moisture separators (PMSs), mid-deck extension, hatch, hinges, riser barrels, top hats, and externals of feedring and J-nozzles were inspected in the general area inspections. Burn-through on the interface of the J-nozzle and feedring was observed at J-nozzle 28 in Steam Generator (SG)
A, and at J-nozzles 7, I1 and 14 in SG B. Burn-through indications are from construction of the SGs and not a service induced condition. The interior of the feedring was clear of any foreign material. The 112 PMSs were visual inspected.
All PMSs were covered in a light coating of magnetite. Baseline ultrasonic testing (UT) measurements were taken in various locations on the secondary side to allow future trending of post-EPU secondary side wear. There were 56 UT measurements taken on the SG A PMSs, 64 UT measurements taken on the SG A feedring, 55 UT measurements taken on the SG B PMSs, and 64 UT measurements taken on the SG B feedring.
No abnormal measurements were identified.
RAI 2 - Please discuss the results of the tube plug inspections.
NextEra Response A video inspection of five installed plugs in SG A (hot and cold legs) and six installed plugs in SG B (hot and cold legs) showed that all plugs are dry. Page 1 of 3 RAI 3 - Please clarify whether 50 or I00 percent of the tube ends in steam generator A were inspected with a rotating probe (since Sections 2.l.b and 2.l.e both indicate that 50 percent of the tubes were inspected).
NextEra Response In the SG A hot leg, 50% of all tubes were inspected for the full depth of the tubesheet with a rotating probe. An expansion to 100% inspection of the tubes in SG A was not required since crack indications were not found in that SG. In the SG B hot leg, the inspection of the tubes within the tubesheet was expanded from 50% to 100% based on the discovery of crack indications in that SG. 100% of the peripheral tubes in the cold leg of both SGs were inspected with a rotating probe for the full depth of the tubesheet.
RAI 4 - In Section 5.2.6, it was indicated that 74 indications of wear at the anti-vibration bars were observed and that 72 of these indications were sized with the bobbin coil. Please discuss how the remaining two indications were sized.
If not sized, how were they dispositioned and how was it determined that condition monitoring criteria were satisfied.
NextEra Response The wording in Section 5.2.b is inconsistent with Table 5-2, which shows the Anti-Vibration Bar (AVB) Wear History for SG B. There are 73 AVB wear indications in 51 tubes that were sized by the bobbin coil in the U1 R33 inspection.
Tube R16 C77 in Table 5-2 is Indication Not Reportable (INR), and therefore, no sizing was performed on that particular tube. Table 5-2 includes Tube R16 C77, which makes the total 74 indications of wear in 52 tubes. Therefore, all 73 indications that had a percent wear call were sized by the bobbin coil. RAI 5 ' - The number of indications of wear above the top of the tubesheet which were attributed to sludge lancing equipment in Table 5-6 does not appear to match the corresponding text. According to the text, there were 17 indications of wear; however, Table 5-6 only lists 10 indications with wear (and 7 "indications not reporfable'j).
Please clarify. NextEra Response A review of the Eddy Current Database was performed.
The 21 SG A tubes with 22 indications reported in Section 5.6 of Reference (2) are comprised of both volumetric (percentage wear) and geometric (GEO) anomalies. Table 5-6 of Reference (2) provides a historical view of the volumetric indications from the current inspection as well as previous inspections for a total of 17 indications. There were 10 indications of wear and 7 previous wear indications which did not show wear and are classified as INR. There is no wear associated with the indications classified as INR, and therefore, those indications are not counted as wear in U1 R33, but are still included in Table 5-6 of Reference (2). Page 2 of 3 Additional reviews of the Eddy Current Database identified additional GEO indications. Table 5-6 of Reference (2) did not include GEO indications because they are geometric distortions without wear and are tracked for additional analysis in future inspections. Based on additional review of the Eddy Current Database, the original report should have stated there were 13 tubes with 14 GEO indications, 10 tubes with wear indications, and 7 tubes with 7 INR as part of monitoring from previous outages for a total of 30 tubes with 31 indications.
In future reports, GEO indications will not be counted as mechanical wear. RAI 6 - Several foreign objects were left in steam generator A. Please confirm that an engineering analysis was performed to assess the acceptability of leaving these objects in the steam generator until the next inspection.
NextEra Response Three sludge rocks and two wire bristles were not retrieved from SG A. The wire bristles were 0.005 inches in diameter and a length of 0.125 inches. There is no reported history of tube damage from a sludge rock and the sludge rocks not retrieved from SG A were determined to be harmless. The wire bristles have essentially no mass associated with them and would not affect tube integrity. Longer wire bristles have previously been reported in the Unit 1 SGs and those evaluations provide a bounding analysis for the smaller wire bristles identified in U1 R33. A foreign object search and retrieval (FOSAR) is scheduled following sludge lancing for both SGs in U1 R34. References (1) NRC letter to NextEra Energy Point Beach, LLC, dated August 28, 2012, Point Beach Nuclear Plant, Unit 1 - Request for Additional Information Regarding the Fall 201 1 Steam Generator Tube Inservice lnspection Report (TAC No.
ME8780) (ML12234A460)
(2) NextEra Energy Point Beach, LLC letter to NRC, dated May 29, 2012, Fall 201 1 Unit 1 (U1 R33) Steam Generator Tube lnspection Report (MLI 21 50A287) Page 3 of 3