Residual Heat Removal Service Water
From kanterella
Revision as of 12:07, 2 November 2017 by
StriderTol
(
talk
|
contribs
)
(Created page with "{{system-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
System
Automatic Depressurization System
Auxiliary Building Gas Treatment System
Auxiliary Feedwater
Circulating Water System
Containment Spray
Control Rod
Control Room Emergency Filtration System
Control Room Emergency Ventilation
Control Room Emergency Ventilation Air Supply
Control Room Envelope
Core Spray
Core Standby Cooling System
Cresent Area Ventilation and Cooling
Critical Function Monitoring System
Decay Heat Removal
Drywell Continuous Atmospheric Monitor
Emergency Cooling Tower
Emergency Core Cooling System
Emergency Diesel Generator
Emergency Equipment Cooling Water
Emergency Feedwater Actuation System
Emergency Feedwater Initiation and Control
Emergency Feedwater System
Emergency Gas Treatment System
Emergency Response Data System
Extraction steam
Feedwater
Fuel Pool Cooling and Cleanup
HVAC
High Pressure Coolant Injection
High Pressure Core Spray
Intermediate Range Monitor
Low Pressure Coolant Injection
Low Pressure Cooling Injection
Main Condenser
Main Steam
Main Steam Isolation Valve
Main Steam Line
Main Steam Safety Valve
Main Transformer
Main Turbine
Main Turbine Bypass System
Mechanical Pressure Regulator
Moisture Separator Reheater
Permanent Magnet Generator
Post Accident Monitoring
Primary Containment Isolation System
Primary containment
Qualified Safety Parameter Display System
Reactor Building Closed Loop Cooling
[ENS]
|
[LER]
|
[Findings]
Site
Start date
Title
Description
IR 05000259/2024003
Browns Ferry
4 November 2024
Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003
IR 05000321/2024003
Hatch
30 October 2024
Edwin I Hatch, Units 1 and 2 - Integrated Inspection Report 05000321/2024003 and 05000366/2024003
IR 05000352/2024012
Limerick
17 October 2024
Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012
CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1
Browns Ferry
9 October 2024
Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1
NRC-24-0058, Status of License Renewal Commitments
Fermi
3 October 2024
Status of License Renewal Commitments
IR 05000263/2024002
Monticello
14 August 2024
Integrated Inspection Report 05000263/2024002
IR 05000341/2024002
Fermi
14 August 2024
Integrated Inspection Report 05000341/2024002
IR 05000387/2024002
Susquehanna
12 August 2024
Integrated Inspection Report 05000387/2024002 and 05000388/2024002
IR 05000321/2024002
Hatch
8 August 2024
Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002
IR 05000333/2024002
FitzPatrick
7 August 2024
Integrated Inspection Report 05000333/2024002
... further results
Category
:
System
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties