ULNRC-06122, Update to License Renewal Application Environmental Permits

From kanterella
Revision as of 08:13, 28 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Update to License Renewal Application Environmental Permits
ML14154A493
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/03/2014
From: Kovaleski S
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-06122
Download: ML14154A493 (14)


Text

'W Ameren MISSOURI Callaway Plant *****************************************************************************************************************************************************************************************************************************************************

          • June 3, 2014 ULNRC-06122 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. 10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51 10 CFR 54 FACILITY OPERATING LICENSE NPF-30 UPDATE TO LICENSE RENEWAL APPLICATION ENVIRONMENTAL PERMITS

Reference:

1) ULNRC-05830 dated December 15,2011 2) ULNRC-06120 dated May 19,2014 By the Reference lletter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) including an Environmental Report (ER) for Callaway Plant Unit 1. Reference 2 provided an update to Table 9-1, "Environmental Authorizations for Current Callaway Unit 1 Operations," of the ER in a line-in/line-out format. The enclosure to this letter provides current copies of two (2) permits (3 line items from Table 9-1) that have been issued since our original LRA application.

It should be noted that there are no changes to commitments contained within this letter . ............................................................................................................................

............................................................................................................................

............................................................................................................................

............................................................................................................................

............................................................................................................................

............................................................................................................................

PO Box 620 Fulton, MD 65251 AmerenMissouri.com . ............ . . ............ . . ............ .

ULNRC-06122 June 3, 2014 Page2 If you have any questions with regard to this submission, please contact me at (573) 489-9435 or Roger Wink at (314) 225-1561.

I declare under penalty of perjury that the foregoing is true and correct. Sincerely, Executed on __ j....;;;....._ll'-_n_e...

__ Sarah Kovaleski Director, Engineering Design DS/nls

Enclosure:

Permits Issued Since December 15, 2011 A. Hazardous Materials Certificate of Registration for Registration Year( s) 2012-2015 Registration Number: 061912 550 089UW issued 6/19/2012 by the United States Department of Transportation B. Permit to Dispense Water to the Public for Ameren Missouri-Callaway Energy Center, PWS ID No. M03182219 issued January 9, 2014 by the State of Missouri Department of Natural Resources ULNRC-06122 June 3, 2014 Page 3 cc: Mr. Marc L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Tam Tran Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. John Daily, Senior Project Manager Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 ULNRC-06122 June 3, 2014 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:

F. M. Diya D. W. Neterer L. H. Graessle B.L.Cox J. S. Geyer M. A. McLachlan S.M. Maglio T. B. Elwood Corporate Communications NSRB Secretary B. C. Daniels G. S. Kremer S. G. Kovaleski R. C. Wink A. J. Burgess G. P. Gary STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Missouri Public Service Commission Ms. Leanne Tippett-Mosby (DNR) E. A. Blocher (STARS PAM COB)

Enclosure to ULNRC-06122 Total 1 0 pages CALLAWAY PLANT UNIT 1 LICENSE RENEWAL APPLICATION Permits Issued Since December 15, 2011 A. Hazardous Materials Certificate of Registration for Registration Year(s) 2012-2015 Registration Number: 061912 550 089UW issued 6/19/2012 by the United States Department of Transportation B. Permit to Dispense Water to the Public for Ameren Missouri-Callaway Energy Center, PWS ID No. M03182219 issued January 9, 2014 by the State of Missouri Department of Natural Resources Enclosure to ULNRC-06122 Page 1 of 1 Permit A UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION HAZARDOUS MATERIALS CERTIFICATE OF REGISTRATION FOR REGISTRATION YEAR(S) 2012-2015 Registrant:

AMERENUE Attn: H E CHAMBLIN 1901 CHOUTEAU AVE MC A-17 STLOUIS, MO 63166-6149 This certifies that the registrant is registered with the U.S. Department of Transportation as required by 49 CFR Part 107, Subpart G. This certificate is issued under the authority of 49 U.S.C. 5108. It is unlawful to alter or falsify this document.

Reg. No: 061912 550 089UW HM Company ID: 045400 Issued: 06/19/2012 Expires: 06/30/2015 Record Keeping Requirements for the Registration Program The following must be maintained at the principal place of business for a period of three years from the date of issuance of this Certificate of Registration:

(1) A copy of the registration statement filed with PHiviSA; and (2) This Certificate of Registration Each person subject to the registration requirement must furnish that person's Certificate of Registration (or a copy) and all other records and information pertaining to the information contained in the registration statement to an authorized representative or special agent of the U. S. Department of Transportation upon request. Each motor carrier (private or for-hire) and each vessel operator subject to the registration requirement must keep a copy of the current Certificate of Registration or another document bearing the registration number identified as the "U.S. DOT Hazmat Reg. No." in each truck and truck tractor or vessel (trailers and semi-trailers not included) used to transport hazardous materials subject to the registration requirement.

The Certificate of Registration or document bearing the registration number must be made available, upon request, to enforcement personnel.

For information, contact the Hazardous Materials Registration Manager, PHH-52, Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, 1200 New Jersey Avenue, SE, Washington, DC 20590, telephone (202) 366-4109.

Enclosure to ULNRC-06122 Page 1 of8 Permit B .,. .. '* Jeremiah W. Oay) NIXOn, Governor

  • Sara Parker Pauley, Diiector T OF NATURAL RESOURCES JAN 0 9 2014 Callaway Co. Ameren Missouri-Callaway Energy Center PWS ID No. M03182219 Mr. Steven Weiss Ameren Missouri-Callaway Energy Center Mail Code 602 P.O. Box 6614 St. Louis, MO 63166

DearMr. Weiss:

www.dnr.mo.gov Enclosed is the Permit to Dispense Water to the Public for Ameren Missouri-Callaway Energy Center, M03182219.

Please review this document carefully.

Operation of the public water system in accordance with the rules and regulations cited in this document is necessary for continued compliance.

It is very important that you read and understand the requirements contained in the permit. The document entitled "Description of Ameren Missouri-Callaway Energy Center's Public Water System as of January 6, 2014" is part of the pennit and should be kept with the certificate in your files. The permit signifies that your water system is a public water system and that it is in compliance with the requirements of the Missouri Safe Drinking Water Law and the Missouri Public Drinking Water Regulations.

The permit will remain valid as long as the facilities are properly operated and maintained, the water produced and distributed continues to meet chemical and microbiological standards, and the ownership remains unchanged.

The enclosed document has important information concerning standard permit conditions and your rights and obligations under the laws and regulations of the State of Missouri.

If you have any questions regarding this permit, please contact Mr. Maher Jaafari, P. E., Chief of Infrastructure, Permits and Engineering Section at 573-751-1127.

Sincerely, WATER PROTECTION PROGRAM Steven W. Sturgess, Chief Public Drinking Water Branch SWS:mjk Enclosure c: Northeast Regional Office 0 Recytled Piper r*

Enclosure to ULNRC-06122 Page 2 of8 Permit B MISSOURI DEPARTMENT OF NATURAL RESOURCES PERMIT OF APPROVAL FOR A NON-TRANSIENT NON-COMMUNITY WATER SYSTEM TO DISPENSE WATER TO THE PUBLIC PERMIT NO. MO 3182219 ISSUED TO Ameren Missouri-Callaway Energy Center ISSUED IN ACCORDANCE WITH SECTION 640.115 REVISED STATUTES OF MISSOURI AND REGULATIONS (10 CSR 60) PROMULGATED UNDER SECTION 640.100, RSMo. This permit applies only to non-traosient non-eommanity water systems with approval to dispense water to the publie; it does not apply to other environmentally regulated areas. JAN 0 9 2014 MO 7S0.1274 (06-11)

Enclosure PWS ID No. M0-3182219 Page 2 of7 to ULNRC-06122 Page 3 of8 Permit B I. Description of Ameren Missouri-Callaway Energy Center's Public Water System as of January 6, 2014 A. System Type: Non-Transient Non-Community Public Water System Non-Transient Non-Community Public Water System: A public water system that is not a community water system and that regularly serves at least twenty-five (25) of the same persons over six (6) months per year. B. Operator Certification Requirements:

Water Treatment System Classification N/A Water Distribution System Classification II 1. All Public Water Systems classified as Community, Non-Transient Non-Community and those Transient Non-Community systems that use surface water or groundwater under the direct influence of surface water are required by 10 CSR 60-14 to hire a Certified Operator with the appropriate certification.

2. Water Treatment System Classifications:

A, B, C, or D per Missouri Safe Drinking Water Law and Regulations 10 CSR 60-14.010 Table 1, as determined by the Department.

3. Water Distribution System Classifications:

DS I, DS II, or DS III, per Missouri Safe Drinking Water Law and Regulations 10 CSR 60-14.010 Table 2, as determined by the Department.

C. Average Number of Persons Per Day Using System: 860 D. Number and Type of Service Connections:

21 Industrial 21 I TyPe of Connection Count E. Sources: Well Date Well Well Total Pump Name Constructed Location ID Status Yield Depth/Casing Capacity (gpm) Depth (ft) (gpm) Grand fathered WeJI 1978 Lat: 38.7614 WL Subject to the 400 1480/400 400 No.3 Long: -91.7763 10163 Conditions Listed in Section L F. Treatment:

Post Hypochlorination G. Master Meter Connections:

None Enclosure to ULNRC-06122 Page 4 of8 Permit B H. Emergency Sources of Water: None I. Distribution Treatment Facilities:

N/ A J. Type of Storage: Type of Storage Growtd Storage TOTAL STORAGE K. System Status Dates: S stem Dates Original Permit to Dispense Issued Total Capacity (gallons) 24,500 24,500 PWS ID No. M0-3182219 Page 3 of7 May 19, 1994 System Commenced Operation January 1, 1978 System Activated as a Public Water System January 10, 1978 L. Special Conditions:

1. If this well develops contamination problems or the public water supply becomes in violation of Missouri's Safe Drinking Water Regulations, the Department shall require the public water system to either: i. Install a Department approved treatment system ii. connect to an approved public water supply or iii. construct a new well according to state standards;
2. Per 10 CSR 23-3.110, if the well falls into such a state of disrepair (such as the pump has been removed or the water line disconnected) that continued use for purposes of obtaining groundwater is impractical and the well has not been in use for a period of two (2) years or more, the division may order that the well be permanently plugged. 3. The well is a grandfathered well and as such may not meet current construction standards for a public water system. 4. All conditions must be disclosed to potential buyers prior to the sale of the property.

I Enclosure to ULNRC-06122 Page 5 of8 M. Staff Recommendations:

Permit B PWS IDNo. M0-3182219 Page 4 of7 On the basis of the review conducted in accordance with the Missouri Safe Drinking Water Law and Regulations 10 CSR 60-3.010, I recommend this Permit to Dispense Water be granted approval.

..

Kfiin Bailey, E. I. Infrastructure Permits and Engineering Section Public Drinking Water Branch Maher Jaafari, PiA5:,P: E., Chief Infrastructure Permits and Engineering Section Public Drinking Water Branch DATE I DATE I*

Enclosure to ULNRC-06122 Page 6 of8 A. Duty to Comply Permit B II. General Conditions and Requirements PWS ID No. M0-3182219 Page 5 of7 The Permittee shall comply with all applicable portions of the Safe Drinking Water Act, Missouri Safe Drinking Water Law and Regulations and the Revised Statutes of Missouri, to include all conditions and requirements of this permit. Failure to comply with any portion of this permit constitutes a violation of the Safe Drinking Water Act, Missouri Safe Drinking Water Law and Regulations and/or the Revised Statutes of Missouri and is grounds for enforcement action. B. Permit Revocation In accordance with Missouri Safe Drinking Water Law and Regulations the Department may modify or revoke this Permit to Dispense Water to the Public as listed in 10 CSR 60-3.010 (3) (B). C. Permit Modification Permit modification will be issued in accordance with Missouri Safe Drinking Water Law and Regulations 10 CSR 60-3.010 The Department may modify this Permit to Dispense Water to the Public at any time to include all newly promulgated requirements of the Safe Drinking Water Act, Missouri Safe Drinking Water Law and Regulations, and the Revised Statutes of Missouri, which are applicable to the public water system, to address requirements necessary to ensure compliance with the laws and regulations pertaining to safe drinking water, and to provide updated information as a result of any future permitted construction.

The Permittee must request a modification of the Permit to Dispense Water to the PubJic by notifying the Department when major modifications (i.e. additions or changes to the source(s), treatment or storage utilized by the public water supply) to the drinking water system are completed.

D. Transfer of Permit to Dispense Water to the Public This Permit to Dispense Water to the Public is non-transferable, except with prior approval of the Department.

To obtain Department approval of the transfer of this Permit to Dispense Water to the Public, the Permittee shall submit written notification to the Department at ]east ninety (90) days in advance of the proposed transfer.

This notification shall include a Permit to Dispense Drinking Water application form which has been completed by the proposed new owner ofthe water system and proof of the pending transfer of ownership of the public water system. The proposed new owner must submit a managerial and financial review (as applicable) which illustrates how the system will be managed to insure its long term viability.

If the Department approves the transfer, a new Permit to Dispense Water to the Public will be issued to the new owner of the system in accordance with 10 CSR E. Appeals Any person aggrieved by an emergency order or the decision to revoke the Permit to Dispense may appeal within thirty days after the issuance of the order to the circuit court of the county in which the public water system is located or if the public water system is located in more than one county, to the circuit court of any such county. The circuit court shall within ten days after the filing of the appeal hear the cause and determine the same per the Revised Statutes of Missouri section 640.130.5.

Enclosure to ULNRC-06122 Page 7 of8 F. Annual Fees Permit B PWS ID No. M0-3182219 Page 6 of7 The Permittee shall remit payment of the primacy fee, laboratory services and program administration fees to the Department as required by 10 CSR 60 Chapter 16 and the Revised Statutes of Missouri RSMo 640.100, including any penalties or fines as authorized by Missouri Safe Drinking Water Law and Regulations and the Revised Statutes of Missouri.

Failure to remit the laboratory services and program administration fees will result in the Department of Natural Resources and Department of Health laboratory services being terminated for the calendar year and may result in the revocation of the Permit to Dispense Water to the Public. G. Construction Permits Construction, extension, alteration or modification of a public water system shall be in accordance with the rules and regulations of the safe drinking water commission.

No construction, extension, alteration or modification can begin until written approval is given by the Department based on 10 CSR 60-3.010.

H. Operation and Maintenance The Permittee shall comply with the operation and maintenance requirements of the Missouri Safe Drinking Water Law and Regulations, the Revised Statutes of Missouri and the Safe Drinking Water Act. All community, non-transient non-community water systems, and those transient non-community water systems using surface water or groundwater under the direct influence of surface water, must have a certified Chief Operator to be in responsible charge ofthe public water system, as per 10 CSR 60-14.010.

Because backflow may cause a health hazard through transmission of contaminants via the public water system, the Continuing Operating Authority must prevent and eliminate any cross-connections within the water system as required by 10 CSR 60-11.010.

I. Inspection and Entry The Continuing Operating Authority shall allow authorized representatives of the Department access to the system and records for the purpose of inspecting, monitoring, or sampling the public water supply source, distribution system or treatment facility for compliance with the Missouri Safe Drinking Water Law and Regulations.

Authorized representatives of the Department, shall be al1owed by the Continuing Operating Authority, upon presentation of credentials and at reasonable times, to enter upon Continuing Operating Authority's premises in which a water supply source, distribution system or treatment facility is located or in which any records are required to be kept under terms and conditions of the permit and or the Missouri Safe Drinking Water Law and Regulation.

J. Sanitary Surveys and Inspections Sanitary Surveys and Inspections for Ground Water Treatment will be conducted per Missouri Safe Drinking Water Law and Regulations 10 CSR 60-4.025.

Ground water systems must provide, at the department's request, any existing information that will enable the department to conduct a sanitary survey or inspection.

A sanitary survey includes, but is not limited to, an onsite review, under the supervision of an engineer, of the water source(s) (identifying sources of contamination by using results of source water assessments or Enclosure to ULNRC-06122 Page 8 of8 Permit B PWS ID No. M0-3182219 Page 7 of7 other relevant information where available), facilities, equipment, operation, maintenance, and monitoring compliance of a public water system in order to evaluate the adequacy of the system, its sources and operations, and the distribution of safe drinking water. If a significant deficiency is identified, unless the department directs the ground water system to implement a specific corrective action, the ground water system must consult with the department regarding the appropriate corrective action within thirty (30) days of receiving written notice from the department of a significant deficiency, written notice from a laboratory that a ground water source sample was found to be fecal indicator-positive, or direction from the department that a fecal indicator-positive sample collected requires corrective action. K. Emergency Procedures The Permittee shall prepare and maintain an up-to-date emergency preparedness plan in accordance with 1 0 CSR 60-12.010 L. Monitoring and Reporting Requirements The Pennittee shall comply with the monitoring and reporting requirements of Missouri Safe Drinking Water Law and Regulations 10 CSR 60-4.010 through 10 CSR 60-4.110 and 10 CSR 60-7.010 through 10 CSR 60-7.020. M. Civil and Criminal Liability Except as authorized by statute and provided in permit conditions nothing in this permit shaH be construed to relieve the Continuing Operating Authority from administrative, civil, or criminal penalties for noncompliance with the Missouri Safe Drinking Water Law and Regulation.

N. State and Federal Laws Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the Continuing Operating Authority from any responsibilities, liabilities, or penalties established pursuant to any applicable state statute or regulations.

0. Water Quality In the event the Continuing Operating Authority becomes aware of any actual or imminent contamination or water systetn pressure dropping below 20 psi anywhere in the system (1 0 CSR 60-4.080) the Continuing Operating Authority will take immediate actions to avoid injury to consumers.

These actions include, but are not limited to, customer notification and investigation into the sources(s) of contamination.

The Missouri public Drinking Water Regulations 10 CSR 60-7.010 requires systems to notify the department within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of failure to comply with any drinking water regulation except where a shorter period is specified by the Department.

The Continuing Operating Authority shall provide water which meets all quality criteria of state and federal Jaw.