Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:Report
MONTHYEARPNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 ML23087A0392023-05-0202 May 2023 PSDAR Comment Resolution PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L PNP 2020-039, 10 CFR 71.95 Report Involving 3-608 Cask2020-11-20020 November 2020 10 CFR 71.95 Report Involving 3-608 Cask ML20272A1662020-09-30030 September 2020 Attachment 3 - Framatome Document No. ANP-3876, Revision 1Q1NP, Response to NRC Request for Additional Information of Palisades Relief Request Number RR 5-8, Repair of Reactor Pressure Vessel Head Penetration, Inservice Inspection Program, ML20267A3912020-09-22022 September 2020 Attachment 4, Framatome Document No. 51-9292503-002, Palisades CEDM Nozzle Idtb Repair - Life Assessment Summary PNP 2019-001, Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event2019-03-20020 March 2019 Request for Deferral of Actions Related to a Beyond-Design-Basis External Seismic Event ML18354B1332019-01-17017 January 2019 Staff Assessment of Flood Focused Evaluation ML18330A1432018-11-26026 November 2018 Relief Request Number RR 5-7, Proposed Alternative to ASME Section Xi Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML18330A1462018-11-24024 November 2018 Framatome, Document No. 51-9292503, Palisades CRDM & Ici Nozzle Idtb Repair - Life Assessment Summary ML18270A3232018-09-27027 September 2018 Attachment 2: Probabilistic Risk Assessment Technical Adequacy PNP 2018-036, Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2018-09-25025 September 2018 Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident PNP 2018-041, Focused Evaluation Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2018-09-25025 September 2018 Focused Evaluation Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident PNP 2016-066, Special Report for Inoperability of High Range Noble Gas Monitor2016-12-20020 December 2016 Special Report for Inoperability of High Range Noble Gas Monitor PNP 2016-042, Annual Status Notification in Response to Confirmatory Order, EA-14-0132016-06-16016 June 2016 Annual Status Notification in Response to Confirmatory Order, EA-14-013 ML16048A3442016-02-10010 February 2016 Annual Fatigue Reporting Form 2015 ML15351A3522015-12-16016 December 2015 Attachment 1, Compliance with Order EA-12-049 ML15351A3532015-12-16016 December 2015 Attachment 2, Order EA-12-049 Compliance Elements Summary ML15351A3542015-12-16016 December 2015 Attachment 3, Audit Open Item Responses ML15351A3552015-12-16016 December 2015 Attachment 4, Interim Staff Evaluation Open Item and Confirmation Item Responses ML15351A3622015-12-16016 December 2015 Attachment 6, System Operating Procedure 23, Plant Heating System, Attachment 14, Actions When Outside Temperatures Are Less than 20 Degrees Fahrenheit. ML15351A3602015-12-16016 December 2015 Attachment 5, Final Integrated Plan PNP 2015-066, Submittal of Report on the 8-120B Cask2015-08-20020 August 2015 Submittal of Report on the 8-120B Cask PNP 2015-058, Technical Specification Required Report2015-08-0404 August 2015 Technical Specification Required Report PNP 2015-037, Appendix a, Computer Files Listing, File No. 1200895.306, Revision 12015-05-22022 May 2015 Appendix a, Computer Files Listing, File No. 1200895.306, Revision 1 ML15147A6192015-05-22022 May 2015 Enclosure 2, Corrected Documentation for Relief Request Number RR 4-18 ML15147A6182015-05-22022 May 2015 Appendix a, Computer File Listing, File No. 1400669.323, Revision 0 ML15147A6172015-05-22022 May 2015 Enclosure 1, Relief Request Number RR 4-21 Proposed Alternative, in Accordance with 10 CFR 50.55a(z)(2), Hardship Without a Compensating Increase in Level of Quality and Safety PNP 2015-018, Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report.2015-02-25025 February 2015 Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report. PNP 2014-108, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.2014-12-18018 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. PNP 2014-051, Response to May 1, 2014 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times2014-07-16016 July 2014 Response to May 1, 2014 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times PNP 2014-038, Special Report for Inoperability of High Range Noble Gas Monitor2014-04-14014 April 2014 Special Report for Inoperability of High Range Noble Gas Monitor PNP 2014-033, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. ML13365A2642014-02-10010 February 2014 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14030A2072014-02-0606 February 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Palisades Nuclear Plant, TAC No.: MF0768 PNP 2013-072, Report of Changes, Tests and Experiments and Summary of Commitment Changes2013-10-14014 October 2013 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2013-063, Unsatisfactory Laboratory Testing Report2013-09-18018 September 2013 Unsatisfactory Laboratory Testing Report ML13242A1592013-08-29029 August 2013 Addendum to the Results of Independent Samples Collected by the NRC at Palisades Nuclear Plant Storm Drain Outfall ML13295A4502013-07-31031 July 2013 WCAP-15353-Supplement 2-NP, Rev. 0, Palisades Reactor Pressure Vessel Fluence Evaluation. PNP 2013-046, Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation2013-06-25025 June 2013 Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation PNP 2013-027, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2013-04-10010 April 2013 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application ML14316A2082013-02-28028 February 2013 Attachment 5 - Westinghouse WCAP-17651-NP, Revision 0, Palisades Nuclear Power Plant Reactor Vessel Equivalent Margins Analysis ML13295A4512013-02-28028 February 2013 WCAP-17651-NP, Rev. 0, Palisades Nuclear Power Plant Reactor Vessel Equivalent Margins Analysis. ML13038A4402013-02-0707 February 2013 BADGER Test Campaign at Palisades Nuclear Plant ML13295A4492013-01-31031 January 2013 WCAP-17403-NP, Rev. 1, Palisades Nuclear Power Plant Extended Beltline Reactor Vessel Integrity Evaluation. ML14316A1992013-01-31031 January 2013 Attachment 3 - Westinghouse WCAP-17403-NP, Revision 1, Palisades Nuclear Power Plant Extended Beltline Reactor Vessel Integrity Evaluation ML12334A0962012-11-27027 November 2012 PLP-RPT-12-00141, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 3 PNP 2012-101, Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-27027 November 2012 Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12334A0972012-11-27027 November 2012 PLP-RPT-12-0041, Rev. 0, Palisades Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 3 2023-09-28
[Table view] Category:Technical
MONTHYEARPNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2020-039, 10 CFR 71.95 Report Involving 3-608 Cask2020-11-20020 November 2020 10 CFR 71.95 Report Involving 3-608 Cask ML20272A1662020-09-30030 September 2020 Attachment 3 - Framatome Document No. ANP-3876, Revision 1Q1NP, Response to NRC Request for Additional Information of Palisades Relief Request Number RR 5-8, Repair of Reactor Pressure Vessel Head Penetration, Inservice Inspection Program, ML20267A3912020-09-22022 September 2020 Attachment 4, Framatome Document No. 51-9292503-002, Palisades CEDM Nozzle Idtb Repair - Life Assessment Summary ML18330A1432018-11-26026 November 2018 Relief Request Number RR 5-7, Proposed Alternative to ASME Section Xi Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML18330A1462018-11-24024 November 2018 Framatome, Document No. 51-9292503, Palisades CRDM & Ici Nozzle Idtb Repair - Life Assessment Summary ML18270A3232018-09-27027 September 2018 Attachment 2: Probabilistic Risk Assessment Technical Adequacy PNP 2018-041, Focused Evaluation Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2018-09-25025 September 2018 Focused Evaluation Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident PNP 2018-036, Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2018-09-25025 September 2018 Revised Mitigating Strategies Assessment for Flooding Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident PNP 2015-058, Technical Specification Required Report2015-08-0404 August 2015 Technical Specification Required Report PNP 2015-018, Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report.2015-02-25025 February 2015 Areva, Inc., 51-9226987-000, Palisades Nuclear Plant Flooding Hazard Re-Evaluation Report. PNP 2014-108, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.2014-12-18018 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. PNP 2014-051, Response to May 1, 2014 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times2014-07-16016 July 2014 Response to May 1, 2014 Request for Additional Information for License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times PNP 2014-038, Special Report for Inoperability of High Range Noble Gas Monitor2014-04-14014 April 2014 Special Report for Inoperability of High Range Noble Gas Monitor ML13365A2642014-02-10010 February 2014 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14030A2072014-02-0606 February 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Palisades Nuclear Plant, TAC No.: MF0768 ML13242A1592013-08-29029 August 2013 Addendum to the Results of Independent Samples Collected by the NRC at Palisades Nuclear Plant Storm Drain Outfall ML13295A4502013-07-31031 July 2013 WCAP-15353-Supplement 2-NP, Rev. 0, Palisades Reactor Pressure Vessel Fluence Evaluation. ML13295A4512013-02-28028 February 2013 WCAP-17651-NP, Rev. 0, Palisades Nuclear Power Plant Reactor Vessel Equivalent Margins Analysis. ML14316A2082013-02-28028 February 2013 Attachment 5 - Westinghouse WCAP-17651-NP, Revision 0, Palisades Nuclear Power Plant Reactor Vessel Equivalent Margins Analysis ML13038A4402013-02-0707 February 2013 BADGER Test Campaign at Palisades Nuclear Plant ML13295A4492013-01-31031 January 2013 WCAP-17403-NP, Rev. 1, Palisades Nuclear Power Plant Extended Beltline Reactor Vessel Integrity Evaluation. ML14316A1992013-01-31031 January 2013 Attachment 3 - Westinghouse WCAP-17403-NP, Revision 1, Palisades Nuclear Power Plant Extended Beltline Reactor Vessel Integrity Evaluation ML12061A2892012-02-28028 February 2012 Attachment 6, Holtec International Report No. HI-2115004, Licensing Report for Replacement of the Palisades Region 1 Spent Fuel Pool Storage Racks. (Non-Proprietary Version) ML1201005032012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 1. Root Cause Evaluation-Service Water Pump P-7C Coupling Failure, Rev 0, Part 2.3 of 7 ML1201004962012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 1. Root Cause Evaluation-Service Water Pump P-7C Coupling Failure, Rev 0, Part 2 of 7 ML1201004992012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 1. Root Cause Evaluation-Service Water Pump P-7C Coupling Failure, Rev 0, Part 2.2 of 7 ML1201005062012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 1. Root Cause Evaluation-Service Water Pump P-7C Coupling Failure, Rev 0, Part 2.4 of 7 ML1201005092012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 2. SDP Assessment of Service Water Pump P-7C Coupling Failures, Part 2 of 7 Completed ML1201005112012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 2. SDP Assessment of Service Water Pump P-7C Coupling Failures, Part 4.1 of 7 ML1201005142012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 2. SDP Assessment of Service Water Pump P-7C Coupling Failures, Part 4.2 of 7 ML1201005162012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 2. SDP Assessment of Service Water Pump P-7C Coupling Failures, Part 4.4 of 7 ML1201005442012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 2. SDP Assessment of Service Water Pump P-7C Coupling Failures, Part 5.2 of 7 ML1201005472012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 2. SDP Assessment of Service Water Pump P-7C Coupling Failures, Part 6.1 of 7 ML1201005482012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 2-End and Attachment 3, Root Cause Evaluation-Plant Trip During Panel ED-11-2 Maintenance, Rev 2, Part 6.2 of 7 ML1201005502012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 3, Root Cause Evaluation-Plant Trip During Panel ED-11-2 Maintenance, Rev 2, Part 6.3 of 7 ML1201005582012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 3, Root Cause Evaluation-Plant Trip During Panel ED-11-2 Maintenance, Rev 2, Part 7.1 of 7 ML1201005592012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 3, Root Cause Evaluation-Plant Trip During Panel ED-11-2 Maintenance, Rev 2, Part 7.2 of 7 ML1201005622012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 3, Root Cause Evaluation-Plant Trip During Panel ED-11-2 Maintenance, Rev 2 - End, Part 7.4 of 7 ML1201005602012-01-0505 January 2012 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 3, Root Cause Evaluation-Plant Trip During Panel ED-11-2 Maintenance, Rev 2, Part 7.3 of 7 ML1201005402011-12-0505 December 2011 Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 2. SDP Assessment of Service Water Pump P-7C Coupling Failures, Part 5.1 of 7 ML11339A1012011-11-14014 November 2011 EA-PSA-SDP-P8B-11-05, Rev. 1, Assessment of Steam Driven Auxiliary Feedwater P-8B Trip on May 10, 2011, Attachment 3 ML12006A0492011-09-0808 September 2011 P-7C Coupling Failure Root Cause ML14316A2072011-07-31031 July 2011 Attachment 4 - Westinghouse, WCAP-15353, Supplement 2-NP, Revision 0, Palisades Reactor Pressure Vessel Fluence Evaluation ML1103800922011-01-31031 January 2011 Areva Np Inc. Technical Report, Document No. ANP-2858NP-003, Palisades SFP Region 1 Criticality Evaluation with Burnup Credit. ML1100606942010-11-12012 November 2010 Attachment 2, Structural Integrity Associates, Inc., Report No. 1000915.401, Revised Pressurized Thermal Shock Evaluation for the Palisades Reactor Pressure Vessel ML1107300842010-11-12012 November 2010 1001026.401, Rev 1, Basis for Period of Validity of the Palisades Pressure-Temperature (P-T) Limit Curves, Attachment 6 to Pnp 2011-016 ML1015403862010-06-0202 June 2010 Documentation for Pressurized Thermal Shock Evaluation Meeting ML1100606952010-05-31031 May 2010 Attachment 3, WCAP-15353-NP, Revision 0, Supplement 1, Palisades Reactor Pressure Vessel Fluence Evaluation ML1100606932010-04-20020 April 2010 Attachment 1, Structural Integrity Associates, Inc., Report No. 0901132.401, Evaluation of Surveillance Data for Weld Heat No. W5214 for Application to Palisades PTS Analysis 2023-09-28
[Table view] |