Regulatory Conference Supporting Documentation for Apparent Violations EA-11-241 and EA-11-243, Attachment 2. SDP Assessment of Service Water Pump P-7C Coupling Failures, Part 6.1 of 7
ML120100547
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/05/2012
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML1200100495 List:
References
EA-11-241, EA-11-243, PNP 2012-06 EA-PSA-SDP-P7C-11-06, Rev. 0
Download: ML120100547 (45)


Text

EA-PSA-SDP-P7C-11-06 Attachment10 Page 1 of 8 Evaluation of Service Water Pumps P-7A and P-7B Failure Rates Following Failure of Pump p-7e 1.0 Introd uction Palisades experienced failure of couplings on the P-7C service water pump on two occasions. The first occurred about 110 days after installation of couplings made of a material that was susceptible to inter-granular stress corrosion cracking (IGSCC). After replacement of the couplings with similar material, another failure occurred approximately 670 days later. Post failure analysis by Lucius Pitkin Incorporated (LPI) determined the failure mechanism and indicated that the other service water pump couplings were susceptible to similar failure mechanisms . Shortly thereafter, all service water pump couplings were replaced with a material less susceptible to IGSCC failure and testing of the couplings for the P-7 A and P-7B pumps was conducted to determine their as-found condition and estimate their expected lifetime had they been allowed to run to failure .

This evaluation examines the conditions discovered by that inspection and the assessment of potential crack growth rates (CGR) for the P-7A and P-7B pump couplings. Based on the as-found condition information provided in the LPI report [1], an estimate of the degraded failure to run rate for each pump was developed . A convolution distribution for the joint probability of failure was derived from the individual pump failure to run rates . This represents the probability of failure of both pumps as a function of time since the couplings were initially installed .

Following failure of pump P-7C , the probability that the two remaining pumps would fail to run can be assessed for any particular time period by subtracting the convolution failure probability at the time of failure of P-7C and the convolution probability of failure at some time thereafter. The key time period of interest is either the repair time for the P-7C pump, or the Technical Specification (TS) allowed outage time whichever is smaller. In this case, the TS allowed outage time of 3 days was used in this evaluation even though the actual time to repair the pump was shorter. This represents a minor conservatism in the analysis that is not expected to affect the result or conclusions appreciably.

EA-PSA-SDP-P7C-11-06 Attachment10 Page 2 of 8 2.0 Evaluation There are three stages to failure of a coupling due to IGSCC. These are crack initiation, crack growth to a through wall condition , and critical fracture (failure of the material) . The last of these occurs rapidly compared to the other two and is conservatively assumed to occur immediately upon crack growth to a through wall state . The crack growth rate (CGR) is a constant over time once initiated ,

while the crack initiation rate varies over time.

As noted in the LPI report [1]:

"The time to failure of a susceptible material in a given environment is dependent on the applied tensile stress, as can be seen in Figure 3-7 (not shown here). The plot compares applied stress or load to the logarithm of exposure time in an environment and illustrates the time to failure increases significantly with decreasing applied stress. The crack propagation time, tcp is taken to be the difference between the time of failure , t" minus the time of initiation, tin. The time at failure is typically known. However, the time of initiation is highly alloy-environment and applied stress dependant and thus is an unknown without specific test data. The initiation time is also highly dependent upon pre-existing flaws that may have been introduced during heat treatment or thread fabrication . Therefore, predicting initiation time is difficult. Unless there are preexisting flaws, a distribution of 80% initiation and 20% propagation is considered reasonable for the life of a component subject to see process as suggested by Figure 3-8 (not shown here) ."

To determine the expected life of the non-failed couplings due to IGSCC , three cases for the CGR were postulated in the LPI report [1] based on the P-7C pump history for the first failure (the shortest time between installation and failure which leads to the highest CGR estimation) .

Case 1 involved using the crack growth rate based on generic data associated with crack growth rates for this type of material in distilled water (2 .3E-04 in/hr) . This produced an expected life of about 90 days if a crack was initiated at the time of installation . Case 2 assumes that half of the observed life of the first P-7C coupling failure was spent in crack initiation and half of the time was spent in crack growth . This case results in a CGR of 3.81 E-04 in/hr. Case 3 involved the assumption that a pre-existing crack had occurred at the time of coupling installation for the first P-7C coupling failure (the one with the shortest time to failure) and resulted in a CGR of 1.91 E-04 in/hr.

The LPI report [1] indicates that the P-7C pump couplings failed initially after about 110 days of operation with the new coupling material in place and the second failure occurred at about 670 days after the first failure with similar coupling material in place. As the CGRs in this evaluation are all based on the shortest time to failure for the P-7C pump , using these CGRs to estimate the remaining life of the as-found coupling for P-7 A and P-7B represents a conservative estimate based on the as-found conditions.

EA-PSA-SDP-P7C-11-06 Attachment10 Page 3 of 8 To evaluate the failure to run rate for the P-7B pump, the actual condition of the worst coupling was used to estimate the remaining life. The worst coupling exhibited cracks with a depth of 0.132 inches with a total wall thickness 0.5 inches . Using the CGRs from the three cases noted above, the LPI report estimated remaining life for this coupling. A Generalized Gamma distribution was fit for this data and is shown below. Weibull++7 software package is used to fit this data [2].

Generalized Gamma for Pump 76 1.E+OO . . , . - - - - - - - - - - - - - - -

l! 1 ,E-01

--=

"j;

~

o 1.E-02 1iN

~

...o a.. _ Generalized Gamma for

  • 1 .E-03

"~

N PUI1lI) 7~

J E
J U 1 ,E-04 1.E-0 5 o 2:0 40 60 80 100 Day after 2nd failure of Pump 7C

EA-PSA-SDP-P7C-11-06 Attachment10 Page 4 of 8 For the P-7 A couplings , there were no indications of crack initiation apparent from the examination of the material after the failure of the P-7C coupling . As a conservative estimation of the remaining life of these couplings , the LPI report [1] assumed that a crack would initiate at the time the coupling was removed for inspection. Thus, the estimated remaining life is based on the CGRs from the three cases noted above and an assumption that cracks existed which were not observed in the as-found condition of the couplings. Using this conservative assumption , a Generalized Gamma distribution was fit for this data and is shown below. Weibull++ 7 software package is used to fit th is data [2].

Generalized Gamma for Pump 7A 1.E+OO , - - - - - - - - - - - - - - - --

G/

~

1 .E-01

.2

~

'0

~ 1.£-02

cfW

..c o

Q.

'- ~ Generalized Gamma fo r 1.E-0 3 PUInP 7A

~

E J

U 1.E t - - - - - - - - - - - - - - - - -

I .E-05 + - - - - r - - - - , - - - - - r - - - - r - - - - - ,

o 20 40 60 80 1 00 Day after 2nd fililure of Pump 7C

EA-PSA-SDP-P7C-11-06 Attachment10 Page 5 of 8 To estimate the probability that both the P-7 A and P-7B couplings would fail within the 3 day time window allowed by Technical Specifications, a convolution of these two failure rates produced the joint failure probability curve shown below. By looking at the joint failure probability at the time of the P-7C failure and the joint failure probability 3 days later, the difference is the probability that both P-7A and P-7B would fail some time during that 3 day period . That value is 2.65E-05 . The figure below shows the convolution curve . The convolution was simulated using Open Bugs [3] and the result of the Open Bugs was fitted to a closed form distribution using EasyFit software package [4] .

Weibull (3P) fit for convolution of Pump 7A and Pump 7B l.E+OO - . - - - - - - - - - - - - - - - - - = - - - - - - - - -

- r - W eibLlIl (3P) fi t for co n vo l L1lion

<U

.2 1.E-O l of Pump 7A and

'iii o

Pump7 B

=

c

/1) l.E-0 2

..a o

a..

- 1.E-02

~ ~ Generalized Gamma for

~

111

..c PU1l11) 7B 0

0-Q/

1.E-03 -+- Weibull (3P) fit for 111 collvolution of Pump 7 A

"'5 E and Pump n

J u

~ llF(oIl I/( t) =Fconv( t )-

1.E-04 Fcoll l,I(857)

1. I: -OS - , 1 - - - - . - - - - - . - - - . - - - . - - - - .

o 4{! 6(' 80 100 Day ilfter 2nd fililure of Pump 7C

EA-PSA-SDP-P7C-11-06 Attachment10 Page 8 of 8 4.0 References

1. F11358-LR-001 Rev. 0, "Past Operability Assessment of Service Water Pumps P-7 A and P-7B associated with As-found Evaluation of Pump Shaft Couplings - Palisades Nuclear Plant", Lucius Pitkin, Inc., September 28, 2011 .
2. Weibull++ 7 website , http://www.reliasoft.com/Weibuil/index.htm
3. Open BUGS website http ://www.openbugs.info/w/FrontPage
4. EasyFit website , http ://www.mathwave.com/

5.0 Appendices Appendix A, Convolution Input and Output (7 pages)

EA-PSA-SDP-P7C-11-06 Attachment10 Appendix A Page 1 of 7 Development of probability of failure curve of coupling pump 7A and 7B Estimated Time to Failure use to develop probability of failure curve of coupling pump 7B Input for Weibull++ 7 (Pump 7B)

Coupling Time to Failure 11-P7B-6K Case 1 552 .5 11-P7B-6K Case 2 515 11-P7B-6K Case 3 574 R~IiaSoft INeW++ 7 - www.ReIii!lSoft.com Probability - Generalized Gamma 99.<nl , - - - - - - - - - - - - - - - - -- - - --.-----------,

Probablity-G-Gamma Datal G-Gamma-3P NLRR SRM MED FM F=3/S=O

  • Data Ports

- ProbabiityLile lO.<nl + - - - - - - - - - - - - - - - - - - - < -/ -- - - - - - - - - - 1 HXUXXl 1000.000 lIme,(t) 73 >e Curve Fitting Result to Generalized Gamma Distribution for Pump 7B Output from Weibull++ 7: Generalized Gamma Distribution with 1-1=6.3173, 0=0 .0231 and A=2 .3501

EA-PSA-SDP-P7C-11-06 Attachment10 Appendix A Page 2 of 7 Use StatAssist that part of EasyFit software package to calculate cumulative probability of failure F(857) F(860) F(867) F(887) F(917) F(947)

Day since the failure of Pump 7-C for the 0 3 10 30 60 90 2nd time Generalized Gamma for Pump 7B where 2.02E-02 2.28E-02 3.02E-02 6.57E-02 1.99E-01 5.64E-01 F(t)=F s(t-403)

Generalized Gamma Fit of Pump 78 l.E+OO

~ General i zed III Gamma for

'0

,~

l.E-O!

l.E-02 Pump 7B

.ctil

.0 n.

0 l.E-03 QI

J l.E-04 E
J u

l.E-OS 0 20 40 60 80 100 Day after 2nd failure of Pump 7C Cumulative Probability of Failure for Pump 7B Input for Weibull++ 7 (Pump 7A)

Coupling Time to Failure 11-P7A-6K Case 1 966 .3 11-P7A-6K Case 2 931 11-P7A-6K Case 3 985

EA-PSA-SDP-P7C-11-06 Attachment10 Appendix A Page 3 of 7 R~Iia9:Jtt YoA!:lbJI++ 7 - wrNW.ReIiaSoI't.com Probability - Generalized Gamma 99.000 - , - - - - - - - - - - - - - - - - - - - - - - - - - - - - ,

Data 1 G-Gamma-3P NLRR SRM MED FM F=3/S=O

  • Data Poi1:s

- ProbabityLJne KriSl'lIn::Ito HaJttjoko

~~~~nrg 10.00~OO.j...

.OOO


'----: 10-,:<

OO.OOO 11:21:31 AM Time, (t)

Curve Fitting Result to Generalized Gamma Distribution for Pump 7 A Output from Weibull++ 7: Generalized Gamma Distribution with 1J=6.8863, 0=0 .0231 and '\=1 .5429 Generalized Gamma Fit of Pump 7 A l.E+OO

~ General i zed

...GI Gamma for Pump

.: l.E-Ol 7A

....~0

~

g l.E-02 til

,g 0

Il. l.E-03 GI

.~

til 3 l.E-04 E

l u

l.E-OS 0 20 40 60 80 100 Day after 2nd failure of Pump 7C Cumulative Probability of Failure for Pump 7A

EA-PSA-SDP-P7C-11-06 Attachment10 Appendix A Page 4 of 7 Use StatAssist that part of EasyFit software package to calculate cumulative probability of failure F(857) F(860) F(867) F(887) F(917) F(947)

Day since the failure of Pump 7-C for the 0 3 10 30 60 90 2nd time Generalized Gamma for Pump 7A 1.89E-02 2.09E-02 2.62E-02 4.96E-02 1.26E-01 3.07E-01 Convolution of Pump 7A and Pump 7B

  • Simulate Pump 7A time to failure with Pump 7B time to failure+403 days.
  • Take the longest time to failure among Pump 7A and 7B for each data generation
  • Generate 100000 data
  • Use Open Bugs to do convolution
  • Fit the 100000 convolution result to a curve .

Input for Open Bugs

  1. new model{

ta-dggamma(ra ,mua ,betaa) tb-dggamma(rb,mub ,betab) tnb<-tb+403 tcomb<-max(ta , tnb)

}

list(ra=0.42 , mua=0 .001 008503 , betaa= 66.73, rb=0.181 , mub=0.001775 , betab= 101 .81) mean sd MC_errorvaI2.5pc median val97.5pcstart sample ta 956.8 35 .83 0.1106 865.7 964.5 1004.0 1001 100000 tb 532.8 27 .96 0.09087 459.6 540.3 565.4 1001 100000 tcomb 966.0 22.23 0.07175 917 .2 966.4 1004.0 1001 100000 tnb 935.8 27 .96 0.09087 862.6 943.3 968.4 1001 100000 Output of OpenBugs mean sd MC_error val2.5pc median val97.5pc sample time to failure pump 7A 956.8 35 .83 0.1106 865.7 964.5 1004 100000 time to failure pump 7B 532.8 27 .96 0.09087 459.6 540.3 565.4 100000 time to failure pump 7B + 403 935.8 27 .96 0.09087 862 .6 943.3 968.4 100000 days time to failure convolution pump 966 22.23 0.07175 917.2 966.4 1004 100000 7A& 7B

EA-PSA-SDP-P7C-11-06 Attachment10 Appendix A Page 5 of 7 Output point from Open Bugs and input for EasyFit OpenBugs simuiaton output and input for I Weibull (3P) fit the best to the convolution result.

Probability Dens ity Function 0.24 0.22-0.2 0.18-0.16 0.14

~ 0.12-0.1 -

0 .08 0 .06 0.04 0.02 840 860 880 900 920 940 960 980 Curve Fitting Result to Weibull (3P) Distribution for Convolution Result Output from Easy Fit: Weibull (3P) with parameter a=8 .630243967 , 13=172.4086991 , and y=803.0072566

EA-PSA-SDP-P7C-11-06 Attachment10 Appendix A Page 6 of 7 Weibull (3P) fit for convolution of Pump 7 A and Pump 78 l.E+OO . - - - - - - - - - - - - - - - - ' - - - - - -

Wei bull (3P) fit l.E-01 for convolution e! of Pump 7A and

!-= Pump 7B

'0

~ l.E-02

c IV

.0

...o c..

CII l.E-03 IV

'3 E

J u l.E-04 +-#-- - - - - - - - - - - - - - - -

1.E-OS - t - - - - - - , - - - - . . . . - - - - - - - , r - - - - - , - - - - - - ,

o 20 40 60 80 100 Day after 2nd failure of Pump 7C Cumulative Probability of Failure for Convolution of Pump 7A and Pump 7B Summary of Cumulative Probability of Failure for Pump 7A, Pump 7B and Convolution Result F(857) F(860) F(867) F(887) F(917) F(947)

Day since the failure of Pump 7-C 0 3 10 30 60 90 for the 2nd time General Gamma for Pump 7A 1.89E-02 2.09E-02 2.62E-02 4.96E-02 1.26E-01 3.07E-01 General Gamma for Pump 7B 2.02E-02 2.28E-02 3.02E-02 6.57E-02 1.99E-01 5.64E-01 Weibull (3P) fit for convolution of 4.45E-05 7.10E-05 1.93E-04 2.01 E-03 2.77E-02 1.90E-01 Pump 7A and Pump 7B

EA-PSA-SDP-P7C-11-06 Attachment10 Appendix A Page 7 of 7 I.E+OO

...::::IGI 1.E-01

'iii

....0 ~ Mconv(t)=

~ 1.E-02 Fco nv(t)-Fco nv( 857)

aIII

.Q

...0 Q..

1.E-03 +----~~-------------~ MB(t) = FB(t)-

GI

> FB(8S7)

'.;:i III

'3 E 1.E-04

I u

I.E-OS 0 20 40 60 80 100 Day after 2nd failure of Pump 7C nd Probability of Both Pump 7A and Pump 7B Fail Since the Pump 7-C Failed for the 2 time. The blue curve assumed completely dependent to the worst pump (pump 7B) and the purple curve assumed pump 7-A and 7-B completely independent nd Probability of Both Pump 7A and Pump 7B Fail Since the Pump 7-C Failed for the 2 time F(857) F(860) F(867) F(887) F(917) F(947)

Day since the failure of Pump 7-C 0 3 10 30 60 90 for the 2nd time

~F B(t) = FB(t)-F B(857) O.OOE+OO 2.61 E-03 9.98E-03 4.55E-02 1.79E-01 5.44E-01

~F conv(t) = Fconv(t)-F conv(857) O.OOE+OO 2.65E-05 1.48E-04 1.97E-03 2.77E-02 1.90E-01

EA-PSA-SDP-P7C-11-06 Attachment 11 , PAL Comments on Draft NUREG, Page 1 of 29 Common-Cause Failure Analysis in Event and Condition Assessment: Guidance and Researtch Song-Hua Shen, NRC Don Marksberry, NRC Gary DeMoss, NRC Kevin Coyne, NRC Dale M. Rasmuson (NRC, retired)

Dana L. Kelly, INL John A. Schroeder, INL Curtis L. Smith, INL iii

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 2 of 29 ABSTRACT Event and condition assessment is an application of probabilistic risk assessment in which observed equipment failures, degradations, and outages are mapped into the risk model to obtain a numerical estimate of risk significance, which can then be used in other applications, such as the Significance Determination Process. Past experience has shown that conditional common-cause failure (CCF) probability is often a substantial contributor to the risk significance of a performance deficiency.

However, guidance for assessing CCF potential has been lacking. Because of this lack of guidance, considerable resources have been expended in efforts to demonstrate an absence of CCF potential, often by scrutinizing piece-part differences across redundant trains instead of focusing on the higher organizational or programmatic issues that were the real cause of the observed failure. Piece parts have often been the object of scrutiny in efforts to declare an observed failure "independent," meaning that no potential existed for CCF of redundant components. Such scrutiny of piece parts is counter to the Significance Determination Process guidance in Inspection Manual Chapter 0308, "Reactor Oversight Process (ROP) Basis Document," which states, "The performance deficiency should most often be identified as the proximate cause of the degradation. In other words, the performance deficiency is not the degraded condition itself, it is the proximate cause of the degraded condition."

This NUREG offers guidance for assessing CCF potential at the level of the observed performance deficiency, provides essential definitions of technical tenns, and describes the treatment ofCCF for a number of categories of component failures and outages. It also describes technical issues with both the consensus CCF model used in probabilistic risk assessments conducted in the United States and the associated parameter estimates and the data upon which they are based. The NUREG closes with a summary of future research intended to address these issues.

v

EA-PSA-SDP-P7C-11-06 Attachment 11 , PAL Comments on Draft NUREG, Page 3 of 29 CONTENTS

1. INTRODUCTION AND MOTIVATION ................. ..... .. ... ............................................................. ..... 1 1.1 PRA Treatment ofI>ependent Failure ...... ............................................ ... ........................................................ 2 1.2 ECA Philosophy Regarding CCF ............................. ..... ....................................................... ..... ...................... 3 1.3 Definitions and Discussion .... ................ ............................. ............................................................................... 4 1.4 ECA Ground Rules for CCF Treallnent ................................... ........ ....................... .............................. .......... 7 1.4.1 Deviations from Ground Rules ...................................... .......... ................ ......................................... ..... 9 1.5 CCF Examples ........................ ......... ............ .. .. .. .. ..................................... .... .... .. ...................................... 10 1.6 SUIllIllaI)'ofGuidance ............................................ .. ........................................................................................... 14
2. DETAILED GUIDANCE FOR TREATMENT OF CCF ...................... .................... .. ................ ..... 15 2.1 Basic Principles of CCF Trea1lnent in ECA ...... .................................................................................... 15 2.2 CCF Treatment Categories ........................................................ ..................................................................... 16 2.2.1 Observed Failure with Loss of Function of One Component in the CCCG ......................... 16 2.2.2 Observed Failures with Loss of Function of Two or More Components in the CCCG ....... 16 2.2.3 Observed Failure with Loss of Function of One Component in dIe CCCG - Component not in SPAR Model. ......... ....... ..... .......................... ........................ ............. .. .... ................. ...... ................ 16 2.2.4 Degradation in One or More Components in CCCG widlout Observed Failure .................. 16 2.2.5 Observed Unavailability of One or More Components in CCCG Due to Testing or Planned Maintenance ..... .... .................................. .................................................... ....... ... .................... ... ... 17 2.2.6 Observed Loss ofFwlction of Components in CCCG Caused by the State of Other Components Not in the CCCG ................ ...... ................ .......................... .................................................... . 17 2.2.7 Observed Loss of FWlction of One or More Components in CCCG as a Result of Environmental Stress Caused by Failure or Degradation of Other Components outside Affected CCCG .......................................................................................... .. ............ .............. ..... .... 17 2.2.8 No Observed Failure or Degradation in dIe Affected CCCG ................................................. 18 2.3 Cases where Guidance Might not Apply ............................................................................................... 18 2.3.1 CCCG Boundary Issues ............................... ............................................................. ........................... 18
3. Issues with Current CCF Modeling and Data Analysis Relevant to ECA .......................................... 19 3.1 Issues with CCF Model. .................................................. ............. ..................................................................... 19 3.1.1 CCF Model is not Causal ................ .............. .................................................. ....................................... 19 3.1.2 BPM Employs a Symmetry Assumption .......... .......... ...... .......... ........................................................ 20 3.1.3 CCF is not Modeled Across Component or System Boundaries .... ............ .... .................... .. ...... 20 3.1.4 Impact on More than One Failure Mode not Captured .......................................... ...................... 20 3.1.5 Conditional CCF Calculations in Models for Support System Initiating Events (SSIE) ..... ..20 3.2 Issues with Alpha-Factor Estimates .................................................... ................ ...... ......... ...................... ... 23 v

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 4 of 29 3.2.1 Treatment of Shared Components and Latent Human Errors ............................... ................ ...... 24 3.2.2 Prior Distributions for Alpha Factors ... .. ... ..... .... .. .................................. ......... ............ ........... ........ 24 3.2.3 Estimates of Alpha Factors are not Plant-Specific ............. ..................... .................. .... ............... .26 3.2.4 Treatment of Staggered Testing ............................... ... ................................................ .................. ..... 26

4. Future Research ................................................... ........... .............. ..... ............................. .. .... ... .. .. ..... 28 4.1 Causal Failure Models ........................................................................ ............................................................... 28 4.2 SSIE Models .... .......... .................... .... ................................. .... .... .. ............................. ............. ... ....... .... ....... 29 4.3 Enhancements to NRC CCF Database ....... ....... .... ................. ....................... ............. .... ..... ........... .. ........ 30 4.3.1 Prior Distribution for Alpha-Factors ................ ............... ......................................... .... .................. 30 4.3.2 Plant-Specific Alpha-Factor Estimates .. .... .... .. ..................... .. ...... ............................. .................... 30 4.3.3 Adjusting Alpha-Factor Estimates .... ................... ..... ........... .... ....................................................... 30 4.3.4 Effects of Testing Schemes on Estimators .................... .. ............. ................................ ................. 30
5. REFERENCES ....... .... ..... .. ....... .. .................. ..... ........ .... ............ ...................................... ................. 31 Appendix A .... ............ ........... ...... .... ..... ... ... .. .... ............ .. .. ... ...... .. ... .. .. ...................... .. ........ ... ..... ............... .. ..33 Conditional Common-Cause Failure Probability Calculations ................ .......................................... ........ ......... 33 Al Review of Basic Parameter Model and Alpha-Factor Parameterization ............................... ... ...... 33 A2 Calculating Conditional Common-Cause Failure Probability ... .......................................... ....... ....... 35 A.2.1 Failure To Start ..... ... .. ............. ................. .. ....... .................... ............ ........... ............... .. ............ 37 A.2.2 Independent Failure To Start .......................... ..... ......... ....... ........ ... .......................... ... ... ... .......... 38 A2.3 Test or Preventive Maintenance Outage ....... ... ... ... .. .... .. ............................ ................................ 39 Appendix B ...................................... .... .............. ... ................. ...... ........................................ .................. ................... 40 Effects of Testing Schemes on Common-Cause Failure Parameters ................................................ ............... ..40 B.l Common-Cause Failure Model Parameters .................................................... ........... ........ .... ........ ......... 40 B.2 Ways of Collecting Data ..... ... ... ...... ................... .... ... ... .............. ...................................... ........ ......... ........ 41 B.2.1 Estimators when All m Components Are Demanded on Each Test ........................................42 B.2.3 Estimators with Staggered Testing ...... ... ... .... ........ ... ... ........ ..................................... ..... .......... ... 44 B.3 Effect of Using the Wrong Formula ...... ... .. ........................................... ..... ... ........... .................... ..... .. .. ..4 7 B.4 Proofs of Selected Results ...................... .............................. ........ ............................................................. 48 FIGURES Figure 1 lllustration of difference between cause of failure and failure mechanism .. ............ .... ......... .... ........ 3 Figure 2 Plot of 500 dependent failure times for two components from Marshall-Olkin shock model, showing simultaneous failure times caused by shared shocks occurring randomly in time .... ... ... ................. 5 Vi

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 5 of 29 Figure 3 Scatterplot of 100 dependent failure times for two components, showing positive correlation of failure times, but without the simultaneous failures that would be produced from a shock model, taken

from (Kelly D. L., 2007) ................................................. ..... .................... ...................... ................................................. 6 Figure 4 Circumferential crack in Eoo flexible coupling .............. ........... ......... ...... ................ .. ................... 11 Figure 5 Lube oil lead from Y -strainer end cap on Dresden Eoo 2/3 ...... ... .... ... ....... .. ........ ............. ... ...... ... .. 12 Figure 6 Failed plastic end cap on Dresden EDG 2/3 lube oil strainer ......................................... .... ............ 12 Figure 7 Reliability block diagram for two pumps in parallel, one normally numing and one in standby 20 Figure 8 Markov model for two-pump configuration in Figure 7 ..................... .... ................................... ........ 21 Figure 9 Reduced Markov model for two-pump CCCG, given that pump B has failed with potential for CCF of pump A ...................................................................... ................................ ..................... .............................22 Figure 10 Example of Bayesian network causal modeL .. ......... ...... ................ ................... ..............................29 Figure 11 Example fault tree for two failure modes and three components ...................................... ........... 36 TABLES Table 1 CCF Data Used To Develop Alpha-Factor Prior Distribution ............................................................ 24 Table 2 Component Failure Probabilities for Three-Component Example .................................................... .36 Table 3 Basic Event Probabilities for Three-Component Example................ ............................................... .. .36 Table 4 Quantified Minimal Cut Sets for Three-Component Example ................................................. .......... 37 Table 5 Quantified Minimal Cut Sets and Conditional Probabilities for Three-Component Example, Given Observed Failure To Start of Component A. ........ ...... ......................................... .... .... ............................ 37 Table 6 Quantified Minimal Cut Sets and Conditional Probabilities for Three-Component Example, Given Observed Independent Failure To Start of Component A ..................................................................... 39 V ll1

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG , Page 6 of 29 FOREWORD The U.S. Nuclear Regulatory Commission's Division of Risk Analysis in the Office of Nuclear Regulatory Research develops and manages research programs relating to probabilistic risk assessments (PRAs), human factors, and human reliability analysis. The division assesses u.s. operational safety data and reliability information to determine risk-significant insights and trends, which allows us to focus on the risks most important to protecting public health and safety.

A general conclusion from PRAs of commercial nuclear power plants is that common-cause failures (CCFs) are significant contributors to the unavailability of safety systems. Especially in event and condition assessment (ECA), an observed performance deficiency has the potential to fail multiple components in a relatively short time period. CCF in ECA has to be analyzed at the level of the observed performance deficiency. In other words, the assessment of the potential for multiple dependent equipment failures in ECA should not be constrained by an assumption that CCF requires failure of the same piece part or subcomponent because of the same failure mechanism. Instead, this assessment should focus on the higher organizational or programmatic issues that were the real cause of the observed failure.

This NUREG offers guidance for assessing CCF potential at the level of the observed perfonnance deficiency, provides essential definitions of technical terms, and describes the treatment ofCCF for a number of categories of component failures and outages. It also describes technical issues with both the consensus CCF model used in PRAs conducted in the United States and the associated parameter estimates and the data upon which they are based. The NUREG closes with a summary of ongoing and future research intended to address these issues.

Richard Correia, Director Division of Risk Analysis Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission I.) This initial discussion of the proposed approach to conduct common cause analysis under the premise that it not be constrained to the same piece part or subcomponent or the same failure mechanism, is contrary to any existing PRA methodology for conducting common cause analysis.

This document attempts to move the concept of cross cutting issues into the PRA model which mayor may not be consistent with the approach to implement common cause contribution in the model. A principal issue is the guidance provided does not include any direction to provide a basis to support the conclusion that the performance deficiency is directly tied to the component failures being observed and that all common cause failures identified would be expected to occur within the PRA mission time of a single event. The approach is to elevate the definition of performance deficiency to the broadest definition that can be shown to encompass the event in question. The elevated description then makes the assertion that many other common cause failures beyond those identified would be possible and not necessarily constrained to the common cause group of the component(s) failed in the event under consideration.

For example, the following is from IM 0308 Attachment 3:

"The staff is responsible to define licensee performance deficiencies. Where the proximate cause of multiple degraded conditions is the same, there is likely to be only one fmding (based on the identified performance deficiency related to the proximate cause) and the risk impact of the collective degraded conditions (including any overlapping conditions) is then appropriately used as the basis for the SDP result. However, this concept could be taken to an extreme of defming all licensee performance deficiencies as "management weakness" or something similarly fundamental. Doing so would then cause all degraded conditions to be manifestations of a single and possibly never-ending finding, would make unnecessary the need for an Action Matrix, and may require the staff to devise a continuous risk meter or similar substitute for the Action Matrix. Thus, a "floor" was set for the implementation of this concept that is consistent with the ROP framework, in that no performance deficiency should be defined at a level associated with the ROP cross-cutting issues (i.e., human performance, safety-conscious work environment, and problem identification and resolution) or more X

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 7 of 29 fundamentally. Although artificially setting this "floor" may create a philosophical inconsistency with use of a probabilistic thinking framework (i.e., if there is really a known common-cause effect taking place, then it should be explicitly acknowledged in a probabilistic model), it remains necessary for practical reasons as long as the Action Matrix continues in its present form. Concerns about possible insufficient regulatory responses arising from this approach are also mitigated as noted below."

It is considered this documents premise is inconsistent with the above.

This documents approach goes on to state, given the definition of the performance deficiency, the current assignments in the PRA model for common cause grouping may no longer be applicable, and the failure mechanisms considered as the common element of group failure are no longer a constraint on the number of components that would be the target group for common cause failure. The issue is that the defmition of the performance deficiency at this high level (,POOR MAINTENANCE PROCESS') represents an unbounded characterization of commonality among a group of components. This would allow cross system groupings, and grouping of dissimilar components, into much larger common cause groups. There is no guidance that mandates the development ofa technical basis that would establish the connection of the specific observed failure(s) to the entire common cause group.

2.) The summary discussion in the foreword also states that it describes technical issues; with the consensus CCF model used in PRAs, and the associated parameter estimates and data upon which they are based. The principal issue with this description is the industry has developed several standards (ASME I ANS) to establish a baseline consistent methodology of implementing risk assessment.

Plants are required to undergo review by external organizations to establish the degree of implementation/compliance with these standards. The authors herein have determined that the current standards are inadequate and infer that the implementation of this approach provides a method of quantifying risk assessments that will correct these deficiencies.

The guidance provided is a proposed means of correcting issues with the current consensus model without having been subjected to the same process of development as the current standards. Moreover, any issues with the current standards should be resolved within the standards process prior to issuing contrary guidance. If there are legitimate issues with the ASME/ANS standard process, it needs to be corrected first.

ACKNOWLEDGMENTS This report benefited from the discussions and comments of A Mosleh, P. Aggignani, L. Criscione, C.

Hunter, J. Lane, A. Salomon, and See-Meng. Wong.

The authors would like to acknowledge the technical contributions of Dr. Corwin Atwood to Appendix B.

x

EA-PSA-SDP-P7C-11-06 Attachment 11 , PAL Comments on Draft NUREG, Page 8 of 29 ABBREVIATIONS ASP accident sequence precursor BPM basic parameter model CCF common-cause failure CCCG common-cause component group CFR Code of Federal Regulations ECA event and condition assessment EDG emergency diesel generator FTR failure to run FTS failure to start HFE human failure event INL Idaho National Laboratory IR inspection report MCC motor control center MLE maximum likelihood estimate NRC U.S. Nuclear Regulatory Commission PORV power-operated relief valve PRA probabilistic risk assessment SAPHIRE Systems Analysis Programs for Hands-On Integrated Risk Evaluations SDP significance determination process SPAR standardized plant analysis risk SSIE support system initiating event x

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 9 of 29 Common-Cause Failure Analysis in Event and Condition Assessment

1. INTRODUCTION AND MOTIVATION Event and condition assessment (ECA)"is an application of probabilistic risk assessment (PRA) in which observed equipment failures, degradations, and outages are mapped into the risk model to obtain a numerical estimate of risk significance. Such an assessment can be either prospective, as when utilities use PRA as an aid in planning and scheduling equipment maintenance, or retrospective, such as in the Nuclear Regulatory Commission's Significance Determination Process (SDP) and Accident Sequence Precursor (ASP) Program. In this report, we focus on retrospective assessments intended to estimate the risk significance of degraded conditions, such as equipment failure caused by a deficiency in a maintenance process.

However, it is important to understand that the analyst is estimating a conditional risk metric (e.g., the conditional probability of core damage) for the event. Because the actual event did not lead to core damage, the event is not modeled exactly as it transpired because this would lead to a conditional core damage probability of zero. Instead, observed failures are mapped into the PRA model, but successes are treated probabilistically; the analyst accounts for the possibility that equipment that functioned successfully might, with some probability, fail to function, and tllat equipment that was not demanded in tlle actual event could have been demanded for some scenarios and also have a probability of failure.

Thus, failure probabilities are left at their nominal values or are conditioned as necessary to reflect tlle details of the event.

3.) This discussion is somewhat vague. When an event happens and core damage does not occur, the conditional probability of core damage is zero. What is being computed is the likelihood that, if such an event or similar event were to occur again under the same boundary conditions that existed when the actual event occurred, that additional failures would have occurred to produce core damage. The key is the probability of what happened is not being evaluated, but what could happen if the event were to occur again.

As an example, many if not most retrospective ECAs in the U.S., are done as part of the NRC's SDP, which is intended to evaluate the risk significance of inspection findings that pertain to an observed deficiency in licensee perfonnance. Therefore, the ECA's main purpose is to quantify the risk significance of the event caused by the deficiency, using a PRA model (U. S. Nuclear Regulatory Commission, 2006). As an example, if the deficiency that led to an observed failure were poor quality control, then the ECA would estimate the risk significance of tlle observed equipment failure caused by this deficiency, and the analysis includes a probabilistic treatment of failures that were not actually observed, but could have been, because multiple equipment items could have been impacted by the deficiency (decreased reliability due to susceptibility to the same cause). Because nuclear plants utilize redundant safety equipment, the risk significance of such a deficiency will often be strongly influenced by the potential for dependent failure of this redundant equipment. Thus, a crucial tenn in the ECA risk equation is the conditional probability that remaining redundant components could fail, given tl1at one or more such components were failed as a result of the identified perfonnance deficiency. This probability is obtained by calculating a conditional common-cause failure (CCF) probability using the inputs to the PRA model.

4.) When an event occurs and the cause of the event is determined, the conditional probability of it being a common cause failure or independent failure is either 1 or O. There may be uncertainty in determining this, so one might assign some probability that it was a common cause using engineering judgment, but this should not be compared with CCF model parameters.

Past SDP experience has shown that conditional CCF probability is often a significant contributor to the risk significance of the deficiency. In addition, guidance for assessing CCF potential has been lacking. Due to this lack of guidance, considerable resources have been expended in efforts to demonstrate an absence of CCF potential, often by scrutinizing differences among subcomponents and 9

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 10 of 29 piece parts across redundant trains instead of focusing on the higher organizational or programmatic issues that were the real cause of the observed failure. Piece parts have often been the object of scrutiny in efforts to declare the observed failure "independent," meaning there was no potential for CCF of

. We will not distinguish, except where it is teclmically necessary to do so, between an "event," which involves the occurrence of a PRA initiating event, and a "condition," which involves degradation of components for some period of time, but without the occurrence of an initiating event.

5.) The guidance above states that, whi le common cause contribution has been shown to be a significant contributor in past Event and Condition Assessments (ECA), there have been issues in not appropriately characterizing the common cause potential perceived to be associated with the observed events. The approach states the problem is related to being overly specific in the statement of the performance deficiency which restricts the focus of the risk assessment.

Therefore, the deficiency description should be elevated and broadened to a level commensurate with the definition of the cornerstone or the general requirements of the Quality Assurance Program Elements. While this is appropriate in the context of determining the possible association of several different events into a depiction of broader organizational issues, it also raises two concerns:

I . Statements of performance deficiencies at this level result in unbounded issues which makes it difficult to impossible to demonstrate issue resolution.

2. The association of component failures from several different events that have been encompassed by this broadened deficiency definition may not have not been shown to be connected by a direct common cause.

The issue is that deficiency definitions at this level are self fulfilling with respect to any group one would choose to create. The defmitions become so vague that anything can be postulated to belong to the gro up.

Almost all equipment failures that have ever occurred could be lumped into a single group as long as we are willing to discuss causes at the proposed level (e.g. poor maintenance processes). In addition, the depiction of the deficiency in this broader characterization to assess several different events that occurred over some extended period of time ignores any correlation that would have established the probability of the different events occurring within a single event response.

PRA models have not been developed to accommodate this type of assessment of organizational issues and there is no data to support the quantification, as is being proposed in this document. This type of assessment has historically been a qualitative determination of the level of significance of the possible impacts of several disparate but similar events.

Current PRA models are not developed with the capability to perform this type of assessment. To now provide a methodology that would superimpose this type of assessment onto a PRA would be subject to subjective determinations, and gross over or underestimation of the risk contribution.

10

EA-PSA-SDP-P7C-11-06 Attachment 11 , PAL Comments on Draft NUREG, Page 11 of 29 redundant components. Such scrutiny of piece parts is counter to the SDP guidance in (U. S. Nuclear Regulatory Commission, 2006), which states, "The performance deficiency should most often be identified as the proximate cause of the degradation. In other words, the performance deficiency is not the degraded condition itself, it is the proximate cause of the degraded condition." The inspector should exercise care to ensure that the performance deficiency is not focused too specifically on a particular subcomponent or piece part. For example, a deficiency related to an inadequate vendor design basis for short-time inrush current on a circuit breaker might better be worded to refer simply to an inadequate vendor design basis, without adding the specific details as to the components that were affected. One of the primary motivations for this NUREG is to elaborate on the performance deficiency issue, and to provide clear guidance for conditioning CCF probability in ECA.

6.) It is unclear what is meant by "proximate cause". This should be better defmed.

1.1 PRA Treatment of Dependent Failure Since the publication of W ASH-1400, PRA studies have recognized the importance of dependent failure as a means of defeating designed-in redundancy and diversity. In treating dependent failure of hardware components, W ASH-1400 employed the term common mode failure, defined as:

Multiple failures which are dep endent, thereby causing the joint foilure probability to increase. The multiple failures are common mode or dependent because they resultfrom a single initiating cause, where "cause " is used in its broadest context.

7.) Per the ASMFJANS PRA standard CCF is defmed as:

common cause failure (CCF): a failure of two or more components during a short period of time as a result of a single shared cause.

This defmition brings in the concept of short time which is only implied in the WASH-1400 definition. Note that the tenn was changed from common mode to common cause because the cause was the key to defming the failures in the same short time interval - failure modes can be common but at different times they are not common cause failures.

W ASH-1400 elaborates on what can constitute a cause of dependent failure, noting that a cause can be "one of a number of possibilities: a conunon property, a common process, a common environment, or a common external event." While WASH -1400 used the term common mode failure to encompass all types of dependence, later PRAs categorized dependent failures largely based on how they were treated in PRA models. The PRA Procedures Guide (U.S. Nuclear Regulatory Commission, 1983) describes nine different types of dependent failure, summarizing these in three categories: common cause initiating events (now called external hazards), inter-system, and inter-component dependencies. External hazards (e.g., earthquake) produce dependent failures of equipment through spatial interactions; such dependencies are treated through special analysis techniques. An example of inter-system dependence, which is generally captured in the PRA fault trees and event trees, is dependence of front-line systems on shared support systems. These can be thought of as hard-wired dependencies that are a result of system design. Inter-component dependencies, which are not captured explicitly in the PRA models, span a wide range, and may include common design, manufacture, testing, maintenance, environment, and many others. The PRA Procedures Guide (U.S. Nuclear Regulatory Commission, 1983) referred to this last dependence category as common cause failure (CCF), and US. PRAs since that time have followed this convention, defining CCF as the failure of multiple redundant components, within the mission time window of the PRA, as a result of a shared cause. However, as noted by (Bedford & Cooke, 2001),

dependent failure treatment in PRA remains "an issue around which much confusion and misleading terminology exist."

Part of the confusion, particularly with respect to ECA, stems from a focus on the manner in which the cause is manifested at a piece-part level, that is, the failure mechanism.

8.) Failure at the "piece part" level is not the same as a failure mechanism. The confusion occurs in the use of CCF models for the purposes they were not intended for.

As discussed above, such a focus is counter to existing SDP guidance in (U S. Nuclear 11

EA-PSA-SDP-P7C-11-06 Attachment 11 , PAL Comments on Draft NUREG , Page 12 of 29 Regulatory Commission, 2006). For example, if the shared cause offailure is a deficiency in a maintenance process, the manner in which the deficiency is manifested across components may vary. In other words, two components could fail in the same mode due to CCF, with the shared cause being the deficiency in the maintenance process, but the failure mechanism at the subcomponent or piece-part level might not be the same. CCF does not require that the failure mechanism be identical, only that the cause of failure is shared. TIlls concept is illustrated graphically in Figure 1.

9.) This discussion does not make it clear that the times of the multiple failures must be synchronized. A failure due to poor maintenance practice and noting that the maintenance practice is shared by redundant components does not meet the defmition of common cause. Poor maintenance practice could just as easily lead to higher independent failure rates than increased CCF potential.

10.) In the discussion of the PRA Treatment of Dependent Failure section 1.1 , the argument is made that once the defmition of the performance deficiency is elevated to a broader scope description, this is sufficient basis for expanding the existing common cause grouping to include any number of diverse components because they can be shown to be encompassed by the all-inclusive definition. Creating deficiency descriptions at this level creates a condition in which almost any failure that ever occurred could be considered part of the group because the over generalized cause statement carmot be proven incorrect. Consequently, this allows the focus to be shifted away from the actual component failures and their direct causes. Attempts to over generalize these conditions to estimate the risk of organizational weakness has not been the purview of PRA modeling and should not be.

The PRA model focus has been, and should continue to be, on maintaining the reliability of components credited in mitigating analyzed events. At no point has there been any discussion of the need to develop a basis for the connection of these events under one common theme. While it is appropriate to characterize events sim ilar to the examples provided as poor maintenance processes as an example for the purpose of aggregating against the ROP cornerstones, or the broadly defined QA areas, it is not necessarily true that the elements of the maintenance processes are all necessarily failed or failed to the same degree.

Also, the failure to correctly implement a procedural requirement one time does not guarantee failure on the next occurrence. This must be demonstrated by providing evidence that the procedural requirement is routinely violated and that evidence exists in implementation of other procedures as well. Even in the case of additional examples, any suspect increase in risk should be restricted to the cases where the evidence is provided. Otherwise, the generalized statements of performance deficiency result, as was done in this document, in an overall indictment ofan entire process which was not supported by any factual information. This is the very issue that was raised in the SDP process to be avoided because of the likely gross over estimation of the risk significance.

12

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on DraftNUREG , Page 13 of 29

.....--- /' ~' "

/ / '"  ! ,

( Component A Failure  :: \ Component B Failure i

  • -:4/.- -.--~.. . -

I 1 \

",,1 '\'.....

/

?--**:rT-.. ~.. .-

/ I \

//

/ 1 \ / J \

/  ! \ / I

/ 1 \ I I 1 \

I \ \ I I 1 \

L J ~ .,... ...1.,\ ./.-1.... / ...1.." \ /_..1."'"

/ -- ' \ /- * ' \ i ..*. ',./* ..*'\  ! . - \( \. "

Sub-Component ',' M i l' A2 i A3 . . ' A4 I ** _. I, B1 .' ( B2 ; : B3 ! :. B4 ! ----

and Failure \ /"'\1 ../ "

' ... . ~ .... - . .,

. \

! \ J

/ /"~......j,../'" ";", /

...; ..... ~\ .;.~/ ..... ". ~

/

Mechanism

......., . . . ,, \ /

/,/

/' ~.....

,., /'

/ .....

,.., /

" ...... 'I /

/

,. /

..... /

",..-' / ..... "'"

'....... . . . \. \

...-------~/

- / / .... /

..-.<.... ..,- ..... , . . /

-""-... . ~ Poor "".... ..... ....

~ rv1aintenance :

Performance Deficiency '-....,-'-.,

Process ,/

Poor Maintenance Process is the observed performance deficiency A2 is the observed failure mechanism of a specific sub-component due to the observed performance deficiency.

B2 is the same failure mechanism of the same sub-component of component B.

A 1, A3, A4, -- and B1 , B3, B4, -- are the other failure mechanisms may be caused by the same performance Deficiency.

11 .) This model would apply equally well to maintenance causing increased independent failure rates or increased common cause potential. The model should include the time element.

Figure 1 Illustration of difference between cause of failure and failure mechanism 1.2 ECA Philosophy Regarding CCF CCF is included in the PRA because analysts have long recognized that many factors, such as the poor maintenance process in the previous example, which are not modeled explicitly in the PRA, can defeat redundancy or diversity and make failures ofmultiple similar components more likely than would be the case if these factors were absent. The effect of these factors on risk can be significant. For practical reasons related to data availability, the PRA community has estimated the CCF probability of similar components using ratios of failure counts collected at the component level, without regard to failure cause. Since CCF probabilities are thus based on composite parameters from a cause perspective, the baseline risk estimate ofPRAs is felt to be correct in an average sense. While use of conditional CCF probability in ECA can be imprecise because of lack of specificity at the cause level, this document will go on to show that it is important to consider (rather than ignore) this conditional probability, and suggest ways that the approach can be improved.

12.) An equally, or more important reason, is that causes are too numerous to mention and difficult to codify.

The causes described here are general cause categories and are not defined sufficiently to determine the type of cause.

Often, factors such as poor maintenance processes are part of the environment in which the components are embedded, and are not intrinsic properties of the components themselves. The conditioning ofCCF probability on observed failures in ECA allows tlle PRA to provide an approximate insight as to the risk significance of these implicit enviromnental or organizational factors; CCF is the principal means (human reliability analysis being the other) by which current PRAs can assess the impact 13

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 14 of 29 of organizational factors on risk, however approximate the assessment may be. As was mentioned above, CCP is modeled parametrically (i.e., the treatment is statistical rather than explicit) in PRA, using what can be considered to be a consensus model, as defined in (Drouin, Parry, Lehner, Martinez-Guridi, LaChance, & Wheeler, 2009). In this consensus model, the CCF parameter values are estimated from a combination of past events, which had a variety of causes. Thus, the CCF parameter values are not specific to a single cause, such as a poor maintenance process. As a result, the conditional CCF probability, which is a fimction of the baseline CCF parameter values, might be either conservative or nonconservative, depending on the specific situation being modeled. In addition, while some causal factors, such as poor maintenance processes, can impact multiple systems, the state of the practice in U. S.

PRA does not include models of intersystem CCF, only CCF within a redundant group of components in a single system. Prom this perspective, the conditional CCP probability could be nonconservative.

13.) The idea of a conditional CCF probability is not carefully defined. Conditional CCF probability is not related to MGL or ALPHA factors. ALPHA factors are correlative and should not be used as surrogate conditional probability values. Moreover, as cited in this document ALPHA factors can be conservative or nonconservative. So if ALPHA factors are applied as surrogate conditional probabilities, the conclusion is unclear.

1.3 Definitions and Discussion Because of the confusion in terminology mentioned by (Bedford & Cooke, 2001), we will define some necessary tenns as clearly as possible. These definitions are in general accord with wider PRA usage.

Dependent failure: The joint probability of two or more components failing is not equal to the product of the individual probabilities of failure when the failures are dependent. For hardware, the joint probability of failure is typically larger in the case of dependence than the product of the individual probabilties, and tIns is tIle reason for concem with dependent failure in the PRA. Note: to be of concern in the calculation of risk, multiple failures have to occur witllin the mission time window; however, dep endent failures do not have to be simultaneous.

14.) Stating the dependant failures must occur within the mission time window is somewhat vague. There are situations where the mission time might be long - months. If the mission time is short and the independent failure rate is high, multiple fai lures in short time intervals are not necessarily CCF.

Common cause failure: When two or more components fail within the PRA mission time window as a result of a shared cause. The failure mechanisms do not have to be shared. In other words, the subcomponent or piece part that fails does not have to be the same; it is the cause of failure that is shared.

Various stochastic models.ofCCF have been developed over several decades. A few of these, such as the Marshall-OIkin model (Marshall & OIkin, 1967) and the binomial failure rate adaptation of that model (Vesely, 1977), are shock models, meaning that dependent failures are due to shocks that affect multiple components simultaneously. The common cause shocks are randomly distributed in time in tIlese models.

In such models, the failure times of components affected by common cause shocks are simultaneous, as shown inp' 2' taken from (Kelly D. L., 2007). Thus, shock models cannot, without modification, 19ure represent more general causes of dependent failure that do not lead necessarily to simultaneous failures.

14

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG , Page 15 of 29

+

o o

Q m

+

I:)

o

<;I o

o 5000 10000 15000 20000 2'5000 1.1 Figure 2 Plot of 500 dependent failure times for two components from Marshall-Olkin shock

=

model, showing simultaneous failure times (those along the line t.2 t.1) caused by shared shocks occurring randomly in time, from (Kelly D. L., 2007)

However, the most commonly used PRA models of CCF (e.g., alpha-factor model) are not shock models.

Furthennore, the requirement that failures be simultaneous in order to count as CCF is overly restrictive; a shared cause such as poor maintenance might generally cause the failure times of affected components to be positively correlated, without giving rise to exactly simultaneous failures, as shown in Figure 3, taken from (Kelly D. L., 2007).

15

EA-PSA-SDP-P7C-11 -06 Attachment 11, PAL Comments on Draft NUREG, Page 16 of 29 0

0

~ 00

~

~

0 a

0 c

'l 0

0 ()

0

~ 0  :)

....: an 0

0 (}

0 0 0 a <> ¢

1) ()

!)

c 1) 0 ¢ 0

0 a C)O  ;) C C 0 <l C qp <;;

0 ~

lJ") <>

0) o 5000 10000 15000 20000 T. l Figure 3 Scatterplot of 100 dependent failure times for two components, showing positive correlation offailure times, but without the simultaneous failures that would be produced from a shock model, taken from (Kelly D. L., 2007)

Common-cause component grOUP (CCCG) : This is defined in (Mosleh, Fleming, Pany, Paula, Worledge,

& Rasmuson, 1988) as "A group of (usually similar) components that are considered to have a high potential offailing due to the same cause." We would revise this definition slightly to say simply that the components share a potential for failing due to the same cause; the potential for failure does not need to be high. In fact, typical CCF probabilities are quite low; in a CCCG of size two, if we have observed a failure of one component, the conditional probability that the second component fails due to the same cause is < 0.05.

Assignment of components to CCCGs is part of the qualitative analysis of CCF done for the PRA. A description of the qualitative analysis can be found in (Mosleh, Fleming, Pany, Paula, Worledge, &

Rasmuson, 1988). If components have been placed into a CCCG as part of the PRA model development, one can assume that a potential for dependent failure exists among the components. As a result, if a component in a CCCG fails as a result of a perfonnance deficiency, potential for CCF exists with other components in tlle CCCG unless the boundaries of the CCCG can be shown to be inaccurate.

16

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 17 of 29 Common mode failure: Term used by WASH-1400 to describe dependent failures of all kinds. This term was later applied to a variety of different conditions, and tIns has led to confusion. One usage of tIle tenn that is heard occasionally today, which we do not encourage, is for failures caused by a shared component, or by a latent human error, where this dependence is not modeled explicitly in tIle PRA.

Because the NRC Standardized Plant Analysis Risk (SPAR) models contain less detail than a typical licensee PRA and the primary function of the NRC CCF database is to support the SPAR models with CCF parameter estimates, such events are classified as common cause failures in the NRC CCF database.

This is due to the boundary definitions ofPRA components developed for the NRC CCF database and the fact that few latent human errors are included explicitly in the SPAR models. For more information on tIle NRC CCF database, see (Wiennan et aI., 2007).

Independent failure: In one sense, an independent failure is just a failure whose probability is not influenced in any way by other failures or successes that may have occurred. Thus, the joint probability of failure of two or more component can be written as the product of the individual (more formally, marginal) failure probabilities; tIns is the mathematical definition of stochastic independence. However, independent failure is a term that is sometimes applied in a more specialized sense when estimating parameters of CCF models, such as the alpha-factor model. The parameter estimates of these models are based fundamentally on observed (and inferred) failure counts. For example, a commonly used estimate in the alpha-factor model is In tllls equation, nk is the number of events involving the failure of k redundant components in a CCCG of size m. For k = 1, the events involve only one component; such events are referred to as independent counts. If the presence of a shared failure cause guaranteed failure of all components sharing tllat cause, the tenn would be apt, as observed single failures would by necessity imply the absence of a shared cause. However, tlris is not the case in reality; a shared cause might only increase the joint probability of multiple failures (per the definition of dependent failure above). Hence, a more appropriate term for nl nright be individualfailures.

Failure memory approach: The aim of using PRA for ECA is to assess probabilistically what else could have happened in the event, but which did not happen, that would have resulted in core damage. So failures are remembered and successes are forgotten. Thus, observed failures are mapped into the PRA model, but successes are treated probabilistically: the analyst accounts for the possibility that equipment that functioned successfully or was not den1anded in the actual event nright, with some probability, fail to function. Thus, failure probabilities are left at their nominal values or are conditioned as necessary to reflect the details of the event. For more details see App. A to Vol. 1 of the RASP Handbook and (Hulsmans, De Gelder, Asensio, & Gomez, 2001).

1.4 ECA Ground Rules for CCF Treatment This section presents the fundamental approach for treating CCF of redundant components in an ECA risk calculation, when one or more of the redundant components are not available due to a deficiency in licensee performance. In past analyses, assessments ofCCF were made in varying ways due to the lack of clear guidance for making the assessment. This section attempts to elinrinate or at least significantly reduce tllls variability by presenting clear and simple guidelines for the assessment, which are consistent with what CCF represents in terms of dependent failure, as described above. We also discuss some deviations from the guidelines, which address linritations in current PRA modeling. A more detailed discussion can be found in Sec. 2.

17

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 18 of 29 l1lere are d1ree basic ground rules for treatment of CCF in ECA. We list iliese rules, along wiili some discussion. Some examples are provided later in dlls Section.

(1) The shared cause is ilie deficiency identified in ilie fuspection Report, which led to ilie observed equipment failure. For example, if the deficiency were poor quality control, which could affect oilier redundant components in ilie CCCG, dlen a potential for CCF would be judged to exist.

The shared cause of failure at dlls level is ilie quality control deficiency. Note iliat ilie shared cause should be considered in a broad sense, and not necessarily limited to what was written in ilie fuspection Report, in order to ensure that ilie potential for CCF is considered appropriately.

IS .) This rule does not address the time element. Ifredundant components share a deficiency, it does not mean that the deficiency will increase the likelihood of a CCF.

For example, the incandescent light bulb; All light bulbs share the same deficiency which explains why almost 100% of failures occur due to the

  • same failure mechanism - thermal fatigue of the filament, However 99.999+% of all cases of light bulb failure due to this mechanism are independent failures . Many cases of shared deficiency can be explained by an increased failure rate.

(U. S. Nuclear Regulatory Commission, 2006) has ilie following to say regarding a performance deficiency: " ...it is important to recognize that discernable (sic) risk increases come from degraded plant conditions, both material and procedurelprocess in nature [emphasis added], and iliat ilie perfonnance deficiency should most often be identified as ilie proximate cause of tlns degradation. In oilier words, ilie perfonnance deficiency is not ilie degraded condition itself, it is dle proximate cause ofilie degraded condition. This detennination of cause does not need to be based on a rigorous root-cause evaluation (which might require a licensee monilis to complete), but railier on a reasonable assessment and judgement ofilie staff."

16.) The guidance states that the performance deficiency is not the degraded condition itself but it's the proximate cause of the degraded condition. Note that ' degraded condition' has crept into the guidance. PRAs do not typically analyze the impact of degraded conditions. More importantly the guidance states that the determination of cause does not need to be based on rigorous root cause evaluation but can be based on ' reasonable assessment and judgment of the staff . Given the possible implications of the findings associated with the performance deficiency, a statement that rigorous evaluation is not required is not consistent with potential consequences of such ajudgment.

Emphasis was placed on degradations in procedures and processes in dlls quote to help discourage overly narrow descriptions of a perfonnance deficiency, focusing on specific subcomponents or piece parts and ilius diluting ilie larger impact of such a deficiency on risk. It is preferable to state iliat a perfonnance deficiency was "poor maintenance practices" railier ilian ""poor maintenance practices associated wiili installing bearings in ilie correct orientation." Oilier examples: "failure to correct a condition adverse to quality" instead of "failure to correct a condition adverse to quality associated wiili lube oil systems;" ilie licensee failed to develop and implement scheduled preventive maintenance, as required by Technical Specifications" instead of"ilie licensee failed to develop and implement scheduled preventive maintenance, as required by Technical Specifications for Agastat E7000 series time delay relays in ilie emergency diesel generator (EDG) 2B protective logic;" "failure to identifY tlle cause of a significant condition adverse to quality" instead of "failure to identifY corrosion on dle turbine-driven auxiliary feedwater pump governor control valve stem."

The effect oftllls ground rule is that ilie analyst will use ilie conditional probability ofCCF, given ilie observed component failure. In applying dlls ground rule, we are treating ilie shared cause probabilistically. This treatment is consistent wiili how oilier events are handled in ECA, relying on ilie failure memory approach. For example, if we observe failure of one component in a CCCG of size two, we know that the oilier component did not fail during ilie event, but still we do not set its failure probability to zero, as it might have failed; likewise, unless conditions exist dmt would prevent ilie cause (e.g., good maintenance practice) of failure from being shared, a potential for CCF is judged to be present.

18

EA-PSA-SDP-P7C-11-06 Attachment 11 , PAL Comments on Draft NUREG, Page 19 of 29 17.) The guidance states that given the failure of one component in a common cause group, the analyst will use the conditional probability ofCCF, given the observed component failure. It is recognized that while one or more additional failures do not occur during an event is not a guarantee that addition common cause failures could not have occurred. This guidance precludes any consideration of facts that could discount or substantially reduce the probability of common cause failure.

In addition, consideration of possible random failure of components that were known to be successful during the event response is not considered the same as arriving at the conclusion that the conditions necessary for a common cause failure of multiple components is present.

One can question whether tlns treatment gives a best estimate of risk or a conservatively large estimate. Continuing with the example of a JXlor maintenance practice, which nlight be shared among comJXlnents but which resulted in the failure of only one comJXlnent in the event, failing to consider the JXltential (i.e., probabilistic) impact of observed JXlor maintenance on the other components in tlle CCCG by not calculating a conditional CCF probability is the same nlistake as setting the failure probabilities of the other comJXlnents to zero, on the basis that they did not fail during the event. Doing so would be inconsistent with the failure memory approach employed in ECA. Likewise, if it was only chance that prevented multiple components from being impacted by the common maintenance practice, then declaring tlle observed failure to have no potential for shared common cause would not give a best estimate of risk; it would give a nonconservatively low estimate because the impact of the poor maintenance practice (i.e., its JXltential to defeat redundancy) is not properly reflected in the risk model.

TIle estimate provided under the assumption of an observed independent failure gives full probabilistic credit to the remaining redundant components, which nlight not be warranted.

(2) For ECA, argun1ents about the time window are irrelevant, and essentially go against the failure memory concept. Simply testing the redundant comJXlnents cannot provide proof that multiple dependent failures would not occur within the nllssion time window, as the failure memory concept does not allow credit for successful operation, and there is no guarantee that multiple comJXlnents could not fail during the mission time window. To put it another way, chance alone cannot be relied uJXln to eliminate CCF JXltential from an ECA, based on failure timing. Of course, for data analysis PurJXlses, CCF failures are of concern when they occur during the nlission time of the PRA, which for internal hazard groups is generally 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This is tlle time window used in estimating parameters in CCF models, in which observed failure counts are used.

18.) This is counter to the ASME/ANS standard definition ofCCF. The time element is key to what makes a failure common cause.

19.) The guidance regarding the impact of the time window for common cause failure or 'chance' conditions states that consideration of the time window for common cause failure is irrelevant and contrary to the 'failure memory concept'.

Further the guidance states that 'simply' testing redundant components cannot provide proof that multiple dependent failures would not occur within the mission time would not occur within the mission time window.

However, it has been long standing practice that upon discovery of a failed risk significant component, that redundant component(s) be immediately tested to verify that the failure is not present in those components. Implicit in this evaluation is an assumption that the tested components are available for the mission time. Ifwe are to accept the premise that redundant components cannot be proven to NOT be subject to common cause failure during the mission time, then it is unclear why plants are not required to shutdown immediately upon discovery of a failure of a risk significant component that can be characterized as a cause which can result in common cause failure.

Further, the guidance discounts the benefit of staggered testing which is a planned evolution based on the premise that such testing provides for early detection of conditions and implementation of corrective actions to minimize the potential for common cause failure. Again the impact of staggered testing is left to the judgment of the analyst to decide whether common cause failures could have occurred during the PRA mission time.

The JXltential for multiple dependent failures within the nlission time window is taken into account in the NRC CCF data collection effort, via a timing factor. This data collection effort examines past events involving failures of comJXlnents in a SPAR CCCG. Because most failures are discovered during testing, and much testing is done on a staggered basis, multiple dependent failures may be separated in calendar time by weeks or months, a period of time much longer than the PRA mission time. In these cases,

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 20 of 29 judgment is applied as to whether such failures would have occurred during the mission time window, had the failures been the result of an actual PRA demand.

20.) For nonnally operating systems, judgments about time windows can be made when the failures are self announced.

In the data collection effort, dle judgment about timing produces a conditional probability iliat the failures would have occurred within the mission time window, given dmt the failures were the result of an actual PRA demand. In contrast, ECA is usually focused on a single failure, and is concerned with the probability that multiple dependent failures during a recurrence of this event could fall within ilie PRA mission time window (3) Credit for programmatic actions to mitigate CCF potential (staggering equipment modifications, etc.) should be applied qualitatively during dle enforcement process and not incorporated into the numerical risk result. In other words, strong defenses against coupling factors can mitigate CCF potential, but such mitigation is to be addressed qualitatively during the enforcement process rather than quantitatively in the ECA. Qualitative consideration of such factors might allow, for example, a low "White" finding to be changed to "Green."

1.4.1 Deviations from Ground Rules Because typical PRAs do not model components to the piece-part level, it is possible d1at some failure causes cannot be shared among components d1at are redundant from the perspective of the PRA model.

In other words, from a high level perspective such as component type and function, components may be placed into the same CCCG in dle PM but there may be differences at a lower level that are important to take into consideration. Conditioning CCF probability on the assumption of a potential shared cause in this case could produce an unnecessarily conservative estimate of risk. As an example, consider ilie failure of the EDG 1A feeder breaker described in Calvert Cliffs Inspection Report (IR) 2006012. While the NRC SPAR model for Calvert Cliffs places ilie EDGs in the same CCCG, EDG 1A, being air-cooled, is a unique design from ilie other EDGs, and employs radiator cooling fans, which contribute to ilie inrush current. The other EDGs are water-cooled and have no corresponding short-time overcurrent trip on the breakers feeding ilie auxiliary MCCs. Thus, depending on ilie specifics ofilie ECA, the analyst might need to treat EDG 1A separately from the odler EDGs. However, caution should be exercised in revising CCCG boundaries, because typical perfonnance deficiencies, which reflect organizational problems, such as poor maintenance, can couple ilie EDGs despite the design differences.

21 .) The guidance recognizes the potential for over-estimating the risk significance of common cause failure by applying a particular failure mode to a conunon cause group in a PRA model where the failure does not apply to all components within the conunon cause group. It is not unusual for conunon cause groupings to be present in a PRA model for a limited set of failure mechanisms that apply to the group, but a full set offailure mechanisms typical of the component type may not be applicable to all components within the group.

However, the guidance cautions against alteration of conunon cause group boundaries to acconunodate these design differences as the characterization of the perfonnance deficiency as a broader based problem can ' couple' the components despite any design differences that could preclude conunon cause failure of components within the group.

The Palisades model has separate conunon cause groupings for which design differences come in to play.

A second category where the ground rules may not strictly apply is also related to the level of detail in the PRA model. In this case, dle licensee PRA may have explicit treatment of some dependencies d1at are treated implicitly via CCF in the associated NRC SPAR models. Two examples are shared equipment and latent (pre-initiator) hUlllall failure events (HFE). For example, the deficiency might apply to a power supply control processor iliat is shared among all steam generator power-operated relief valves (PORV),

where this dependency is modeled explicitly in the fault trees ofilie licensee's PRA, but is not included in ilie fault trees of ilie associated SPAR model. In this case, an event in which a failure of the shared control processor led to multiple dependent PORV failures would be captured in the NRC CCF data collection effort, and would contribute to alpha-factor estimates used to calculate CCF probability of the PORVs in the SPAR model. Rather than calculating a conditional CCF probability for the remaining

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 21 of 29 PORVs, an alternative treatment of a deficiency involving the shared control processor might be to modifY the SPAR fault trees to capture this dependency explicitly, allowing better comparison to the licensee PRA. The other generic example related to level of detail is latent HFEs (e.g., miscalibmtions).

These are not treated comprehensively in the SPAR models, and again are captured indirectly by including such events in the alpha-factor estimates.

1.5 CCF Examples We include in this chapter some selected examples ofCCF that have resulted in an ECA. Note that none of theSe events are coded as CCF events in the current version of the NRC CCF database: This is because each event involved failure of only a single component. Failures of single components are added to the CCF database only infrequently, when there is judged to be incipient failure of at least one other component in the CCCG. Such events are assigned a fractional count in estimating the alpha factors for the associated CCCG.

22.) The guidance here suggests that events described in the examples provided are not currently considered common cause failure in the current version of the NRC CCF database and that they will be added in a future update. This represents another example of the implication of deficiencies in other processes that are theorized to underestimate the actual CCF parameters.

Moreover, the guidance suggests that analyses of events that involve these deficiencies will be within the SDP process via implementation oftrus (NUREG) process without having first addressed the issues in the underlying processes (ASMFJANS).

Hatch EDG Coupling Failure CEA-09-054, SIR 2008008))

Cmcking in the engine-to-generator flexible coupling for EDG IB caused severe vibration during a 24-hour load run. The EDG was secured and declared to be inopemble following troubleshooting.

Similar cmcking was found in the flexible couplings of the other EDGs, and as a result EDG 1C was also declared inopemble. An example of the cmcking is shown in Figure 4. Such cracking had been first observed by the utility in 1988,20 years before the event. At that time, the cracking was not viewed as being indicative of coupling degradation. In fact, the observations of cracking were not even doclUllented. No considemtion was given to industry experience with cmcking ofEDG flexible couplings, and no condition report was written for the cmcking observed in 1988. Taking all of this into account, the perfonnance deficiency in the IR for the 2008 event was against 10 CFR 50 App. B, Criterion XVI, which requires that measures be established to promptly identifY and correct conditions adverse to quality.

The utility detennined the root cause of the cracking to be age-related hardening of the rubber in the flexible coupling between the engine and the generator. This cause was shared with the couplings in the other EDGs because they were similar in age, manufacture, operational and enviromnental conditions, and were subject to the same maintenance and testing program. Despite the shared cause, an argument for not treating this as a CCF was presented. This argument was based on a claimed low likelihood tllat multiple couplings would fail within the PRA mission time window for EDG operation. The low likelihood portion of the arglUllent was based in turn on predicted failure times using a regression model developed from ex situ testing of the EDG couplings, and on the lower clUllulative run times of the other EDGs.

23 .) There is not enough information in this example to properly evaluate. Were the failures observed here used to revise the failure rate estimate? Evaluating the CCF parameter must also include a look at the failure rate as it is used before judging the adequacy of the model.

There are nlUllerous problems with this argument, but regardless of these problen1S the argument is counter to the guidance provided above because the potential for CCF exists at the level of the identified perfonnance deficiency. Furthennore, the failure memory approach does not credit

. As a result of discussion dwing a March 2011 meeting, these events will be

EA-PSA-SDP-P7C-11-06 Attachment 11 , PAL Comments on Draft NUREG , Page 22 of 29 included in future revisions of the database.

successful tests. Thus, an ECA of this event should use conditional probabilities of CCF for the

. the observed failure to nul.

2515*

Figure 4 Circumferential crack in EDG flexible coupling Dresden EDG Strainer Plug Failure (IR 2009005)

EDG 2/3 was 25 minutes into a monthly surveillance run in June 2009 when an oil leak on the turbo lube oil system Y-strainer end cap required EDG shutdown. The leak is shown in Figure 5. This was caused by failure to replace a plastic shipping plug on the recently installed strainer with a metal end cap (see Figure 6). The utility had not ordered the metal cap, and receipt inspection and subsequent maintenance activities failed to identifY and correct the problem. The strainer on EDG 2/3 had been replaced in 2008 because of wear on tlle strainer blowdown caps, which may have been caused by the use of improper tools. The root causes of the failure were judged to be failure to order proper parts and failure to detect the problem during receipt inspection and subsequent maintenance and testing (i.e., a material control deficiency).

Inspection found that the other four EDGs had metal end caps installed on tlleir Y -strainers, which had not been replaced, and this was the basis for an argument that this constituted an independent failure ofEDG 2/3. This argument conflates the cause offailure (inadequate material control, and not just oflube oil strainers) with the manifestation of the cause (failed plastic shipping plug). As discussed above, CCF does not require failure of identical piece parts, only that the cause of failure be shared, which it was in this case. A material control deficiency can affect multiple items in EDGs and other important plant components, increasing the joint failure probability of these components.

In this example, the material control deficiency was discovered because of the strainer failure. It is possible tlmt other important components in the plant were impacted by this deficiency, but focusing too much on the manifestation of the cause at the piece-part level can unoerestimate the risk

EA-PSA-SDP-P7C-11-06 Attachment 11 , PAL Comments on Draft NUREG , Page 23 of 29 significance of the deficiency.

24.) In the discussion of the Dresden event, the argument by the licensee is discredited based on the elevation of the performance deficiency description to 'inadequate material control'. This description allows for the arbitrary inclusion of a broader scope of components that results in substantially higher risk significance. At issue in this example is; does any factual information to support a conclusion that the broader group of components was subject to an elevated level of risk from specific performance deficiencies which could impact their performance, exist?

The original deficiency was appropriately characterized as a failure to order proper parts and failure to detect the problem during receipt inspection (i.e. a material control deficiency in the broader context) with respect to one diesel generator. However, all other diesel generators had the appropriate part installed and no other material control deficiencies were identified with respect to any of the other diesel generators. In fact, the example states that because of the elevated description of the deficiency all other diesel generators become suspect and assigned increased probability of failure as a group.

The example argues that because of the elevated description, the issue is now about any other possible failure mechanisms that could result from inadequate material control 'not just lube oil strainers' (the original issue) without having any evidence that material control deficiencies currently exist that could result in failure of the rennlll1ntnp" diesel There is a certain level of association and in this Figure 5 Lube oil lead from V-strainer end cap on Dresden EDG 2/3

EA-PSA-SDP-P7C-11-06 Attachment 11 , PAL Comments on Draft NUREG , Page 24 of 29 Figure 6 Failed plastic end cap on Dresden EDG 2/3 lube oil strainer

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 25 of 29 Farley Residual Heat Removal (RHR) Motor-Operated Valve (MOV) Failure (EA-07-l73)

An encapsulated MOV in the suction line from the containment smnp to RHR pump 2A failed to stroke fully open on two occasions in 2006 and 2007. TIle specific root cause offailure could not be identified clearly, but the performance deficiency was failure to promptly identifY and correct conditions adverse to quality (10 CFR 50, App. B, Criterion XVI). One candidate root cause was corrosion, caused by high humidity in the valve encapsulation. Another was hammerblow forces on the valve torque switch, with this cause not being shared among the redundant valves, because they had different actuator configurations.

At the level of the performance deficiency, which was failure to adequately identifY an equipment problem and take appropriate corrective actions, the argument at the piece-part level is no longer relevant. The identified deficiency, which is an organizational problem, can lead to an increased probability of multiple equipment failing. In tins specific instance, the problem manifested itself in failure of a single MOV in the RHR system, but from a probabilistic perspective the problem could have been manifested in multiple dependent failures, so the risk evaluation would use tile conditional CCF probability for the other valves in the CCCG.

Calvert Cliffs EDG Failure OR 2006012)

The feeder breaker to EDG lA tripped in 2006 due to a low design set point. The perfonnance deficiency was identified as an inadequate vendor design basis for short-time inrush current on the feeder breaker to EDG lA auxiliary motor control centers (MCC). The EDG arrangement at Calvert Cliffs is somewhat unique in that EDG lA is a very different design than the other three. EDG lA, being air-cooled, uses radiator cooling fans, whereas the other three EDGs are water-cooled. The radiator fans on EDG lA contribute to tile short-time inrush current; the other EDGs do not even have a short-time overcurrent trip on the feeder breakers to their auxiliary MCCs.

However, despite these differences, the defined EDG common cause component group in the Calvert Cliffs PRA includes both the single air-cooled diesel and the three water-cooled diesels. Although the specific failure manifestation of the perfonnance deficiency was associated with a unique feature of the EDG lA, all four EDGs share numerous common attributes that can introduce the potential for common cause failure, including EDG support systems other than cooling and maintenance and testing practices. For this reason, the performance deficiency should be viewed in tile broader sense of a failure of the licensee to adequately verifY design basis information supplied by a vendor, rather than in the more narrow sense of only being associated with breaker current trip settings. In this case, the specific regulatory violation was cited against 10 CFR 50, Appendix B, Criterion III for inadequate design control, a deficiency that has potential to propagate to other EDG trains.

Therefore, this event had the potential to affect other trains within the common cause component group and the risk assessment should include consideration of CCF potential.

25.) In the Calvert Cliffs example, a diesel generator experienced a failure due to a design feature unique to that diesel. This diesel incorporates a fan cooled radiator for engine cooling. The other diesel engines are water cooled and do not experience the additional in-rush current from the radiator fans on diesel start. This design feature represents a diversity of design that offsets at least some level of contribution from common cause failure as a consequence of a support system failure.

However, the guidance establishes the position that while the particular mechanism is NOT shared among the component group, it is sufficient to argue that other failure mechanisms exist between components within the group and therefore the existence of this uncorrelated failure is a basis to elevate the risk impact of common cause failure of the group is justifiable. If this approach holds, then any benefit from diversity of design is negated. This type of argument represents a self-fulfilling prophecy. One can always argue that while a particular failure mechanism is not shared within the common cause group the presence of other failure mechanisms that could be considered shared is an appropriate basis for increasing the common cause probability of the grOtlp as a consequence of the existence of this unshared failure mechanism.

25

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 26 of 29 Comanche Peak EDG Failure Due to Paint (IR 2007008, EA-08-028)

EDG 1-02 failed to start during a monthly surveillance test in 2007. Troubleshooting revealed two fuel rack linkage/metering rods bound by paint. The painting had occurred immediately after the last successful surveillance test. The performance deficiency was failure to adequately implement maintenance procedures, which require post-painting verification of equipment functionality. One might argue that this was a random independent failure because the redundant EDG had not been painted. However, this appeared to be pure chance; because of the procedural breakdown (the procedure is a CCF defense mechanism), the other EDG could easily have been painted before finding the problem on EDG 1-02. Preventing CCF requires deliberate defenses against coupling factors among redundant components; in this case the defense mechanism was the maintenance procedure, which was not correctly implemented.

26.) In the Comanche Peak example, a diesel generator had been painted immediately after a successful surveillance test and apparently failed the next surveillance test due to a failure to assure that the painting did not impact the functionality of the painted components. The performance deficiency was failure to adequately implement maintenance procedure(s). This approach implements the

' chance' argument. The information provided only identifies a single occurrence of the failure to implement this aspect of the procedure. The 'chance' argument is predicated on the possibility that the other diesel might have been painted between subsequent diesel tests. .

Given painting of diesel components is not considered a routine activity, this appears to be an overestimation of the probability of the second diesel becoming subject to the same condition. While it cannot be argued that this is impossible, the question is how probable was it? But, the process discounts conditions which would support lower probability of a common cause event. The argument provided also assumes that the isolated occurrence of the failure to implement the procedure represents a condition that guarantees future failure, and no credit can be considered for the procedure to prevent a second occurrence of the failure.

1.6 Summary of Guidance In summary, the three ECA ground rules are:

(1) The shared cause is the performance deficiency identified in the Inspection Report.

(2) For ECA, arguments about the time window are irrelevant, and essentially go against the failure memory concept.

(3) Defenses agaiust CCF are to be addressed qualitatively during the enforcement process rather than quantitatively in the ECA.

CCF is tlle principal means by which PRA can quantifY the contribution to risk of crosscutting organizational issues. As noted above, with current CCF models this quantification is an approximation, and might either under- or overestimate the actual contribution in specific situations.

If the performance deficiency is related to issues rooted in the organization, such as procedures or control of maintenance, some level of dependence is likely among affected components (more than the failed component are affected), and the CCF probability for these components in the PRA should be conditioned on the observed failure and the presence of a shared cause of dependent failure.

Looking for differences in how a failure cause is manifested at a subcomponent or piece-part level, in addition to consUllling resources, is almost certain to underestimate the risk associated with such a deficiency; differences can always be found at a low enough level. The only case where these general ground rules might not apply would appear to be issues with the CCCG boundary. However, if the shared cause is rooted in an organizational performance deficiency, the ground rules are expected to be generally applicable.

27.) Sections 1.4 - 1.6 of the draft NUREG describe the ECA (Event and Condition Assessment) ground rules for treatment of a component failure in a common cause group. The general approach described is that any component that fails will have some impact on the common cause group failure probability regardless of the 26

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 27 of 29 timing of the failures or the failure mechanism. This implies that essentially all failures may impact common cause group failure probability.

For example, pump 'A' fails due to cause 'X', and pump 'B', a redundant pump, fails 5 years later due to cause 'Y. Following the draft NUREG guidance, these failures could be treated as a common cause due to any performance deficiency. The performance deficiencies could be the same preventive maintenance was performed, or the pumps have a similar design, or they are in the same room, or they operate at the same temperature, etc. etc.

A further example could be a group of redundant components have been installed in a plant for 30 years. Over that period there have been 3 failures spaced 10 years apart. This data would typically be used to update the random failure probability for the components, but does not result in evidence that warrants an increase in the common cause failure probability simply because the components have the same design characteristics or operating environment.

NUREG/CR-6268 and NUREG/CR-4780 when defining common cause factors state:

"The concept of a shared cause of malfunction or change in component state is the key aspect of a CCF event. The use of the word "shared" implicitly includes the concept of couplingfactor or mechanism. In addition, the reference to a time interval between failures acknowledges the reliability significance of these events. Multiple componentfailuresfrom a shared cause, but without affecting mission requirements, in a period required for perfonnance are of little or no significance from a reliability point of view. It is the correlation offailure times and their simultaneity in reference to the specified mission time that carries their reliability significance. Often when the same cause is acting on multiple components, failure times are also closely correlated. "

NUREG/CR-6268 further defines the timing factor for announced failures as within three times the PRA mission time.

There is no discussion in the draft NUREG of when plant specific evidence may be applied to update random failure probability when performing an ECA. The failures in the above examples would be more appropriately treated as an increase in the random failure probability. The components may constitute a common cause group, but if they are unreliable, this will be reflected in their individual random failure probabilities.

2. DETAILED GUIDANCE FOR TREATMENT OF CCF In this section we expand upon the high-level guidance introduced above. We provide guidance for CCF treatment within SAPHIRE 8 of a number of cases that can be encountered with varying frequency in ECA. We also give more detailed discussion of deviations from tllis guidance that may be encountered. However, as stated above, such deviations are expected to be infrequent.

2.1 Basic Principles of CCF Treatment in ECA We begin with the basic principles that underlie the detailed guidance that is to follow.

ill CCF represents all implicit intercomponent dependencies. To reiterate from earlier, CCF is included in the PRA because many factors, such as poor maintenance practices, which are not modeled explicitly in tlle PRA, can defeat redundancy and make failures of multiple redundant components more likely than would be the case if these factors were absent. These factors often reside in the organizational environment in which the components are embedded, and are not intrinsic properties of the components themselves.

ill The treatment of such intercomponent dependencies is probabilistic. The unconditional probabilities associated with CCF basic events in the PRA represent joint dependent failure probabilities of similar components that have been placed into a CCCG on the basis tl1at shared causes of dependent failure exist. ECA requires these CCF probabilities to be conditioned upon observed failures of components in the CCCG. As a simple example, assume a CCCG contains three redundant valves. If one valve is already failed, the unconditional probability of three valves failing dependently must be replaced by the conditional probability tl1at the remaining two valves fail dependently, given that one valve has already failed. This conditional probability of two 27

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG, Page 28 of 29 valves failing will obviously be higher than the unconditional probability that all three valves fail.

ill The parameters in the probabilistic CCF models are not estimated for specific causes of failure.

CCF parameter estimates are based on counting component failures, with these failures due to an array of different causes. Thus, the alpha-factor estimates in the NRC CCF database are based on events spanning a range of causes, and there are currently no means to condition a CCF probability upon a particular cause of failure using these estimates. Thus, with the current consensus CCF modeling approach, the best that can be done is to condition CCF probability upon failures observed in the event being analyzed.

ill All identified performance deficiencies (typically in an IR) that result in failure of one or more components in a CCCG have the potential for CCF . Exceptions to this principle are expected to be infrequent in practice, and will most often be related to issues with the CCCG boundaries. We discuss potential exceptions in more detail below.

ill ECA relies on the failure memory approach, and gives no credit to observed successful equipment operation. This treatment of CCF is consistent with how other events are handled in ECA. This principle governs the issues of testing and mission time window. A successful operability test of redundant components in dle CCCG in which a failure was observed does not reduce the conditional CCF probability ofCCF offue remaining components to zero. For EC.A, argUl11ents about the time window are irrelevant, and essentially go against the failure memory concept. Again, the failure memory concept does not allow credit for successful operation, and there is no guarantee that multiple components could not fail during the mission time window.

(6) With respect to defenses against CCF, such as staggering maintenance on redundant components, such defenses must be deliberate and effective in order to break dependence. To put it another way, chance alone cannot be relied upon to eliminate CCF potential from an ECA. The effect of such defenses on risk is to be considered qualitatively in during the enforcement phase rather than quantitatively in the ECA.

28

EA-PSA-SDP-P7C-11-06 Attachment 11, PAL Comments on Draft NUREG , Page 29 of 29 2.2 CCF Treatment Categories In this section we describe categories of events that are expected to span the spectrum of cases enCOlll1tered in ECA. Guidance is given for CCF treatment in each of these categories using the ECA Workspace in SAPHIRE 8. a See App. C for examples that illustrate the ECA Workspace. SAPHIRE 8 calculates conditional CCF probabilities for each category, using the approach described in (Rasmuson &

Kelly, 2008).

2.2.1 Observed Failure with Loss of Function of One Component in the CCCG 28.) There is no basis for the approach of using the alpha factor in the baseline PRA model as an estimate for the conditional probability that an event is a CCF. The CCF model is being implemented in a manner that it was never intended to be used for. The alpha factor is correlative and not a conditional probability. Again this surrogate use of an alpha factor may be driven by the goal of creating a fast and dirty conditional probability value but any conclusion is suspect.

In this category, which is probably the most commonly encountered one in ECA, the event being analyzed involves the observed failure of one component in a CCCG. The corresponding basic event in the SPAR model is set to "Failure with potential shared cause" in the ECA Workspace in SAPHIRE 8.

Tllis will be the case regardless of the outcome of an operability test on the other components in the CCCG. This treatment is also generally independent of differences among the components in the CCCG at the subcomponent or piece-part level; exceptions will be infrequent and will typically involve CCCG boundary issues, which should be resolved via modifications to the SPAR model, with assistance from the INL, before carrying out the conditional CCF calculation, as discussed below.

29.) This treatment arbitrarily brings in some knowledge to update the PRA model and excludes others. Ifit is determined that the remaining components are not affected by the cause of the first failure, it should be modeled as an independent event.

NO ADDITIONAL COMMENTS 29

EA-PSA-SOP-P7C-11-06 Attachment 12 Comments on SOP Phase 3 Analysis Page 1 of 5 ATIACHMENT1 SOP PHASE 3 ANALYSIS To calculate the exposure time , Section 2.1 of Volume 1 of the Risk Assessment of Operational Events (RASP) Handbook was used. The RASP Handbook states that the exposure time is the duration period of the failed or degraded structure , system , or component (SSC) being assessed that is reasonably known to have existed and includes repair time. For the P-7C pump , the exposure time was one year (the maximum allowable time used in risk analyses) , based upon the new stainless steel material for the couplings for all three SW pumps be ing in place since at least mid-May 2010 . The P-7C pump failed on August 9, 2011 , at 1201 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.569805e-4 months <br /> and was returned to service on August 12 , 2011 , at 0309 hours0.00358 days <br />0.0858 hours <br />5.109127e-4 weeks <br />1.175745e-4 months <br /> following successful post-maintenance surveillance testing. Thus, the repair time was approximately 63 hours7.291667e-4 days <br />0.0175 hours <br />1.041667e-4 weeks <br />2.39715e-5 months <br />.

There is no recovery credit in this analysis .

This analysis divided the exposure time into two segments :

  • The exposure time with the P-7C SW pump not failed (for approximately one year) , but with an increased failure-to-run (FTR) rate for all three SW pumps .
  • The exposure time when the P-7C SW pump was fa iled (approximately 63 hours7.291667e-4 days <br />0.0175 hours <br />1.041667e-4 weeks <br />2.39715e-5 months <br />) , with an increased FTR rate for SW pumps P-7A and P-7B .

The SRA used the Palisades Standardized Plant Analysis Risk (SPAR) model (version 8.17 dated June 20, 2011) , and the SAPHIRE 8 version 8.0.17 software .

The Palisades SPAR model was modified using the Events and Conditions Assessment (ECA) workspace with the following changes:

  • A revised FTR rate for the three SW pumps was obtained using statistical analysis , i.e. , a Bayesian update with a Jeffreys non-informative prior. The two observed failures of the SW pumps over a total run-time of 40509 hours for the three SW pumps (since the new stainless steel couplings were installed until the failure of the P-7C pump on August 9, 2011) was used . The revised FTR rate for the three SW pumps was 6.17E-5/hour.
  • A revised in itiating event frequency (IEF) for a loss of service water (IE-LOSW) was obtained based on an approximate method recommended by Idaho National Laboratory (INL) . To estimate a new IEF for the LOSW event, the existing SW system fault tree was solved with the nominal SW pump FTR failure rate (3 .9E-6/hour) , and then again with the new FTR rate (6.17E-5/hour) . The ratio of the SW system unavailability with the new rate to that of the system unavailability with the old rate was then calculated. The IEF for the LOSW was then increased by this ratio .

1.) The approach for revising the IE-LOSW uses a ratio of calculated unavailability from a mitigation system fault tree and then multiplying by the existing IE frequency. This method would not be capable of meeting the ASME/ANS PRA Standard Supporting Requirements IE C-9 and IEC-10 as it combines fault trees for system unavailability with a model for initiating event analysis. However, it is recogni ~~d that SPAR modeling utilizes conservative 1 Attachment