H. B. Robinson Steam Electric Plant, Unit 2 - Corrected Technical Specification Pages for TSTF-425 License Amendment Request
ML18269A009
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/25/2018
From: Kapopoulos E J
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-18-0048
Download: ML18269A009 (16)


Text

(-, DUKE ENERGY Serial: RA-18-0048 SEP 2.5. io18 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23 Ernest J. Kapopoulos, Jr. H. B. Robinson Steam Electric Plant Unit 2 Site Vice Presidenl Duke Energy 3581 West Entrance Roaa Hartsville, SC 29550 0: 843-951-1701 F: 843-951-1319 Emie.Kapopoulos@duke-energy

.com 10 CFR 50.90

SUBJECT:

CORRECTED TECHNICAL SPECIFICATION PAGES FOR TSTF-425 LICENSE AMENDMENT REQUEST

REFERENCES:

1. Duke Energy letter, Application For Technical Specifications Change Regarding Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425 , Revision 3), dated April 16, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 18117 A006) Ladies and Gentlemen:

In Reference 1, Duke Energy Progress, LLC (Duke Energy) submitted a request for an amendment to the Technical Specifications (TS) for H.B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP).

The proposed amendment would modify HBRSEP's TS by relocating specific Surveillance Frequencies to a licensee-controlled program. Per subsequent discussion with the NRG Project Manager regarding the Reference 1 submittal, a subset of the proposed TS page changes have been revised and are provided in Attachment

1. These proposed TS page changes supersede the respective TS pages in Attachment 3 of Reference
1. No new commitments have been made in this submittal.

If you have additional questions, please contact Mr. Kevin Ellis, Manager -Regulatory Affairs, at 843-951-1329.

I declare under penalty of perjury that the foregoing is true and correct. Executed on 2 < Sff~6f~o18. Sincere!~~ Ernest J. Kapopoulos, Jr. Site Vice President U.S. Nuclear Regulatory Commission RA-18-0048 Page2 EJK/jbd Attachments:

cc: 1. Revision of Proposed Technical Specification Page Changes C. Haney, Regional Administrator USNRC Region II J. Rotton, USNRC Senior Resident Inspector

-RNP D. J. Galvin, NRR Project Manager -RNP L. Garner, Manager, Radioactive and Infectious Waste Management Section (SC) A Wilson, Attorney General (SC) S. E. Jenkins, Chief, Bureau of Radiological Health (SC)

U.S. Nuclear Regulatory Commission RA-18-0048 Page3 bee: Chris Nolan Art Zaremba Kate Nolan David Cummings File: (Corporate)

Electronic Licensing Library (ELL) Kevin Ellis Christine Caudell (For RNP Licensing/Nuclear Records Files)

Attachment 1 RA-18-0048 Attachment 1 Revision of Proposed Technical Specification Page Changes

1. 1 Definitions SHUTDOWN MARGIN ( confi nued) SLAVE RELAY TEST THERMAL POWER Definitions 1.1 a. Al.1 .rod cluster .cont~ol assemblies

.CRCCAs} are fully inserted except for the single RCCA of highest reactivity worth. which is assumed to be fully withdrawn.

With any RCCA not capable -0f being fully inserted.

the reactivity worth of the RCCA llllst be accounted for in the determination of SOM: and b. In MODES 1 and 2. the fuel and moderator temperatures are changed to 547°F. A SLAVE RELAY TEST shall -consist of energizing each slave relay and verifying the OPERABILITY of each slave relay. The SLAVE RELAY TEST shall include, as a minimum. a continuity check of associated testa~le actuation devices. THERMAL POWER shall be the*total reactor core heat transfer rate to the reactor coolant. * .... TRIP-ACTUATING-DEVICE--*---A -TAOOTshall

-consisY of operating the trip . OPERATIONAL TEST actuating device and verifying the OPERABILITY

  • of (TAD0T) required alarm. interlock.

display, and trip . functions.

The TADOT shall include adjustment.

as necessary.

of the trip a'ctuating device so that it actuates at the required setpoint within the required accuracy.

HBRSEP Unit No. 2 1.1-5 Amendment No.~

Rod Group Alignment Limits 3.1.4 SURVEILLANCE REQUIREMENTS (continued}

SR 3.1.4.2 SR 3.1.4.3 SURVEILLANCE Verify rod freedom of movement (trippability) by moving each rod not fully inserted in the core~ 10 steps in either direction.

Verify rod drop time of each rod, from the fully withdrawn position, is~ 1.8 seconds from the beginning of decay of stationary gripper coil voltage to dashpot entry, with: a. Tavo 540°F; and b. All reactor coolant pumps operating.

HBRSEP Unit No. 2 3.1-9 FREQUENCY 92 days l1N~T1 I Prior to reactor criticality after each removal of the reactor head Amendment No. m

~URVEILLANCE REQUIREMENTS RPS Instrumentation 3.3.1 *******-**--------**********-***-**~-NOTE-*--*-*******-********************-**

Refer to Table 3.3.1-1 to determine which SRs apply for each RPS Function.


SURVEILLANCE SR 3.3.1.1 Perform CHANNEL CHECK. SR 3.3.1.2 *-**--*---*-***----NOTES---*---*---*--*----

SR 3.3.1.3 1. Adjust NIS channel if absolute difference is> 2X. 2. Not required to be.performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL POWER is 2: lSt RTP. Compare results of calorimetric heat balance calculation to Nuclear Instrumentation System CNIS) channel output. -*------------*---*NOTES--------*----------

1. Adjust NIS channel if absolute difference is 2: 3t. 2. Not required to be performed until 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> after THERMAL POWER is 2:: 15.t RTP. Compare results of the incore detector measurements to NIS AFD. HBRSEP Unit No. 2 3.3-8 FREQUENCY 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> tjlNSERT 1 I 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> PN~T 1 I l1N,RT1 j 31 effecti -.,e full power days CEFPD) (continued)

Amendment No. 116 u u RCS Loops -MOOE 4 3.4.6 Ar~TTONS < cont i n1 ,Pn) -CONDITION REQUIRED ACTION B. One required loop B.1 Be in MODE 5. or train inoperable.

MID One required RHR train OPERABLE.

C. Two required loops or C.1 Suspend operations trains inoperable.

that would cause introduction into the OR RCS. coolant with boron concentration Required loop or train less than required to not in operation.

meet SDM of LCO 3.1.1. MID C.2 Initiate action to restore one loop or train to OPERABLE status and operation.

SURVEILLJI.NCE SR 3.4.6.1 Verify one RHR train or RCS loop is in operation.

SR 3.4.6.2 Verify SG secondary side water levels are 16t for required RCS loops. SR 3.4.6.3 Verify correct breaker alignment and indicated power are available to the required pump that is not in operation.

COMPLETION TIME 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Immediately Immediately FREQUENCY 12 ho1:1rs tjlNSERT 1 I 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> tjlNSERT 1 I 7 days tjlNSERT 1 I HBRSEP Unit No. 2 3.4-15 Amendment No. 176,199 f .~AR 1 2G01 CONDITION REQUIRED ACTION D. Required Action and D.1 Bein MODE 3. associated Completion Time of Condition B or C AND. not met. D.2 Bein MODE4. SURVEILLANCE REQUIREMENTS SR 3.4.9.1 SR 3.4.9.2 SR 3.4.9.3 SURVEILLANCE Verify pressurizer water level is within limits. Verify capacity of required pressurizer heaters is i:!: 125 kW. Verify required pressurizer heaters are capable of being powered from an emergency power supply. HBRSEP Unit No. 2 3.4-22 Pressurizer

3.4.9 COMPLETION

TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours FREQUENCY

~fS ~INSERT 1 I 24 moAths I 24 months ~---' YINSERT 1 j Amendment No. 268 V ,\CTIONS CONDITION REQUIRED ACTION F. (continued)

F.2 Restore one block valve to OPERABLE status. AND F.3 Restore remaining block valve to OPERABLE status. G. Required Action and G.1 Be in MODE 3. associated Completion Time of Condition F AND not met. G.2 Be in MODE 4. SURVEILLANCE REQUIREMENTS SR 3.4.11.1 SURVEILLANCE

---*-*****--*-**-**NOTE--******************

Not required to be met with block valve closed in accordance with the Required Action of Condition*e or E. Perform a complete cycle of each block valve. HBRSEP Unit No. 2 3.4*27 Pressurizer PORVs 3.4.11 COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 72 hours 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours FREQUENCY 92 days (continued)

Amendment No. m

-. ---u u ACTIONS (continued)

CONDITION C. Required Action and C.1 associated Completion Time of Condition A not met. nB. DOSE EQUIVALENT I-131 > 60 µCi/gm. SURVEILLANCE REQUIREMENTS SURVEILLANCE REQUIRED ACTION Be in MODE 3 with T*yg < 500°F. SR 3.4.16.1 Verify reactor coolant gross specific activity s 100~ µCi/gm. RCS Specific Activity 3.4.16 COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> FREQUENCY 7 days tjlNSERT 1 I SR 3.4.16.2 *******************NOTE-***-*--**--*-----*-

-* Only required to be performed in MODE 1. Verify reactor coolant DOSE EQUIVALENT 1-131 specific activity~

0.25 µCi/gm. HBRSEP Unit No. 2 3.4-46 14 days Ml[} Between 2" and . 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after a THERJ-La.L POWER change of :i!: 15.\' RTP within a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period (continued)

Amendment No. m. 201 SURVEILLANCE REQUIREMENTS (continued)

SR 3.5.2.7 SR 3.5.2.8 SURVEILLANCE Verify the following valves in the listed position:

  • Number FCV-605 HCV-758 Position Function Closed/Motive RHR Air Isolated Closed/Motive RHR Air Isolated Verify the following manual valve is locked in the listed position Number RHR-764 Position Locked Open Function LHSI HBRSEP Unit No. 2 3.5-7 ECCS-Operati ng 3.5.2 FREQUENCY 31 daY' 92 da.ve Amendment No. m AC Sources-Operating

3.8.1 3URVEILLANCE

REQUIREMENTS SURVEILLANCE SR 3.8.1.1 Verify correct breaker alignment and indicated power availability for the offsite circuit. SR 3.8.1.2 ****************-**NOTES*******************

1. Performance of SR 3.8.1.7 satisfies this SR. 2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading. 3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.

When modified start procedures are not used, the time. voltage, and frequency tolerances of SR 3.8.1.7 must be met. Verify each DG starts from standby conditions and achieves steady state voltage~ 467 V ands 493 V, and frequency 58.8 Hz and~ 61.2 Hz. HBRSEP Unit No. 2 3.8-4 FREQUENCY 7 days :n .days (continued). Amendment No. 176 u AC Sources -Operating

3.8.1 SURVEILLANCE

REQUIREMENTS

{continued)

SR 3.8.1.3 SR 3.8.1.4 SR 3.8.1.5 SURVEILLANCE

  • **-**-~----**-*****NOTES*******************
1. 0G loadings may include gradual loading as recommended by the manufacturer.
2. Momentary transients outside the load range do not invalidate this test. 3. This Surveillance shall be conducted on only one DG at a time: 4. This SR shall be preceded by and immediately follow without shutdown a s~ccessful performance of SR 3.8.1.2 or SR 3.8.1.7.
  • 5. During periods when a diesel generator is being operated for testing purposes, its protective trips need not be bypassed after the diesel generator has properly assumed the load on its bus. Verify each DG is synchronized and loaded and operates for~ 60 minutes at a load 2350 kW and~ 2500 kW. Verify each day tank contains~

140 gallons of fuel oil. Check for and remove accumulated water.from each day tank. HBRSEP Unit No. 2 3.8-5 FREQUENCY 31 days 31 day.s 31 days {continued)

Amendment No. µ6 V 3.8 ELECTRICAL POWER SYSTEMS 3. 8. 4 DC Sources -Operating DC Sources -Operating 3.8.4 LCO 3.8.4 The Train A and Train B DC electrical power*subsystems shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4. ACTIONS CONDITION REQUIRED ACTION A. One DC electrical A.l Restore DC electrical power subsystem inoperable.

power subsystem to OPERABLE status. B. Required Action and 8.1 Be in MODE 3. Associated Completion Time not met. AND B.2 Be in MODE 5. SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.4.1 Verify battery terminal voltage is 125.7 Von float charge. HBRSEP Unit No. 2

  • 3.8-19 COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 6 hours 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> FREQUENCY 7 days (continued)

Amendment No. m AC Instrument Bus Sources -Operating

3.8.7 SURVEILLANCE

REQUIREMENTS SR 3.8.7.1 SR 3.8.7.2 SURVEILLANCE Verify correct inverter voltage. frequency.

and alignment to required AC instrument buses .. Verify voltage availability and correct CVT alignment to required AC instrument buses. HBRSEP Unit No. 2 3.8-29 FREQUENCY 7 days 7 days Amendment No. 176