05000275/FIN-2010005-02

From kanterella
Revision as of 16:49, 8 October 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
02
Site: Diablo Canyon Pacific Gas & Electric icon.png
Report IR 05000275/2010005 Section 1R05
Date counted Dec 31, 2010 (2010Q4)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.05
Inspectors (proximate) E Wong
P Goldberg
L Ricketson
M Brown
M Peck
C Graves
R Kopriva
D Allen
C Osterholtz
I Anchondo
D Reinert
C Alldredge
B Latta
CCA H.7, Documentation
INPO aspect WP.3
'