MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] Category:License-Operator Examination Report (Non-Power Reactors Only)
MONTHYEARIR 05000424/20053022006-01-0606 January 2006 Er 05000424-05-302 & 05000425-05-302, 11/23/05, Vogtle Electric Generating Plant, Units1 and 2 Licensed Operator Examinations IR 05000424/20053012005-07-0505 July 2005 Er 05000424-05-301, Er 05000425-05-301; 5/17-25/05; Vogtle Electric Generating Plant, Units 1 and 2; Licensed Operator Examinations ML0601301502005-07-0505 July 2005 Er 05000424-05-301, Er 05000425-05-301; 5/17-25/05; Vogtle Electric Generating Plant, Units 1 and 2; Licensed Operator Examinations 2006-01-06
[Table view] |
Text
January 6, 2006
Southern Nuclear Operating Company, Inc.ATTN:Mr. D. E. Grissette, Vice President - Vogtle Project P. O. Box 1295 Birmingham, AL 35201-1295
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NRC EXAMINATION REPORT 05000424/2005302 AND 05000425/2005302
Dear Mr. Grissette:
On November 23, 2005, members of your training staff administered an NRC Senior Reactorwritten retake examination to one employee of your company who had reapplied for a license to operate the Vogtle Electric Generating Plant. The NRC waived the Reactor Operator portion ofthe written examination, and the operating examinations.The SRO applicant passed the written retake examination. There were no post examcomments.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosures will be available electronically for public inspection in the NRC Public Document Roomor from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (thePublic Electronic Reading Room).
Sincerely,/RA/James H. Moorman, III, ChiefOperation Branch Division of Reactor SafetyDocket Nos.: 50-424, 50-425License Nos.: NPF-68, NPF-81
Enclosure:
Report Details cc w/encl: (See page 2)
SNC2cc w/encl:J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
Electronic Mail DistributionT. E. TynanGeneral Manager, Plant Vogtle Southern Nuclear Operating Company, Inc.
Electronic Mail DistributionN. J. StringfellowManager-Licensing Southern Nuclear Operating Company, Inc.
Electronic Mail DistributionBentina C. TerrySouthern Nuclear Operating Company, Inc.
Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295Director, Consumers' Utility CounselDivision Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600Office of the County CommissionerBurke County Commission Waynesboro, GA 30830Director, Department of Natural Resources205 Butler Street, SE, Suite 1252 Atlanta, GA 30334Manager, Radioactive Materials ProgramDepartment of Natural Resources Electronic Mail DistributionAttorney GeneralLaw Department 132 Judicial Building Atlanta, GA 30334Laurence BergenOglethorpe Power Corporation Electronic Mail DistributionResident ManagerOglethorpe Power Corporation Alvin W. Vogtle Nuclear Plant Electronic Mail DistributionArthur H. Domby, Esq.Troutman Sanders Electronic Mail DistributioinSenior Engineer - Power SupplyMunicipal Electric Authority of Georgia Electronic Mail DistributionReece McAlisterExecutive Secretary Georgia Public Service Commission 244 Washington Street, SW Atlanta, GA 30334Ken Holmes, Plant Training & Emergency Preparedness Manager Vogtle Electric Generating Plant P. O. Box 1600 Waynesboro, GA 30830
_________________________OFFICERII:DRSRII:DRSRII:DRDSIGNATURE/RA By JMoorman for//RA//RA By JMoorman for/NAMEGLaska:pmdJMoormanMWidmanDATE16/06 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO EnclosureNUCLEAR REGULATORY COMMISSIONREGION IIDocket Nos.:050000424, 05000425License Nos.:NPF-68, NPF-81 Report Nos.:05000424/2005302, 05000425/2005302 Licensee:Southern Nuclear Operating Company, Inc. (SNC)
Facility:Vogtle Electric Generating Plant Units 1 and 2Location:7821 River RoadWaynesboro, GA 30830Date:Written Exam - November 23, 2005 Examiner:G. Laska, Chief Examiner Approved by:James H. Moorman, III, ChiefOperations Branch Division of Reactor Safety SUMMARY OF FINDINGSER 05000424/2005302, ER 05000425/2005302; 11/23/2005; Vogtle Electric Generating Plant,Units 1 and 2, Licensed Operator Examinations.An NRC examiner conducted an operator licensing initial retake examination in accordance withthe guidance of NUREG-1021, Revision 9, Operator Licensing Examiner Standards for PowerReactors. This examination implemented the operator licensing requirements of 10 CFR
§55.43. The facility licensee administered the written retake examination on November 23, 2005. Theoperator licensing initial written retake examination was developed by the licensee. One seniorreactor operator (SRO) applicant passed this retake written examination and was issued a license.No significant issues were identified.
Report Details4.OTHER ACTIVITIES (OA)4OA5Operator Licensing Initial Examinations a.Inspection ScopeThe examiners reviewed the written examination developed by the licensee forcompliance with the guidelines specified in NUREG-1021, Revision 9.The examiner reviewed the licensee's examination security measures while preparingand administering the examinations to ensure that examination security and integrity complied with 10 CFR 55.49, "Integrity of examinations and tests." The examiner evaluated one SRO applicant who was being assessed under theguidelines specified in NUREG-1021. The licensee administered the retake of thewritten examination on November 23, 2005. The evaluation of the applicant and areview of documentation was performed to determine if the applicant met the requirements specified in 10 CFR Part 55. b.FindingsNo findings of significance were identified. The applicant passed his retake examination.
The NRC determined that the licensee's examination submittal was within the range ofacceptability expected for a proposed examination. One SRO passed the written retakeexamination. No post exam comments were submitted. The SRO written examination and answer keys, and examination references may be accessed in the ADAM S system(ADAMS Accession Number, ML060060281).4OA6MeetingsExit Meeting SummaryOn December 1, 2005, the examiner discussed the examination and preliminary findingswith Mr. Lee Mansfield, Operations Training Manager, and other members of his staff.
The examiner confirmed that proprietary information was not provided or examined during the inspection.
PARTIAL LIST OF PERSONS CONTACTEDLicenseeL. Mansfield, Operations Training ManagerD. Scukanec, Senior Operations Instructor T. Thompson, Operations Instructor NRCG. McCoy, Senior Resident Inspector