ML061870337

From kanterella
Revision as of 01:58, 27 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Susquehanna, Unit 2, TRM2 - Technical Requirements Manual, Unit 2, Revision 25
ML061870337
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 06/26/2006
From:
Susquehanna
To: Gerlach R M
Document Control Desk, Office of Nuclear Reactor Regulation
References
028401 TRM2, Rev 25
Download: ML061870337 (14)


Text

Jun. 26, 2006 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2006-28891 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 06/26/2006 LOCATION:

USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.TRM2 -TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 06/13/2006 ADD MANUAL TABLE OF CONTENTS DATE: 06/23/2006 CATEGORY:

DOCUMENTS TYPE: TRM2 0 (

Jun. 26, 2006 Page 2 of 2 ID: TEXT 3.4.1 REPLACE: REV:I CATEGORY: ID: TEXT REPLACE: DOCUMENTS TYPE: TRM2 LOES REV:25 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM /1.0-2 Page TRM / 1.0-3 Effective Date 05130/2006 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002

,,04/12/1999 11/15/2004 12/03/2004 11/15/2004 11/15/2005 I 2.0 3.0 3.1 3.2 3.3 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM I 2.0-5 Pages TRM / 2.0-6 and TRM / 2.0-7 Page TRM / 2.0-8 Pages TRM / 2.0-9 through TRM / 2.0-11 Pages TRM / 2.0-12 through TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 <Page TRM / 3.0-3 Page TRM /3.0-4 REACTIVITY CONTROL SYSTEMS\",, .Pages 3.1-1 through 3.1-6 , Pages TRM / 3.1-7 and TRM / 3.1"-8 Pages TRM / 3.1-9,and TRM'/,3.1-9a Page TRM / 3.1-10. \CORE OPERATING.LIMITS REPORT Page 3.2-1>Pages TRM / 3.2-2 through TRM 13.2-39 INSTRUMENTATION

ýPages'TRM

/ 3.3-1 through TRM I 3.3-3 age-TRM / 3.3-4 Pa-ges 3.3-5 and 3.3-6 Page TRM 3.3-7 Page 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-11 a Page TRM / 3.3-12 Page TRM/ 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 N)(\\N/7>04/08/1999 03/1512002 11/30/2005 08/31/1998 11/15/2005 02/18/1999 02/18/1999 08/31/1998 03/03/2005 07/16/1999 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/17/1998 05/30/2006 06/02/2005 05/30/2006 03/30/2001 09/13/2005 12/14/1998 10/22/2003 SUSQUEHANNA

-UNIT 2 TRM / LOES-1 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Page TRM / 3.3-16 Pages TRM / 3.3-17 and TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Pages TRM /3.3-21a through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages 3.4-6 through 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 3.5 3.6 3.7 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM I 3.6-9 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 and TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Page TRM / 3.7-9 Page TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM / 3.7-12 and TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Pages TRM / 3.7-23 and TRM / 3.7-24 Pages TRM / 3.7-25 through TRM /3.7-27 Page TRM / 3.7-28 Effective Date 06/27/2001 06/14/2002 10/22/2003 11/15/2004 11/15/2004 12/03/2004 05/16/2003 10/22/2003 03/31/2006 10/23/1998 08/31/1998 12/03/2004 03/31/2006 01/28/2005 08/31/1998 04/17/2000 08/31/1998

'08/31/1998 01/07/2002 08/31/1998 12/31/2002 07/29/1999 08/31/1998 03/31/2006 08/02/1999 03/31/2006 08/16/2005 01/21/2000 08102/1999 08109/2005 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/09/2005 SUSQUEHANNA

-UNIT 2 TRM / LOES-2 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Pages 3.7-41 and 3.7-42 Page TRM / 3.7-43 Pages 3.7-44 through 3.7-47 Page TRM / 3.7-48 Pages TRM / 3.7-49 and TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and .TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 11/16/2001 11/30/2005 11/16/2001 01/09/2004 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 08/31/1998 03/31/2006 10/13/1998 03/08/2003 03/09/2001 12/03/2004 04/15/2003 07/29/1999 3.8 3.9 04/02/2002 01/28/2005 01/31/2005 04/02/2002 12/03/2004 08/10/2004 12/03/2004 08131/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 3.10 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Page TRM-/ 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 08/31/1998 03/31/2006 08/30/1998 03/08/2003 06/05/2002 03/31/2006 04/17/2002 SUSQUEHANNA

-UNIT 2 TRM / LOES-3 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date 3.11 3.12 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM /3.11-10 Pages 3.11-11 and 3.11-12 Page 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 -Page TRM / 3.11-19 Pages TRM /3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Pages TRM / 3.11-24 Page 3.11-25 Pages TRM / 3.11-26 through TRM /3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM /3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03131/2006 08/31/1998 12/03/2004 08/31/1998 09/01/1998 12/03/1004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 03/31/2006 05/13/2005 09/01/1998 01/21/2004 12/03/2004 01/21/2004 03/31/2006 08/3111998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 08/31/1998

4.0 ADMINISTRATIVE

CONTROLS Pages 4.0-1 through 4.0-8 SUSQUEHANNA

-UNIT 2 TRM /.LOES-4 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.0 B3.1 B 3.2 B 3.3 B 3.4 B3.5 B 3.6 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14-Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 08/31/1998 11/15/2005 02/18/1999 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page B 3.3-2 Pages TRM / B 3.3-3 and TRM / B 3.3-3A Pages TRM / B 3.3-4 through TRM / B 3.3-7 Pages TRM / B 3.3-8 and TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Page TRM / B 3.3-15 Page TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a through TRM / B 3.3.19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B3.3-22 Page TRM / B3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 CONTAINMENT BASES Page TRM/ B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 04/07/2000 08/31/1998 01/31/2005 05/30/2006 03/30/2001 08/31/1998 09/13/2005 12/03/2004 06/25/2002 06/14/2002 06/14/2002 10/22/2003 10/22/2003 10/22/2003 11/15/2004 11/15/2004 05/16/2003 10/22/2003 05/16/2003 08/31/1998 10/15/1999 08/31/1998 08/31/1998 07/26/2001 02/01/1999

.08/31/1998 SUSQUEHANNA

-UNIT 2 TRM / LOES-5 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B 3.7 B3.8 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-10a through TRM / B 3.7-a1 a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM I B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM / B 3.7-21 and TRM / B3.7-21a Pages TRM/B 3.7-22 and TRM/B 3.7-23 Page B 3.7-24 Page TRM / B 3.7-25 Pages B 3.7-26 through B 3.7-30 Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM I B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM I B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 09/23/1999 01/07/2002 12/03/2004 12/31/2002 08/31/1998 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 04/07/2000 08/31/1998

'12/03/2004 08/31/1998 12/03/2004 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/02/2002 01/28/2005 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 SUSQUEHANNA

-UNIT 2 TRM / LOES-6 EFFECTIVE DATE 05/30/2006 SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)Section Title Effective Date B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 08/31/1998 10/23/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM / 3.10-7 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3;11-11 and TRM/B 3.11-1 Ia Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM /B 3.11-14 Page TRM /B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Pages TRM / B 3.11-21 through TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 08/31/1998 03/08/2003 08/23/1999 04/17/2002 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 01/21/2004 "08/31/1998 11/30/2005 12/03/2004 08/31/1998 02/12/1999 02/05/1999 TRM2 text LOES.doc 6/1512006 SUSQUEHANNA

-UNIT 2 TRM / LOES-7 EFFECTIVE DATE 05/30/2006 Reactor Coolant System Chemistry 3.4.1 PPL Rev-.3.4 Reactor Coolant System 3.4.1 Reactor Coolant System Chemistry TRO 3.4-.1 The chemistry of the reactor coolant system shall be maintained within the limits specified in Table 3.4.1-1 and the conductivity recorder shall be OPERABLE.APPLICABILITY:

At all times ACTIONS NOTE 1. The provisions of TRO 3.0.4 are not applical CONDITION REQUIRED ACTION COMPLETION TIME A. Conductivity not within the A.1 Perform TRS 3.4.1.1 and Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> limits specified in TRS 3.4.1.3.Table 3.4.1-1. AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> A.2 Perform TRS 3.4.1.4 B. Conductivity or Chlorides B.1 Restore parameter within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> not within the limits limits specified in Table 3.4.1-1 AND in MODE 1 but with conductivity less than 10 < 336 hour0.00389 days <br />0.0933 hours <br />5.555556e-4 weeks <br />1.27848e-4 months <br />s/year.

j.Lrho/cm at 25 0 C and cumulative time chloride concentration less exceeding the limit than 0.5 ppm.C. pH not within limits of C.1 Restore pH within limits. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Table 3.4.1-1 in MODE 1.D. Required Actions and D.1 Be in MODE 2 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Times of Conditions B or C not met.(continued)

SUSQUEHANNA UNIT 2.TRM / 3.4-1 EFFECTIVE DATE 03/31/2006 Reactor Coolant System Chemistry PPL Rev.-4 3.4.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME NOTE E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Actions shall be completed if this Condition is -NOTE --entered. AND Cooldown should be performed as rapidly as E. Conductivity greater than possible not to exceed or equal to 10 p.mho/cm at E.2 Be in MODE 4. the cooldown rate 25 0 C or chloride concentration greater than or equal to than 0.5 ppm. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F. Reactor Coolant Chemistry F.1 Restore parameter to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> not within limits specified in within limits.Table 3.4.1-1 for MODE 2 or 3 G. Required Actions and G.1 Be in MODE 3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time of Condition F not met. AND G.2 Be in MODE 4 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> H. NOTE H.1 Restore parameter to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Only applicable when in a within limits MODE other than MODES 1,2, or3.Reactor Coolant Chemistry not within limits specified in Table 3.4.1-1.(continued)

SUSQUEHANNA UNIT 2 3.4-2 EFFECTIVE DATE 10/2311998 Reactor Coolant System Chemistry PPL RevA. 3.4.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME NOTE-- 1.1 Perform Engineering Evaluation Prior to proceeding Required Actions shall be of structural integrity to MODE 3 completed if this Condition is entered.I1.Chloride concentration greater than 0.5 ppm for>24 hours J. Conductivity recorder*

J.1 Obtain in-line conductivity NOTE-inoperable, measurement or grab sample Applicable in MODES 1, 2, or 3.Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> AND NOTE-Applicable in other than MODES 1, 2, or 3.Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SUSQUEHANNA UNIT 2 3.4-3 EFFECTIVE DATE 10/23/1998 Reactor Coolant System Chemistry 3.4.1 PPL Rev4-I TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.4.1.1 Analyze a sample of reactor coolant for chlorides 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> TRS 3.4.1.2 Analyze a sample of reactor coolant for conductivity 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> TRS 3.4.1.3 Analyze a sample of reactor coolant for pH NOTE-Only required to be performed if reactor conductivity is greater than 1.0 Lmho/cm at 25 0 C 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> TRS 3.4.1.4 Perform CHANNEL CHECK of the continuous 7 days conductivity monitor SUSQUEHANNA UNIT 2 3.4-4 EFFECTIVE DATE 10/23/1998 Reactor Coolant System Chemistry 3.4.1 PPL Rev--I TABLE 3.4.1-1 REACTOR COOLANT SYSTEM CHEMISTRY LIMITS CONDUCTIVITY CHLORIDE MODE p~mho/cm @ 25 0 C CONCENTRATION ppm pH 1 <1.0 0.2 5.65 <pH 8.6 2 and 3 < 2.0 0.1 5.65 <pH 8.6 At all times other _ 10.0 < 0.5 5.35 pH <8.6 than MODE 1, 2, or 3 SUSQUEHANNA UNIT 2 3.4-5 EFFECTIVE DATE 10/23/1998