Jun. 26, 2006 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2006-28891 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 06/26/2006 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 06/13/2006 ADD MANUAL TABLE OF CONTENTS DATE: 06/23/2006 CATEGORY: DOCUMENTS TYPE: TRM2 0

(

Jun. 26, 2006 Page 2 of 2 ID: TEXT 3.4.1 REPLACE: REV:I CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES REPLACE: REV:25 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC TABLE OF CONTENTS 05130/2006 I 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM /1.0-2 10/04/2002 Page TRM / 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM I 2.0-5 ,,04/12/1999 Pages TRM / 2.0-6 and TRM / 2.0-7 N) 11/15/2004 Page TRM / 2.0-8 12/03/2004 Pages TRM / 2.0-9 through TRM / 2.0-11 ( 11/15/2004 Pages TRM / 2.0-12 through TRM / 2.0-15 \\ 11/15/2005 N

3.0 /7>

APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 < 04/08/1999 Page TRM / 3.0-3 03/1512002 Page TRM /3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS\",, .

Pages 3.1-1 through 3.1-6 , 08/31/1998 Pages TRM / 3.1-7 and TRM / 3.1"-8 11/15/2005 Pages TRM / 3.1-9,and TRM'/,3.1-9a 02/18/1999 Page TRM / 3.1-10. \ 02/18/1999 3.2 CORE OPERATING.LIMITS REPORT Page 3.2-1> 08/31/1998 Pages TRM / 3.2-2 through TRM 13.2-39 03/03/2005 3.3 INSTRUMENTATION

ýPages'TRM / 3.3-1 through TRM I 3.3-3 07/16/1999 age-TRM / 3.3-4 03/31/2006 Pa-ges 3.3-5 and 3.3-6 08/31/1998 Page TRM 3.3-7 03/31/2006 Page 3.3-8 08/31/1998 Pages TRM / 3.3-9 and TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-10 05/30/2006 Page TRM / 3.3-11 06/02/2005 Page TRM / 3.3-11 a 05/30/2006 Page TRM / 3.3-12 03/30/2001 Page TRM/ 3.3-13 09/13/2005 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-16 06/27/2001 Pages TRM / 3.3-17 and TRM / 3.3-18 06/14/2002 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 11/15/2004 Pages TRM /3.3-21a through TRM / 3.3-21d 11/15/2004 Page TRM / 3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages 3.4-6 through 3.4-11 08/31/1998 Page TRM / 3.4-12 12/03/2004 Page TRM / 3.4-13 03/31/2006 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 04/17/2000 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 '08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM I 3.6-9 12/31/2002 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 07/29/1999 Page 3.7-3 08/31/1998 Pages TRM / 3.7-4 and TRM / 3.7-5 03/31/2006 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Page TRM / 3.7-9 03/31/2006 Page TRM / 3.7-10 08/16/2005 Page TRM / 3.7-11 01/21/2000 Pages TRM / 3.7-12 and TRM / 3.7-13 08102/1999 Page TRM / 3.7-14 08109/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 03/31/2006 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 03/31/2006 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Pages TRM / 3.7-23 and TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 through TRM /3.7-27 08/02/1999 Page TRM / 3.7-28 08/09/2005 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OFEFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.7-29 11/16/2001 Page TRM / 3.7-30 11/30/2005 Page TRM / 3.7-31 11/16/2001 Page TRM / 3.7-32 01/09/2004 Page TRM / 3.7-33 10/05/2002 Page TRM / 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Pages TRM / 3.7-40 and TRM / 3.7-40a 02/14/2005 Pages 3.7-41 and 3.7-42 08/31/1998 Page TRM / 3.7-43 03/31/2006 Pages 3.7-44 through 3.7-47 10/13/1998 Page TRM / 3.7-48 03/08/2003 Pages TRM / 3.7-49 and TRM / 3.7-50 03/09/2001 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 and TRM / 3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and .TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 12/03/2004 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004 Pages 3.8-13 and 3.8-14 08131/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Page TRM-/ 3.10-5 03/08/2003 Page TRM / 3.10-6 06/05/2002 Page TRM / 3.10-7 03/31/2006 Page TRM / 3.10-8 04/17/2002 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03131/2006 Pages 3.11-7 through 3.11-9 08/31/1998 Page TRM /3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page 3.11-13 09/01/1998 Page TRM / 3.11-14 12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM /3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 03/31/2006 Pages TRM / 3.11-24 05/13/2005 Page 3.11-25 09/01/1998 Pages TRM / 3.11-26 through TRM /3.11-28 01/21/2004 Page TRM / 3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/3111998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM /3.11-39 11/30/2005 Pages 3.11-40 through 3.11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM /.LOES-4 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005

- Page TRM / B 3.0-15 03/15/2002 B3.1 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 07/13/1999 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 11/15/2005 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Page B 3.3-2 08/31/1998 Pages TRM / B 3.3-3 and TRM / B 3.3-3A 01/31/2005 Pages TRM / B 3.3-4 through TRM / B 3.3-7 05/30/2006 Pages TRM / B 3.3-8 and TRM / B 3.3-9 03/30/2001 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM / B 3.3-12 09/13/2005 Page TRM / B 3.3-13 12/03/2004 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 06/14/2002 Page TRM / B 3.3-14b 06/14/2002 Page TRM / B 3.3-15 10/22/2003 Page TRM / B 3.3-16 10/22/2003 Page TRM / B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 11/15/2004 Pages TRM / B 3.3-19a through TRM / B 3.3.19e 11/15/2004 Pages TRM / B 3.3-20 and TRM / B 3.3-21 05/16/2003 Page TRM / B3.3-22 10/22/2003 Page TRM / B3.3-23 05/16/2003 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 08/31/1998 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 B3.5 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 08/31/1998 B 3.6 CONTAINMENT BASES Page TRM/ B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 .08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.6-4 09/23/1999 Page TRM / B 3.6-5 01/07/2002 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 08/02/1999 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Pages TRM / B 3.7-6 and TRM / B 3.7-6a 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Pages TRM / B 3.7-10a through TRM / B 3.7-a1 a 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Pages TRM I B 3.7-14a and TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Pages TRM / B 3.7-21 and TRM / B3.7-21a 02/14/2005 Pages TRM/B 3.7-22 and TRM/B 3.7-23 04/07/2000 Page B 3.7-24 08/31/1998 Page TRM / B 3.7-25 '12/03/2004 Pages B 3.7-26 through B 3.7-30 08/31/1998 Page TRM / B 3.7-31 12/03/2004 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 B3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM I B 3.8-2a 01/28/2005 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/02/2002 Page TRM I B 3.8-4a 08/10/2004 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 05/30/2006

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 25 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 08/31/1998 Page TRM / B 3.10-3 03/08/2003 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Pages TRM / B 3.10-6 and TRM / 3.10-7 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3;11-11 and TRM/B 3.11-1 Ia 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM /B 3.11-14 12/03/2004 Page TRM /B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Pages TRM / B 3.11-21 through TRM / B 3.11-23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 "08/31/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 12/03/2004 Pages B 3.11-31 through B 3.11-35 08/31/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 02/05/1999 TRM2 text LOES.doc 6/1512006 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 05/30/2006

Reactor Coolant System Chemistry PPL Rev-. 3.4.1 3.4 Reactor Coolant System 3.4.1 Reactor Coolant System Chemistry TRO 3.4-.1 The chemistry of the reactor coolant system shall be maintained within the limits specified in Table 3.4.1-1 and the conductivity recorder shall be OPERABLE.

APPLICABILITY: At all times ACTIONS NOTE

1. The provisions of TRO 3.0.4 are not applical CONDITION REQUIRED ACTION COMPLETION TIME A. Conductivity not within the A.1 Perform TRS 3.4.1.1 and Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> limits specified in TRS 3.4.1.3.

Table 3.4.1-1. AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> A.2 Perform TRS 3.4.1.4 B. Conductivity or Chlorides B.1 Restore parameter within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> not within the limits limits specified in Table 3.4.1-1 AND in MODE 1 but with conductivity less than 10 < 336 hour0.00389 days <br />0.0933 hours <br />5.555556e-4 weeks <br />1.27848e-4 months <br />s/year.

j.Lrho/cm at 250 C and cumulative time chloride concentration less exceeding the limit than 0.5 ppm.

C. pH not within limits of C.1 Restore pH within limits. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Table 3.4.1-1 in MODE 1.

D. Required Actions and D.1 Be in MODE 2 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Times of Conditions B or C not met.

(continued)

SUSQUEHANNA UNIT 2 .TRM / 3.4-1 EFFECTIVE DATE 03/31/2006

Reactor Coolant System Chemistry PPL Rev.-4 3.4.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME NOTE E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Actions shall be completed if this Condition is -NOTE --

entered. AND Cooldown should be performed as rapidly as E. Conductivity greater than possible not to exceed or equal to 10 p.mho/cm at E.2 Be in MODE 4. the cooldown rate 25 0 C or chloride concentration greater than or equal to than 0.5 ppm. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F. Reactor Coolant Chemistry F.1 Restore parameter to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> not within limits specified in within limits.

Table 3.4.1-1 for MODE 2 or 3 G. Required Actions and G.1 Be in MODE 3 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time of Condition F not met. AND G.2 Be in MODE 4 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> H. NOTE H.1 Restore parameter to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Only applicable when in a within limits MODE other than MODES 1,2, or3.

Reactor Coolant Chemistry not within limits specified in Table 3.4.1-1.

(continued)

SUSQUEHANNA UNIT 2 3.4-2 EFFECTIVE DATE 10/2311998

Reactor Coolant System Chemistry PPL RevA. 3.4.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME NOTE-- 1.1 Perform Engineering Evaluation Prior to proceeding Required Actions shall be of structural integrity to MODE 3 completed if this Condition is entered.

I1.

Chloride concentration greater than 0.5 ppm for

>24 hours J. Conductivity recorder* J.1 Obtain in-line conductivity NOTE-inoperable, measurement or grab sample Applicable in MODES 1, 2, or 3.

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> AND NOTE-Applicable in other than MODES 1, 2, or 3.

Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SUSQUEHANNA UNIT 2 3.4-3 EFFECTIVE DATE 10/23/1998

Reactor Coolant System Chemistry PPL Rev4-I 3.4.1 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.4.1.1 Analyze a sample of reactor coolant for chlorides 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> TRS 3.4.1.2 Analyze a sample of reactor coolant for conductivity 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> TRS 3.4.1.3 Analyze a sample of reactor coolant for pH NOTE-Only required to be performed if reactor conductivity is greater than 1.0 Lmho/cm at 25 0C 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> TRS 3.4.1.4 Perform CHANNEL CHECK of the continuous 7 days conductivity monitor SUSQUEHANNA UNIT 2 3.4-4 EFFECTIVE DATE 10/23/1998

Reactor Coolant System Chemistry PPL Rev--I 3.4.1 TABLE 3.4.1-1 REACTOR COOLANT SYSTEM CHEMISTRY LIMITS CONDUCTIVITY CHLORIDE MODE p~mho/cm @ 25 0 C CONCENTRATION ppm pH 1 <1.0 *0.2 5.65<pH* 8.6 2 and 3 < 2.0 *0.1 5.65<pH* 8.6 At all times other _ 10.0 < 0.5 5.3*5 pH <8.6 than MODE 1, 2, or 3 SUSQUEHANNA UNIT 2 3.4-5 EFFECTIVE DATE 10/23/1998