ML072480246

From kanterella
Revision as of 16:05, 22 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summer Inspection / Activity Plan 09/01/2007 - 03/31/2009, Report 22
ML072480246
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/31/2007
From:
NRC/RGN-I/DRP/PB5
To:
References
Download: ML072480246 (2)


Text

Summer Inspection / Activity Plan 09/01/2007

-03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2007 09:06:20 Report 22 1 EB3-HS-HEAT SINK Baseline Inspections 09/10/2007 09/14/2007 1 7111107B IP Heat Sink Performance 3 PSB1-EP-EP EXERCISE Baseline Inspections 10/01/2007 10/05/2007 1 7111401 IP Exercise Evaluation Baseline Inspections 10/01/2007 10/05/2007 1 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/01/2007 10/05/2007 1 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/01/2007 10/05/2007 1 71151-EP02 IP ERO Drill Participation Baseline Inspections 10/01/2007 10/05/2007 1 71151-EP03 IP A lert & Notification System 5 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections 12/10/2007 12/14/2007 1 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 12/10/2007 12/14/2007 1 7111117B IP Permanent Plant Modifications 1 PI&R-PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections 01/28/2008 02/01/2008 1 71152B IP Identification and Resolution of Problems 4 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 03/10/2008 03/14/2008 1 71152B IP Identification and Resolution of Problems Baseline Inspections 03/24/2008 03/28/2008 1 71152B IP Identification and Resolution of Problems 1 PSB1-RP-RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections 03/31/2008 04/02/2008 1 7112101 IP A ccess Control to Radiologically Significant Areas 3 PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections 04/21/2008 04/25/2008 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 04/21/2008 04/25/2008 1 7112102 IP A LARA Planning and Controls Baseline Inspections 04/21/2008 04/25/2008 1 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 04/21/2008 04/25/2008 1 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 04/21/2008 04/25/2008 1 71151-PR01 IP RETS/ODCM Radiological Effluent 1 EB3-ISI-SUMMER - ISI Baseline Inspections 04/28/2008 05/02/2008 1 7111108P IP Inservice Inspection Activities - PWR 3 PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections 05/05/2008 05/09/2008 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 05/05/2008 05/09/2008 1 7112102 IP A LARA Planning and Controls Baseline Inspections 05/05/2008 05/09/2008 1 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/05/2008 05/09/2008 1 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 05/05/2008 05/09/2008 1 71151-PR01 IP RETS/ODCM Radiological Effluent 7 EB1-CDBI-COMPONENT DESIGN BASIS INSPECTION Baseline Inspections 07/28/2008 08/01/2008 1 7111121 IP Component Design Bases Inspection Baseline Inspections 08/11/2008 08/15/2008 1 7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Summer Inspection / Activity Plan 09/01/2007

-03/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2007 09:06:20 Report 22 7 EB1-CDBI-COMPONENT DESIGN BASIS INSPECTION Baseline Inspections 08/25/2008 08/29/2008 1 7111121 IP Component Design Bases Inspection Baseline Inspections 09/08/2008 09/12/2008 1 7111121 IP Component Design Bases Inspection 2 OL RQ-REQUAL INSPECTION Baseline Inspections 08/11/2008 08/15/2008 1 7111111B IP Licensed Operator Requalification Program 1 PSB1-EP-EP INSP Baseline Inspections 09/22/2008 09/26/2008 1 7111402 IP A lert and Notification System Testing Baseline Inspections 09/22/2008 09/26/2008 1 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 09/22/2008 09/26/2008 1 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 09/22/2008 09/26/2008 1 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 09/22/2008 09/26/2008 1 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 09/22/2008 09/26/2008 1 71151-EP02 IP ERO Drill Participation Baseline Inspections 09/22/2008 09/26/2008 1 71151-EP03 IP A lert & Notification System 3 OL EXAM-INITIAL EXAM PREP Not Applicable 01/05/2009 01/09/2009 1 V23297 SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 3 OL EXAM-INITIAL EXAM Not Applicable 01/26/2009 02/06/2009 1 V23297 SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 3 PSB2-EP-EP EXERCISE Baseline Inspections 03/30/2009 04/03/2009 1 7111401 IP Exercise Evaluation Baseline Inspections 03/30/2009 04/03/2009 1 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/30/2009 04/03/2009 1 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/30/2009 04/03/2009 1 71151-EP02 IP ERO Drill Participation Baseline Inspections 03/30/2009 04/03/2009 1 71151-EP03 IP A lert & Notification System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.