MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements 1999-06-28
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML20140B8291997-03-24024 March 1997 Rev 3 to EOP ATT-12.0, Attachment N2 Porvs ML17264A8221997-02-0606 February 1997 Rev 15 to FR-P.1, Response to Imminent Pressurized Thermal Shock Condition. ML17264A8201997-02-0606 February 1997 Rev 7 to AP-RCC.2, Rcc/Rpi Malfunction. ML17264A8081997-01-23023 January 1997 Revised Emergency Operating Procedures,Including Rev 14 to E-1,Rev 19 to E-3,Rev 14 to ECA-2.1,Rev ECA-3.3,Rev 20 to ES-1.3,Rev 13 to FR-C.1,Rev 12 to FR-C.2 & Rev 14 to FR-P.1 ML20133N3351997-01-10010 January 1997 Rev 7 to FR-C.3, Response to Saturated Core Cooling ML17264A8881996-10-10010 October 1996 Rev 9 to ODCM for Ginna Station. ML20128N0681996-10-0303 October 1996 Revised Emergency Operating Procedures,Including Rev 5 to Att-10.0, Attachment Faulted S/G & Rev 6 to Att-16.0, Attachment Ruptured S/G ML17264A5311996-05-31031 May 1996 Revised Emergency Operating Procedures,Including Rev 10 to AP-RCP.1,Rev 12 to ECA-0.1,Rev 12 to ECA-2.1,Rev 3 to FR-H.2,Rev 3 to FR-H.4,Rev 7 to FR-I.1,Rev 12 to FR-P.1,Rev 10 to FR-S-1 & Rev 6 to FR-S.2 ML17264A5161996-05-22022 May 1996 Rev 2 to Technical Requirements Manual (TRM) ML17264A4581996-04-0808 April 1996 Rev 7 to ODCM for Ginna Station. ML17264A4371996-04-0101 April 1996 Rev 1 to Technical Requirements Manual (TRM) ML17264A4391996-04-0101 April 1996 Rev 1 to Updated Technical Requirements Manual (TRM) ML17264A4191996-02-24024 February 1996 Rev 0 to Technical Requirements Manual (Trm). ML17264A6901996-02-23023 February 1996 Rev 0 to Inservice Testing Program. 1999-05-12
[Table view] |
Text
June 1981 Tendon Surveillance Program Robert E.Ginna Nuclear Power Station April 27, 1981 1 JUNE 1981 SURVEILLANCE PROGRAM
1.0 INTRODUCTION
The June 1981 tendon surveillance program is presented in detail.The program includes the liftoff of fourteen (14)tendons including the four (4)tendons with load cells.The data collection system required will not only confirm the liftoff data, but it will also obtain data needed to continue the investigation into the larger than predicted tendon losses.The inspection and selection process discussed in the Proposed Revision 3 to USNRC Regulatory Guide 1.35 are followed.The measured force for each tendon will be evaluated with respect to its predicted lower limit force discussed in this guide.These predicted lower limit forces are obtained using the loss calculation methodology described in the Proposed USNRC Regulatory Guide 1.35 Position l.2.0 OB JECTIVES, The June, 1981 surveillance program is required to verify that the tendon forces are within the technical specifications and to provide further information as to why tendons have experienced prestress losses in excess of their predicted values.This surveillance program as outlined herein has four objectives:
1~To measure lift-off forces in selected tendons.2.To compare lift-off forces with those predicted, using either the existing relaxation data and/or retensioned wire data from the testing currently underway at Lehigh University.
3.To compare the two force measuring systems: a.Strain gaged stressing rod.
1 W b.Pressure gauge and effective ram area.4.To test the 6%overstress effect.The following surveillance program is intended for use only in June'1981.It is expected that the detail data gathering proposed will not be necessary on subsequent surveillances.
3.0 TENDON
SELECTION 3.1 The tendon selection process will: 1.Verify that tendon force losses have stabilized.
.2.Survey enough tendons to extend present data base.3.Include all four tendons with load cells.4.Include tendons retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> after initial stressing.
5.Include tendons from each tendon mark category.3.2 Table 1 contains the complete list of selected tendons.3~3 To verify that the tendon force loss has stabilized,-tendons 62 and 76 are selected because they experienced large losses during the first eleven (ll)years.Tendon 51 is selected as an average loss tendon and 155 as a minimal loss tendon.3.4 To extend the data base, tendons 17 and 84 are selected because they each have four (4)recorded data points.3.5 Load cells are present under tendons 13, 53, 93, and 133, therefore, these are selected for surveillance.
Tendons 133 and 13 will be used to evaluate the 6/overstress effect.
k I' 3.6 To include tendons retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, four are selected;two surveyed previously (36 and 111)and two not surveyed (33 and 116).4.0 TEST PROCEDURE FOR LIFT-OFF 4.1 Initial Conditions 1.Plant may be in any phase of operation.
2.Pressure gauge has been calibrated.
3.Hydraulic ram area has been calibrated.
4.Hydraulic pump and ram are functional and ready for operation.
5.Load cells and stressing rod have been calibrated.
6.All tendons to be stressed have been inspected for broken wires and corrosion.
7.Containment structure has been inspected for cracks, spalling, etc.4.2 Precautions 1.Observe all RGB safety rules and regulations.
2.Do not exceed 6560 psi gauge pressure for jack and tendons.3.Whenever hydraulic pump is operating, the reservoir vent valve must be open.4.Do not extend ram more than 8 inches.
4.3 General
Instructions 1.Fill in line 1-4 on the data sheet (See Appendix I)and record comments from the visual inspection on line 5.2.Move assembled hydraulic jack to position for coupling to the anchor head and place the pump in a convenient location for operation.
a.Carefully thread stressing adaptor onto tendon anchor head.Note: Leave a minimum of one thread and maximum of three threads on tendon anchor exposed below the lower edge of the stressing adaptor.b.Place jack assembly, on tendon base plate.c.Center jack chair carefully over tendon head and thread stressing rod into stressing adaptor.d.Center compression shims and tighten jack rod nut at top (ram)end of jack being careful not to damage strain gaged area and the electrical connector on top of the, jack rod.3.Make the appropriate strain gage connections and check for malfunctions.
4.Before attaching hoses to jack for the first tendon, check pump and hoses by performing the following:
a.Set valves to pump position.b.Start pump at the same time depress the ball valve.
c.Pump slowly to fill hose with oil until it comes out of the hose free of bubbles.d.Release ball valve and start pumping again.Continue pumping;hose will become stiff;gauge pressure will rise rapidly and then hold constant.5.Reduce pressure and connect hoses to jack.6.Record all initial readings in the appropriate columns on the data sheet.7.Start pump and increase pressure to 2,000 psi.a.Record stressing rod reading in column 3a on data sheet.b.Record load'ell reading in column 4a on the data sheet if tendon has load cell.c.Record ram position in inches in column 5 on data sheet.d.Calculate and record force values for the stressing rod, pressure gauge and load cell.8.Increase pressure up to 4,000 psi and hold.a.Inspect for leakage of hydraulic fluid and note if leakage is excessive.
b.Record stressing rod and load cell (if tendon has load cell)-readings in the appropriate columns on the data sheet.c.Calculate and record force for the stressing rod, pressure gauge and load cell.
9.Increase pressure until a 0.035 (1/32)inch thick feeler shim can be inserted into the shim stack at two equally spaced positions around the shim stack.10.Reduce ram pressure 1000 psi or until the feeler shims cannot be removed.Increase pressure until both feeler shims can be removed.Note in the comment section if there is a large difference in the load at which each feeler shim can be removed.This is defined as liftoff.a.Record the pressure gauge reading on the data sheet in column 2a.b.Record the stressing rod reading on the data sheet in column 3a.c.Record the load cell reading for load cell tendons in column 4a.d.Record the ram position in column 5 of the data sheet.e.Calculate and record force values.11.Stress tendons 13 and 133 an additional 6%over recorded liftoff pressure.a.Record computed 6/overstress pressure on data sheet in column 2a.b.Increase pressure to computed 6/over stressing pressure and record stressing rod reading, load cell reading and ram position on the data sheet.c.Place two.035 (1/32)inch thick feeler shims in the shim pack and reduce ram pressure to approximately 2900 psi.
l' d.Slowly increase pressure until the feeler shims can be withdrawn from shim stack.This is defined as liftoff.Record load cell, pressure gauge, strain gage and ram position on data sheet.e.Calculate and record force values on data sheet.12..Decrease pressure to approximately 4,000 psi.a.Record stressing rod reading, load cell and ram position on the data sheet.b.Calculate and record force values on data sheet.13.Decrease pressure to approximately 2,000 psi.a.Record stressing rod reading, load'cell reading and ram position on the data sheet.b.Calculate and record force values on the data sheet.14.Decrease pressure until all load is removed from jack rod.a.Record stressing rod reading, load cell reading and ram position on the data sheet.15.Remove jack assembly from tendon.a.Disconnect strain gage equipment.
b.Unthread stressing rod from coupler.c.Remove jack chair and stressing rod assembly.d.Remove adapter from tendon head.
16.Record any comments concerning liftoff on the data sheet.17.Move to next tendon.5.0 DATA COLLECTION PROCEDURES 5.1 Test Data-Record all data as required in 4.0, Test Procedure for Liftoff 5.2 Data sheet-The proposed data sheet is presented in Appendix I.5.3 Strip chart recordings of force from load cell tendons will begin when the jack assembly is moved from that tendon and continue for 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />.6.0 TENDON SURVEILLANCE SEQUENCE The schedule is presented in Table 2.7.0 ACCEPTANCE CRITERIA The measured liftoff.forces will be evaluated in accordance with the present"Ginna Technical Specifications."
Table 1 TENDON SELECTION Tendon Number Tendon Mark Comments 13 17'33 36 51 53 62 76 84 93 111 116 133 155 A C GS HT A A A B A A A2 ER A A Load cell Maximum recorded data Retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> Retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> Average ll year loss Ioad cell Large ll year loss Large 11 year loss Maximum recorded data Ioad'cell Retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> Retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> Load cell Small 11 year loss 10 Table 2 TENDON SURVEILLANCE SE(}UENCE Sequence Number Tendon Number S ecial Instructions 9 10 ll 12 13 14 13 17 33 36 51 53 62 76 84 93 111 116 133 155 I,oad cell and 6/overstressing Load cell Load cell Ioad cell and 6/overstressing.
Appendix I Data Sheet-June 1981 Tendon Surveillance 12 DATA SHEET 1-JUNE, 1981 TENDONSURVEILLANCE RG&E GINNA NUCLEAR POWER STATION ROCHESTER GAS AND ELECTRIC CORPORATION 1)Date 2)Hydraulic Jack No.3)Hydraulic Pump No.4)Load Cell Factor--Tendon No.Ram Area"=Pressure Gauge No.Shim Stack Thickness Stressing Rod Gage Factor~'~5)Tendon Inspection Comments 1 Condition 2 Pressure Gau e 3 Stressin Rod 4 I.oad Cell 5 Ram Position 6 Comments Initial Increasing Increading Liftoff a (b Pressure Force" (si)(lbs)2000 4000 a Strain (m in/in)b Force---(lbs)b Strain Force""" (m in/in)(lbs)inches Liftoff+6g (Tendons 13&133)Liftoff Decreasing Decreasing Decreasin 4000 2000 0 13 DATA SHEET 1 (Cont'd)Notes: (-)Ram area to be used to calculate ram force in column 2b: Force=Ram Area x Pressure Load Cell Factor to be used to calculate force in column 4b: Force=Load Cell Factor x (Strain'Reading-Initial Strain Reading)Stressing Rod Gage Factor to be used to calculate force in rod in column 3b: Force=Stressing Rod Gage Factor x (Strain-Initial Strain Reading)