ML16123A346
ML16123A346 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 05/02/2016 |
From: | Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
10-S-01-19, Rev. 021 | |
Download: ML16123A346 (19) | |
Text
Volume 10 Section 01 PLANT OPERATIONS MANUAL REFERENCE USE EMERGENCY PLAN PROCEDURE PERSONNEL INJURY SAFETY RELATED 10-8-01-19 Revision: 021 Date: 5-2-16 Prepared:
Reviewed:Ma g.ergency laMingListofEffectivePages:
Pages 1-9 Attachments I-IIListofTCNsIncorporated:RevisionTCN o None 1 1 2-021 None J:\ADMLSRVS\TECH_PUB\10\10S0119.DOC GRANDGULFNUCLEAR STATION EMERGENCY PLAN PROCEDURETitle:PersonnelInjury No.: 10-S-01-19RPTSFORM Revision: 021Page:i REQUIRED REVIEW PERFORMED o PAD o 50.59 Screen/Eva!.(Checkallthatapply)(EN-L1-100)(EN-L1-1 01)o 72.48 Screen/Eva!.
o 50.54 Eva!.Transmit applicableReviewFormasa (EN-L1-112)(EN-NS-210)separaterecordalongwith procedure to o PAD Not Required{EN-L1-100 or 01-S-02-3)
Document Control.o Process Applicability Excluded o Editorial Change o lSI/1ST Implementation o TCN IncorporationorAutoRev.
o Other Process-Number:PADReviewer:
/(forPADNot Required)Signature/Date Cross-Disci line review re uired?Pre arer Initials>>>(Note affected Departments Below)Department Cross-Discipline Reviews Needed Signoff:(signed, electronic, telcon)Industrial Safety (.,..,."..*...c*.
\"""'--.::J
___Does this directive containTechSpec Triggers?()YES (X)NO REQUIREMENTS CROSS-REFERENCE LIST Requirement Implemented by Directive Directive Paragraph Number Name Paragraph Number That Implements Requirement GGNS Emergency Plan 6.7.3.51,52
&6.7.4.S56.3(Note)&6.4.110CFR50 72.B.3.XII 6.3 (Caution)*Coveredby directiveasawholeorbyvarious paragraphsofthe directive.
J:\ADM_SRVS\TECH_PUB\10\10S0119.DOC GRANDGULFNUCLEARSTATION EMERGENCY PLAN PROCEDURETitle:PersonnelInjury No.: 10-S-01-19Revision:021Page:ii The Equipment Database (EDB)Requeststatement is applicableonlytoVolume06and07 maintenance directives.EDBChange Request generatedandthebackup documentation available for setpoint and/orcalibrationdataonly DYesDN/AEDBCR#_CurrentRevision StatementRevision021:*Add reference to Management Standard#20-OperatingHard-Card,ControlRoomActionsforMedicalEmergency.(Reference CR-GGN-2016-2247CA#2)*Changestoreporting emergenciesandControlRoomactionstobe consistent with ManagementStandard#20.
J:\ADM_SRVS\TECH_PUB\lO\lOSOl19.DOC I'Page: 1 EMERGENCY PLAN PROCEDURE I ReVISion: 021GRANDGULFNUCLEARSTATION I Title: Personnel InJury I No.: 10-8-01-19
'---------------
TABLE OF CONTENTS'Page 1.0PURPOSEANDDISCUSSION 2 2.0 RESPONSIBILITIES 2
3.0 REFERENCES
3 4.0 ATTACHMENTS 3 5.0 DEFINITIONS 3 6.0 DETAILS 4 6.1 Reporting of Injuries 4 6.2 Immediate Actions 5 6.3 Ambulance Transport 6 6.4 Offsite Medical Facilities 8 6.5 Hospital Preparation to Receive Patients 9 J:\ADM_SRVS\TECH_PGB\lO\lOSOl19.
DOC GRANDGULF NUCLEAR STATION I Title: Personnel Injury 1.0 PURPOSE AND DISCUSSION
1.1 Purpose
I No.: 1o-s-01-19 EMERGENCY PLAN PROCEDURE1.1.1To provide guidance on response to, reportingof,and transferofinjured personnel under the following conditions:a.Injuredperson requiring transporttoan offsite medical care facilityb.Any injuries discovered during an emergency classification 1.2 Discussion1.2.1By agreement between Entergy Operations,Inc.andthe primary and backup.medical care facilities, personnelattheGrand Gulf Nuclear Station sustaining injuries from ionizing radiation or injuries complicated by radiation exposure or radioactive contaminationaretobe providedcareand treatment at those facilities.
Procedures and equipmentforthiscareand treatment are maintained at these facilities.
An individual whose clothing, skin and/or wounds are contaminated with radioactive material may present a radiation hazard to attending personnelinthe absence of adequate procedures to prevent the spreadofthe contaminant, orcontrolthe radiation exposureinthe event of radioactive shrapnel wound.Since radiation injuriesarenot immediately life-threatening, primary attention should always be directed to traumatic life-threatening injuries.After such treatment is rendered, the patient should be decontaminated.
2.0 RESPONSIBILITIES2.1The Manager.Radiation Protection-Is responsibleforthe implementationoftheFirstAid ProgramatGGNS.2.2The Radiation Protection Supervisor-Is responsibleforthe administration and managementoftheFirstAid Program including:2.2.1The assignmentofaFirstAid qualified individualtoeach Radiation Protection shift.2.2.2 Maintenanceoffirstaid supplies and medical emergency response equipment.
2.2.3 Transportation
of injured personneltothe hospital and contamination control measures as necessary.
J:\ADM_SRVS\TECH_PUB\lO\lOSOl19.
DOC GRAND GULF NUCLEAR STATION I Title: Personnel Injury I No.: 10-8-01-19 EMERGENCY PLAN PROCEDURE I ReVISion: 0212.3All GGNS personnel-Are to immediately report observed serious injuriestothe Control Room.Personnel within the Protected Area requiring minor firstaidareto report to Radiation Protection for medical treatment.
2.4 The OSC Manager-Is responsible for organizing and dispatchingofFirstAid Teams per EN-EP-611 when the OSC is operational.
2.5 The EOF Public Information Liaison-Is responsible for notifying the Company Spokesperson regarding worker injuries during adeclaredemergency.
3.0 REFERENCES
3.1 Corporate
Procedure EN-IS-113, Reporting&Investigating Occupational Injuries/Illnesses And Near Misses 3.2 Grand Gulf Nuclear Station emergency Phone Book SectionE,Fireand Medical Support.3.3 Management Standard#20,OperatingHardCard-Control Room Actions for Medical Emergency'
4.0 ATTACHMENTS
4.1 AttachmentI-Directions to Claiborne County Hospital 4.2 AttachmentII-Directions to River Region Medical Center 5.0 DEFINITIONS 5.1 OSC-Operations Support Center 5.2 TSC-Technical Support Center5.3RPS-Radiation Protection Supervisor5.4REA-Radiation Emergency Area J:\ADM_SRVS\TECH_PUB\10\10S0119.
DOC GRANDGULFNUCLEARSTATIONEMERGENCYPLANPROCEDURE I Title: Personnel Injury6.0DETAILS6.1ReportingofInjuries I ReVISion: 021 I Page: 4 Maintain communicationswiththeControlRoomuntilallreportedinformationisproperly acknowledged.6.1.1Anyindividualfindinganinjuredpersonwhorequiresmajormedicalassistanceisto immediately NOTIFY the ControlRoombythe quickestavailablemeans.a.Thefollowing informationshouldbeprovidedtotheControlRoom:(1)Nameand locationoftheinjuredperson (2)Natureoftheemergency,ifknown.(3)IsMedical Help/Ambulance needed?(4)Nameofthecaller6.1.2The ControlRoomistoperformthefollowingactions.Ifavailableuse ManagementStandard#20-OperatingHardCardforMedicalEmergency:a.ImmediatelyNOTIFYthe Radiation Protection(RP)Lab or Site Medical PersonneltodispatchFirstResponderstothescene.b.Ifrequired, Contact AmbulanceforresponsetoGrandGulfNuclearStation.Givethemthelocationoftheemergency.ProvideaCallBackNumberandsiteaddress;7003BaldHillRoad,PortGibson,MississippiTIME:_c.ContactSecurityIslandof Ambulanceresponseandauthorizeentry,as needed.d.HaveSecurity dispatchedtoscene,asnecessary.
NameTime_e.SOUNDSiteFireAlarm;MAKEPAANNOUNCEMENT: "MEDICAL EMERGENCY AT unnecessarypersonnelstayclearofthearea." J:\ADM SRVS\TECH PUB\10\10S0119.DOC
--
GRANDGULFNUCLEARSTATION ITitle:Personnel InJury I No.: 10-8-01-19 EMERGENCY PLAN PROCEDURE I RevIsion: 021 f.REPEAT notificationevery5minutesuntiltheControlRoomhas confirmationthatthefirstaidteamhasbeenassembledatthescene.
g.Dispatch operatortoscenewithFirstAidTraumaKitandAED.FirstAidTraumaKitandAEDlocationsarelistedon ManagementStandard#20.
h.L ContactIndustrialSafety.
Name Time_ContactDutyManager.
Name Time_j.Shift Manager determinereportability,asneeded.6.1.3Ifduringdeclared emergency and emergencyresponsefacilitiesareoperational:
a.NOTIFY the OSCandprovidethe applicableinformationaboutthelocationofthe workerandextentofinjuries,ifknown.
b.NOTIFY the TSC EmergencyPlantManager.6.2ImmediateActions6.2.1Uponreceiving notificationofamedicalemergency:theRPLabshould PERFORMthefollowing NOTE:TheFirstAidTeammaybenotifiedbyGaitronics,plantradioorpagerusingAlphaPagingontheGGNSHomePageunder Processes/Programs (pageFirstAidTeam)a.NotifytheControlRoomifnotalreadynotified.
b.DISPATCHaFirstAidTeamtothesceneofthemedicalemergency.TheFirstAidpersonnelshouldbeequippedwiththefollowing:
(1)First Aid trauma kit (2)Portable radio (3)Radiological survey instruments and personnel protective equipment (Le.,respiratoryprotectiondevices,PCs)suitableforthehazardsatthelocationandthenatureoftheeventwhichcausedtheinjury(i.e.,fire,explosion).
J:\ADM SRVS\TECH PUB\10\10S0119.DOC
--
GRANDGULFNUCLEARSTATION ITitle:Personnel InJury6.2.1(continued)
I No.: 10-8-01-19EMERGENCYPLANPROCEDURE I RevIsion: 021c.TheFirstAidTeamshouldestablishandmaintaincommunicationswiththeRPLab,ControlRoom,orOSCandprovideperiodicupdates.6.2.2FirstAidpersonnelaretoPERFORMthefollowingactionsatthesceneofthemedicalemergency:a.DETERMINEtheinjuredperson'sphysicalconditionandextentofinjuries.b.ADMINISTERfirstaidnecessarytosustainlifeandtostabilizetheinjured worker.c.MOVEtheinjuredpersontoasafelocationiflife-threateningradiologicalorphysicalhazardsarepresent.
d.lEtheinjuryoccurredinaradiologicallypostedarea,THENperformacontaminationsurveyoftheinjuredworkerandREADtheworker's dosimetry.e.PROVIDEthefollowinginformationtotheRPLaborOSCRadChem Coordinator:RadiationProtection(OSCRadChemCoordinator)mustNotifytheControlRoomandprovidethefollowing information (1)Name and locationoftheinjuredperson.
(2)Extentofinjuriesandtreatmentbeingadministered.(3)Personnel contamination survey and dosimeterresultsfortheinjuredworker.(4)Theneedforanambulanceorotherassistance.f.PREPAREtheinjuredworkerfortransfertothehospital.g.RadiationProtectionpersonnelatthesceneofthemedicalemergencymustPERFORMradiologicalsurveysasnecessarytoprotectteammembersandsupportpersonnel.
J:\ADM SRVS\TECH PUB\10\10S0119.DOC
--
GRANDGULFNUCLEARSTATION ITitle:Personnel InJury 6.3 Ambulance Transport I N o.: 1 0-$-01-19 EMERGENCY PLAN PROCEDURE I ReVISion: 021 The-transportofinjuredpersonsisnormallyprovidedbytheregionalambulanceservice.Iftheregional ambulanceserviceisunavailable,theinjuredpersonshouldbetransportedincompanyownedorprivatevehicle.
CAUTIONIfa contaminated injured person is transported to an offsite medical facility, the NRC shall be notified within eight hours, in accordance with 01-5-06-5.6.3.1If ambulance transportisnecessarythe Control RoomshouldusethephonenumberslistedinReference3.2 torequestanambulance.a.Informthe ambulanceofthelocationoftheinjured,accesspointor anyotherinformationnecessary.6.3.2The Control Room must NOTIFY SecurityifanOnsiteorOffsite ambulance isrequiredtoentertheprotectedareaandmust SPECIFYthepatientpickuppoint.a.TheSecurity Coordinator must ENSUREthatOffsite ambulancecrewsare issued dosimetryattheentrancetotheProtectedArea.b.RadiationProtectionpersonnelatthesceneofthemedical emergency must ENSUREthatOffsiteambulancecrewmembersareproperlywearing the appropriate dosimetryandprotectiveclothingforentryinto radiologicallycontrolledareas.6.3.3The Shift Manager should NOTIFY the EOF Emergency Director and INFORM himofthe transportation of aninjuredcontaminatedworkertothehospital.Thehospital.mustreceivethisinformationassoonaspossibleinordertomakethenecessary preparationsforthe emergency treatmentoftheworker.ThehospitalphonenumbersarelistedintheEmergencyTelephoneBook.
J:\ADM SRVS\TECH PUB\10\10S0119.DOC
--
GRANDGULFNUCLEARSTATION ITitle:Personnel InJury I No.: 10-8-01-19 EMERGENCYPLANPROCEDURE I Page: 8 6.3.4TheRP Supervisor/Shift leadHP(OSCRadChern Coordinator) receiving the initial information must notify the hospital and provide the following information as soon as possible.a.Nameofinjuredworker(s) b.Extentofinjuries c.Contaminationlevelsoninjuredworker(s),ifapplicabled.Expected arrival timeathospital,ifknown.6.3.5GGNSpersonnelshould PERFORMthefollowingenroutetothehospital:*AfriskerisnormallymaintainedintheOnsiteAmbulance*Surveysmaybelimitedorimpracticalduetotheextentofinjuriesreceivedbytheworker.
a.PERFORMa detailed contamination surveyoftheinjuredworkeriftheinjuryoccurredina RadiologicallyControlledArea.6.4OffsiteMedicalFacilities6.4.1TheRadiationProtection Supervisor/ShiftLeadHP(OSCRadChem Coordinator) is responsible for determiningwhichmedicalfacilitytouse.Facilitiesavailableforuseinclude:a.ClaiborneCountyHospitalb.RiverRegionMedicalCenter
6.4.2 AttachmentIandIIareusedto
determine transportationroutestothemedical facilities.
J:\AOM_SRVS\TECH_PUB\lO\lOSOl19:00C GRANDGULFNUCLEARSTATION ITitle:Personnel InJury I No.: 10-8-01-19EMERGENCYPLANPROCEDURE I Page: 96.4.3Processforselectinghospitalfacilitiesduringnon-radiologicalemergenciesis:a.Non-contaminated,non-lifethreatening:RiverRegionMedicalCenter,orClaiborneCountyHospital.StreetClinicinVicksburgisrecommendedwhereapplicable.b.Non-contaminated,lifethreatening-transporttoClaiborneCounty Hospital.c.PlantSafetyandEMTpersonnelmayalsoauthorizehospitallocationsduringnon-radiologicalemergenciesusingtheguidelinesabove.6.4.4Contaminatedpersonnelwithminorormajorinjuriesshouldbetransportedtooneofthemedicalfacilitiesidentifiedin6.4.1.6.4.5Patientsmustbedeliveredtohospitalfacilitiesasfollows:a.AllinjuredworkerswhoarenotcontaminatedshouldbetransporteddirectlytothehospitalEmergencyRoom.b.Contaminatedpersonnelshouldbetransportedtothehospital Radiation Emergency Area.6.4.6Whenacontaminatedinjuredworkeristransportedtothehospital,GGNSpersonnelatthehospitalshouldprovidethefollowingsupport,ifavailable:a.PROVIDEthephysicianwithallavailableinformationconcerningtheaccidentandthecontaminationhazardspresent,uponrequest.
b.ASSISTthehospitalstaff,ifpossible..c, COORDINATEthecollectionanddisposalofcontaminatedwaste materials.
d.COLLECTOffsiteambulancecrewdosimetryandPERFORMcontaminationsurveyofambulance.
ARRANGEfordecontamination,if necessary.6.5HospitalPreparationtoReceivePatients6.5.1ThehospitalroomREA(RadiationEmergencyArea)isnormallysetupby hospital p.ersonnelbeforethearrivalofthepatient.
J:\ADM_SRVS\TECH_PUB\10\10S0119.DOC GRANDGULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE 10-S-01-19 Attachment IRevision:021Page1of1 DIRECTIONS TO CLAIBORNE COUNTY HOSPITAL G,:G1NS I{GrandGulfRoad DIRECTIONS:TakeHwy61Sto McCombAvenue(StateRoad547).GoEaston547andthehospitalisonyourleft.The entrancetothe Radiation EmergencyAreaisthroughthe Emergency RoomEntranceontheNorthendofthe hospital J:\ADM_SRVS\TECH_PUB\10\10S0119.DOC I I I I I I I I I I Port:Gibson I I I I I I HWY462 HWY18 I I I:Claiborne:County I Hospital o.llmAve GRANDGULF NUCLEAR STATION.EMERGENCY PLAN PROCEDURE 10-S-01-19Revision:021 Attachment IIPage1of1DIRECTIONSTORIVERREGION MEDICAL CENTER TakeUS61Northpast CulkinAve.Youwillseethe hospital on yourright.The Emergency Room entranceisonthe South side of the hospital.The doortothe DecontaminationRoomistothe right oftheER.entrance.
River Region.A.-f----Medical Center
---.\DIRECTIONS:
J:\ADM_SRVS\TECH_PUB\10\10S0119.DOC ATTACHMENT
9.1 SHEET
1 OF 5 10CFR50.54(q)
SCREENING Procedure/Document Number: 10-S-01-19 I Revision: 21 Equipment/Facility/Other:
Grand Gulf Nuclear Station Title: Personnel Injury Part I.Description of Activity Being Reviewed(eventoraction,orseriesofactionsthatmayresultinachangetotheemergencyplanoraffecttheimplementationoftheemergencyplan):
Revision 021: 1.Changes to reporting emergencies and Control Room actionstobe consistent with Management Standard#20.2.Added Medical Facility/Site Nurse to section2.3asan option for personnel requiring minor first aid, since this facility/position is manned during outages.3.Added Plant Occupational Health Nurse to section 6.4.3 list of personnel who may authorize hospital facilities to transport patients to.Editorial Changes:4.Add reference to Management Standard#20-Operating Hard-Card, Control Room Actions for Medical Emergency.(Reference CR-GGN-2016-2247 CA#2)5.Changedthetitle River Region Hospital to Merit Health River Region duetoa changeinthe facility name.PartII.Activity Previously Reviewed?Isthis activity fully boundedbyan NRC approved 10 CFR 50.90 submittal or Alert and Notification System Design Report?IfYES, identify bounding source document number/approval reference and ensure the basis for concluding the source document fully bounds the proposed change is documented below: Justification:
DBoundingdocumentattached(optional)
DYES 50.54(q)(3)
Evaluation is NOT required.Enter justification below and complete Part VI.t81 NO Continue to next partPartIII.Applicability of Other Regulatory Change Control ProcessesCheckifanyotherregulatorychangeprocessescontroltheproposed activity.(RefertoEN-L1-100)NOTE:Forexample,whenadesignchangeistheproposedactivity,consequentialactionsmayincludechangestootherdocumentswhichhaveadifferentchangecontrolprocessandareNOTtobeincludedinthis50.54(q)(3)
Screening.
APPLICABILITY CONCLUSIONIftherearenocontrollingchangeprocesses,continuethe50.54(q)(3)Screening.
DOneormorecontrollingchangeprocessesareselected,however,someportionoftheactivityinvolvestheemergencyplanoraffectstheimplementationoftheemergencyplan;continuethe50.54(q)(3)Screeningforthatportionoftheactivity.Identifytheapplicablecontrollingchangeprocessesbelow.
oOneormorecontrollingchangeprocessesareselectedandfullyboundsallaspectsoftheactivity.
50.54(q)(3)
Evaluation is NOTrequired.IdentifycontrollingchangeprocessesbelowandcompletePart VI.CONTROLLINGCHANGEPROCESSES EN-EP-305 REV 3 ATTACHMENT
9.1 SHEET
2 OF 5 10CFR50.54(q), SCREENING Procedure/Document Number: 10-5-01-19 I Revision: 21 Equipment/Facility/Other:
Grand Gulf Nuclear Station Title: Personnel InjuryPartIV.Editorial Change DYES t8J NO 50.54(q)(3)ContinuetonextIsthisactivityaneditorialortypographicalchangesuchasformatting,paragraph Evaluation is partnumbering,spelling,orpunctuationthatdoesnotchangeintent?
NOT required.Justification:
Changes#4&5arereferencechangesandareconsiderededitorial EnterjustificationandchangesaccordingtoEN-EP-305andEN-AD-101.NoischeckedattherightbecausecompleteParttheremainingchangesarenon-editorial.
VI.Part V.Emergency Planning Element/Function Screen(Associated10CFR50.47(b)planningstandardfunctionidentifiedinbrackets)Doesthisactivityaffectanyofthefollowing,includingprogramelementsfromNUREG-0654/FEMAREP-1SectionI/?
1.Responsibility for emergency response is assigned.[1]D 2.The response organizationhasthestaffto respondandto augment staffona continuingbasis(24/7 D staffing)in accordancewiththe emergencyplan.[1]3.The process ensures thatonshift emergency response responsibilities are staffedandassigned.[2]
D 4.The process for timely augmentation of onshift staff is established and maintained.
[2]D 5.Arrangements for requestingandusing off site assistancehavebeenmade.[3]
D 6.Stateand local staffcanbe accommodatedattheEOFin accordancewiththe emergencyplan.[3]D I 7.A standard scheme of emergency classificationandactionlevelsisinuse.[4]
D 8.Procedures for notificationofStateandlocal governmental agencies are capableofalertingthemof D the declared emergency within 15 minutes after declarationofan emergency and providing follow-up notifications.
[5]9.Administrative and physical meanshavebeen established for alerting and providing prompt D instructionstothe publicwithintheplume exposure pathway.[5]10.The public ANS meets the design requirements of FEMA-REP-10,Guidefor EvaluationofAlertand D Notification Systems for Nuclear Power Plants, or complieswiththe licensee's FEMA-approved ANS design report and supporting FEMA approvalletter.[5]
11.Systems are established for prompt communication among principal emergency response D organizations.
[6], 12.Systems are established for prompt communication to emergency response personnel.
[6]D 13.Emergency preparedness information is made availabletothe publicona periodicbasiswithinthe 0 plume exposure pathway emergency planningzone(EPZ).[7]
14.Coordinated dissemination of public information during emergencies is established.
[7]*0 15.Adequate facinties are maintained to support emergency response.[8]D 16.Adequate equipment is maintained to support emergency response.[8]D 17.Methods, systems, and equipment for assessment of radioactive releasesareinuse.[9]
D18.Arangeof public PARs is available for implementation during emergencies.
[10]D 19.Evacuation time estimatesforthe population locatedintheplume exposure pathway EPZ are D available to support the formulationofPARsandhavebeen providedtoStateandlocal governmental authorities.
[10]20.A range of protective actions is available for plant emergency workers during emergencies, including D those for hostile action events.[10]
EN-EP-305 REV 3 ATTACHMENT
9.1 SHEET
3 OF 5 10CFR50.54(q)
SCREENING Procedure/Document Number: 10-S-01-19 I Revision: 21 Equipment/Facility/Other:
Grand Gulf Nuclear Station Title: Personnel Injury 21.The resources for controlling radiological exposures for emergency workers are established.
[11]D 22.Arrangements are made for medical services for contaminated, injured individuals.
[12]D23.Plansfor recovery and reentry are developed.
[13]D24.Adrilland exercise program (inclUding radiological, medical, health physics and other program Dareas)is established.
[14]25.Drills, exercises, andtrainingevolutions that provide performance opportunities to develop, D maintain, and demonstratekeyskillsare assessedviaaformal critique process in order to identify weaknesses.
[14]26.Identified weaknesses are corrected.
[14]D 27.Training is provided to emergency responders.
[15]D 28.Responsibility for emergency plan development and review is established.
[16]D 29.Planners responsible for emergency plan development and maintenance are properly trained.[16]D APPLICABILITY CONCLUSION aIfnoPartVcriteriaarechecked,a50.54(q)(3)EvaluationisNOTrequired;documentthebasisforconclusionbelowandcompletePartVI.
aIfanyPartVcriteriaarechecked,completePartVIandperforma50.54(q)(3)Evaluation.BASISFOR CONCLUSION Changes#4&5areeditorialchangesanddonotrequireevaluation.1.ChangestoreportingemergenciesandControlRoomactionstobeconsistentwithManagementStandard#20.ThischangerevisestheinformationtheControlRoomshouldrequestfromacallerreportingamedical emergencyandaddsadditionalinformationtothestepstakenbytheControlRoomtorespondtotheemergency.Theplanningstandardsandprogramelementsrequirethatmedicalservicesbearrangedforcontaminated,injuredworkersbuttheydonotdescribetheactionstakenbythelicenseetorespondtomedicalemergencies.Thischangedoesnoteliminateanymedicalresponseequipmentorqualificationsanddoesnotaffectoffsite arrangementsformedicalsupportincludingtransportation.Thischangewillnotaffecttheplanningstandardsorprogramelementsin10CFR50.470(b)[12]anddoesnotneedanevaluation.
EN-EP-305REV3 ATTACHMENT
9.1 SHEET
4 OF 5 10CFR50.54(q)
SCREENING Procedure/Document Number: 10-S-01-19 I Revision: 21 Equipment/Facility/Other:
Grand Gulf Nuclear Station Title: Personnel InjuryBASISFOR CONCLUSION (continued)
- Added Medical Facility/SiteNursetosection2.3asanoptionforpersonnelrequiringminorfirstaid,sincethis facility/positionismannedduringoutages.
Normallyfirstaid casesarehandledbyRPpersonnel.Duringoutages,whenwehaveanincreasein workforce, Grand Gulfmaysetupasitemedicalfacility and/orstaffasitenursepositionto facilitatetheexpected increaseinfirstaid and/or medical emergencycases.Thisprocedurechangeallows personnelrequiringfirstaidtoreporttothesite medicalfacilityorsitenurse,ifstaffed,ratherthanlimitingthemtoreporttotheRP department.
.*The planning standardsandprogramelementsin 10CFR50.47(b)[10]requirearangeof protective actions be availableforplant workers,butdoesnotspecifythelocationorstaffingofsitefirstaid stationsormedicalfacilitiessothischangewillnotaffectthesitesabilitytomeettherequirementsof 10CFR50.47(b)[10].*This changedoesnotreducethe numberoffirstaidqualified personnelanddoesnotreducetheshiftstaffingasrequiredin 10CFRS0.47(b)[2]orNUREG06s4tableB-1.thischangewillnotaffectthesitesabilitytomeetthe requirementsof1OCFRS0.47(b)[2].*Thischangedoesnotreducethe amountorlocationofmedical equipmentandsuppliesandwillnot affectthesitesabilitytomeetthe requirements of 10CFR50.47(b)[8].*This changedoesnotaffectthe arrangementsinplaceformedicalservicesforcontaminatedand injured individualsandwillnotaffectthesitesabilitytomeetthe requirementsof10CFRS0.47(b)[12].
This changewillnotaffectanyoftheplanningstandardsorprogram elementsin1OCFR50.470(b)anddoes not require an evaluation.
- Added Plant OccupationalHealthNursetosectionlistof personnelwhomayauthorizewhich hospital facilitiestowhich patientsaretransported.
Section6.1.3of 10-S-01-19 describestheprocessforselectinq hospitals during non-radiological emergenciesandliststhemedical facilitiespersonnelshouldbe transported to life-threateningor life-threateninginjuries.ThissectionstatesthatPlantSafetyandEMT personnel mayalsoauthorize hospital locations.Thischangeaddstheplant OccupationalHealthNursetothatgroup.Thissection only applies to non-contaminated individuals.
- 10CFR50.47(b)[12]requires licenseestoensure arrangements are made for.medical services for contaminated, injured individuals.
These arrangementswouldincludehospitals and otheroffsitemedicalfacilities.
10-S-01-19liststhesefacilitiesinsection6.4.*1.Thechange beingmadeto 10-S-01-19willnotaffectthislistortheprocessfor determiningwhichhospital to transport contaminated individualsto.Thischangewillnotaffectthesitesabilityto meet the requirements of 10CFR50.47(b)[12].*The planning standardsandprogram elements in 10CFR50.47(b)[10]requirearangeofprotective actions be availableforplantworkers,butdoesnotspecifythepositionthatshoulddeterminewhat medical facilitiestouse.Thischangewillnotaffectthesitesabilitytomeettherequirementsof 10CFR50.47(b)[10].The changesbeingmadeto 10-8-01-19willnotaffectanyof the 10CFR50.47(b)planningstandardsorprogramelements.This changemaybemade withoutpriorNRCapprovalanddoesnotneeda 10CFR50.54q evaluation.
EN-EP-305REV3 ATTACHMENT
9.1 SHEET
5 OF 5 10CFR50.54(q)
SCREENING Procedure/Document Number: 10-S-01-19 I Revision: 21 Equipment/Facility/Other:
Grand Gulf Nuclear Station Title: Personnel InjuryPartVI.Signatures:PreparerName(Print)
Date:/:/--.7-RichardVanDen Akker<r:4-21-16 i....._(Optional)
ReviewerName(Print)
Reviewer Signature Date:ReviewerName(Print)
Reviewer Signature Date:TomSowdon C f;4-22-2016NuclearEP Project Manager.<<
,//" e.-/tttfJ-'tC4'l'..t:--
ApproverName(Print)
Approver Signature Date:--:r I£'P'PEP manager or designee 6')2./16//7'EN-EP-305REV3 Volume 10 Section 01 PLANT OPERATIONS MANUAL REFERENCE USE EMERGENCY PLAN PROCEDURE PERSONNEL INJURY SAFETY RELATED 10-8-01-19 Revision: 021 Date: 5-2-16 Prepared:
Reviewed:Ma g.ergency laMingListofEffectivePages:
Pages 1-9 Attachments I-IIListofTCNsIncorporated:RevisionTCN o None 1 1 2-021 None J:\ADMLSRVS\TECH_PUB\10\10S0119.DOC GRANDGULFNUCLEAR STATION EMERGENCY PLAN PROCEDURETitle:PersonnelInjury No.: 10-S-01-19RPTSFORM Revision: 021Page:i REQUIRED REVIEW PERFORMED o PAD o 50.59 Screen/Eva!.(Checkallthatapply)(EN-L1-100)(EN-L1-1 01)o 72.48 Screen/Eva!.
o 50.54 Eva!.Transmit applicableReviewFormasa (EN-L1-112)(EN-NS-210)separaterecordalongwith procedure to o PAD Not Required{EN-L1-100 or 01-S-02-3)
Document Control.o Process Applicability Excluded o Editorial Change o lSI/1ST Implementation o TCN IncorporationorAutoRev.
o Other Process-Number:PADReviewer:
/(forPADNot Required)Signature/Date Cross-Disci line review re uired?Pre arer Initials>>>(Note affected Departments Below)Department Cross-Discipline Reviews Needed Signoff:(signed, electronic, telcon)Industrial Safety (.,..,."..*...c*.
\"""'--.::J
___Does this directive containTechSpec Triggers?()YES (X)NO REQUIREMENTS CROSS-REFERENCE LIST Requirement Implemented by Directive Directive Paragraph Number Name Paragraph Number That Implements Requirement GGNS Emergency Plan 6.7.3.51,52
&6.7.4.S56.3(Note)&6.4.110CFR50 72.B.3.XII 6.3 (Caution)*Coveredby directiveasawholeorbyvarious paragraphsofthe directive.
J:\ADM_SRVS\TECH_PUB\10\10S0119.DOC GRANDGULFNUCLEARSTATION EMERGENCY PLAN PROCEDURETitle:PersonnelInjury No.: 10-S-01-19Revision:021Page:ii The Equipment Database (EDB)Requeststatement is applicableonlytoVolume06and07 maintenance directives.EDBChange Request generatedandthebackup documentation available for setpoint and/orcalibrationdataonly DYesDN/AEDBCR#_CurrentRevision StatementRevision021:*Add reference to Management Standard#20-OperatingHard-Card,ControlRoomActionsforMedicalEmergency.(Reference CR-GGN-2016-2247CA#2)*Changestoreporting emergenciesandControlRoomactionstobe consistent with ManagementStandard#20.
J:\ADM_SRVS\TECH_PUB\lO\lOSOl19.DOC I'Page: 1 EMERGENCY PLAN PROCEDURE I ReVISion: 021GRANDGULFNUCLEARSTATION I Title: Personnel InJury I No.: 10-8-01-19
'---------------
TABLE OF CONTENTS'Page 1.0PURPOSEANDDISCUSSION 2 2.0 RESPONSIBILITIES 2
3.0 REFERENCES
3 4.0 ATTACHMENTS 3 5.0 DEFINITIONS 3 6.0 DETAILS 4 6.1 Reporting of Injuries 4 6.2 Immediate Actions 5 6.3 Ambulance Transport 6 6.4 Offsite Medical Facilities 8 6.5 Hospital Preparation to Receive Patients 9 J:\ADM_SRVS\TECH_PGB\lO\lOSOl19.
DOC GRANDGULF NUCLEAR STATION I Title: Personnel Injury 1.0 PURPOSE AND DISCUSSION
1.1 Purpose
I No.: 1o-s-01-19 EMERGENCY PLAN PROCEDURE1.1.1To provide guidance on response to, reportingof,and transferofinjured personnel under the following conditions:a.Injuredperson requiring transporttoan offsite medical care facilityb.Any injuries discovered during an emergency classification 1.2 Discussion1.2.1By agreement between Entergy Operations,Inc.andthe primary and backup.medical care facilities, personnelattheGrand Gulf Nuclear Station sustaining injuries from ionizing radiation or injuries complicated by radiation exposure or radioactive contaminationaretobe providedcareand treatment at those facilities.
Procedures and equipmentforthiscareand treatment are maintained at these facilities.
An individual whose clothing, skin and/or wounds are contaminated with radioactive material may present a radiation hazard to attending personnelinthe absence of adequate procedures to prevent the spreadofthe contaminant, orcontrolthe radiation exposureinthe event of radioactive shrapnel wound.Since radiation injuriesarenot immediately life-threatening, primary attention should always be directed to traumatic life-threatening injuries.After such treatment is rendered, the patient should be decontaminated.
2.0 RESPONSIBILITIES2.1The Manager.Radiation Protection-Is responsibleforthe implementationoftheFirstAid ProgramatGGNS.2.2The Radiation Protection Supervisor-Is responsibleforthe administration and managementoftheFirstAid Program including:2.2.1The assignmentofaFirstAid qualified individualtoeach Radiation Protection shift.2.2.2 Maintenanceoffirstaid supplies and medical emergency response equipment.
2.2.3 Transportation
of injured personneltothe hospital and contamination control measures as necessary.
J:\ADM_SRVS\TECH_PUB\lO\lOSOl19.
DOC GRAND GULF NUCLEAR STATION I Title: Personnel Injury I No.: 10-8-01-19 EMERGENCY PLAN PROCEDURE I ReVISion: 0212.3All GGNS personnel-Are to immediately report observed serious injuriestothe Control Room.Personnel within the Protected Area requiring minor firstaidareto report to Radiation Protection for medical treatment.
2.4 The OSC Manager-Is responsible for organizing and dispatchingofFirstAid Teams per EN-EP-611 when the OSC is operational.
2.5 The EOF Public Information Liaison-Is responsible for notifying the Company Spokesperson regarding worker injuries during adeclaredemergency.
3.0 REFERENCES
3.1 Corporate
Procedure EN-IS-113, Reporting&Investigating Occupational Injuries/Illnesses And Near Misses 3.2 Grand Gulf Nuclear Station emergency Phone Book SectionE,Fireand Medical Support.3.3 Management Standard#20,OperatingHardCard-Control Room Actions for Medical Emergency'
4.0 ATTACHMENTS
4.1 AttachmentI-Directions to Claiborne County Hospital 4.2 AttachmentII-Directions to River Region Medical Center 5.0 DEFINITIONS 5.1 OSC-Operations Support Center 5.2 TSC-Technical Support Center5.3RPS-Radiation Protection Supervisor5.4REA-Radiation Emergency Area J:\ADM_SRVS\TECH_PUB\10\10S0119.
DOC GRANDGULFNUCLEARSTATIONEMERGENCYPLANPROCEDURE I Title: Personnel Injury6.0DETAILS6.1ReportingofInjuries I ReVISion: 021 I Page: 4 Maintain communicationswiththeControlRoomuntilallreportedinformationisproperly acknowledged.6.1.1Anyindividualfindinganinjuredpersonwhorequiresmajormedicalassistanceisto immediately NOTIFY the ControlRoombythe quickestavailablemeans.a.Thefollowing informationshouldbeprovidedtotheControlRoom:(1)Nameand locationoftheinjuredperson (2)Natureoftheemergency,ifknown.(3)IsMedical Help/Ambulance needed?(4)Nameofthecaller6.1.2The ControlRoomistoperformthefollowingactions.Ifavailableuse ManagementStandard#20-OperatingHardCardforMedicalEmergency:a.ImmediatelyNOTIFYthe Radiation Protection(RP)Lab or Site Medical PersonneltodispatchFirstResponderstothescene.b.Ifrequired, Contact AmbulanceforresponsetoGrandGulfNuclearStation.Givethemthelocationoftheemergency.ProvideaCallBackNumberandsiteaddress;7003BaldHillRoad,PortGibson,MississippiTIME:_c.ContactSecurityIslandof Ambulanceresponseandauthorizeentry,as needed.d.HaveSecurity dispatchedtoscene,asnecessary.
NameTime_e.SOUNDSiteFireAlarm;MAKEPAANNOUNCEMENT: "MEDICAL EMERGENCY AT unnecessarypersonnelstayclearofthearea." J:\ADM SRVS\TECH PUB\10\10S0119.DOC
--
GRANDGULFNUCLEARSTATION ITitle:Personnel InJury I No.: 10-8-01-19 EMERGENCY PLAN PROCEDURE I RevIsion: 021 f.REPEAT notificationevery5minutesuntiltheControlRoomhas confirmationthatthefirstaidteamhasbeenassembledatthescene.
g.Dispatch operatortoscenewithFirstAidTraumaKitandAED.FirstAidTraumaKitandAEDlocationsarelistedon ManagementStandard#20.
h.L ContactIndustrialSafety.
Name Time_ContactDutyManager.
Name Time_j.Shift Manager determinereportability,asneeded.6.1.3Ifduringdeclared emergency and emergencyresponsefacilitiesareoperational:
a.NOTIFY the OSCandprovidethe applicableinformationaboutthelocationofthe workerandextentofinjuries,ifknown.
b.NOTIFY the TSC EmergencyPlantManager.6.2ImmediateActions6.2.1Uponreceiving notificationofamedicalemergency:theRPLabshould PERFORMthefollowing NOTE:TheFirstAidTeammaybenotifiedbyGaitronics,plantradioorpagerusingAlphaPagingontheGGNSHomePageunder Processes/Programs (pageFirstAidTeam)a.NotifytheControlRoomifnotalreadynotified.
b.DISPATCHaFirstAidTeamtothesceneofthemedicalemergency.TheFirstAidpersonnelshouldbeequippedwiththefollowing:
(1)First Aid trauma kit (2)Portable radio (3)Radiological survey instruments and personnel protective equipment (Le.,respiratoryprotectiondevices,PCs)suitableforthehazardsatthelocationandthenatureoftheeventwhichcausedtheinjury(i.e.,fire,explosion).
J:\ADM SRVS\TECH PUB\10\10S0119.DOC
--
GRANDGULFNUCLEARSTATION ITitle:Personnel InJury6.2.1(continued)
I No.: 10-8-01-19EMERGENCYPLANPROCEDURE I RevIsion: 021c.TheFirstAidTeamshouldestablishandmaintaincommunicationswiththeRPLab,ControlRoom,orOSCandprovideperiodicupdates.6.2.2FirstAidpersonnelaretoPERFORMthefollowingactionsatthesceneofthemedicalemergency:a.DETERMINEtheinjuredperson'sphysicalconditionandextentofinjuries.b.ADMINISTERfirstaidnecessarytosustainlifeandtostabilizetheinjured worker.c.MOVEtheinjuredpersontoasafelocationiflife-threateningradiologicalorphysicalhazardsarepresent.
d.lEtheinjuryoccurredinaradiologicallypostedarea,THENperformacontaminationsurveyoftheinjuredworkerandREADtheworker's dosimetry.e.PROVIDEthefollowinginformationtotheRPLaborOSCRadChem Coordinator:RadiationProtection(OSCRadChemCoordinator)mustNotifytheControlRoomandprovidethefollowing information (1)Name and locationoftheinjuredperson.
(2)Extentofinjuriesandtreatmentbeingadministered.(3)Personnel contamination survey and dosimeterresultsfortheinjuredworker.(4)Theneedforanambulanceorotherassistance.f.PREPAREtheinjuredworkerfortransfertothehospital.g.RadiationProtectionpersonnelatthesceneofthemedicalemergencymustPERFORMradiologicalsurveysasnecessarytoprotectteammembersandsupportpersonnel.
J:\ADM SRVS\TECH PUB\10\10S0119.DOC
--
GRANDGULFNUCLEARSTATION ITitle:Personnel InJury 6.3 Ambulance Transport I N o.: 1 0-$-01-19 EMERGENCY PLAN PROCEDURE I ReVISion: 021 The-transportofinjuredpersonsisnormallyprovidedbytheregionalambulanceservice.Iftheregional ambulanceserviceisunavailable,theinjuredpersonshouldbetransportedincompanyownedorprivatevehicle.
CAUTIONIfa contaminated injured person is transported to an offsite medical facility, the NRC shall be notified within eight hours, in accordance with 01-5-06-5.6.3.1If ambulance transportisnecessarythe Control RoomshouldusethephonenumberslistedinReference3.2 torequestanambulance.a.Informthe ambulanceofthelocationoftheinjured,accesspointor anyotherinformationnecessary.6.3.2The Control Room must NOTIFY SecurityifanOnsiteorOffsite ambulance isrequiredtoentertheprotectedareaandmust SPECIFYthepatientpickuppoint.a.TheSecurity Coordinator must ENSUREthatOffsite ambulancecrewsare issued dosimetryattheentrancetotheProtectedArea.b.RadiationProtectionpersonnelatthesceneofthemedical emergency must ENSUREthatOffsiteambulancecrewmembersareproperlywearing the appropriate dosimetryandprotectiveclothingforentryinto radiologicallycontrolledareas.6.3.3The Shift Manager should NOTIFY the EOF Emergency Director and INFORM himofthe transportation of aninjuredcontaminatedworkertothehospital.Thehospital.mustreceivethisinformationassoonaspossibleinordertomakethenecessary preparationsforthe emergency treatmentoftheworker.ThehospitalphonenumbersarelistedintheEmergencyTelephoneBook.
J:\ADM SRVS\TECH PUB\10\10S0119.DOC
--
GRANDGULFNUCLEARSTATION ITitle:Personnel InJury I No.: 10-8-01-19 EMERGENCYPLANPROCEDURE I Page: 8 6.3.4TheRP Supervisor/Shift leadHP(OSCRadChern Coordinator) receiving the initial information must notify the hospital and provide the following information as soon as possible.a.Nameofinjuredworker(s) b.Extentofinjuries c.Contaminationlevelsoninjuredworker(s),ifapplicabled.Expected arrival timeathospital,ifknown.6.3.5GGNSpersonnelshould PERFORMthefollowingenroutetothehospital:*AfriskerisnormallymaintainedintheOnsiteAmbulance*Surveysmaybelimitedorimpracticalduetotheextentofinjuriesreceivedbytheworker.
a.PERFORMa detailed contamination surveyoftheinjuredworkeriftheinjuryoccurredina RadiologicallyControlledArea.6.4OffsiteMedicalFacilities6.4.1TheRadiationProtection Supervisor/ShiftLeadHP(OSCRadChem Coordinator) is responsible for determiningwhichmedicalfacilitytouse.Facilitiesavailableforuseinclude:a.ClaiborneCountyHospitalb.RiverRegionMedicalCenter
6.4.2 AttachmentIandIIareusedto
determine transportationroutestothemedical facilities.
J:\AOM_SRVS\TECH_PUB\lO\lOSOl19:00C GRANDGULFNUCLEARSTATION ITitle:Personnel InJury I No.: 10-8-01-19EMERGENCYPLANPROCEDURE I Page: 96.4.3Processforselectinghospitalfacilitiesduringnon-radiologicalemergenciesis:a.Non-contaminated,non-lifethreatening:RiverRegionMedicalCenter,orClaiborneCountyHospital.StreetClinicinVicksburgisrecommendedwhereapplicable.b.Non-contaminated,lifethreatening-transporttoClaiborneCounty Hospital.c.PlantSafetyandEMTpersonnelmayalsoauthorizehospitallocationsduringnon-radiologicalemergenciesusingtheguidelinesabove.6.4.4Contaminatedpersonnelwithminorormajorinjuriesshouldbetransportedtooneofthemedicalfacilitiesidentifiedin6.4.1.6.4.5Patientsmustbedeliveredtohospitalfacilitiesasfollows:a.AllinjuredworkerswhoarenotcontaminatedshouldbetransporteddirectlytothehospitalEmergencyRoom.b.Contaminatedpersonnelshouldbetransportedtothehospital Radiation Emergency Area.6.4.6Whenacontaminatedinjuredworkeristransportedtothehospital,GGNSpersonnelatthehospitalshouldprovidethefollowingsupport,ifavailable:a.PROVIDEthephysicianwithallavailableinformationconcerningtheaccidentandthecontaminationhazardspresent,uponrequest.
b.ASSISTthehospitalstaff,ifpossible..c, COORDINATEthecollectionanddisposalofcontaminatedwaste materials.
d.COLLECTOffsiteambulancecrewdosimetryandPERFORMcontaminationsurveyofambulance.
ARRANGEfordecontamination,if necessary.6.5HospitalPreparationtoReceivePatients6.5.1ThehospitalroomREA(RadiationEmergencyArea)isnormallysetupby hospital p.ersonnelbeforethearrivalofthepatient.
J:\ADM_SRVS\TECH_PUB\10\10S0119.DOC GRANDGULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE 10-S-01-19 Attachment IRevision:021Page1of1 DIRECTIONS TO CLAIBORNE COUNTY HOSPITAL G,:G1NS I{GrandGulfRoad DIRECTIONS:TakeHwy61Sto McCombAvenue(StateRoad547).GoEaston547andthehospitalisonyourleft.The entrancetothe Radiation EmergencyAreaisthroughthe Emergency RoomEntranceontheNorthendofthe hospital J:\ADM_SRVS\TECH_PUB\10\10S0119.DOC I I I I I I I I I I Port:Gibson I I I I I I HWY462 HWY18 I I I:Claiborne:County I Hospital o.llmAve GRANDGULF NUCLEAR STATION.EMERGENCY PLAN PROCEDURE 10-S-01-19Revision:021 Attachment IIPage1of1DIRECTIONSTORIVERREGION MEDICAL CENTER TakeUS61Northpast CulkinAve.Youwillseethe hospital on yourright.The Emergency Room entranceisonthe South side of the hospital.The doortothe DecontaminationRoomistothe right oftheER.entrance.
River Region.A.-f----Medical Center
---.\DIRECTIONS:
J:\ADM_SRVS\TECH_PUB\10\10S0119.DOC ATTACHMENT
9.1 SHEET
1 OF 5 10CFR50.54(q)
SCREENING Procedure/Document Number: 10-S-01-19 I Revision: 21 Equipment/Facility/Other:
Grand Gulf Nuclear Station Title: Personnel Injury Part I.Description of Activity Being Reviewed(eventoraction,orseriesofactionsthatmayresultinachangetotheemergencyplanoraffecttheimplementationoftheemergencyplan):
Revision 021: 1.Changes to reporting emergencies and Control Room actionstobe consistent with Management Standard#20.2.Added Medical Facility/Site Nurse to section2.3asan option for personnel requiring minor first aid, since this facility/position is manned during outages.3.Added Plant Occupational Health Nurse to section 6.4.3 list of personnel who may authorize hospital facilities to transport patients to.Editorial Changes:4.Add reference to Management Standard#20-Operating Hard-Card, Control Room Actions for Medical Emergency.(Reference CR-GGN-2016-2247 CA#2)5.Changedthetitle River Region Hospital to Merit Health River Region duetoa changeinthe facility name.PartII.Activity Previously Reviewed?Isthis activity fully boundedbyan NRC approved 10 CFR 50.90 submittal or Alert and Notification System Design Report?IfYES, identify bounding source document number/approval reference and ensure the basis for concluding the source document fully bounds the proposed change is documented below: Justification:
DBoundingdocumentattached(optional)
DYES 50.54(q)(3)
Evaluation is NOT required.Enter justification below and complete Part VI.t81 NO Continue to next partPartIII.Applicability of Other Regulatory Change Control ProcessesCheckifanyotherregulatorychangeprocessescontroltheproposed activity.(RefertoEN-L1-100)NOTE:Forexample,whenadesignchangeistheproposedactivity,consequentialactionsmayincludechangestootherdocumentswhichhaveadifferentchangecontrolprocessandareNOTtobeincludedinthis50.54(q)(3)
Screening.
APPLICABILITY CONCLUSIONIftherearenocontrollingchangeprocesses,continuethe50.54(q)(3)Screening.
DOneormorecontrollingchangeprocessesareselected,however,someportionoftheactivityinvolvestheemergencyplanoraffectstheimplementationoftheemergencyplan;continuethe50.54(q)(3)Screeningforthatportionoftheactivity.Identifytheapplicablecontrollingchangeprocessesbelow.
oOneormorecontrollingchangeprocessesareselectedandfullyboundsallaspectsoftheactivity.
50.54(q)(3)
Evaluation is NOTrequired.IdentifycontrollingchangeprocessesbelowandcompletePart VI.CONTROLLINGCHANGEPROCESSES EN-EP-305 REV 3 ATTACHMENT
9.1 SHEET
2 OF 5 10CFR50.54(q), SCREENING Procedure/Document Number: 10-5-01-19 I Revision: 21 Equipment/Facility/Other:
Grand Gulf Nuclear Station Title: Personnel InjuryPartIV.Editorial Change DYES t8J NO 50.54(q)(3)ContinuetonextIsthisactivityaneditorialortypographicalchangesuchasformatting,paragraph Evaluation is partnumbering,spelling,orpunctuationthatdoesnotchangeintent?
NOT required.Justification:
Changes#4&5arereferencechangesandareconsiderededitorial EnterjustificationandchangesaccordingtoEN-EP-305andEN-AD-101.NoischeckedattherightbecausecompleteParttheremainingchangesarenon-editorial.
VI.Part V.Emergency Planning Element/Function Screen(Associated10CFR50.47(b)planningstandardfunctionidentifiedinbrackets)Doesthisactivityaffectanyofthefollowing,includingprogramelementsfromNUREG-0654/FEMAREP-1SectionI/?
1.Responsibility for emergency response is assigned.[1]D 2.The response organizationhasthestaffto respondandto augment staffona continuingbasis(24/7 D staffing)in accordancewiththe emergencyplan.[1]3.The process ensures thatonshift emergency response responsibilities are staffedandassigned.[2]
D 4.The process for timely augmentation of onshift staff is established and maintained.
[2]D 5.Arrangements for requestingandusing off site assistancehavebeenmade.[3]
D 6.Stateand local staffcanbe accommodatedattheEOFin accordancewiththe emergencyplan.[3]D I 7.A standard scheme of emergency classificationandactionlevelsisinuse.[4]
D 8.Procedures for notificationofStateandlocal governmental agencies are capableofalertingthemof D the declared emergency within 15 minutes after declarationofan emergency and providing follow-up notifications.
[5]9.Administrative and physical meanshavebeen established for alerting and providing prompt D instructionstothe publicwithintheplume exposure pathway.[5]10.The public ANS meets the design requirements of FEMA-REP-10,Guidefor EvaluationofAlertand D Notification Systems for Nuclear Power Plants, or complieswiththe licensee's FEMA-approved ANS design report and supporting FEMA approvalletter.[5]
11.Systems are established for prompt communication among principal emergency response D organizations.
[6], 12.Systems are established for prompt communication to emergency response personnel.
[6]D 13.Emergency preparedness information is made availabletothe publicona periodicbasiswithinthe 0 plume exposure pathway emergency planningzone(EPZ).[7]
14.Coordinated dissemination of public information during emergencies is established.
[7]*0 15.Adequate facinties are maintained to support emergency response.[8]D 16.Adequate equipment is maintained to support emergency response.[8]D 17.Methods, systems, and equipment for assessment of radioactive releasesareinuse.[9]
D18.Arangeof public PARs is available for implementation during emergencies.
[10]D 19.Evacuation time estimatesforthe population locatedintheplume exposure pathway EPZ are D available to support the formulationofPARsandhavebeen providedtoStateandlocal governmental authorities.
[10]20.A range of protective actions is available for plant emergency workers during emergencies, including D those for hostile action events.[10]
EN-EP-305 REV 3 ATTACHMENT
9.1 SHEET
3 OF 5 10CFR50.54(q)
SCREENING Procedure/Document Number: 10-S-01-19 I Revision: 21 Equipment/Facility/Other:
Grand Gulf Nuclear Station Title: Personnel Injury 21.The resources for controlling radiological exposures for emergency workers are established.
[11]D 22.Arrangements are made for medical services for contaminated, injured individuals.
[12]D23.Plansfor recovery and reentry are developed.
[13]D24.Adrilland exercise program (inclUding radiological, medical, health physics and other program Dareas)is established.
[14]25.Drills, exercises, andtrainingevolutions that provide performance opportunities to develop, D maintain, and demonstratekeyskillsare assessedviaaformal critique process in order to identify weaknesses.
[14]26.Identified weaknesses are corrected.
[14]D 27.Training is provided to emergency responders.
[15]D 28.Responsibility for emergency plan development and review is established.
[16]D 29.Planners responsible for emergency plan development and maintenance are properly trained.[16]D APPLICABILITY CONCLUSION aIfnoPartVcriteriaarechecked,a50.54(q)(3)EvaluationisNOTrequired;documentthebasisforconclusionbelowandcompletePartVI.
aIfanyPartVcriteriaarechecked,completePartVIandperforma50.54(q)(3)Evaluation.BASISFOR CONCLUSION Changes#4&5areeditorialchangesanddonotrequireevaluation.1.ChangestoreportingemergenciesandControlRoomactionstobeconsistentwithManagementStandard#20.ThischangerevisestheinformationtheControlRoomshouldrequestfromacallerreportingamedical emergencyandaddsadditionalinformationtothestepstakenbytheControlRoomtorespondtotheemergency.Theplanningstandardsandprogramelementsrequirethatmedicalservicesbearrangedforcontaminated,injuredworkersbuttheydonotdescribetheactionstakenbythelicenseetorespondtomedicalemergencies.Thischangedoesnoteliminateanymedicalresponseequipmentorqualificationsanddoesnotaffectoffsite arrangementsformedicalsupportincludingtransportation.Thischangewillnotaffecttheplanningstandardsorprogramelementsin10CFR50.470(b)[12]anddoesnotneedanevaluation.
EN-EP-305REV3 ATTACHMENT
9.1 SHEET
4 OF 5 10CFR50.54(q)
SCREENING Procedure/Document Number: 10-S-01-19 I Revision: 21 Equipment/Facility/Other:
Grand Gulf Nuclear Station Title: Personnel InjuryBASISFOR CONCLUSION (continued)
- Added Medical Facility/SiteNursetosection2.3asanoptionforpersonnelrequiringminorfirstaid,sincethis facility/positionismannedduringoutages.
Normallyfirstaid casesarehandledbyRPpersonnel.Duringoutages,whenwehaveanincreasein workforce, Grand Gulfmaysetupasitemedicalfacility and/orstaffasitenursepositionto facilitatetheexpected increaseinfirstaid and/or medical emergencycases.Thisprocedurechangeallows personnelrequiringfirstaidtoreporttothesite medicalfacilityorsitenurse,ifstaffed,ratherthanlimitingthemtoreporttotheRP department.
.*The planning standardsandprogramelementsin 10CFR50.47(b)[10]requirearangeof protective actions be availableforplant workers,butdoesnotspecifythelocationorstaffingofsitefirstaid stationsormedicalfacilitiessothischangewillnotaffectthesitesabilitytomeettherequirementsof 10CFR50.47(b)[10].*This changedoesnotreducethe numberoffirstaidqualified personnelanddoesnotreducetheshiftstaffingasrequiredin 10CFRS0.47(b)[2]orNUREG06s4tableB-1.thischangewillnotaffectthesitesabilitytomeetthe requirementsof1OCFRS0.47(b)[2].*Thischangedoesnotreducethe amountorlocationofmedical equipmentandsuppliesandwillnot affectthesitesabilitytomeetthe requirements of 10CFR50.47(b)[8].*This changedoesnotaffectthe arrangementsinplaceformedicalservicesforcontaminatedand injured individualsandwillnotaffectthesitesabilitytomeetthe requirementsof10CFRS0.47(b)[12].
This changewillnotaffectanyoftheplanningstandardsorprogram elementsin1OCFR50.470(b)anddoes not require an evaluation.
- Added Plant OccupationalHealthNursetosectionlistof personnelwhomayauthorizewhich hospital facilitiestowhich patientsaretransported.
Section6.1.3of 10-S-01-19 describestheprocessforselectinq hospitals during non-radiological emergenciesandliststhemedical facilitiespersonnelshouldbe transported to life-threateningor life-threateninginjuries.ThissectionstatesthatPlantSafetyandEMT personnel mayalsoauthorize hospital locations.Thischangeaddstheplant OccupationalHealthNursetothatgroup.Thissection only applies to non-contaminated individuals.
- 10CFR50.47(b)[12]requires licenseestoensure arrangements are made for.medical services for contaminated, injured individuals.
These arrangementswouldincludehospitals and otheroffsitemedicalfacilities.
10-S-01-19liststhesefacilitiesinsection6.4.*1.Thechange beingmadeto 10-S-01-19willnotaffectthislistortheprocessfor determiningwhichhospital to transport contaminated individualsto.Thischangewillnotaffectthesitesabilityto meet the requirements of 10CFR50.47(b)[12].*The planning standardsandprogram elements in 10CFR50.47(b)[10]requirearangeofprotective actions be availableforplantworkers,butdoesnotspecifythepositionthatshoulddeterminewhat medical facilitiestouse.Thischangewillnotaffectthesitesabilitytomeettherequirementsof 10CFR50.47(b)[10].The changesbeingmadeto 10-8-01-19willnotaffectanyof the 10CFR50.47(b)planningstandardsorprogramelements.This changemaybemade withoutpriorNRCapprovalanddoesnotneeda 10CFR50.54q evaluation.
EN-EP-305REV3 ATTACHMENT
9.1 SHEET
5 OF 5 10CFR50.54(q)
SCREENING Procedure/Document Number: 10-S-01-19 I Revision: 21 Equipment/Facility/Other:
Grand Gulf Nuclear Station Title: Personnel InjuryPartVI.Signatures:PreparerName(Print)
Date:/:/--.7-RichardVanDen Akker<r:4-21-16 i....._(Optional)
ReviewerName(Print)
Reviewer Signature Date:ReviewerName(Print)
Reviewer Signature Date:TomSowdon C f;4-22-2016NuclearEP Project Manager.<<
,//" e.-/tttfJ-'tC4'l'..t:--
ApproverName(Print)
Approver Signature Date:--:r I£'P'PEP manager or designee 6')2./16//7'EN-EP-305REV3