MONTHYEARML18017A9271999-10-21021 October 1999 Proposed Tech Specs Implementing Selected Improvements as Described in GL 93-05 ML18017A8531999-08-26026 August 1999 Proposed Tech Specs Pages,Revising TS 3/4.9.4 to Allow Penetrations Which Provide Direct Access from Containment Atmosphere to Outside Atmosphere to Remain Open During Refueling Operations ML18016B0521999-08-0404 August 1999 Proposed Tech Specs,Incorporating Analytical Methodology in TS 6.9.1.6.2 Which Are Used to Determine Core Operating Limits ML18016B0451999-08-0202 August 1999 Proposed Tech Specs 6.2.2.e Re Operations Mgt License Requirements ML18016B0101999-07-0909 July 1999 Proposed Tech Specs 3/4.2.2,3/4.2.3 & 3/4.2.5,providing Clarification & Reducing Burden of Addl License Amend Process by Implementing Guidance in GL 88-16 & NUREG-1431, Rev 1, Std Ts,W Plants. ML18016B0131999-07-0909 July 1999 Proposed Tech Specs,Relocating 3/4.3.3.3,3/43.3.4,3/4.3.3.9 & 3/4.3.3.11 to Plant Procedure PLP-114, Relocated Tech Specs & Design Basis, IAW GL 95-10 ML18016A9911999-06-15015 June 1999 Proposed Tech Specs Incorporating performance-based 10CFR50,App J,Option B for Type a Tests (Containment Integrated Leakage Rate Tests) ML18016A9781999-06-0202 June 1999 Proposed Tech Specs Revising TS 6.5 & TS 6.8 ML18016A8401999-02-26026 February 1999 Proposed Tech Specs Revising Table Notations for TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints, Specifically Time Constants Utilized in lead-lag Controller for Steam Line Pressure Low (Table Item 1.e.) ML18016A7701998-12-23023 December 1998 Proposed Tech Specs 5.6, Fuel Storage, Increasing Spent Fuel Storage Capacity by Adding Rack Modules to Pools 'C' & 'D.' ML18016A7591998-12-0707 December 1998 Retyped Tech Specs Pages 3/4 6-4 & 3/4 6-4a,incorporating Changes Resulting from Issuance of Amend 84 Re Containment Air Locks ML18016A7561998-12-0707 December 1998 Proposed Retyped Tech Specs Page 3/4 9-13,incorporating Changes Resulting from Issuance of Amend 84 Re SFP Water Level & Revised Fuel Handling Accident Analyses ML18016A7531998-12-0707 December 1998 Proposed Retyped Tech Specs Page 3/4 7-5,incorporating Changes Resulting from Issuance of Amend 77 Re Afs SRs ML18016A6571998-10-28028 October 1998 Corrected TS Pages 6-5 & 6-27 Re 970612 Request for Amend to License NPF-63 Re Proposed Changes to TS 6.0.Original Submittal Contained Editorial Errors ML18016A6261998-10-15015 October 1998 Proposed Tech Specs 3/4.5.1 Re Accumulators & Associated Bases ML18016A6051998-10-0101 October 1998 Proposed Tech Specs 3.0.4 Concerning Applicability of Limiting Conditions for Operation & SR to Be Consistent with GL 87-09 ML18016A5941998-09-23023 September 1998 Proposed Tech Specs 3/4.6.3, Containment Air Locks for Consistency with NUREG-1431,Rev 1 & Clarifying Requirements for Locking Air Lock Door Shut ML18016A5461998-09-0101 September 1998 Proposed Tech Specs Section 3/4.9.11,requiring 23 Feet of Water Above Top of Fuel Rods within Irradiated Fuel Assemblies Seated in Storage Racks ML18016A5381998-08-27027 August 1998 Proposed Tech Specs,Revising Section 6.0, Administrative Controls. ML18016A5411998-08-27027 August 1998 Proposed Tech Specs Re Applicability of LCO & Surveillance Requirements ML18016A5311998-08-24024 August 1998 Proposed Tech Specs Re Use of SG Sleeves Designed by ABB-CE ML18016A4301998-05-15015 May 1998 Revised Proposed TS Pages Which More Closely Reflect Generic TS Wording Contained in Std TS W Plants ML18016A4021998-04-24024 April 1998 Proposed Tech Specs 3/4.3.2,allowing Two Hour Surveillance Interval to Facilitate Testing of 6.9 Kv Emergency Bus Undervoltage Relays ML18016A3881998-04-13013 April 1998 Proposed Tech Specs Bases Section 4.0.2,clarifying Guidance Related to Safety Performing Surveillance Testing at Power ML18016A3481998-03-12012 March 1998 Proposed Tech Specs Deleting SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 Months ML18016A2591997-12-16016 December 1997 Proposed Tech Specs Pages,Revising TS 4.7.1.2.1.a.2.a to Change Differential Pressure & Flow Requirements of Steam turbine-driven AFW Pump to Allow Testing of Pump at Lower Speed than Is Currently Performed ML18016A2241997-10-29029 October 1997 Proposed Tech Specs Revising TS 3/4.8.1, AC Sources - Operating & Associated Bases to Clarify Intent of TS ML18012A8121997-06-12012 June 1997 Proposed Tech Specs 6.0 Amending Administrative Controls. ML18012A7991997-05-23023 May 1997 Proposed Tech Specs,Providing Retyped TS Pages Re Revised Action & Surveillance for ECCS Accumulators ML18012A7861997-05-16016 May 1997 Proposed Tech Specs,Informing That TS 4.6.2.3 a.2 Requires Verification at Least Once Per 31 Days of Cw Flow Rate of Greater than or Equal to 1425 Gpm to Each Containment Fan Cooler ML18012A6361997-04-23023 April 1997 Proposed Tech Specs,Incorporating Enhancements to TS Identified in Plant Review Performed IAW GL 96-01.Changes Affected Specs 4.3.2.1.1.a,4.3.2.1.4.b,4.3.2.1.6.g, 4.3.2.1.10.a,4.3.2.1.10.b & 4.7.3.b.3 ML18012A5811997-03-17017 March 1997 Proposed Tech Specs Surveillances 4.1.2.2c,4.5.2.e, 4.6.2.1c,4.6.2.2.c,4.6.3.2,4.7.1.2.1.b,4.7.3.b & 4.7.4.b to Delete Specific Restrictions in Text of Surveillances ML18022B0041997-03-14014 March 1997 Proposed Tech Specs,Increasing AOT for Refueling Water Storage Tank to Twelve Hs While Performing TS Surveillance 4.4.6.2.2 ML18022B0071997-03-10010 March 1997 Proposed Tech Specs 3/4.5 Re Emergency Core Cooling Systems ML18012A5361997-02-27027 February 1997 Proposed Tech Specs,Amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded SG Tubes ML18012A5281997-02-21021 February 1997 Proposed Tech Specs 3.0.5 Re Exception to TS 3.0.1 to Permit Equipment to Be Placed Into Svc in Order to Perform Testing to Demonstrate Operability ML18012A5351997-02-21021 February 1997 Proposed Tech Specs Revising TS 3.3.2 in Action 16 of Table 3.3-3 to Add Specific Time Interval of Six H to Place an Inoperable Channel in Bypassed Condition ML18012A5311997-02-18018 February 1997 Proposed Tech Specs 3/4.7.1, Turbine Cycle Safety Valves. ML18012A5101997-02-13013 February 1997 Proposed Tech Specs 3.2.3 Re Rated Thermal Power ML18012A5011997-02-0606 February 1997 Proposed Tech Specs 3/4.0,adding New Entry 3.0.5 to Provide Specific Guidance for Returning Equipment to Svc Under Adminstrative Control for Sole Purpose of Performing Testing to Demonstrate Operability ML18012A4961997-01-29029 January 1997 Proposed Tech Specs 3/4.0 Re Applicability ML18012A4641997-01-10010 January 1997 Proposed Tech Specs 4.8.1.1.2 Re AC Sources - Operating Surveillance Requirements ML18012A4531996-12-30030 December 1996 Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits ML18012A4161996-10-31031 October 1996 Proposed Tech Specs Re Ultimate Heat Sink Level & Temp ML18012A3981996-10-0808 October 1996 Proposed Tech Specs Bases Change to 3/4.6.1.4 & 3/4.6.1.6 Changing Calculated Peak Pressure for MSLB Event ML18012A3721996-09-18018 September 1996 Proposed Tech Specs 4.8.1.1.2 Re Surveillance Requirements for Diesel Fuel Oil Sys Pressure Testing ML18012A3071996-07-19019 July 1996 Proposed Tech Specs 3/4.6.2,CSS,extending Surveillance Interval for Performance of Air or Smoke Flow Test Through CS Nozzles from Once Every 5 Years to Once Every 10 Years ML18012A2531996-05-31031 May 1996 Proposed Tech Specs,Correcting Location Described for One of Three Triaxial Peak Accelerograph Recorders ML18012A1831996-03-20020 March 1996 Proposed Relocation of TS 3.3.3.2, Movable Incore Detectors & Associated Bases,Consistent w/NUREG-1431 & GL 95-10 ML18012A1441996-02-16016 February 1996 Proposed Tech Specs 4.3.2 Re ESFAS Instrumentation 1999-08-04
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18017A9271999-10-21021 October 1999 Proposed Tech Specs Implementing Selected Improvements as Described in GL 93-05 ML18017A8531999-08-26026 August 1999 Proposed Tech Specs Pages,Revising TS 3/4.9.4 to Allow Penetrations Which Provide Direct Access from Containment Atmosphere to Outside Atmosphere to Remain Open During Refueling Operations ML18016B0521999-08-0404 August 1999 Proposed Tech Specs,Incorporating Analytical Methodology in TS 6.9.1.6.2 Which Are Used to Determine Core Operating Limits ML18016B0451999-08-0202 August 1999 Proposed Tech Specs 6.2.2.e Re Operations Mgt License Requirements ML18016B0101999-07-0909 July 1999 Proposed Tech Specs 3/4.2.2,3/4.2.3 & 3/4.2.5,providing Clarification & Reducing Burden of Addl License Amend Process by Implementing Guidance in GL 88-16 & NUREG-1431, Rev 1, Std Ts,W Plants. ML18016B0131999-07-0909 July 1999 Proposed Tech Specs,Relocating 3/4.3.3.3,3/43.3.4,3/4.3.3.9 & 3/4.3.3.11 to Plant Procedure PLP-114, Relocated Tech Specs & Design Basis, IAW GL 95-10 ML18016A9911999-06-15015 June 1999 Proposed Tech Specs Incorporating performance-based 10CFR50,App J,Option B for Type a Tests (Containment Integrated Leakage Rate Tests) ML18016A9781999-06-0202 June 1999 Proposed Tech Specs Revising TS 6.5 & TS 6.8 ML18016A8401999-02-26026 February 1999 Proposed Tech Specs Revising Table Notations for TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints, Specifically Time Constants Utilized in lead-lag Controller for Steam Line Pressure Low (Table Item 1.e.) ML18016A7701998-12-23023 December 1998 Proposed Tech Specs 5.6, Fuel Storage, Increasing Spent Fuel Storage Capacity by Adding Rack Modules to Pools 'C' & 'D.' ML18016A9341998-12-15015 December 1998 Rev 11 to ODCM, for Shnpp ML18016A7531998-12-0707 December 1998 Proposed Retyped Tech Specs Page 3/4 7-5,incorporating Changes Resulting from Issuance of Amend 77 Re Afs SRs ML18016A7561998-12-0707 December 1998 Proposed Retyped Tech Specs Page 3/4 9-13,incorporating Changes Resulting from Issuance of Amend 84 Re SFP Water Level & Revised Fuel Handling Accident Analyses ML18016A7591998-12-0707 December 1998 Retyped Tech Specs Pages 3/4 6-4 & 3/4 6-4a,incorporating Changes Resulting from Issuance of Amend 84 Re Containment Air Locks ML18016A6571998-10-28028 October 1998 Corrected TS Pages 6-5 & 6-27 Re 970612 Request for Amend to License NPF-63 Re Proposed Changes to TS 6.0.Original Submittal Contained Editorial Errors ML18016A6261998-10-15015 October 1998 Proposed Tech Specs 3/4.5.1 Re Accumulators & Associated Bases ML18016A6051998-10-0101 October 1998 Proposed Tech Specs 3.0.4 Concerning Applicability of Limiting Conditions for Operation & SR to Be Consistent with GL 87-09 ML18016A5941998-09-23023 September 1998 Proposed Tech Specs 3/4.6.3, Containment Air Locks for Consistency with NUREG-1431,Rev 1 & Clarifying Requirements for Locking Air Lock Door Shut ML18016A5461998-09-0101 September 1998 Proposed Tech Specs Section 3/4.9.11,requiring 23 Feet of Water Above Top of Fuel Rods within Irradiated Fuel Assemblies Seated in Storage Racks ML18016A5411998-08-27027 August 1998 Proposed Tech Specs Re Applicability of LCO & Surveillance Requirements ML18016A5381998-08-27027 August 1998 Proposed Tech Specs,Revising Section 6.0, Administrative Controls. ML18016A5311998-08-24024 August 1998 Proposed Tech Specs Re Use of SG Sleeves Designed by ABB-CE ML18016A4301998-05-15015 May 1998 Revised Proposed TS Pages Which More Closely Reflect Generic TS Wording Contained in Std TS W Plants ML18016A4021998-04-24024 April 1998 Proposed Tech Specs 3/4.3.2,allowing Two Hour Surveillance Interval to Facilitate Testing of 6.9 Kv Emergency Bus Undervoltage Relays ML18016A3881998-04-13013 April 1998 Proposed Tech Specs Bases Section 4.0.2,clarifying Guidance Related to Safety Performing Surveillance Testing at Power ML18016A3481998-03-12012 March 1998 Proposed Tech Specs Deleting SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 Months ML18016A3051998-01-29029 January 1998 Rev 0 to HNP-IST-002, Shearon Harris Nuclear Power Plant, IST Program Plan - 2nd Interval. ML18022B0351998-01-26026 January 1998 Rev 0 to Procedure HNP-ISI-002, Shearon Harris Nuclear Power Plant,Isi Program Plan,2nd Interval. ML18016A4131997-12-18018 December 1997 Rev 10 to ODCM for Shearon Harris Nuclear Power Plant. ML18016A2591997-12-16016 December 1997 Proposed Tech Specs Pages,Revising TS 4.7.1.2.1.a.2.a to Change Differential Pressure & Flow Requirements of Steam turbine-driven AFW Pump to Allow Testing of Pump at Lower Speed than Is Currently Performed ML18016A2241997-10-29029 October 1997 Proposed Tech Specs Revising TS 3/4.8.1, AC Sources - Operating & Associated Bases to Clarify Intent of TS ML18012A8121997-06-12012 June 1997 Proposed Tech Specs 6.0 Amending Administrative Controls. ML18012A7991997-05-23023 May 1997 Proposed Tech Specs,Providing Retyped TS Pages Re Revised Action & Surveillance for ECCS Accumulators ML18012A7861997-05-16016 May 1997 Proposed Tech Specs,Informing That TS 4.6.2.3 a.2 Requires Verification at Least Once Per 31 Days of Cw Flow Rate of Greater than or Equal to 1425 Gpm to Each Containment Fan Cooler ML18012A6361997-04-23023 April 1997 Proposed Tech Specs,Incorporating Enhancements to TS Identified in Plant Review Performed IAW GL 96-01.Changes Affected Specs 4.3.2.1.1.a,4.3.2.1.4.b,4.3.2.1.6.g, 4.3.2.1.10.a,4.3.2.1.10.b & 4.7.3.b.3 ML18012A5811997-03-17017 March 1997 Proposed Tech Specs Surveillances 4.1.2.2c,4.5.2.e, 4.6.2.1c,4.6.2.2.c,4.6.3.2,4.7.1.2.1.b,4.7.3.b & 4.7.4.b to Delete Specific Restrictions in Text of Surveillances ML18022B0041997-03-14014 March 1997 Proposed Tech Specs,Increasing AOT for Refueling Water Storage Tank to Twelve Hs While Performing TS Surveillance 4.4.6.2.2 ML18022B0071997-03-10010 March 1997 Proposed Tech Specs 3/4.5 Re Emergency Core Cooling Systems ML18012A5361997-02-27027 February 1997 Proposed Tech Specs,Amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded SG Tubes ML18012A5351997-02-21021 February 1997 Proposed Tech Specs Revising TS 3.3.2 in Action 16 of Table 3.3-3 to Add Specific Time Interval of Six H to Place an Inoperable Channel in Bypassed Condition ML18012A5281997-02-21021 February 1997 Proposed Tech Specs 3.0.5 Re Exception to TS 3.0.1 to Permit Equipment to Be Placed Into Svc in Order to Perform Testing to Demonstrate Operability ML18012A5311997-02-18018 February 1997 Proposed Tech Specs 3/4.7.1, Turbine Cycle Safety Valves. ML18012A5101997-02-13013 February 1997 Proposed Tech Specs 3.2.3 Re Rated Thermal Power ML18012A5011997-02-0606 February 1997 Proposed Tech Specs 3/4.0,adding New Entry 3.0.5 to Provide Specific Guidance for Returning Equipment to Svc Under Adminstrative Control for Sole Purpose of Performing Testing to Demonstrate Operability ML18012A4961997-01-29029 January 1997 Proposed Tech Specs 3/4.0 Re Applicability ML18012A4641997-01-10010 January 1997 Proposed Tech Specs 4.8.1.1.2 Re AC Sources - Operating Surveillance Requirements ML18012A4531996-12-30030 December 1996 Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits ML18012A4161996-10-31031 October 1996 Proposed Tech Specs Re Ultimate Heat Sink Level & Temp ML18012A3981996-10-0808 October 1996 Proposed Tech Specs Bases Change to 3/4.6.1.4 & 3/4.6.1.6 Changing Calculated Peak Pressure for MSLB Event ML18012A3721996-09-18018 September 1996 Proposed Tech Specs 4.8.1.1.2 Re Surveillance Requirements for Diesel Fuel Oil Sys Pressure Testing 1999-08-04
[Table view] |
Text
ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT EMERGENCY DIESEL GENERATOR DAY TANK LEVEL TECHNICAL SPECIFICATION PAGES 9109030g3g'XVVZS-PDR AOOCK 05000400 P--PDR (1249HHP) 3/4.8 ELECTRICAL POWER SYSTEM 3/4.8.1 A.C.SOURCES OPERAT!NO LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C.electrical power source>>hall ba OPERABLE: a.Two physically independent circuits between the offsfta transmission network and the onsita C1ass 1E dfstribution sysŽ~<<d b.Two separate and independent diesel generators, a f45 A separate day tank containing a minimum of of whi is a i giant to indicated ave a minim~i I level 40~2.A sa main ua oi.s or ank containing a minimum of 100,000 gallons of fuel, and 3.A separate fua 1 oi 1 transfer pump.APPLICABILITY:
MODES 1, 2, 3 and 4.ACTION: a0 b.With one offsfta circuit of 3 8.1.1.a inoperabla, demonstrate the OPERABILITY of the~infng A.C.Sou~m by perfoming Survei11anca Requi~nt 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.
If either emergency diesel generator (EDG)has not been successfully tasted withfn the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> preceding entrY into this ACTION, demonstrate its OPERABILITY by p~forming.Surveil1ance ReQuirement 4.8.1.1.2.a.4 and a.6 separately for each such EDG within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.Restore the offsita circuit, to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or ba in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within tha following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.With one diesel generator of 3.8.1.1.b inoperable, demonstrate OPERABILITY of the A.C.offsfti 5ou~s by perfomlng Su~eillanca R~i~nt 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and ff the EDG b~me inoperable due to any cause other than preplanned preventive maintenance or tastfng, demonstrate the OPERABILITY of the~infng OPERABLE EDG performing Su~eillanca Requirement 4.8.1.1.2.a.4 and a.6 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />"0;restore~fs test is required to be completed regardless
<<"hen t"a'" p" is restored to OPERABILITY.
gActfvitf as that, normally support tasting pursuant to 4.8.1.1.2.a.4 which~ould render the diesel inoperable (a-g., air Mll), shall not be pe formed for t stf re uire b th Ns+~Ivlinimuel ind!~lt.vc,l~86 a.cruel oil~~cipit-p!nUig 0 0 8 jns~~n foison paling cd'ed~0 f afgrgnco 5pEi6c!aviQ oF 0 874 SHEARON HARRIS-UNIT 1~8-1
~~ELECTRICAL POSER SYSTEMS A.C.SOURCES SHUTOOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C.electrical power sources shall be OPERABLE: a.One circuit between the offsfte transmission network and the onsite Class 1E.distribution system, and b.One diesel generator with: 2.Day tank contafning a minimum volume fuel, which is equivalent to nd a.min mum i&lc&c level o A epara e masn rue o>s ume of 100,000 gallons of fuel, and 3.A fuel oi'1 transfer pump.APPLICABILITY:
MODES 5 and 6.~(ev of gallnns of catea eve , containing a minimum vol-ACTION: Mfth less than the above minimum required A.C.electrical P~>>ou<<es.OPERABLE, immediately suspend all operatfons involving CORE ALTERATIONS
~positive'reactfvity changes, movant of frradfat d fuel, or crane operation with loads over irradiated fuel and withfn 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, depressu>>>e Reactor Coolant System through a vent of greater than or equal to 2.9 square inches.In addition, when in MODE 5 with the reactor coolant loops not filled, or in MODE 6 with the wat,r level less than 23 feet above the reactor vessel flange, immediately initiate corrective actfon to restore the required sources to OPERABLE status as soon as possible.SURVEILLANCE RE UIREMENTS 4.8.1.2 The above required A.C.electrfcal power sources shall be demonstrated OpERABLE by the performance of each of the requirements of Specifications 4.8.1.1.1 and 4.8.1.1.2.
<>>M)g(yy)gm indi'craze level giWa.6d~i 8'"'~~(z>~rncnI~Hon ontioq~r fercnco o+I<9"'/" SHEARON HARRIS-UNIT 1 3/4 8-11--
3/4.8 ELECTRICAL PO SYSTEM 3/4.8.1 A.C.SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C.electrical power sources shall be OPERABLE'~Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and b.Two separate and independent diesel generators, each with: l.A separate day tank containing a minimum of 1457 gallons of fuel, which is equivalent to a minimum indicated level of 40X--2.A separate main fuel oil storage tank containing a minimum of 100,000 gallons of fuel, and 3.A separate fuel oil transfer pump.APPLICABILITY:
MODES 1, 2, 3 and 4.ACTION: a~With one offsite circuit of 3.8.1.1.a inoperable, demonstrate the OPERABILITY of the remaining A.C.sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.
If either emergency diesel generator (EDG)has not been successfully tested within the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> preceding entry into this ACTION, demonstrate its OPERABILITY by performing Surveillance Requirement 4.8.1.1.2.a.4 and a.6 separately for each such EDG within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.b~With one diesel generator of 3.8.1.l.b inoperable, demonstrate the OPERABILITY of the A.C.offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and if the EDG became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE EDG performing Surveillance Requirement 4.8.1.1.2.a.4 and a.6 within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s~0;restore the-"This test is required to be completed regardless of when the inoperable EDG is restored to OPERABILITY.
PActivities that normally support testing pursuant to 4.8.1.1.2.a.4 and a.6, which would render the diesel inoperable (e.g., air roll), shall not be per-formed for testing required by this ACTION statement.
-'~Minimum indicated level with a fuel oil specific gravity of 0.83 and the level instrumentation calibrated to a reference specific gravity of 0.876.SHEARON HARRIS-UNIT 1 3/4 8-1 Amendment No.
ELECTRICAL POWER SYSTEMS A.C.SOURCES SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C.electrical power sources shall be OPERABLE: a.One circuit between the offsite transmission network and the onsite Class lE distribution system, and b.One diesel generator with: 1.Day tank containing a minimum volume of 1457 gallons of fuel, which is equivalent to a minimum indicated level of 40X~, 2.A separate main fuel oil storage tank containing a minimum volume of 100,000 gallons of fuel, and 3.A fuel oil transfer pump.APPLICABILITY:
MODES 5 and 6.ACTION: With less than the above minimum required A.C.electrical power sources OPERABLE, immediately suspend all operations involving CORE ALTERATIONS, positive reactivity changes, movement of irradiated fuel, or crane operation with loads over irradiated fuel and within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, depressurize and vent the Reactor Coolant System through a vent of greater than or equal to 2.9 square inches.In addition, when in MODE 5 with the reactor coolant loops not filled, or in MODE 6 with the water level less than 23 feet above the reactor vessel flange, immediately initiate corrective action to restore the required sources to OPERABLE status as soon as possible.SURVEILLANCE REQUIREMENTS 4.8.1.2 The above required A.C.electrical power sources shall be demonstrated OPERABLE by the performance of each of the requirements of Specifications 4.8.1.1.1 and 4.8.1.1.2.
~Minimum indicated level with a fuel oil specific gravity of 0.83 and the level instrumentation calibrated to a reference specific gravity of 0.876.SHEARON HARRIS-UNIT 1 3/4 8"11 Amendment No.