Proposed Tech Specs,Correcting Location Described for One of Three Triaxial Peak Accelerograph Recorders
ML18012A253
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/31/1996
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18012A252 List:
References
NUDOCS 9606070018
Download: ML18012A253 (7)


Text

ENCLOSURE 5 SHEARON HARRIS NUCLEARPOWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT TRIAXIALPEAK ACCELEROGRAPH LOCATION TECHNICALSPECIFICATION PAGES 9bOb0700i8 9b053i PDR ADQCK 05000400I P

PDR

~4 TABLE 3.3~7 SEISMIC MONITORING INSTRUMEHTATION INSTRUMENTS ANO SEHSOR LOCATIONS

1. Triaxfal Time-Hfstory Accelerographs a.

Containment Mat (EI 221 ft)

b. Containment (El 286 ft)
c. Ofesel Fuel Of 1 Storage Tank Building (El 242 ft)
2. Triaxfal Peak Accelerograph Recorders

~s a.

Reactor Coolant Pipe (Loop g) b.

Steam Generator IA Pedestal (EI'.238.ft) )

c'. Reactor Auxiliary Building (El 236 ft)

)"-

3. Trfaxfa.l,. Seismic Swftches
a. Starter Unit for Time Hfs ory Accalerograph Systen-Containment Mat (El 221 ft)
b. Trfaxfal Sefsmfc SwitchContafnment Mat {El 221 ft)
4. Trfaxfal Response-Spectrum Recorders a.

Steam Generator 18 Pedestal

{El 238 ft)

b. Reactor Auxflfary Building (El 216 ft)

MEASVREMEHT RANGE 0.01"1.0 g 0.01-1.0 g

0.01-1.0 g

LO g

-2g

~ 10 g 0.005 " 0.05 0.025 - 0.25 2 g MINIMUM INSTRUMENTS OPERABLE

c. Qfesel Fuel Oil Storage Tank Building o 2 g (E1 242 ft)
d. Containment Building (El 221 ft)

~2g

'Hath mafn control room indication.

"'%fth main control room recording.

SHEARON HARRIS - UNIT 1 3'

58

I l

TABLE 4. 3-4 SEISMIC MONITORING INSTRUMENTATION SURVEILLANC REOUIREMENTS INSTRUMENTS ANO SENSOR LOCATIONS

1. Trfaxfal Time-History Accelerographs a.

Containment Mat (El 221 ft)

b. Containment (El 286 ft)
c. Ofesel Fuel Ofl Storage Tank Building (El 242 ft)

ANALOG CHANNEL CHANNEL CHANNEL OPERATIONAL CHECK CALIBRATION TEE SAR%'R SARRR SA~R

2. Triaxial Peak Accelerograph Recorde a.

Reactor Coolant Pipe (Loop H.A.

c. Reactor Auxilfary Building (El Z36 ft)
3. Trfaxial Seismic Swftches
a. Starter Unit for Time Hfstory Accelerograph System Containment Mat (El 221 ft)~
b. Triaxfal Seismic S~f tch-Containment Mat (El ZZl ft)~
4. Trfaxial Response-Spectrum Recorders a.

Containment Bufldfng (Active)

(El 221 ft)~"

N.A.

b.

Steam Generator IA Pedestal (El 238 ft)

N.A.

N.A.

f N.A.

N.A.

SASSY Span%

b.

Steam Generator (Passive)

XB Pedestal

c. Reactor Auxiliary Building (Passive)

(El 2N ft)

d. Ofesel Fuel Of 1 Storage Tank Building (Passive)

(El 24Z ft)

N.A.

H.A.

H.A.

N.A.

N.A.

N.A.

"Except seismic starter unft.

~"0th main control room alarms.

The bfstable trip setpofnt need not be determined during the performance of a channel operatfonal test.

SHEARON HARRIS UNIT 1 3/4 3-59

TABLE 3.3-7 0

SEISMIC MONITORING INSTRUMENTATION INSTRUMENTS AND SENSOR LOCATIONS

1. Triaxial Time-History Accelerographs
a. Containment Mat (El 221 ft)
b. Containment (El 286 ft)
c. Diesel Fuel Oil Storage Tank Building (El 242 ft)
2. Triaxial Peak Accelerograph Recorders a.

Reactor Coolant Pipe (Loop B) b.

Steam Generator 1A Pedestal (El 238 ft)

c. Reactor Auxiliary Building (El 236 ft)
3. Triaxi a 1 Sei smi c Swi tches
a. Starter Unit for Time History Accelerograph System--Containment Mat (El 221 ft)

MEASUREMENT RANGE 0.01-1.0 g

0.01-1.0 g

0.01-1.0 g

+10 g

+2g

+10g 0.005

- 0.05 MINIMUM INSTRUMENTS OPERABLE 1**

1**

1**

b. Triaxial Seismic Switch--Containment 0.025

- 0.25 Mat (El 221 ft) 1*

4. Tri axial Response-Spectrum Recorders a.

Steam Generator 1B Pedestal (El 238 ft)

b. Reactor Auxiliary Building (El 216 ft)

+2g

+2g

c. Diesel Fuel Oil Storage Tank Building

+ 2 g (El 242 ft)

d. Containment Building (El 221 ft)

'With main control room indication.

  • "With main control room recording.

+2g 1*

SHEARON HARRIS - UNIT 1 3/4 3-58 Amendment No.

~

) g TABLE 4 3-4

'EISMIC MONITORING INSTRUMENTATION SURVEILLANCE RE UIREMENTS INSTRUMENTS AND SENSOR LOCATIONS ANALOG CHANNEL CHANNEL CHANNEL OPERATIONAL CHECK CALIBRATION TEST

1. Triaxial Time-History Accelerographs
a. Containment Mat (El 221 ft)

M*

b. Containment (El 286 ft)

M*

c. Diesel Fuel Oil Storage Tank Building M*

(El 242 ft)

2. Triaxial Peak Accelerograph Recorders
a. Reactor Coolant Pipe (Loop B) b.

Steam Generator lA Pedestal (El 238'ft)

N.A.

c. Reactor Auxiliary Building (El 236 ft)

N.A.

3. Triaxial Seismic Switches
a. Starter Unit for Time History Accelerograph System--Containment Mat (El 221 ft)
b. Triaxial Seismic Switch--Containment M

Mat (El 221 ft)

4. Triaxial Response-Spectrum Recorders
a. Containment Building (Active)

(El 221 ft)**

b.

Steam Generator (Passive) 1B Pedestal N.A.

c. Reactor Auxiliary Building (Passive)

N.A.

(El 216 ft)

d. Diesel Fuel Oil Storage Tank Building N.A.

(Passive)

(El 242 ft)

R SA R

SA R,

SA R

N.A.

R N.A.

R N.A.

SA SA SA N.A.

"Except seismic starter unit.

"With main control room alarms.

The bistable trip setpoint need not be determined during the performance of a channel operational test.

SHEARON HARRIS - UNIT 1 3/4 3-59 Amendment No.

Ja

+."l

~.

~'

ll