ML18012A144

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 4.3.2 Re ESFAS Instrumentation
ML18012A144
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/16/1996
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18012A143 List:
References
NUDOCS 9602230361
Download: ML18012A144 (3)


Text

ENCLOSURE TO SERIAL: HNP-96-025 ENCLOSURE4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT ENGINEERED SAFETY FEATURES ACTUATIONSYSTEM (ESFAS) INSTRUMENTATION PAGE CHANGF. INSTRUCTIONS Removed Pa c ~Inserted Pa c 3/4 3-41 3/4 3-41 960223036i 9602L6 PDR ADOCK 05000400 P PDR

ENCLOSURE TO SERIAL: HNP-96-025 ENCLOSURES SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT ENGINEERED SAFETY FEATURES ACTUATIONSYSTEM (ESFAS) INSTRUMENTATION TECHNICAL SPECIFICATION PAGES

TNLE h.3-2 ENGINEfRED SAFET FEATURES ACTUAT ION SYSTEN INSTRNENTATION E IR NS TRIP ANALOG ACTWAIHG HODES CHANNEL DEVICE . HASTER SlAVf fOR MIIICII CIIA)iHEL CIIANNKL CllN+L OPERATIONAL OPE RATIONAL ACTUATION Rf lAY RELAY SURVE I lLANCE FIIKTIOHAL UNIT CIIECK CAlllRATION TEST TEST lOGIC TEST TEST IESI IS REIS~IIREO C

l. Safety Injec tion (Reactor Trip, Feedwa ter Isolation, Control Rooe Iselatioa, Start Diesel Generators, Containsent Ventilation IsolaLion, Phase a Con-tainaent Isolation, StarL Auxiliary Fee@rater Systea Hotor Driven Pueps, Start Containaent Fan Coolers, StarL Eaergency Service Mater Puaps, Start, foergency Service Mater booster tuaps)
a. Hanual Initiation H. As H.A. H.A. HA NA 1 2 3
b. Autoaatic Actuation logic and Actuation H.A. H.A. H.A. H.A. H(l) H(1) 0(3) 1, 2, 3, i Relays
c. Containaent Pressure S H.A. H.A. N.A. N.A. 1, 2, 3, I Illgh-I
d. Pressurizer Pressure-" S N.$ . N.A. H.A. H.A. 1, 2,3 lmt
e. Steaa line S" N.A. H.A. N.A. N.A. I, 2, 3 Pressure--Ltat Note: *R = The B SSPS input from the Hain Control Board Panel C Hanual Safety Injection Switch is to be tested before reactor startup from Refueling Outage No. 7, or when the plant is in Hode 5 for at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, whichever occurs first.