ENCLOSURE TO SERIAL: HNP-96-025 ENCLOSURE4 SHEARON HARRIS NUCLEARPOWER PLANT NRC DOCKETNO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT ENGINEERED SAFETY FEATURES ACTUATIONSYSTEM (ESFAS) INSTRUMENTATION PAGE CHANGF. INSTRUCTIONS Removed Pa c

3/4 3-41

~Inserted Pa c

3/4 3-41 960223036i 9602L6 PDR ADOCK 05000400 P

PDR

ENCLOSURES ENCLOSURE TO SERIAL: HNP-96-025 SHEARON HARRIS NUCLEARPOWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT ENGINEERED SAFETY FEATURES ACTUATIONSYSTEM (ESFAS) INSTRUMENTATION TECHNICALSPECIFICATION PAGES

TNLE h.3-2 ENGINEfRED SAFET FEATURES ACTUATION SYSTEN INSTRNENTATION E

IR NS CIIA)iHEL FIIKTIOHALUNIT C

l. Safety Injec Trip, Feedwa tion (Reactor ter Isolation, Control Rooe Iselatioa, Start Diesel Generators, Containsent Ventilation IsolaLion, Phase a Con-tainaent Isolation, StarL Auxiliary Fee@rater Systea Hotor Driven Pueps, Start Containaent Fan
Coolers, StarL Eaergency Service Mater Puaps, Start, foergency Service Mater booster tuaps)

TRIP ANALOG ACTWAIHG HODES CHANNEL DEVICE HASTER SlAVf fOR MIIICII CIIANNKL CllN+L OPERATIONAL OPE RATIONAL ACTUATION RflAY RELAY SURVEIlLANCE CIIECK CAlllRATION TEST TEST lOGIC TEST TEST IESI IS REIS~IIREO

a. Hanual Initiation
b. Autoaatic Actuation H.A.

logic and Actuation Relays

c. Containaent Pressure S Illgh-I
d. Pressurizer Pressure-"

S lmt e.

Steaa line S"

Pressure--Ltat H. As H.A.

H.A.

H.A.

H.A.

H.A.

N.$.

N.A.

H.A.

H(l)

H.A.

N.A.

H.A.

N.A.

N.A.

1, 2, 3, I H.A.

H.A.

1, 2,3 N.A.

N.A.

I, 2, 3

HA NA 1

2 3

H(1) 0(3) 1, 2, 3, i Note:

  • R = The B SSPS input from the Hain Control Board Panel C Hanual Safety Injection Switch is to be tested before reactor startup from Refueling Outage No. 7, or when the plant is in Hode 5 for at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, whichever occurs first.