Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000295/199001324 August 1990Forwards Notices of Violations from Insp Repts 50-456/90-13, 50-457/90-16,50-295/90-13 & 50-304/90-15 Inadvertently Removed from Rept Package Due to Administrative Error
IR 05000295/199202312 January 1993Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/92-23 & 50-304/92-23
IR 05000295/19920349 February 1993Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/92-34 & 50-304/92-34
IR 05000295/19930099 September 1993Discusses Insp Repts 50-295/93-09,50-304/93-09,50-295/93-14 50-304/93-14 on 920727-930323 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000
IR 05000295/199302021 January 1994Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/93-20 & 50-304/93-20
IR 05000295/199401318 May 1994Forwards Insp Repts 50-295/94-13 & 50-304/94-13 on 940511.Violations Noted.Repts Involve Enforcement Conference.Record CopySafe Shutdown
Shutdown Margin
Operability Determination
IR 05000295/199600130 January 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/96-01 & 50-304/96-01 on 961223Non-Destructive Examination
Incorporated by reference
Scaffolding
Operability Assessment
IR 05000295/19960064 February 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/96-06 & 50-304/96-06Grab sample
Missed surveillance
Grace period
IR 05000295/19960087 November 1996Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/96-08 & 50-304/96-08
IR 05000295/199601022 January 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/96-10 & 50-304/96-10
IR 05000295/199601112 March 1997Discusses Insp Repts 50-295/96-11 & 50-304/96-11 on 960722- 0822 & Forwards Notice of Violation & Proposed Imposition of Civil Penatlty in Amount of $100,000Emergency Lighting
Operability Assessment
IR 05000295/19960144 April 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/96-14, 50-304/96-14,50-295/96-17 & 50-304/96-17 on 970128 & 0203
IR 05000295/199602030 May 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/96-20 & 50-304/96-20 on 970324
IR 05000295/199602117 June 1997Discusses Insp Repts 50-295/96-21 & 50-304/96-21 on 961203- 970122 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty for $50,000.Insp Included Review of Plant Program for Transportation of Radioactive Matl
IR 05000295/199700125 November 1997Confirms Plans to Conduct Predecisional Enforcement Conference on 971201 in Lisle,Illinois to Discuss Apparent Violations Identified in Insp Repts 50-295/97-01 & 50-304/97-01 Re Implementation of fitness-for-duty ProgramFitness for Duty
IR 05000295/19970026 October 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/97-02 & 50-304/97-02
IR 05000295/199700312 September 1997Discusses Insp Repts 50-295/97-03 & 50-304/97-03 on 961207-970527 & Forwards Nov.Initial Plant Design Failed to Compensate for Unfiltered Ventilation Flow Path That Maint Personnel Routinely Created
IR 05000295/19970062 September 1997Discusses Insp Repts 50-295/97-06,50-295/97-02,50-304/97-02, 50-295/97-07 & 50-304/97-07 on 970206-0428 & Forwards NOV & Proposed Imposition of Civil Penalties in Amount of $330,000
IR 05000295/199700918 June 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/97-09 & 50-304/97-09 on 970506
IR 05000295/199701226 November 1997Ack Receipt of 970818,0915 & 29 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/97-12 50-295/97-13,50-304/97-13,50-295/97-16 & 50-304/97-16 Issued on 970717,0815 & 28.No Further Questions
IR 05000295/199702213 February 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/97-22 & 50-304/97-22.Actions Will Be Examined During Future Insp
IR 05000295/199702324 March 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/97-23 & 50-304/97-23.Actions Will Be Examined During Future InspPast operability
Condition Adverse to Quality
Scaffolding
IR 05000295/199702511 March 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/97-25 & 50-304/97-25
IR 05000295/19970321 April 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/97-32 & 50-304/97-32.Actions Will Be Examined During Future Insp
IR 05000295/199800323 March 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/98-03 & 50-304/98-03 Issued on 980206
IR 05000295/199800520 May 1998Forwards Insp Repts 50-295/98-05 & 50-304/98-05 on 980314-0424.No Violations Noted.Staff Responded to Several Events Involving Configuration Control Deficiencies
IR 05000304/198500624 February 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-304/85-06
ML1003201452 July 1980Forwards Request for Addl Info Re Backfitting of Severe Accident Mitigation Features.Response Requested within 30 Days
ML1112303814 June 1980Forwards Revision 1 to Draft Emergency Plan.Emergency Plan Station Annexes Also Encl
ML11196019125 March 1996Forwards Operability Assessment App B & Proprietary Rev 0 to C-E Rept CEN-628-P, Verification of Structural Integrity of Abb Ceno SG Welded Sleeve, Per Recent SG Tube Sleeve Indications Discovered at Prairie Island.C-E Rept WithheldUnanalyzed Condition
Probabilistic Risk Assessment
ML16342B73111 February 1991Forwards Rev 0 to Special Rept TSSP-002-91, Control Room HVAC Duct In-Leakge Test, in Response to Insp Repts 50-295/87-05 & 50-304/87-05 Re 860911 Release of Airborne Radioactivity Into Auxiliary BldgScaffolding
ML17174B22315 February 1978Forwards Rept of Radioactive Effluents,1977, Solid Radwaste Rept,Jul-Dec 1977 & 1977 Rept of Occupational Personnel Radiation Doses.
ML17194A37017 December 1981Forwards Control Room Habitability Study for Quad Cities 1 & 2, Final Rept & Control Room Habitability Study for Dresden 2 & 3, Final Rept.Railroad Track Near Zion Does Not Present Major Threat
ML17252A76013 July 1993Forwards Rev 63b to Topical Rept CE-1-A, QA Program for Nuclear Generating Stations.Safe Shutdown
Shutdown Margin
Non-Destructive Examination
Hydrostatic
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
ML17263A6869 June 1994Submits Addl Info Re Rev 1 to GL 92-01, Reactor Pressure Vessel Structural Integrity. Next Response Will Be Submitted Prior to 940624
ML17264A1161 August 1995Forwards BAW-2257, Response to Part (1) of GL 92-01,Rev 1, Suppl 1.
ML17325B6815 October 1984Provides Results of 840910 Shutdown Due to Steam Generator Primary to Secondary Leakage.Westinghouse Safety Evaluation Checklist Encl
ML17346B3472 July 1985Forwards Revised Onsite Maps for Zion,Quad Cities & Braidwood & Offsite Map for Braidwood for Insertion Into Environ Group Procedure 2.W/four Oversize Maps.Aperture Cards Available in PDR
ML17353A43225 October 1995Forwards Rev 1 to BAW-2245, Initial Rt of Linde 80 Welds Based on Fracture Toughness in Transition Range. Rev Corrects Several Typographical Errors & Replaces BAW-2245, Marked Obsolete
ML18024B52213 October 1978Forwards LER#78-090/03L-0
ML18024B52513 October 1978Forwards LER#78-093/03L-0
ML18046B42014 January 1982Submits Addl Fee for Amends 62 & 59 to Licenses DPR-39 & DPR-48.Concern Expressed Over Criteria for Assessing FeesSafe Shutdown
Boric Acid
Ultimate heat sink
Tornado Missile
Pressure Boundary Leakage
ML19263A68427 October 1978Forwards Deficiency Rept Re Refueling Water Storage Tank Design
ML19274C7022 November 1978Responds to 780913 Ltr Re the Use of Iafolla Aggregate at Seabrook W/Encl Test Results.While Iafolla Aggregate Has Not Been in Use,Encl Tests Indicate That Use Is Acceptable.Its Use Is Planned,Given Advantageous Econ & Other Factors
ML20054E6307 June 1982Clarifies Discussion of in-core Instrumentation Contained in App C to Util Re Steam Generator Insp & Repair. Ten Alternative Thimbles Can Be Used for Calibr
ML20054E88412 May 1982Forwards Public Version of Revised Emergency Plan Implementing Procedures Index.Receipt Form Encl
ML20054F3877 June 1982Forwards Revision 21 to QA Program,Topical Rept CE-1-A
ML20054F84215 June 1982Informs That,Due to Util Lack of Attempts to Satisfy 10CFR2.790 requirements,820414 Response to Control of Heavy Loads Technical Evaluation Rept Is Being Returned.Addl Info RequiredControl of Heavy Loads
ML20054G11117 June 1982Forwards Westinghouse Analytical Assessment for Effects of Loose Parts,Zion 1, & Affidavit Requesting Certain Portions Be Considered Proprietary & Be WithheldAffidavit
ML20054G11815 June 1982Discusses Reasons for Withholding Info Contained in Analytical Assessment for Effects of Loose Parts,Zion 1 & Forwards Affidavit Certifying Proprietary NatureAffidavit