Clarifies Discussion of in-core Instrumentation Contained in App C to Util Re Steam Generator Insp & Repair. Ten Alternative Thimbles Can Be Used for Calibr
ML20054E630
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 06/07/1982
From: Lentine F
COMMONWEALTH EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
4274N, NUDOCS 8206140008
Download: ML20054E630 (1)


Text

._

N Commonwealth Edison I

^;

'/ One Fust Nation"I Ptaz2, Chicrgo. Illinois

~'

Addrns Reply 13: P:st Offica Box 767 Chicago. Illinois 60690 Jun e 7, 1982 Mr. Darrell G. Eisenhut, Director Division o f Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Zion Station Unit 1 Steam Generator Inspection and Repair NRC Docket No. 50-295 Reference (a):

Ma y 17, 1982, letter from F. Lentine to D. G. Eisenhut.

Dear Mr. Eisenhut:

This is to provide clarification to the discussion of the incore instrumentation tubing contained in Appendix C to reference (a).

This information was requested by your staff in a telecon on Jun e 3, 1982.

The incore instrumentation system consists of 58 incore thimble tubes with six detectors ( A through F).

Each detector is used to scan nine or ten o f the thimbles and all are normally cali-brated in a single thimble,. installed for the purpose.

If the use of the calibration thimble is lost, each detector can be inserted in any o f the ten "C" detector thimbles.

Therefore, there are ten alternative thimbles that can be used for calibration.

Please address any questions regardin'g this matter to this o f fice.

Very truly yours, jj $$a F. G. Lentine Nuclear Licensing Administrator 1m 0\\

0 4274N I

8206140008 820607 PDR ADOCK 05000295 P