Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML19270F8838 March 1979Preservice Insp & Testing Plan,Revision 3,March 1979.
ML19296D40221 November 1979In-Plant Safety Relief Valve Test, Revision 2
ML19305D69611 April 1979Procedure for ASME Section XI Repairs & Revisions.Repair/ Revision Repts 5-8 & 23-30 EnclHydrostatic
ML19326E03422 May 1979Emergency Procedures for Facility,Including General Abnormal Procedures,General Abnormal Index & Operating Abnormal IndexReactor Vessel Water Level
ML19327A75216 August 1989Rev 2 to Combined Units 1 & 2 Inservice Testing Program for Pumps & Valves.High Radiation Area
Stroke time
Cold shutdown justification
Power Operated Valves
ML19330C32112 May 1980County 1 Sqrt Test Plan, Revision 1
ML19340C40927 October 1980of In-Plant Safety Relief Valve Test.
ML20023D19121 October 1982Rev 0 to Project Instruction PI-LS-42, Review of QC Documentation for LaSalle County Station Units 1 & 2.
ML20024A1533 May 1983Public Version of Rev 2 to Emergency Plan Implementing Procedure LZP-1330-32, Post-Accident Sampling of Ga Wide- Range Gas Monitor. Offsite Procedure Mod Forms & Revised Index EnclGrab sample
ML20024B10324 June 1983Startup Test Procedure 9,Water Level Measurement.
ML20024B10424 June 1983Startup Test Procedure 12,Average Power Range Monitor Calibr.
ML20024B10724 June 1983Startup Test Procedure 17,Sys Expansion.
ML20024B10924 June 1983Startup Test Procedure 23A,Feedwater Control Sys.
ML20024B11024 June 1983Startup Test Procedure 26,Relief Valves.Stroke time
ML20024B11124 June 1983Startup Test Procedure 29,Recirculation Flow Control Sys.Power change
ML20024B11224 June 1983Startup Test Procedure 30,Recirculation Sys.Flow Induced Vibration
ML20024B11524 June 1983Startup Test Procedure 33,Drywell Piping Vibration.Coast down
ML20024B11624 June 1983Startup Test Procedure 35,Recirculation Sys Flow Calibr.
ML20024B11924 June 1983Startup Test Procedure 74,Offgas Sys.
ML20024B78828 April 1983Procedure IB-8307, Instructions for Installation of Close Latch Anti-Shock Spring in Hk Mechanism (Used in Breakers Less than 1,000 Mva).
ML20024D5958 July 1983Public Version of Revised Lzp index.W/830712 Ltr
ML20028E30431 May 1982Rev 0 to LaSalle County Station Radiation Chemistry Technician Basic Training Program.High Radiation Area
Grab sample
ML20028F37220 January 1983Verification Testing of Separation Between Class IE & Nonclass IE Power Cable in Raceways for Use in LaSalle Nuclear Generating Station - Units 1 & 2, Rev a
ML20038B85630 November 1981to LaSalle County Station Offsite Dose Calculation Manual.Offsite Dose Calculation Manual
ML20039A88413 November 1981Public Version of Revised Lzp Procedures Manual,Including Procedures LZP-1210-1 Re Hazardous Matl Incidents Reporting & LZP-1330-11 Re Dilution & Transfer of Gas Samples.Index & Tabs Encl
ML20039G57029 July 1981Process Control Program for Radwaste Solidification SysProcess Control Program
ML20040H5035 February 1982Technical Proposal PR-5792, Program Plan - Independent Design Review. Book 1 of 2
ML20041C02619 January 1982Public Version of Revised Lzp Procedures,Including Procedures LZP-1120-1 Re Operations Director & LZP-1160-01 Re Administrative Director.Revised Index EnxlSafe Shutdown
Grab sample
Nuclear Accident Reporting System
Earthquake
Fatality
ML20041E6598 March 1982to Process Control ProgramProcess Control Program
ML20042C29712 March 1982to Process Control Program.Process Control Program
ML20043G47918 May 1990Offsite Procedures,Including Rev 1 to LZP-1330-12,Rev 2 to LPZ-1330-13,Rev 1 to LZP-1330-14 & Rev 6 to LPZ-1330-14Grab sample
ML20045B59228 May 1993Rev 1 to Procedure LZP-1210-4, Reporting of Transportation Accident.Nuclear Accident Reporting System
ML20050A55128 February 1982to Procedure 0291A, Meteorological Monitoring, Offsite Dose Calculation Program for Emergency Preparedness at Operating Nuclear Power Plants.Offsite Dose Calculation Manual
Met Tower
Nuclear Accident Reporting System
ML20050B6118 September 1981Reporting of 10CFR21 Offenses.
ML20052A43931 March 1982Offsite Dose Calculation Manual,Revision 4Grab sample
Offsite Dose Calculation Manual
ML20052B5301 April 1982Public Version of Revision 0 to Lzp Procedure LZP-1330-29, Sampling at High Radiation Sampling Sys (Valve Operations at Hrss Valve Control Panel. Revised Index Encl
ML20052F4559 April 1982Public Version of Revision 2 to LZP-1440-1, Onsite Generating Station Emergency Plan Communication Sys. Revised Index Encl
ML20053C44519 March 1982Public Version of Revised Lzp Procedures,Including Procedures Lzp 1330-25 Re Sampling of Reactor Coolant at High Radiation Sample Sys & Lzp 1330-26 Re Sampling of Containment Air at High Radiation Sampling Sys.Index EnclGrab sample
ML20053D66817 May 1982Public Version of 10CFR50.59 Format for Safety Evaluation of Revision 4 to Test/Procedure Lzp 1320-1, Augmentation of Plant Staffing.
ML20053D7027 May 1982Public Version of Revised Lzp Procedures,Including Procedure Lzp 1330-21 Re Determination of Reactor Coolant Chloride Concentration at High Radiation Sampling Sys. Revised Index EnclGrab sample
ML20053D7151 April 1982Public Version of Revision 3 to Emergency Plan Lzp Procedure Lzp 1320-1, Augmentation of Plant Staffing. Revised Index EnclHealth Physics Network
ML20053D73423 September 1976Specs for Concrete Expansion Anchor Work
ML20053E4217 May 1982Public Version of 10CFR50.59 Format for Safety Evaluation of Revised Lzp Procedures,Including Procedures Lzp 1330-21 Re Determination of Reactor Coolant Chloride Concentration at High Radiation Sampling Sys
ML20054E8296 May 1982Public Version of LZP-1200-2,Revision 1, Classification of Noble Gas Release. Revised Index Encl
ML20054H15228 May 1982Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H42928 May 1982Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054J8692 June 1982Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures, Including Revision 2 to Procedure ED-3 Re Demand Polling of Meteorological Data
ML20054M33922 June 1982Public Version of Revision 4 to Emergency Plan Implementing Procedure EPIP 700-1, Corporate Command Ctr Group Directory. Revision 7 to Table of Contents Encl
ML20054M37210 June 1982Public Version of 10CFR50.59 Format for Safety Evaluation & Safety Evaluation Checklist for Lzp Tests/Procedures, Including Procedure LZP-1200-4 Re Classification of Liquid Release
ML20055A9933 June 1982to Inservice Insp Program:Asme Class 1,2 & 3 Components, Vols 1 & 2Hydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
Dissimilar Metal Weld