Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML020990363 | 3 April 2002 | Steam Generator Tube Inspection Report for Surry Power Station Unit 2 | |
ML022620705 | 19 September 2002 | Reactor Vessel Neutron Embrittlement -- Surry, Attachment to Dominion Draft Report on Surry Power Stations (SPS) Reactor Vessel Neutron Embrittlement Evaluation | |
ML023010480 | 19 September 2002 | Part 2 of 7 - GE BWR/4 Advanced Course R-504B | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level Half scram Stroke time Water Inventory Control Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Abnormal operational transient Scram Discharge Volume Breakaway torque Overtravel Fuel cladding Backfit Coast down Fatality |
ML023010597 | 19 September 2002 | Part 5 of 7 - GE BWR/4 Advanced Course R-504B | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Safe Shutdown Earthquake Probabilistic Risk Assessment Abnormal operational transient Earthquake Hardened vent Fuel cladding Pressure Boundary Leakage Backfit |
ML023430343 | 2 December 2002 | Response to Request for Additional Information, Dominion'S Reload Nuclear Design Methodology Topical Report | |
ML031890337 | 10 July 2003 | Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Millstone, Nort | Enforcement Discretion |
ML042450164 | 31 August 2004 | Transmittal of Fitness-for-Duty Program Semi-Annual Performance Data Report for Millstone, North Anna, and Surry Power Stations | Fitness for Duty |
ML050530039 | 21 February 2005 | Fitness-for-duty Program Semi-Annual Performance Data Report | Fitness for Duty |
ML050540304 | 22 February 2005 | Fitness-for-Duty Program Semi-Annual Performance Data Report Correction of Information | Fitness for Duty |
ML050600120 | 28 February 2005 | Owner'S Activity Reports | VT-2 Through-Wall Leak |
ML051460325 | 25 May 2005 | .2 & 3, North Anna Power Station Units 1 & 2, Surry Power Station Units 1 & 2 - Nuclear Liability Insurance Endorsement | |
ML051880480 | 7 July 2005 | Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 | |
ML051950570 | 14 July 2005 | Virginia Electric and Power Company Surry Power Station Unit 2 ASME Section XI Inservice Inspection Program Embedded Flaw Evaluation | |
ML052350114 | 22 August 2005 | Fitness-For-Duty Program Semi-Annual Performance Data Report | Fitness for Duty |
ML052350484 | 22 August 2005 | Owner'S Activity Reports | VT-2 |
ML052690317 | 28 September 2005 | Relief Request, ASME Section XI ISI on Partial Examination (Tac No. MC4633, MC4634, MC4635, MC4636, MC4637) | Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Through-Wall Leak |
ML060040035 | 3 January 2006 | Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 | |
ML061100512 | 20 April 2006 | Virginia Electric and Power Company North Anna and Surry Power Stations 30-Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.26 | |
ML061650080 | 13 June 2006 | Update to NRC Reactor Vessel Integrity Database and Exemption Request for Alternate Material Properties Basis Per 10 CFR 50.60(b) | Anticipated operational occurrence Hydrostatic Exemption Request |
ML062330071 | 16 August 2006 | Fitness-for-Duty Program Semi-Annual Performance Data Report | Fitness for Duty |
ML063410162 | 27 February 2006 | Fitness-For-Duty Program Semi-Annual Performance Data Report | Fitness for Duty |
ML070590327 | 27 February 2007 | Fitness-For-Duty Program Semi-Annual Performance Data Report | Fitness for Duty |
ML072681096 | 19 September 2007 | Proposed Technical Specifications Change Revised Setting Limits and Overtemperature T/Overpower at T Time Constants. | Hydrostatic GOTHIC |
ML073170678 | 19 May 2007 | SCS-00684, Rev. Draft-2, Design Report, ASME Bp&V Section III, Class 3, SS-45S8-18622-NSR Ball Valve, SS-45XS8-18623-NSR Ball Valve, Enclosure 2 | Finite Element Analysis |
ML080370470 | 28 January 2008 | Order EA-03-009 Sixty-Day Report Reactor Pressure Vessel Head Inspection Results | Boric Acid VT-2 |
ML080650562 | 29 February 2008 | Supplemental Response to NRC GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Boric Acid High Radiation Area Mission time Safe Shutdown Earthquake Coatings Operating Basis Earthquake Finite Element Analysis Design basis earthquake Foreign Material Exclusion Earthquake Fuel cladding Scaffolding |
ML080980229 | 4 April 2008 | Stations - Request for Approval of Appendix C of Fleet Report DOM-NAF-2 Qualification of the Westinghouse WRB-2M CHF Correlation in the Dominion VIPRE-D Computer Code | |
ML082070199 | 18 July 2008 | Order EA-03-009 Sixty-Day Report Reactor Pressure Vessel Head Inspection Results | Boric Acid VT-2 |
ML082190013 | 7 August 2008 | Monthly Operating Reports Second Quarter 2008 | Reserve Station Service Transformer Power change |
ML082320015 | 18 August 2008 | Cycle 22 Startup Physics Tests Report | Fuel cladding |
ML082610715 | 17 September 2008 | Final Precursor Analysis - Surry 2 (LER 281/06-002) | Mission time Significance Determination Process |
ML092120202 | 6 May 2009 | LTR-SGMP-09-64 Rev. 2 Np, Surry, Unit 1, Support for Emergency Technical Specification Amendment to Address Permeability Variation Signals at the Tube Ends. | |
ML092150462 | 30 June 2009 | WCAP-17092-NP, Revision 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 51F), Attachment 6 | Hydrostatic Finite Element Analysis |
ML092190894 | 4 August 2009 | Units 1 & 2, Millstone, Units 2 and 3 and Kewaunee - Approved Topical Report DOM-NAF-2, Revision 0.1-A | Exemption Request Fuel cladding |
ML092660616 | 27 August 2009 | LTR-SGMP-09-108 NP-Attachment, Response to NRC Request for, Additional Information on H*; Model 44Fand Model 51F Steam Generators. | Finite Element Analysis |
ML092990570 | 26 October 2009 | Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules | |
ML093070164 | 15 October 2009 | Technical Report No. EE-0116, Revision 5 | Offsite Dose Calculation Manual |
ML101270439 | 5 May 2010 | Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants | |
ML101930417 | 6 May 2010 | Tritium Database Report | Offsite Dose Calculation Manual Hydrostatic |
ML102390419 | 31 August 2010 | DOM-NAF-2, Rev. 0.2-A, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code. | B.5.b Mitigating Strategies Exemption Request Fuel cladding |
ML102600216 | 13 May 2010 | Engineering Transmittal, ET-CEP-10-0006, Revision 0, Evaluation of Aluminum Conduit Seal Penetration Fire Tests, Dated May 13, 2010, North Anna and Surry Power Stations Units 1 and 2 (Redacted Version), Enclosure 2 | Boric Acid Fire Barrier Coatings Temporary Modification Cyber Security Aging Management Time Critical Operator Action B.5.b Mitigating Strategies Exemption Request Maintenance Rule Program Fire Protection Program |
ML112070144 | 26 July 2011 | Draft Letter Report, Entitled Risk-Informing EP Oversight: Evaluation of EALs Using Saphia Pilot Study of Peach Bottom and Surry | High winds Probabilistic Risk Assessment Earthquake Pressure Boundary Leakage Power change |
ML11215A059 | 30 June 2011 | WCAP-17345-NP, Rev 2, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (3-Loop Model 44F/ Model 51F), Attachment 5 to 11-403 | Finite Element Analysis |
ML12024A078 | 28 December 2011 | State-of-the-Art Reactor Consequence Analysis (Soarca); Exclusive Summary for the Full NUREG for Peach Bottom and Surry | Probabilistic Risk Assessment Large early release frequency Severe Accident Management Guideline Earthquake |
ML12046A849 | 27 February 2012 | Review of the Steam Generator Tube Inservice Inspection Report for the Refueling Outage in 2010 | |
ML12073A385 | 8 March 2012 | Resources Services, Inc., Notification Letter That Surry Power Station Not Received a Copy of the Waste Shipment Record (Wsr) Signed by the Owner or Operator of the Designated Waste Disposal Site | |
ML12124A296 | 25 February 2010 | Soarca Peer Review Comments | Internal Flooding Probabilistic Risk Assessment Significance Determination Process Severe Accident Management Guideline B.5.b Mitigating Strategies Earthquake |
ML12124A297 | 11 March 2010 | Soarca Documents Review/Approval Process | |
ML12166A134 | 27 June 2012 | Closeout of Bulletin 2011-01, Mitigating Strategies. | B.5.b Mitigating Strategies |
ML12166A519 | 14 June 2012 | Transmittal of Final Accident Sequence Precursor (ASP) Analysis | Mission time Reserve Station Service Transformer Significance Determination Process |