Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20148G17117 March 1988PNS-IV-88-001:on 880316,telephone Threat Against Util & Plant Received at Corporate Ofc in Houston,Tx.Caller Stated That Two Power Poles Had Been Cut Down.Util Confirmed That Two Poles Had Been Cut Down.Contingency Plans Implemented
ML20207P83915 January 1987PNS-IV-87-001:during pre-hot Functional Test Insp of Reactor Coolant Pumps,Licensee Discovered 14-inch Metal Spike Inserted Between Rotor & Stator of Loop C.Formal Access Control Established.Insp for Addl Tamperings in Progress
ML20217A3621 December 1978PNO-78-201:on 781201,Region IV Received Telcon from J Clement (Reporter from San Antonio Express News) Expressing Interest in Allegations Which Had Been Made Re Nonconforming Const Practices at Plant
ML20236L0542 February 1977PNO-77-020:util Informed NRC Region IV Ofc of an Incident Involving Falsification of Concrete Aggregate Test Records for South Texas Project by Pittsburg Testing Lab Employee
ML20236L52914 February 1977PNO-77-027:licensee Has Suspended Concrete Placement Activities Due to Discovery of Extensive Cracking of Concrete in non-category I Turbine Pedestal Columns & in Wall of Category I Fuel Handling Building
PNO-IV-80-007, section of Reactor Containment Bldg Steel Liner Was Inadvertently Bulged During Volumetric Determination Using Water Under Pressure.Cause Not Stated13 February 1980PNO-IV-80-007:section of Reactor Containment Bldg Steel Liner Was Inadvertently Bulged During Volumetric Determination Using Water Under Pressure.Cause Not Stated
PNO-IV-85-024, on 850530,util Reported That Agreement Reached on Cash Settlement of Lawsuit Against Halliburton,Co,Parent Company of Brown & Root,Inc.City of Austin,One of Four Principal Owners,Still Considering Agreement30 May 1985PNO-IV-85-024:on 850530,util Reported That Agreement Reached on Cash Settlement of Lawsuit Against Halliburton,Co,Parent Company of Brown & Root,Inc.City of Austin,One of Four Principal Owners,Still Considering Agreement
PNO-IV-86-021, on 860626,Hurricane Bonnie Came Ashore Near Port Arthur,Tx on Louisiana/Texas Border.Bonnie Described as Minimal Hurricane.Hurricane Protection Procedures Implemented as Required26 June 1986PNO-IV-86-021:on 860626,Hurricane Bonnie Came Ashore Near Port Arthur,Tx on Louisiana/Texas Border.Bonnie Described as Minimal Hurricane.Hurricane Protection Procedures Implemented as Required
PNO-IV-86-024, on 860710,overflow of Approx 2,000 Gallons Occurred While Filling Emergency Diesel Fuel Oil Storage Tank.Augmented Fire Protection Measures Established.Cleanup Underway11 July 1986PNO-IV-86-024:on 860710,overflow of Approx 2,000 Gallons Occurred While Filling Emergency Diesel Fuel Oil Storage Tank.Augmented Fire Protection Measures Established.Cleanup Underway
PNO-IV-86-028, on 860829,beam Lowered Through Equipment Hatch in Containment Bldg Fell,Striking Pipefitter on Head.Injured Workman Removed by Ambulance & Subsequently Air Evacuated to Houston Hosp.Press Release Planned29 August 1986PNO-IV-86-028:on 860829,beam Lowered Through Equipment Hatch in Containment Bldg Fell,Striking Pipefitter on Head.Injured Workman Removed by Ambulance & Subsequently Air Evacuated to Houston Hosp.Press Release Planned
PNO-IV-86-028A, on 860829,beam Lowered Through Equipment Hatch in Containment Bldg Fell,Striking Pipefitter on Head. Cause Not Stated.Pipefitter Suffered Massive Trauma & Died After Air Evacuation to Hosp.Press Release Issued2 September 1986PNO-IV-86-028A:on 860829,beam Lowered Through Equipment Hatch in Containment Bldg Fell,Striking Pipefitter on Head. Cause Not Stated.Pipefitter Suffered Massive Trauma & Died After Air Evacuation to Hosp.Press Release IssuedFatality
PNO-IV-86-034, on 861031,foam Suppression Sys for Emergency Diesel Generator 13 Fuel Oil Storage Tank Room Manually Activated & on 861111,nitrogen Sys for 365-kV - 13.8-kV Standby Transformer Found Overpressurized12 November 1986PNO-IV-86-034:on 861031,foam Suppression Sys for Emergency Diesel Generator 13 Fuel Oil Storage Tank Room Manually Activated & on 861111,nitrogen Sys for 365-kV - 13.8-kV Standby Transformer Found Overpressurized
PNO-IV-87-004, on 870114,licensee Discovered Problem W/One Diesel Generator While Performing 24 H Preoperational Test. Caused by Stuck Intake Valve Push Rod.Diesel Generator Shutdown & Repaired by Licensee14 January 1987PNO-IV-87-004:on 870114,licensee Discovered Problem W/One Diesel Generator While Performing 24 H Preoperational Test. Caused by Stuck Intake Valve Push Rod.Diesel Generator Shutdown & Repaired by Licensee
PNO-IV-87-009, on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C. Caused by Operator Overlooking Step in Procedure.All Hot Functional Testing Put on Hold Pending Evaluation13 March 1987PNO-IV-87-009:on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C. Caused by Operator Overlooking Step in Procedure.All Hot Functional Testing Put on Hold Pending Evaluation
PNO-IV-87-009A, on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C.Caused by Operational Errors.After Cooldown from Hot Functional Testing,Sys Damage Will Be Repaired13 March 1987PNO-IV-87-009A:on 870311,steam/water Hammer Event Occurred in Component Cooling Water Lines Servicing RHR HX Trains B & C.Caused by Operational Errors.After Cooldown from Hot Functional Testing,Sys Damage Will Be Repaired
PNO-IV-87-010, on 870317,plant Experienced Failure of Circulating Water Pump Pedestal Casing.Piece of Pedestal Casing Blown Out by Water Pressure Rendering Pump Inoperable.Licensee Assessing Damage & Cause of Event18 March 1987PNO-IV-87-010:on 870317,plant Experienced Failure of Circulating Water Pump Pedestal Casing.Piece of Pedestal Casing Blown Out by Water Pressure Rendering Pump Inoperable.Licensee Assessing Damage & Cause of Event
PNO-IV-87-023, on 870430,const Craftsman Fell 30 Ft from Ladder & Suffered Broken Elbow & Concussion.Another Man Onsite Found Dead of Heart Attack30 April 1987PNO-IV-87-023:on 870430,const Craftsman Fell 30 Ft from Ladder & Suffered Broken Elbow & Concussion.Another Man Onsite Found Dead of Heart AttackFatality
PNO-IV-87-040, on 870828,painter Working in Unit 1 Turbine Bldg Injured from Fall of Approx 25 Ft.Painter Transported to Matagorda General Hosp & Then to St Lukes Hosp in Houston28 August 1987PNO-IV-87-040:on 870828,painter Working in Unit 1 Turbine Bldg Injured from Fall of Approx 25 Ft.Painter Transported to Matagorda General Hosp & Then to St Lukes Hosp in Houston
PNO-IV-87-043, on 870903,fire Occurred in Auxiliary Transformer & Switchgear Room 13.8 Kv Busing.Investigation Underway to Determine Cause of Electrical Fault & Resulting Fire4 September 1987PNO-IV-87-043:on 870903,fire Occurred in Auxiliary Transformer & Switchgear Room 13.8 Kv Busing.Investigation Underway to Determine Cause of Electrical Fault & Resulting Fire
PNO-IV-87-045, on 870913,two of Six Seismic Monitors Recorded Deflation of About 0.01 G & Alarmed.Licensee Contacted Regional & Natl Seismic Monitoring Stations.Insp Shows No Evidence of Damage14 September 1987PNO-IV-87-045:on 870913,two of Six Seismic Monitors Recorded Deflation of About 0.01 G & Alarmed.Licensee Contacted Regional & Natl Seismic Monitoring Stations.Insp Shows No Evidence of Damage
PNO-IV-87-060, on 871122,auxiliary Feed Sys Vibration Resulting in Pipe Failure Occurred.Occurrence Will Impact Startup Schedule.Licensee Investigating Failure & NRC Monitoring Activities23 November 1987PNO-IV-87-060:on 871122,auxiliary Feed Sys Vibration Resulting in Pipe Failure Occurred.Occurrence Will Impact Startup Schedule.Licensee Investigating Failure & NRC Monitoring Activities
PNO-IV-88-016, on 880228,reactor Trip Occurred W/Control Rods Positioned for Initial Criticality & Boron Dilution Was in Progress.Caused by Spurious Signal from Loop 3 lo-lo Temp Cold.Test Procedures Modified to Restart Testing29 February 1988PNO-IV-88-016:on 880228,reactor Trip Occurred W/Control Rods Positioned for Initial Criticality & Boron Dilution Was in Progress.Caused by Spurious Signal from Loop 3 lo-lo Temp Cold.Test Procedures Modified to Restart Testing
PNO-IV-88-018, on 880301,local Business Agents for Const Electricians & Pipefitters Stopped Supervision of Field Work.Work Supervised by Nonmanual & Supervisory Personnel. Law Enforcement Authorities Notified Due to Fights2 March 1988PNO-IV-88-018:on 880301,local Business Agents for Const Electricians & Pipefitters Stopped Supervision of Field Work.Work Supervised by Nonmanual & Supervisory Personnel. Law Enforcement Authorities Notified Due to Fights
PNO-IV-88-024, on 880330,reactor Trip & Safety Injection Occurred Due to Loss of Offsite Power.Caused by Troubleshooting Work on Main Generator Control Circuits to Determine Cause of Main Generator Output Breaker Trip31 March 1988PNO-IV-88-024:on 880330,reactor Trip & Safety Injection Occurred Due to Loss of Offsite Power.Caused by Troubleshooting Work on Main Generator Control Circuits to Determine Cause of Main Generator Output Breaker Trip
PNO-IV-88-030, on 880418,Train a Control Room Ventilation Makeup Supply Damper Failed to Close During Surveillance. Licensee Repaired Failed Damper & Plant Returned to Power Escalation from 13% Power18 April 1988PNO-IV-88-030:on 880418,Train a Control Room Ventilation Makeup Supply Damper Failed to Close During Surveillance. Licensee Repaired Failed Damper & Plant Returned to Power Escalation from 13% Power
PNO-IV-88-036, util Begun 2 to 3-wk Maint Outage.Startup Testing Completed on 30% Power Testing Plateau.Licensee Also Plans to Replace Corroded Aluminum Bronze Fittings & Valves in Essential Cooling Water Sys.State of Tx Informed4 May 1988PNO-IV-88-036:util Begun 2 to 3-wk Maint Outage.Startup Testing Completed on 30% Power Testing Plateau.Licensee Also Plans to Replace Corroded Aluminum Bronze Fittings & Valves in Essential Cooling Water Sys.State of Tx InformedThrough Wall Leak
Flow Induced Vibration
PNO-IV-88-039, on 880506,review of Eddy Current Test Data Revealed Wear on 19 Thimble Tubes.Caused by Flow Induced Vibrations.Util Expecting Recommendation for Corrective Action from Westinghouse9 May 1988PNO-IV-88-039:on 880506,review of Eddy Current Test Data Revealed Wear on 19 Thimble Tubes.Caused by Flow Induced Vibrations.Util Expecting Recommendation for Corrective Action from WestinghouseFlow Induced Vibration
PNO-IV-88-045, on 880521,plant Startup Followed Extended Outage for Performance of Maint Work.Completion of Testing at 30% Plateau Scheduled for 880526.Upon Satisfactory testing,50% Plateau Will Commence on 88052723 May 1988PNO-IV-88-045:on 880521,plant Startup Followed Extended Outage for Performance of Maint Work.Completion of Testing at 30% Plateau Scheduled for 880526.Upon Satisfactory testing,50% Plateau Will Commence on 880527
PNO-IV-88-046, on 880525,steam-driven Main Feedwater Pump Failed.Licensee Preparing to Inspect Main Condenser for Damage.Repairs Should Take Several Days.No One Injured from Flying Debris.Facility Will Remain Shutdown26 May 1988PNO-IV-88-046:on 880525,steam-driven Main Feedwater Pump Failed.Licensee Preparing to Inspect Main Condenser for Damage.Repairs Should Take Several Days.No One Injured from Flying Debris.Facility Will Remain Shutdown
PNO-IV-88-050, on 880613,Unit 1 Startup Following 880525 Shutdown Initiated.Subj Notification Issued as Plant Status Update.Maint Activities Performed During Outage.Completion of Testing at 30% Plateau Scheduled for 88061914 June 1988PNO-IV-88-050:on 880613,Unit 1 Startup Following 880525 Shutdown Initiated.Subj Notification Issued as Plant Status Update.Maint Activities Performed During Outage.Completion of Testing at 30% Plateau Scheduled for 880619
PNO-IV-88-051, failure of Westinghouse DS-416 Electrical Breakers.Failures Could Be Generic Problem.Westinghouse Representatives on Site Observing Testing,Insp & Installation of Subj Breakers16 June 1988PNO-IV-88-051:failure of Westinghouse DS-416 Electrical Breakers.Failures Could Be Generic Problem.Westinghouse Representatives on Site Observing Testing,Insp & Installation of Subj Breakers
PNO-IV-88-060, on 880728,licensee Tripped Reactor from 100% Power as Part of Planned 100% Power Plateau Initial Startup Test Program.Preliminary Results Satisfactory.Unit Will Remain in Hot Shutdown for Repairs28 July 1988PNO-IV-88-060:on 880728,licensee Tripped Reactor from 100% Power as Part of Planned 100% Power Plateau Initial Startup Test Program.Preliminary Results Satisfactory.Unit Will Remain in Hot Shutdown for Repairs
PNO-IV-88-066, on 880812,Region IV Notified of Truck Accident on Interstate 10,approx 30 Miles West of Baton Rouge.Truck Carrying Eight New Fuel Assemblies to Facility.Shipping Packages Undamaged.Packages Returned to State of Sc12 August 1988PNO-IV-88-066:on 880812,Region IV Notified of Truck Accident on Interstate 10,approx 30 Miles West of Baton Rouge.Truck Carrying Eight New Fuel Assemblies to Facility.Shipping Packages Undamaged.Packages Returned to State of Sc
PNO-IV-88-069, on 880824,util 100 H NSSS Acceptance Test Completed.Upon Completion of Review of Startup Test Results by Plant Operations Review Committee,Util Will Be in Position to Begin Commercial Operation.State of Tx Informed24 August 1988PNO-IV-88-069:on 880824,util 100 H NSSS Acceptance Test Completed.Upon Completion of Review of Startup Test Results by Plant Operations Review Committee,Util Will Be in Position to Begin Commercial Operation.State of Tx Informed
PNO-IV-88-072, on 880830,shutdown Began from Approx 45% Power to Repair Main Steam Vent Line Leak Coming from a Sock Weld. Licensee Will Insp Similar Socket Welds on Main Steam & Main Feed Lines Inside Containment During Shutdown30 August 1988PNO-IV-88-072:on 880830,shutdown Began from Approx 45% Power to Repair Main Steam Vent Line Leak Coming from a Sock Weld. Licensee Will Insp Similar Socket Welds on Main Steam & Main Feed Lines Inside Containment During Shutdown
PNO-IV-88-078, on 880923,util Plans to Begin Scheduled Outage to Inspect Bottom Mounted Instrument (Bmi) Tubes.On 880506, Util Reported That Review of Eddy Current Test Data on 58 Bmi Thimble Tubes Revealed Wear on 19 Thimble Tubes23 September 1988PNO-IV-88-078:on 880923,util Plans to Begin Scheduled Outage to Inspect Bottom Mounted Instrument (Bmi) Tubes.On 880506, Util Reported That Review of Eddy Current Test Data on 58 Bmi Thimble Tubes Revealed Wear on 19 Thimble Tubes
PNO-IV-89-013, on 890120,manual Turbine/Generator Trip Initiated When Hydrogen Fueled Fire Occurred in Main Generator.Testing Revealed That Wall Thickness of Bottom Mounted Instrumentation Thimble Tubes Below Requirement2 March 1989PNO-IV-89-013:on 890120,manual Turbine/Generator Trip Initiated When Hydrogen Fueled Fire Occurred in Main Generator.Testing Revealed That Wall Thickness of Bottom Mounted Instrumentation Thimble Tubes Below Requirement
PNO-IV-89-016, on 890312,initial Criticality Achieved.Region IV Operational Readiness Review Insp Team on Site for First Days of Low Power Operation.Commission Meeting on Full Power License Scheduled for 89032813 March 1989PNO-IV-89-016:on 890312,initial Criticality Achieved.Region IV Operational Readiness Review Insp Team on Site for First Days of Low Power Operation.Commission Meeting on Full Power License Scheduled for 890328
PNO-IV-89-019, on 890315,util Received Allegations Re Util Incompetence & Mismanagement Re Const Costs & Plant Operation.Region IV Formed Multidisciplined Team to Identify Safety Issues.Util Also Conducting Investigation16 March 1989PNO-IV-89-019:on 890315,util Received Allegations Re Util Incompetence & Mismanagement Re Const Costs & Plant Operation.Region IV Formed Multidisciplined Team to Identify Safety Issues.Util Also Conducting Investigation
PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants23 March 1989PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants
PNO-IV-89-022, on 890328,reactor Power Increased Above 5% for First Time.License Issued Earlier Authorizing Full Power Operation.Power to Be Increased in Increments for Few Wks W/Performance of Equipment & Sys Tests at Various Levels30 March 1989PNO-IV-89-022:on 890328,reactor Power Increased Above 5% for First Time.License Issued Earlier Authorizing Full Power Operation.Power to Be Increased in Increments for Few Wks W/Performance of Equipment & Sys Tests at Various Levels
PNO-IV-89-024, on 890405,reactor Trip Occurred During Attempt to Synchronize Main Generator to Electrical Distribution Sys.Some Nonsafety Equipment Did Not Function as Expected. Resident Inspectors Will Continue to Monitor Activities5 April 1989PNO-IV-89-024:on 890405,reactor Trip Occurred During Attempt to Synchronize Main Generator to Electrical Distribution Sys.Some Nonsafety Equipment Did Not Function as Expected. Resident Inspectors Will Continue to Monitor Activities
PNO-IV-89-025, on 890406,util Declared Notification of Unusual Event at Facility Due to One Inoperable Diesel Generator.Util Declared Diesel Generator 12 Operable After Replacing Defective Resistor in Governor Control Circuit6 April 1989PNO-IV-89-025:on 890406,util Declared Notification of Unusual Event at Facility Due to One Inoperable Diesel Generator.Util Declared Diesel Generator 12 Operable After Replacing Defective Resistor in Governor Control Circuit
PNO-IV-89-026, on 890405,unit Tripped from 11% Power Due to Lockout of Main & Auxiliary Transformers During Attempt to Synchronize Main Generator to Electrical Distribution Sys. Unit in Hot Standby & Startup Not Expected Until 8904096 April 1989PNO-IV-89-026:on 890405,unit Tripped from 11% Power Due to Lockout of Main & Auxiliary Transformers During Attempt to Synchronize Main Generator to Electrical Distribution Sys. Unit in Hot Standby & Startup Not Expected Until 890409
PNO-IV-89-033, on 890512,unusual Event Declared When Two of Four Pressurizer Water Level Indication Channels Inoperable. Reactor Shutdown.Possibly Caused by Valve Disc Stuck on Valve Seat.Insulation Installed on Piping15 May 1989PNO-IV-89-033:on 890512,unusual Event Declared When Two of Four Pressurizer Water Level Indication Channels Inoperable. Reactor Shutdown.Possibly Caused by Valve Disc Stuck on Valve Seat.Insulation Installed on PipingTemporary Modification
PNO-IV-89-048, on 890713,main Transformer 2A Locked Out Due to Transformer Bursting,Causing Mineral Oil to Spill Into Transformer Oil in Recovery Pit.Caused by Loss of Power to Auxiliary Bus.Unit Will Not Be Restarted for 2 to 3 Days14 July 1989PNO-IV-89-048:on 890713,main Transformer 2A Locked Out Due to Transformer Bursting,Causing Mineral Oil to Spill Into Transformer Oil in Recovery Pit.Caused by Loss of Power to Auxiliary Bus.Unit Will Not Be Restarted for 2 to 3 Days
PNO-IV-89-051, radioactive Contamination Outside Radiation Controlled Area Discovered.Apparent Cause Associated W/Operation of Radwaste Evaporator.No Contamination Found in Neutralization Basin & No Personnel Contaminated15 August 1989PNO-IV-89-051:radioactive Contamination Outside Radiation Controlled Area Discovered.Apparent Cause Associated W/Operation of Radwaste Evaporator.No Contamination Found in Neutralization Basin & No Personnel Contaminated
PNO-IV-89-051A, on 890814,radioactive Contamination Found Outside Radiation Controlled Area in Stairwell of Mechanical Auxiliary Bldg & on 890817,contamination Found in 11A Mab Chiller Open Cooling Sys Discharge Drain.Events Unrelated18 August 1989PNO-IV-89-051A:on 890814,radioactive Contamination Found Outside Radiation Controlled Area in Stairwell of Mechanical Auxiliary Bldg & on 890817,contamination Found in 11A Mab Chiller Open Cooling Sys Discharge Drain.Events Unrelated
PNO-IV-90-024, on 900628,Steam Generator D PORV Found to Have Congealed Electro Hydraulic Control Fluid.Caused by Heat & Moisture from body-to-bonnet Steam Leak on Porv.Reactor Shut Down6 July 1990PNO-IV-90-024:on 900628,Steam Generator D PORV Found to Have Congealed Electro Hydraulic Control Fluid.Caused by Heat & Moisture from body-to-bonnet Steam Leak on Porv.Reactor Shut Down
PNO-IV-90-025, on 900716,Unit 1 Tripped from 100% Power During Operational Test of Reactor Trip Breaker Trip Actuating Device Which Forced Outage to Exceed 72 H.State of Tx Informed.No Press Release Issued17 July 1990PNO-IV-90-025:on 900716,Unit 1 Tripped from 100% Power During Operational Test of Reactor Trip Breaker Trip Actuating Device Which Forced Outage to Exceed 72 H.State of Tx Informed.No Press Release Issued