Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
L-10-384, Extended Power Uprate Licensing Report, Attachment 6; Applications for Withholding Proprietary Information from Public Disclosure9 November 2010Extended Power Uprate Licensing Report, Attachment 6; Applications for Withholding Proprietary Information from Public DisclosureFuel cladding
L-16-001, Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.24 May 2018Units. 3 and 4, Response to Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.Aging Management
L-2000-179, In-Service-Inspection Program, Third Interval Second Period, Owner'S Activity Reports for Refueling Outages SL1-18 and SL1-1910 August 2005In-Service-Inspection Program, Third Interval Second Period, Owner'S Activity Reports for Refueling Outages SL1-18 and SL1-19VT-2
Moisture barrier
Through Wall Leak
L-2000-259, Price Anderson Guarantees/Annual Financial Report in Accordance Wth 10CFR 140.21 Flordia Power and Light Co Submits the Attached Financial Information20 December 2000Price Anderson Guarantees/Annual Financial Report in Accordance Wth 10CFR 140.21 Flordia Power and Light Co Submits the Attached Financial InformationIncorporated by reference
L-2001-262, Inservice Inspection Plans, Unit 1 Third & Unit 2 Second Ten-Year Intervals, Unit 1 Relief Request 21 & Unit 2 Relief Request 31, Request for Additional Information Response14 April 2003Inservice Inspection Plans, Unit 1 Third & Unit 2 Second Ten-Year Intervals, Unit 1 Relief Request 21 & Unit 2 Relief Request 31, Request for Additional Information ResponseNondestructive Examination
L-2001-287, Price Anderson Guarantees/Annual Financial Report27 December 2001Price Anderson Guarantees/Annual Financial ReportIncorporated by reference
L-2002-002, Florida Power and Light Letter Re St. Lucie Units 1 and 2, Proposed License Amendments - Supplement Consolidated Line Item Improvement Process TSTF-358 - Missed Surveillance Requirements25 January 2002Florida Power and Light Letter Re St. Lucie Units 1 and 2, Proposed License Amendments - Supplement Consolidated Line Item Improvement Process TSTF-358 - Missed Surveillance RequirementsTime of Discovery
Missed surveillance
L-2002-006, Notice of Transfer of Nonqualified Decommissioning Trust Fund from Florida Power & Light Company to Wholly-Owned Subsidiary3 January 2002Notice of Transfer of Nonqualified Decommissioning Trust Fund from Florida Power & Light Company to Wholly-Owned Subsidiary
L-2002-008, Physical Security Plan - Revision 5731 January 2002Physical Security Plan - Revision 57
L-2002-011, Revised Page of Application for Renewed Operating Licenses8 January 2002Revised Page of Application for Renewed Operating Licenses
L-2002-024, Florida Power & Light Letter Re St. Lucie Units 1 and 2, Proposed License Amendments Containment Vacuum Relief Valve Allowed Outage Time Extension20 February 2002Florida Power & Light Letter Re St. Lucie Units 1 and 2, Proposed License Amendments Containment Vacuum Relief Valve Allowed Outage Time ExtensionStroke time
Enforcement Discretion
L-2002-028, Revision 8 to EPIP-09, Off-Site Dose Calculations.18 February 2002Revision 8 to EPIP-09, Off-Site Dose Calculations.Grab sample
Met Tower
L-2002-033, 2001 Annual Operating Report28 February 20022001 Annual Operating Report
L-2002-035, Additional Copies of Application for Renewed Operating Licenses18 February 2002Additional Copies of Application for Renewed Operating Licenses
L-2002-041, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 200128 February 2002Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2001
L-2002-054, Florida Power & Light'S Response to Order for Interim Safeguards and Security Compensatory Measures14 March 2002Florida Power & Light'S Response to Order for Interim Safeguards and Security Compensatory Measures
L-2002-055, Request for Extension of Time in Which to Seek a Hearing February 25, 2002 Order Modifying Licenses15 March 2002Request for Extension of Time in Which to Seek a Hearing February 25, 2002 Order Modifying Licenses
L-2002-058, Annual Radiological Environmental Operating Report for Calendar Year 200117 April 2002Annual Radiological Environmental Operating Report for Calendar Year 2001Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
L-2002-059, Nuclear Property Insurance 10 CFR 50.54(w)(3)21 March 2002Nuclear Property Insurance 10 CFR 50.54(w)(3)
L-2002-061, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity2 April 2002Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary IntegrityBoric Acid
VT-2
L-2002-062, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors, 10CFR 50.46 Annual Report27 March 2002Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors, 10CFR 50.46 Annual ReportFuel cladding
L-2002-066, March 2002 Monthly Operating Report for St. Lucie Units 1 and 212 April 2002March 2002 Monthly Operating Report for St. Lucie Units 1 and 2
L-2002-083, Emergency Plan Implementing Procedure2 May 2002Emergency Plan Implementing ProcedureHealth Physics Network
L-2002-084, NEI 97-06 Steam Generator Report19 April 2002NEI 97-06 Steam Generator Report
L-2002-088, Withdrawal of Proposed License Amendments Re ESFAS Trip/Bypass Single Failure Vulnerabilities6 June 2002Withdrawal of Proposed License Amendments Re ESFAS Trip/Bypass Single Failure Vulnerabilities
L-2002-093, Transmittal of St. Lucie Guard Training & Qualification Plan - Revision 115 May 2002Transmittal of St. Lucie Guard Training & Qualification Plan - Revision 1
L-2002-094, Physical Security Plan - Revision 5822 May 2002Physical Security Plan - Revision 58
L-2002-095, Safeguards Contingency Plan - Revision 1322 May 2002Safeguards Contingency Plan - Revision 13
L-2002-096, Official Service List Change3 May 2002Official Service List Change
L-2002-097, Florida Power & Light Company - Supplemental Response to Order for Interim Safeguards and Security Compensatory Measures17 May 2002Florida Power & Light Company - Supplemental Response to Order for Interim Safeguards and Security Compensatory Measures
L-2002-100, Emergency Plan Implementing Procedures14 May 2002Emergency Plan Implementing ProceduresHealth Physics Network
L-2002-133, June 2002 Monthly Operating Report for St. Lucie, Units 1 & 211 July 2002June 2002 Monthly Operating Report for St. Lucie, Units 1 & 2
L-2002-134, Revision 4 to EPIP-01, Classification Emergencies.11 July 2002Revision 4 to EPIP-01, Classification Emergencies.Safe Shutdown
Ultimate heat sink
Offsite Dose Calculation Manual
Earthquake
L-2002-137, Completed Form 536, Operator Licensing Examination Data10 July 2002Completed Form 536, Operator Licensing Examination DataGeneric Fundamentals Examination
L-2002-139, Enclosure 4: Draft RAI Responses Concerning the Scoping and Screening Methodology19 July 2002Enclosure 4: Draft RAI Responses Concerning the Scoping and Screening MethodologyBoric Acid
Ultimate heat sink
Aging Management
L-2002-140, Proposed License Amendments Technical Specification Improvements Associated with Handling of Recently Irradiated Fuel Assemblies15 July 2002Proposed License Amendments Technical Specification Improvements Associated with Handling of Recently Irradiated Fuel AssembliesRecently irradiated fuel
L-2002-142, Inservice Inspection Program Second Ten-Year Interval Relief Request 29 Risk-Informed Inservice Inspection Program23 July 2002Inservice Inspection Program Second Ten-Year Interval Relief Request 29 Risk-Informed Inservice Inspection ProgramProbabilistic Risk Assessment
Nondestructive Examination
VT-2
Large early release frequency
Maintenance Rule Program
L-2002-143, Request for Amendments, Proposed License Amendments Allow Risk-Informed One Time Increase in Integrated Leak Rate Test Surveillance Interval15 August 2002Request for Amendments, Proposed License Amendments Allow Risk-Informed One Time Increase in Integrated Leak Rate Test Surveillance IntervalCoatings
Nondestructive Examination
Large early release frequency
Moisture barrier
L-2002-144, Enclosure 5: Draft RAI Responses Concerning the Scoping and Screening Results6 August 2002Enclosure 5: Draft RAI Responses Concerning the Scoping and Screening ResultsSafe Shutdown
Boric Acid
Fire Barrier
Aging Management
Moisture barrier
Fire Protection Program
L-2002-145, Emergency Plan Implementing Procedure, Rev. 7 to EPIP-13 and Rev. 41 to HP-908 August 2002Emergency Plan Implementing Procedure, Rev. 7 to EPIP-13 and Rev. 41 to HP-90Health Physics Network
L-2002-149, Supplemental Response to Generic Letter 96-06 Re Resolution of Waterhammer Issues29 July 2002Supplemental Response to Generic Letter 96-06 Re Resolution of Waterhammer Issues
L-2002-157, Enclosure 6: Draft RAI Responses Concerning Aging Management Reviews (Amrs)6 August 2002Enclosure 6: Draft RAI Responses Concerning Aging Management Reviews (Amrs)Boric Acid
Ultimate heat sink
Fire Barrier
Coatings
Aging Management
L-2002-159, Enclosure 7: Draft RAI Responses Concerning AMRs Related to Auxiliary Systems2 August 2002Enclosure 7: Draft RAI Responses Concerning AMRs Related to Auxiliary SystemsBoric Acid
Packing leak
Coatings
Aging Management
Biofouling
Through-Wall Leak
Fire Protection Program
L-2002-163, Semi-Annual Fitness-For-Duty Program Performance Data12 August 2002Semi-Annual Fitness-For-Duty Program Performance DataFitness for Duty
L-2002-164, July 2002 Monthly Operating Report for St. Lucie Units 1 & 213 August 2002July 2002 Monthly Operating Report for St. Lucie Units 1 & 2
L-2002-165, Enclosure 8: Draft RAI Responses Concerning Time-Limited Aging Analyses26 August 2002Enclosure 8: Draft RAI Responses Concerning Time-Limited Aging AnalysesBoric Acid
Non-Destructive Examination
Hydrostatic
Enforcement Discretion
Operating Basis Earthquake
Aging Management
Dissimilar Metal Weld
L-2002-166, Enclosure 9: Draft RAI Responses Concerning AMPs26 August 2002Enclosure 9: Draft RAI Responses Concerning AMPsFire Barrier
Coatings
Nondestructive Examination
Aging Management
Biofouling
Through-Wall Leak
Fire Protection Program
L-2002-176, Supplemental Response to NRC Request for Additional Information Related to the Staff'S Review of Severe Accident Mitigation Alternatives26 August 2002Supplemental Response to NRC Request for Additional Information Related to the Staff'S Review of Severe Accident Mitigation Alternatives
L-2002-177, Response to Order for Interim Safeguards and Security Compensatory Measures28 August 2002Response to Order for Interim Safeguards and Security Compensatory Measures
L-2002-178, In-Service-Inspection Plan Unit 1 Third Ten-Year Interval & Unit 2 Second Ten-Year Interval Contingency Reactor Vessel Head Penetration Weld Repair and Flaw Evaluation Relief Requests26 September 2002In-Service-Inspection Plan Unit 1 Third Ten-Year Interval & Unit 2 Second Ten-Year Interval Contingency Reactor Vessel Head Penetration Weld Repair and Flaw Evaluation Relief RequestsBoric Acid
Non-Destructive Examination
Hydrostatic
Liquid penetrant
Through-Wall Leak
Dissimilar Metal Weld