L-2002-163, Semi-Annual Fitness-For-Duty Program Performance Data

From kanterella
Jump to navigation Jump to search
Semi-Annual Fitness-For-Duty Program Performance Data
ML022260155
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/12/2002
From: Jernigan D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2002-163
Download: ML022260155 (3)


Text

Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 I=:PL L August 12, 2002 L-2002-163 10 CFR 26.71 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Semi-Annual Fitness-For-Duty Program Performance Data In accordance with 10 CFR 26.71 (d), this letter forwards the attached fitness-for-duty program performance data for the six-month period ending June 30, 2002.

Please ntact us should you have any questions regarding this submittal.

V ly yours, Donald E. igan Vice President St. Lucie Plant DEJ/tit Attachment an FPL Group company

L-2002-163 Page 1 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 Florida Power & Liaht (FPL) June 30. 2002 Company Six Month Ending St. Lucie Nuclear Plant Location Julie Mueller (772) 467-7008 Contact Name Phone (include Area Code)

Cutoffs: Screen/Confirmation (ng/ml) Appendix A to 10 CFR 26 Marijuana 50 / 10 Amphetamines 1000 / 500 /

Cocaine 300 / 150 Phencyclidine 25/ 25 /

Opiates 300 / 300 Alcohol (%BAC) .04% /

TESTING UCENSEE LONG-TERM SHORT-TERM RESULTS EMPLOYEES CONTRACTOR PERSONNEL CONTRACTOR PERSONNEL Average Number with Unescorted Access TOTAL: 1166 909 164 93 CAEOIS# # # # # #

CATEGORIES TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE Pre-Access 34 0 0 0 222 3 TOTAL: 256 Post For Cause Accident TOTAL: 4 Observed 1 0 0 0 0 0 Behavior Random 234 0 40 0 23 1 TOTAL: 297 Follow-up 9 0 0 0 0 0 TOTAL: 9 Other: 0 0 0 0 0 0 0 TOTAL 566 278 0 42 0 246 4

L-2002-163 Page 2 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 6 Month Report P"Il,4 Il*"lWol in inni 9!"! 2 . ECUMA Refusal Cocaine Opiates Amphetamines Phencyclidine Alcohol tofTst CATEGORY: Marijuana to Test Licensee Employees 0 0 0 0 0 0 0 Long-Term Contractors o 0 0 0 0 0 0 Short-Term Contractors 2 1 0 1 0 0 0 Total PSL Total 21 0* 4**

  • Individual also tested positive for Marijuana exceeding the DHHS/NRC cutoff level (100ng/ml).
    • Two (2) of the positive drug tests for marijuana listed above exceeded the Florida Power & Light cutoff level (50ng/ml) but did not exceed the DHHS/NRC cutoff level (100ng/ml). All of the remaining positive drug test results listed above exceeded the DHHS/NRC cutoff levels.

FFD Performance Data Review/Comments:

1. Were any programmatic weaknesses identified: None.
2. What management actions have been taken or initiated? If any, explain: N/A
3. Notate any specimens that were adulterated and substance detected: None.