L-2002-163, Semi-Annual Fitness-For-Duty Program Performance Data

From kanterella
Jump to navigation Jump to search
Semi-Annual Fitness-For-Duty Program Performance Data
ML022260155
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/12/2002
From: Jernigan D
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2002-163
Download: ML022260155 (3)


Text

Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 L

August 12, 2002 I=:PL L-2002-163 10 CFR 26.71 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Semi-Annual Fitness-For-Duty Program Performance Data In accordance with 10 CFR 26.71 (d), this letter forwards the attached fitness-for-duty program performance data for the six-month period ending June 30, 2002.

Please ntact us should you have any questions regarding this submittal.

V ly yours, Donald E.

igan Vice President St. Lucie Plant DEJ/tit Attachment an FPL Group company

L-2002-163 Page 1 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 Florida Power & Liaht (FPL)

Company St. Lucie Nuclear Plant Location Julie Mueller Contact Name Cutoffs: Screen/Confirmation (ng/ml)

Marijuana 50

/

10 Amphetamines Cocaine 300

/

150 Phencyclidine Opiates 300

/

300 Alcohol (%BAC)

June 30. 2002 Six Month Ending (772) 467-7008 Phone (include Area Code)

Appendix A to 10 CFR 26 1000 /

500

/

25/

25

/

.04%

/

TESTING UCENSEE LONG-TERM SHORT-TERM RESULTS EMPLOYEES CONTRACTOR PERSONNEL CONTRACTOR PERSONNEL Average Number with Unescorted Access TOTAL:

1166 909 164 93 CAEOIS#

CATEGORIES TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE Pre-Access 34 0

0 0

222 3

TOTAL:

256 Post For Cause Accident TOTAL:

4 Observed 1

0 0

0 0

0 Behavior Random 234 0

40 0

23 1

TOTAL:

297 Follow-up 9

0 0

0 0

0 TOTAL:

9 Other:

0 0

0 0

0 0

0 TOTAL 566 278 0

42 0

246 4

L-2002-163 Page 2 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 6 Month Report in inni Refusal CATEGORY:

Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol tofTst to Test Licensee Employees 0

0 0

0 0

0 0

Long-Term Contractors o

0 0

0 0

0 0

Short-Term Contractors 2

1 0

1 0

0 0

PSL Total 21 0*

4**

Total Individual also tested positive for Marijuana exceeding the DHHS/NRC cutoff level (1 00ng/ml).

Two (2) of the positive drug tests for marijuana listed above exceeded the Florida Power & Light cutoff level (50ng/ml) but did not exceed the DHHS/NRC cutoff level (100ng/ml). All of the remaining positive drug test results listed above exceeded the DHHS/NRC cutoff levels.

FFD Performance Data Review/Comments:

1. Were any programmatic weaknesses identified:
2.

What management actions have been taken or initiated? If any, explain:

None.

N/A

3. Notate any specimens that were adulterated and substance detected:

"Il Il* "lWol 9!"!

2 ECUMA None.

P

,4