L-2002-163, Semi-Annual Fitness-For-Duty Program Performance Data
| ML022260155 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/12/2002 |
| From: | Jernigan D Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2002-163 | |
| Download: ML022260155 (3) | |
Text
Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 L
August 12, 2002 I=:PL L-2002-163 10 CFR 26.71 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Semi-Annual Fitness-For-Duty Program Performance Data In accordance with 10 CFR 26.71 (d), this letter forwards the attached fitness-for-duty program performance data for the six-month period ending June 30, 2002.
Please ntact us should you have any questions regarding this submittal.
V ly yours, Donald E.
igan Vice President St. Lucie Plant DEJ/tit Attachment an FPL Group company
L-2002-163 Page 1 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 Florida Power & Liaht (FPL)
Company St. Lucie Nuclear Plant Location Julie Mueller Contact Name Cutoffs: Screen/Confirmation (ng/ml)
Marijuana 50
/
10 Amphetamines Cocaine 300
/
150 Phencyclidine Opiates 300
/
300 Alcohol (%BAC)
June 30. 2002 Six Month Ending (772) 467-7008 Phone (include Area Code)
Appendix A to 10 CFR 26 1000 /
500
/
25/
25
/
.04%
/
TESTING UCENSEE LONG-TERM SHORT-TERM RESULTS EMPLOYEES CONTRACTOR PERSONNEL CONTRACTOR PERSONNEL Average Number with Unescorted Access TOTAL:
1166 909 164 93 CAEOIS#
CATEGORIES TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE Pre-Access 34 0
0 0
222 3
TOTAL:
256 Post For Cause Accident TOTAL:
4 Observed 1
0 0
0 0
0 Behavior Random 234 0
40 0
23 1
TOTAL:
297 Follow-up 9
0 0
0 0
0 TOTAL:
9 Other:
0 0
0 0
0 0
0 TOTAL 566 278 0
42 0
246 4
L-2002-163 Page 2 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 6 Month Report in inni Refusal CATEGORY:
Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol tofTst to Test Licensee Employees 0
0 0
0 0
0 0
Long-Term Contractors o
0 0
0 0
0 0
Short-Term Contractors 2
1 0
1 0
0 0
PSL Total 21 0*
4**
Total Individual also tested positive for Marijuana exceeding the DHHS/NRC cutoff level (1 00ng/ml).
Two (2) of the positive drug tests for marijuana listed above exceeded the Florida Power & Light cutoff level (50ng/ml) but did not exceed the DHHS/NRC cutoff level (100ng/ml). All of the remaining positive drug test results listed above exceeded the DHHS/NRC cutoff levels.
FFD Performance Data Review/Comments:
- 1. Were any programmatic weaknesses identified:
- 2.
What management actions have been taken or initiated? If any, explain:
None.
N/A
- 3. Notate any specimens that were adulterated and substance detected:
"Il Il* "lWol 9!"!
2 ECUMA None.
P
,4