Issue date | Title | Topic | |
---|---|---|---|
ML19210D388 | 24 September 1979 | Forwards Response to IE Bulletin 79-19.One Solid Low Level Radwaste Shipment of 0.5619185 Ci Made in 1979.Liquid Radwaste Shipped in 55-gallon Drums to Todd Nuclear for Processing | |
ML19224D072 | 2 July 1979 | Forwards Preliminary Physical Security Plan.Plan Withheld (Ref 10CFR2.790) | |
ML19225A138 | 10 July 1979 | Forwards Corrected Page 33 to Tech Specs for License R-8 | |
ML19242A154 | 23 July 1979 | Forwards Fifteenth Progress Rept 1978, Submitted to DOE | |
ML19246A989 | 2 July 1979 | Forwards Application for Renewal of License R-83,SNM Requirements,Sar,Tech Specs,Eia,Emergency Plan & Operator Requalification Program | |
ML19249B587 | 23 August 1979 | Requests Inclusion on Mailing List Re License R-83 | |
ML19254D945 | 7 September 1979 | Submits Info Re Impact of Pending Safeguards Upgrade Rule, on Continued Operation.Also Forwards Annual Operating Rept 1978 | |
ML19256B434 | 2 July 1979 | Submits Application for Renewal of License R-83 for Continued Operation of Triga pool-type Reactor.W/Supporting Documents & Financial Rept for Year Ending 780831 | |
ML19261D456 | 13 June 1979 | Submits Addl Info Re Tech Spec Change Request to Allow Radiography of Explosive Matl,In Response to NRC 790607 Telcon | |
ML19291B115 | 21 August 1979 | Responds to 790821 Telcon Request for Change to Tech Specs for License Amend.In Interest of Industrial Safety & Protection of Equipment,Implementation of Smoke Detector Sys Presently Under Study | |
ML19296A193 | 6 February 1979 | Forwards Safety Analyses for Amend 7 to License R-83. Proposes to Modify Tech Spec to Permit Radiography of Up to 5 Lb of Explosive Matl in a Radiography Facility Associated W/Nuclear Science Center Reactor | |
ML19318A456 | 23 May 1980 | Responds to NRC 800515 Ltr Re Violations Noted in IE Insp Rept 50-128/80-01.Corrective Actions:Redundant SOP Book Will Not Be Returned to Control Room | |
ML19323G464 | 14 April 1980 | Responds to Item of Noncompliance Noted in IE Insp 50-128/80-01.Corrective Actions:Sop Book Surveillance Record Has Been Placed at Front of Vol 1 of Each Set of SOPs for Documentation of SOP Book Surveillance.Memo 59 Encl | |
ML19325C839 | 13 October 1989 | Forwards 801020 Ltr Documenting Change of Licensee for Nuclear Science Ctr Reactor,Agreement Ltr Re Occupational Safety Advice & Revised Tech Spec Page 46 | |
ML19327B289 | 24 October 1989 | Requests That Licensee on License R-83 Be Officially Designated as Texas Engineering Experiment Station,Texas A&M Univ Sys,Per 890904 License Amend Request | |
ML19330A802 | 25 July 1980 | Forwards ORO-4207-13, Sixteenth Progress Rept of Tx A&M Univ Nuclear Science Ctr, 1979 | |
ML19331D607 | 28 August 1980 | Forwards Revised App III to Sixteenth Progress Rept of Tx A&M Univ Nuclear Science Ctr, 1979 Consisting of Summaries of Health Physics Support,Effluent Releases,Environ Survey Program,Radiation & Contamination Control Program | |
ML19339A660 | 20 October 1980 | Application to Revise 790702 Request for Renewal of License R-83.Revisions to Application,Tech Specs & Safety Evaluation Are Due to Adminstrative Changes | |
ML19350C199 | 5 February 1981 | Discusses Calibr of Regulating Control Rod for Core VI & Safety Amplifier Response to Noise Transients.Calibr Performed on 810119 Due to Extended Period of Maint.On 810130,two Safety Control Rods Scrammed | |
ML20012A067 | 28 February 1990 | Advises That Federal Govt Funding Not Available for Conversion of Nuclear Science Ctr Triga Reactor from High Enriched U to Low Enriched U Fuel During FY90.Reactor Does Not Have Further Plans for Conversion in 1990 | |
ML20012C549 | 9 March 1990 | Responds to Violation Noted in Insp Rept 50-128/90-01 on 900110-12.Corrective Actions:Emergency Preparedness & Physical Security Designated as Next Scheduled Operator Requalification Program Topic for Lecture | |
ML20023B649 | 29 April 1983 | Forwards Completion & Results of Phase I of Nscr Post-Damage Pulse Test Program for Full Flip Triga Core. | |
ML20023B905 | 12 April 1983 | Responds to NRC 830316 Ltr Re Violations Noted in IE Insp Rept 50-128/82-03.Corrective Actions:Training Sessions Conducted for Reactor Operations Personnel to Demonstrate Proper Preparation of Ice Bath | Shutdown Margin |
ML20023D974 | 30 May 1983 | Forwards Revised Page 29 of Tech Specs Correcting Error in Item 3.8 Re Primary Coolant Conditions | |
ML20024D977 | 21 June 1983 | Forwards Public Version of Summary Evaluation of Evacuation Time Estimates.Adverse Weather Conditions (Rain) Should Be Considered for Summer Scenario | |
ML20028A189 | 28 October 1982 | Forwards Public Version of Emergency Preparedness Plan | |
ML20028A645 | 1 November 1982 | Forwards Public Version of Corrected Page 13 & App B,Item 1,to Recently Submitted Emergency Plan | |
ML20041A511 | 12 February 1982 | Requests Extension Until 820305 to Respond to 42 Questions & to Submit Fuel Damage Rept.Extension Will Provide Sufficient Time to Complete Neutron Radiography Studies of Fuel Elements Adjacent to Damaged Fuel Positions | |
ML20041D908 | 5 March 1982 | Forwards Response to Questions Generated by Lasl Site Visit & Fuel Incident Rept Interpretation of Damage to Flip Fuel During Operation of Nuclear Science Ctr Reactor at Tx A&M Univ. | Shutdown Margin |
ML20042C672 | 8 February 1982 | Requests Opportunity to Meet W/Commission Chairman to Present Concern Re Proposed Regulations That Will Severely Impede Programs of Many Reactor Facilities | |
ML20043B152 | 11 May 1990 | Responds to Violations Noted in Insp Rept 50-128/90-01 on 900221-23.Corrective Actions:Program for Review of Users License Established & Responsibility for Radiation Protection Program Transferred to Licensee | |
ML20043E258 | 4 June 1990 | Forwards Proposed Change to Reactor Operator & Senior Reactor Operator Requalification Program.Proposed Change Makes Written Exams Administered to Operators on Physical Security Plan Part of Operator Requalification Program | |
ML20050E202 | 4 February 1982 | Forwards Rept of Contamination Involving Visitors & Personnel on Upper Research Level of Containment Bldg Adjacent to Pool | |
ML20058C331 | 21 July 1982 | Forwards Eighteenth Progress Rept of Tx A&M Univ Nuclear Science Ctr,1981 | |
ML20058L508 | 24 July 1990 | Forwards Kr Hall Re Availability of Funds for Any Future Decommissioning of Nuclear Science Ctr Reactor, Per 10CFR50.33(k),for Filing | |
ML20058L516 | 9 July 1990 | Advises That Request Will Be Made to State of Tx Legislature for Appropriation of Funds for Decommissioning & Decontamination of Nuclear Science Ctr Reactor After Future Decision for Final Shut Down Made | |
ML20064M231 | 4 February 1983 | Forwards Nuclear Science Ctr Reactor Post-Damage Pulse Test for Full Flip Triga Core, for Review.Plan Approved W/Minor Changes by Reactor Safety Board on 830128 | |
ML20071E400 | 8 March 1983 | Informs That DE Feltz Has Accepted Position of Director of Nuclear Science Ctr | |
ML20071E967 | 26 January 1983 | Forwards post-damage Test Program for Flip Triga Core. Program Submitted for Reactor Safety Board Review on 830128 | |
ML20072N985 | 4 February 1983 | Forwards Nuclear Science Ctr Reactor Post-Damage Pulse Test Program for Full Flip Triga Core | |
ML20076E774 | 9 May 1983 | Requests Copy of Region IV Organization Chart | |
ML20076E943 | 29 April 1983 | Forwards Completion & Results of Phase I of Nuclear Science Ctr Reactor Post-Damage Pulse Test Program for Full Flip Triga Core. Pulse Test Planned at Phase I Level to Study Fuel Characteristics | |
ML20077C721 | 22 July 1983 | Describes Procedure Change for Shipment of Irradiated Triga Fuel from Facility to Anl/West.Responsibility for Fuel & Inventory Transfer Will Occur When Fuel Is in Cask & Cask Is Ready for Closure | |
ML20077D381 | 20 July 1983 | Advises of Scheduled Transfer of Irradiated Triga Fuel to Anl West Triga Facility in Idaho Falls,Id During Wk of 830822.Description of Fuel Loading for Each Shipping Package Submitted | |
ML20078N994 | 28 October 1983 | Forwards Final Rept of RO on 831004 Re Possible Operation in Excess of Licensed Power Level | |
ML20078P006 | 28 October 1983 | Forwards Final Rept of RO on 831004 Re Possible Operation in Excess of Licensed Power Level | |
ML20080B654 | 14 July 1983 | Advises That Irradiated Reactor Fuel Will Be Transported to Anl in Two GE-T2 F Casks | |
ML20080B998 | 30 January 1984 | Advises That Requirements of Category III Physical Security Met Following Shipment & Transfer of 1,106 G U-235,in Form of Triga Flip Elements,To Idaho Falls,Id.Shipment Completed in Aug 1983 | |
ML20082S984 | 28 October 1983 | Memorializes 831027 Telcon Re 1-day Extension for Final Rept of RO on 831006.Final Rept Will Be Mailed on 831028 | |
ML20083N225 | 21 January 1983 | Forwards Experimental Pulse Test Program for Full Flip Triga Core for Review & Approval.Program Involves Measurement of Pulse Core Parameters Necessary to Establish Operational Pulsing Core.Fuel Insp Program Included in Program |