Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML020440018 | 15 January 2002 | Resubmittal of Final Report No. 41, Report of a Potential Safety Hazard from Dresser-Rand | |
ML021510295 | 15 May 2002 | 10 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems | |
ML021550249 | 10 May 2002 | Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems | |
ML022830278 | 1 October 2002 | Part 21.21 Report Involving Stability Option III: Possible Successive Confirmation Count Resets | |
ML023310569 | 22 November 2002 | Part 21 Report Re General Electric Identified the Stability Option III Period Based Detection Algorithm T-Min Specification Has a Defect | |
ML023330442 | 25 November 2002 | Spectrum Technologies, Part 21 Initial Notification - Cutler-Hammer A200 NEMA Size 1 Starters | MELLLA |
ML030550248 | 17 February 2003 | 10CFR Part 21 Notification - Carboline Company | Coatings |
ML032170035 | 21 July 2003 | Thermo Westronics Model 2100C Series Recorders | |
ML040300254 | 28 January 2004 | 10CFR Part 21 Notification Regarding Wide Range Ion Chamber (Update) | |
ML050460194 | 11 February 2005 | Part 21 Report Re Field Complaint About Masterpatch 240CR. Florida Power & Light Reported to Degussa That When Masterpatch 240 CR Was Applied, It Did Not Harden Properly | |
ML050950428 | 29 March 2005 | 10CFR21 Reportable Condition Notification: Involving Potential to Exceed Low Pressure Technical Specification Safety Limit | Anticipated operational occurrence Fuel cladding |
ML052170170 | 2 August 2005 | Event Report 41888 for Catawba Plant Regarding Potential Part 21 Issue with Struthers-Dunn Relays | Commercial Grade |
ML052640220 | 14 September 2005 | CFR 21 Notification - Identification of Defect | Commercial Grade |
ML052690084 | 20 September 2005 | Part 21 Notification Completion: Critical Power Determination for GE14 and GE12 Fuel with Zircaloy Spacers | Anticipated operational occurrence |
ML060830114 | 21 March 2006 | 10 CFR Part 21 Notification Ref: FP&L Tpn Supplied Ingersall Rand Auxiliary Feed Pump No. 0601 001 FP&L Po No. 67845 | |
ML060950401 | 3 April 2006 | Director Office of Inspection & Enforcement Reference: 10 CFR 21 Notification of 3/30/06 Rev1 | |
ML062770224 | 27 September 2006 | Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves | |
ML062850360 | 5 October 2006 | Notification of Existence of Potential Defect in Otek Panel Meters | |
ML063210279 | 10 November 2006 | Event Report No. 42880, Southern Testing Services, Potential Defect in Otek Panel Meters | |
ML070640253 | 27 February 2007 | Notification of Potential Part 21 Re Chiller Copper Sleeve Cracks Leading to Slow Refrigerant Discharge | |
ML071000229 | 6 April 2007 | Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1152 Pressure Transmitters | Hydrostatic Loctite |
ML071370309 | 7 March 2007 | Velan, Inc., Piston Check Cv Information | |
ML072830334 | 8 October 2007 | Notification of Potential Part 21 Report - Areva Minimum Critical Power Ratio | Anticipated operational occurrence |
ML073100082 | 1 November 2007 | Notification of Potential 10 CFR Part 21 of an Error in BWR MCPR Calculation | Anticipated operational occurrence |
ML073310381 | 21 November 2007 | Notification of Potential Part 21 Report Welding of Safety Related Components | |
ML073440211 | 7 December 2007 | Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters | |
ML080430446 | 11 February 2008 | Notification of Potential Part 21 Report Power Supply Unit Is Limited at Elevated Temperatures | |
ML080990634 | 4 April 2008 | Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items | |
ML081200882 | 14 April 2008 | Notification of Potential Part 21 on Safety Related Noncompliance Deviation | Coatings |
ML081830523 | 27 June 2008 | Part 21 Notification - Performance Affected on 3 CL150 Fisher V150 Valve Assemblies | |
ML082390106 | 25 August 2008 | Notification of Potential Part 21 on Failure of F and G Switches | Test box |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | |
ML083330187 | 21 November 2008 | Notification of Potential Part 21 Re Tyco Electronics, Transfer of Information - CII-012 | |
ML083540469 | 18 December 2008 | Duke Energy Carolinas, Llc., Deficiency Report on Defective Digital Optical Isolators | Unanalyzed Condition Commercial Grade |
ML090350211 | 16 January 2009 | Part 21 Report Re Identification of Defect Found in Basic Component. Initially Reported to NRC on 12/18/2008 | Commercial Grade |
ML090350217 | 27 January 2009 | Notification of Potential Part 21 Report from Fisher Controls International - Water Quality Deficiency | |
ML090400748 | 5 February 2009 | Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111 | |
ML090410485 | 6 February 2009 | Notification of Potential Part 21 Report (Draft) Re Defective ASME SA-193, Grade 6 Cap Screw Material | |
ML090761188 | 11 March 2009 | Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs | |
ML092590242 | 11 September 2009 | Notification of Potential Part 21 Problem with Seismic Soil Structure Analysis Software | Ultimate heat sink |
ML100820059 | 22 March 2010 | GE Hitachi Nuclear Energy, Part 21 60-Day Interim Report Notification: Failure of HPCI Turbine Overspeed Reset Control Valve Diaphragm | |
ML100920093 | 25 March 2010 | 10 CFR21 Notification of a Potential Weld Defect | |
ML101820160 | 1 July 2010 | Notification of Potential Part 21 Reportable Condition Re Failure of HPCI Turbine Overspeed Reset Control Valve Diaphragm | |
ML101890739 | 1 July 2010 | Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm | |
ML102520219 | 3 September 2010 | Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102530446 | 8 September 2010 | Rotork Inc. Part 21 Notification Sintered Gear | Commercial Grade Power-Operated Valves |
ML102700614 | 27 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102730063 | 27 September 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102930505 | 20 October 2010 | GE Hitachi Nuclear Energy - Notification of Potential Part 21 60-Day Interim Report: Crack Indications in Marathon Control Rod Blades | |
ML102950281 | 20 October 2010 | Part 21 Notification - Crack Indications in Marathon Control Rod Blades |