MONTHYEARML23241A0022023-08-25025 August 2023 Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils ML23221A3702023-08-0303 August 2023 Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0 ML21271A2342021-09-23023 September 2021 EN 55282 (Updated) - Framatome Part 21 Reportable Defect - Vacuum Breakers ML20108F5302020-03-20020 March 2020 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0129, Rev. 0, Test Stand Deficiency - EMD Fuel Injectors P/N H40084720 ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19091A0502019-03-21021 March 2019 Engine Systems, Inc. 10 CFR 21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0124, Rev. 0, Excitation Transformers for Vickers Voltage Regulator System ML19087A2522019-03-21021 March 2019 Engine Systems, Inc. - 10 CFR 21 Reportable Notification on Excitation Transformers for Vickers Voltage Regulator System ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19053A5002019-02-0101 February 2019 Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block ML19042A0802019-01-25025 January 2019 Part 21 Report No. 10CFR21-0124-INT; Rev. 0 - Saturable Reactor (Magnetic Amplifier) for Vickers Voltage Regulator System, P/N 8408218-ESI ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18354A7422018-12-0404 December 2018 Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18353A4282018-11-30030 November 2018 Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps ML17325B0222017-11-17017 November 2017 Fisher Controls International LLC Information Notice (FIN) 2017-05 ML17324A9792017-11-17017 November 2017 Part 21 Report Re Fisher Type 461 Valve Plug Machining ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17104A2882017-04-13013 April 2017 Emerson Process Management, LLC - Fisher Information Notice, (FIN) 2017-02 ML17114A0702017-04-13013 April 2017 Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML16243A4742016-08-26026 August 2016 Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays ML16232A6042016-08-15015 August 2016 Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML16238A1862016-08-15015 August 2016 Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML16196A0642016-07-10010 July 2016 Part 21 Report - Materials Not Properly Dedicated ML16188A3762016-06-21021 June 2016 Part 21 Interim Evaluation of Deviation - Contractor Failure ML16154A2072016-05-26026 May 2016 Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC ML16194A1992016-05-25025 May 2016 Azz/Nli - Update - Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML16154A2052016-05-20020 May 2016 Part 21 Interim Evaluation of a Deviation - Contactor Failure ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16111A4202016-04-0808 April 2016 Part 21 Report No. P21-04302015, Rev. 1 Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays, Per Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project ML16061A0112016-02-27027 February 2016 Nuclear Logistics, Inc. - Part 21 Contactor Making Noise, Per Turkey Point ML16061A0102016-02-19019 February 2016 Nuclear Logistics, Inc. - Part 21 - Contractor Making Noise ML15345A3902015-12-0808 December 2015 Part 21 Report - 2 Motors Were Not Properly Prepared Before Small Steel Shot Blasting ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML15159A5682015-04-30030 April 2015 Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML15089A4362015-03-21021 March 2015 Part-21 Report - Valve Seat Leakage Defect ML15089A4372015-03-20020 March 2015 Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14217A3472014-07-31031 July 2014 Part 21 Interim Report - Temperature Switch Set Points Out of Calibration ML14169A0302014-06-15015 June 2014 Update to Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 2023-08-03
[Table view] |
Text
degussa.
creatingessentials Degussa Construction Chemicals, Inc.
February 11, 2005 889 Valley Park Drive Shakopee, MN 55379 Document Control Desk www.degussa.com U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Re: Field Complaint about Masterpatch 240CR Dr. Konrad Wemthaler VP. R&D/Technology To Whom It May Concern: T 952-496-6369 F 952-233-8402 Pursuant to 10 CFR part 21, this letter is intended to notify the NRC about a problem konrad.wemthaler~degussa-com with a product manufactured by Degussa Construction Chemicals and sold to Florida Power and Light located at 6501 South Ocean Drive, Jensen Beach, FL 34957-2041, an entity licensed by the NRC as a commercial nuclear power plant.
Masterpatch 240 CR repair concrete is a proprietary blend of Portland cement, graded aggregate and additives. This flowable repair concrete is suited for full depth repairs on horizontal and formed vertical or overhead surfaces.
On December 15, 2004, Florida Power and Light reported to Degussa that when Masterpatch 240 CR was applied, it did not harden properly and failed to achieve the expected strengths within the expected time frame (1 and 3 days). Reportedly, the material was chipped out and replaced by a new batch of Masterpatch 240 CR supplied by us on December 16, 2004.
The material in question, prior to being shipped, had been tested twice by Degussa Construction Chemicals and had performed according to specifications both times.
However, when the material was used in the field, it reportedly failed. Degussa was not advised by our customer how the Masterpatch 240 CR was being used. We have investigated the reported failure but have been unable to determine the cause of the problem.
To our knowledge, Florida Power and Light was the only customer within the last year licensed by the NRC purchasing this material. Their reporting of the problem to Degussa indicates their awareness of the issue. Therefore, unless we discover relevant new information, this letter will be our final notification.
If you have any questions or need additional information, please contact Alice McFarland, Quality Assurance Manager, at 216-839-7343. If needed, I can be reached at 952-496-6369.
Retpectfully, K rad WernthaV Vice President, R&D and Technology Degussa Construction Chemicals