U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 rotorw8 Controls From:

To:

Date:

Subject:

Patrick A. Shaw, P.E NRC Document Control Desk September 81h 2010 Rotork Inc. Part 21 Notification Sintered Gear

Dear Sir/Madame,

Rotork designs and manufactures Valve Actuators; a product that attaches to a valve to permit the remote operation of the valve. Please see attached publication PUB004-001-00.

I am writing to notify the NRC that Duke Energy has received from Rotork a basic assembly containing a defective sintered gear Pt No 22641. No other NCR licensee has received this part. The defective component is part of an optional subassembly called an "Add On Pack" (AOP). Duke Energy purchase AOPs with all Rotork NA1 E type actuators.

The defective gear could cause the AOP to seize and fail to operate. The actuator will continue to perform its safety related function with a seized AOP. The AOP provides position information, through auxiliary switches, during the actuator's operation. See attached wiring diagrams.

Duke Energy was first notified of the condition on July 16th 2010 and on August 6th 2010 received a formal letter in which the extent of condition was communicated. Rotork proceeded to investigate the problem, run life tests and understand the failure mode. On September 3 2010 Duke Energy informed Rotork in writing that the AOP must support the design-basis function of the associated valve/actuator assembly. On the same date Rotork shared with Duke Energy, Appendix 1 & 2 of Rotork SP IR05.03 (See attached),

which confirmed that the gear design was sound and that the gear failure was attributable to the supplier's manufacturing process.

The gear supplier's production process has been corrected and Rotork quality assurance is verifying that subsequent batches are conformant to specification. Duke Energy is being provided with replacement AOPs and conformant gears on an as requested basis.

In addition to correcting the supplier's process, the resolution includes the conversion of sintered gear 22641 to a basic component, controlled under Rotork's 10CFR50 App. B quality program.

Rotork Controls,, Inc.

675 Mile Crossing Blvd.

Rochester, New York 14624 tel: +1 585 247 2304 fax: +1 585 247 2308 www.rotork.com info@rotork.com Please contact me with any questions or concerns.

Yours Sincerely I

Patrick A. Shaw, P.E obertArnold, Quality Assurance Manager President Tel (585) 770-1019 P.E tEl9

Rotork Controls, Inc.

Page 1 of 6 Document Reference No:

SP R105.03 Oualitv Control Procedure Issue No.: 03 Issue Date:

05/06/10 Originated By:

Karen Black Approved By:

Patrick Shaw APPENDIX 1 EVALUATION FOR RE-CALL Affected Order No. - See attached A.

Evaluation for Re-Call:

1.

Is the non-conformance a design or hardware defect in a basic component and does the equipment have any inherent defect of the following nature?

a)

Hardware defect in manufacturing or repair? (X) Yes ( ) No b)

Design defect (Equipment was improperly designed)?( ) Yes (X) No c)

Operating and maintenance instructions provided improper guidance? ( ) Yes (X) No d)

Does Rotork have the ability to perform the evaluation ( ) Yes (X) No Explain:

It has been discovered during the investigation into the seizure of NAIE sintered gear 2264 Ion the AOP shaft that:

The component was not oil impregnated as required by the Rotork design specification.

The manufacturing process used introduced variability into the material properties, in particular the hardness.

The manufacturing process produced undersized hole in the gear meaning that a secondary machining operation was required to size it.

2.

If Yes in #1 above, could the defect cause a major reduction in the degree of protection provided to the public health and safety?

( ) Yes (X) No Explain: The seizure of the gears on the AOP shaft would result in a loss of drive to the AOP. This in turn would mean that the auxiliary switches would not function. The torque and limit switches would not be affected therefore the primary safety function would not be compromised.

Note: The actual impact of the potential failure must be assessed by individual users/utilities as Rotork is not aware of the precise application requirements for each location.

3.

If the answer to item 2 is Yes, initiate Tracking Sheet. Tracking Sheet Number __

B.

Is an Evaluation Analysis Sheet required?

( ) Yes (X) No Note:

A non-conformance which is not returned to the original condition in the disposition requires an evaluation to be performed. "Accept-as-is" and "Repair" are examples of such dispositions.

Explain: The investigation has concluded that if gears are made to specification they will perform as required. So the potentially defective gears in the actuators identified will be replaced by correctly manufactured components of the same spec* ication. The part number will b/eeame i.e.

Engineerin Manager Quality Manager Date

Rotork Controls, Inc.

Page 2 of 6 Document Reference No:

SP RI05.03 Ouality Control Procedure Issue No.: 03 Issue Date:

05/06/10 Originated By:

Karen Black Approved By:

Patrick Shaw APPENDIX 2 SUBSTANTIAL SAFETY HAZARD

1.

Name and Address of Reporting Individual:

Patrick A. Shaw P.E Quality Assurance Manager Rotork Inc 675 Mile Crossing Blvd.

Rochester, NY 14624

2.

Identification of Basic Component:

Sintered gear part no 22641

3.

Identification of Firm Supplying Component:

Gt. B Components, Innovation House, Fleet Lane, St Helens Merseyside WA9 2RJ UK

4.

Nature of Defect, Substantial Safety Hazard Created, and Evaluation:

It has been discovered during the investigation that:

  • The gear was not oil impregnated as required by the Rotork design specification.

" The manufacturing process used introduced variability into the material properties, in particular the hardness.

" The manufacturing process produced undersized hole in the gear meaning that a secondary machining operation was required to size it. The surface finish in the bore was found to be poor.

The seizure of the gears to the shafts actually occurred after a low number of cycles in the two reported instances.

This is at odds with the operating experience as the assembly has been supplied on Rotork 'A' Range and Awt product ranges for at least 3 years and there has been no other reported instances. The standard life for the standard product ranges is 10000 to 20000 cycles.

To establish the cause of the seizure evaluation, analysis and testing has been carried out. See Rotork Report ER423.

The main points from the investigation are:

Sintered stainless gears have been used in AOP assemblies for over 15 years. Operating experience shows that they are reliable and have performed well.

Rotork moved supply to Gt. B components in 2007 because the current supplier at the time did not want to continue because the volumes had reduced Although the gears went through the normal approval process for a new it has been discovered that apart from the very early supplies the gears have not been oil impregnated by the supplier as required by the design specification.

The intention of oil impregnation was to give ongoing lubrication throughout the components life.

Life testing of the as received gears i.e. no oil impregnation showed that a variable life was achieved with the lowes; number of cycles achieved being 1610.

Rotork Controls, Inc.

Page 3 of 6 Document Reference No:

SP R105.03 Oualtit Control Procedure Issue No.: 03 Issue Date:

05/06/10 Originated By:

Karen Black Approved By:

Patrick Shaw Examination of the failed assembly showed evidence of a buildup of metallic powder that eventually led to seizure. The powder was coming from the gears.

Analysis of the gears by National Physical Laboratory concluded that the material hardness in the bore was variable. This would not normally be an issue because the process would result in a relatively hard and consistent surface over the whole component including the hole. The machining operation carried out to size the bore removed that hard surface and exposed the variable structure of the material below.

It was thought that the rapid seizure of the gears may have been due to slipping the AOP clutch during final production testing. Unlike the switchmechanism it is not possible to disengage the AOP clutch during the test process so the gears can be driving against the clutch loads for relatively long periods. Testing showed that this would indeed lead to rapid failure.

A series of tests was carried out on:

o Thermally aged gears, machined bores, no clutch slip, no oil impregnation.

o Thermally aged gears, machined bores, no clutch slip, with oil impregnation.

o As received gears, machined bores, no clutch slip, no oil impregnation.

o As received gears, machined bores, no clutch slip, with oil impregnation.

o Thermally aged gears, machined bores, clutch slip, no oil impregnation.

o As received gears, machined bores, clutch slip, no oil impregnation.

o Gears to design specification, without machined bores, no clutch slip, with oil impregnation.

o Gears to design specification, without machined bores, no clutch slip, no oil impregnation.

o Gears to design specification, without machined bores, clutch slip, with oil impregnation.

o Gears to design specification, without machined bores, clutch slip, no oil impregnation.

o Thermally aged gears to design specification, without machined bores, clutch slip, with oil impregnation.

Following the investigation and testing the following rationale/conclusions were drawn:

o The primary failure was caused by the machining of the bore.

o This exacerbated the impact of the variable material properties in particular the hardness. The machining exposed the softer material to the bearing surface.

o The lowest number of cycles achieved before failure during testing on 'as received gears, machined bores, no clutch slip, no oil impregnation identical to what is in the field was 1610 cycles.

o The rapid seizure of the two failed examples was almost certainly due to the extra load imposed on the gearing by the AOP clutch slip during production rig testing.

o Once the gears get through the initial number of cycles the probability of failure is very low.

This is backed up by field experience where there have been no reported failures. Also there is an example (Catawba) where actuators were operated 3 times a day, every day without problems.

And additionally the testing performed at Rotork.

o When the gears are made to specification without the need to machine the bore they will complete the standard actuator life of 10000 cycles of 25 turns open to close. Additionally following the life test the same gear assembly was subjected to AOP clutch slip of 9 turns of the centre column as well as 9 turns of normal AOP operation.

Recommended actions o

All stock of gears and AOP assemblies containing the defect gears must be quarantined. This applies to customers stock as well as all Rotork manufacturing sites and service centres.

o The actuators identified on the attached list are susceptible to AOP gear seizure even though the probability of this happening is very low. The customers at the locations where these actuators are installed will be notified.

o As Rotork does not have the exact information regarding the AOP role and functionality within each plant safety systems, each plant must review their own application to assess the criticality at their individual location and where necessary liaise with Rotork QA to convey what is needed and the urgency in terms of product and timescales.

o Based on requirements from the plant evaluation Rotork will make available gear sets and/or AOP assemblies. The gears will be made to specification and will not have machined bores.

Rotork Controls, Inc.

Ouality Control Procedure Document Reference No:

Issue No.: 03 Originated By:

Ka AMoroved By:

Pai Page 4 of 6 SP R105.03 Issue Date:

05/06/10 ren Black trick Shaw o

It is recommended that installed product is inspected to determine if metallic dust is being released from the gear cluster (see photos below). If there is evidence of this, gears should be replaced.

Rotork Controls, Inc.

Ouality Control Procedure Document Reference No:

Issue No.: 03 Originated By:

K Approved By:

Pa Page 5 of 6 SP R105.03 Issue Date:

05/06/10 ren Black trick Shaw Page of APPENDIX 3 SUBSTANTIAL SAFETY HAZARD

5.

Date Information of Defect Was Obtained:

06/25/2010

6.

Number and Location of Defect:

Extent of condition applies to all NAlE actuators fitted with AOPs furnished to Duke Energy from 12'h July 2007 to 28th July 2010. Affected items listed in letter to Duke Energy, dated 08/06/2010, title of "Defective Sintered Gear 22641 Extent of Condition Notification". No other NRC licensee has been furnished with this product.

7.

Corrective Action:

Inform Licensee (Duke Energy) formally & specify extent of condition. Run life tests and extend investigation to obtain full understanding of failure mode. Share appendix 1 & 2 with Duke Energy & determine from Duke Energy whether the AOP subassembly is used un a safety related application..

At the 09/03/2010 telecoms meeting: Agreed with Duke Energy that in addition to the measures that Rotork had taken to resolve the supplier quality problems the corrective action must include the conversion 22641 to a basic component. An N prefixed version of the part number has been issued to designate it as a "basic component" and to brina the item under Rotork's 10CFR50 Amp. B p~rogram.

On 09/03/2010 Duke Energy informed Rotork that the AOP s are used in safety related applications.

8.

Advice to Purchasers:

On August 6 th 2010, Duke Energy received a formal letter which stated the extent of condition i.e. all affected actuator serial numbers and spare parts orders during the extent of condition dates. On August 13th a second letter was also issued to address requested clarifications.

Supply of new basic sintered gears has commenced.

No other NRC licensees is affected.

Rotork Controls, Inc.

Quality Control Procedure Document Reference No:

Issue No.: 03 Originated By:

Ka Approved By:

Pal Page 6 of 6 SP R105.03 Issue Date:

05/06/10 ren Black trick Shaw Page of APPENDIX 4 SUBSTANTIAL SAFETY HAZARD INFORMATION TRACKING SHEET

1.

GENERAL INFORMATION Number Date Reviser Topic Sintered Gear 22641 How was topic first identified?

Duke Energy returned an actuator with a seized AOP.

List Correspondence documents, telecoms applicable to the determination of the substantial safety hazard Email 07/16/2010, Letter 08/06/2010, Telecoms meeting 08/23/2010, Telecoms meeting 09/03/2010. Letter 09/03/2010

2.

DISPOSITION Determined to be substantial safety hazard:

(X) Yes

( ) No Discussion/Justification:

Duke Letter of September 3 rd 2010 stating that AOP function is safety related Signature: Engineering Manager ( 'L

  • o Date

/

3.

Report Signed By:

Time Date

4.

SUBSTANTIAL SAFETY HAZARD 2 Day Notification to NRC Notified by Rotork Controls, Inc.

(Name) Patrick A. Shaw Time:

Applicable Correspondence:

5 Day Notification to Utilities if applicable Notified by Rotork Controls, Inc.

Time:

Applicable Correspondence:

5.

FOLLOW-UP/FINAL REPORT (if required within 30 Days)

Due Date:

N/A Customer:

N/A report completed Applicable Correspondence:

N/A

6.

MISCELLANEOUS INFORMATION:

(Name) Patrick A. Shaw Date: N/A

7.

PROGRAM TRACKING DOCUMENT(S)

8.

CLOSE-OUT:

Signature:

Date:

'7

//

Engineering Manager or Quality Manager

rotorw Controls Nuclear Electric Actuators Established Leaders in Actuation Technology

rotorw Contents Controls SwIthn Nge SO(tioll Poqiý 1 Imrodt"W"I o

q) ol I I I I I i t o I I )f I I lo llljfýl( I lit ('-d 7 V,) I V(, 111 (A e f t o 1)

I own" M" mm q JOV Wkwo q-"ww-.

VI A WHOM I

qwdOwd wh"n I knit" A ("Imulpt"Mi 1 A(MOO1 4 f"I no" n Amy who H duwý 0

rtorl,"

Control

rotorw Controls Rotork is a global leader in valve actuation technology. We provide a comprehensive range of valve actuators, controls and associated equipment, as well as a variety of valve actuator services including commissioning, preventive maintenance and retrofit solutions.

We strive always for technical excellence, innovation and the highest quality standards in everything we do. As a result, our people and products remain at the forefront of actuation technology.

Uncompromising reliability is a feature of our entire product range, which includes pneumatic, hydraulic and electro-hydraulic actuators, as well as gear boxes and valve accessories. We manufacture to the highest standards at plants located in Europe and North America.

Rotork is committed to providing first class support to each client throughout the whole life of their plant, from initial site surveys to installation, maintenance, audits and repair.

From our network of national and international offices, our engineers work around the clock to maintain our position of trust.

Rotork. Established leaders in valve actuation technology.

rotorW rotor*

Controls Fluid Systems rotonr rotonW Gears Site Services Established Leaders in Actuation Technology

(')

1 Introduction Electric motor and manually operated valves feature prominently in the centralized control systems of nuclear power generating stations and make a major contribution to the economy, efficiency, reliability and safety of the station in which they operate. The emphasis on safety has raised the level of technology required for a wide range of equipment associated with these systems.

Rotork has been involved In the supply of electric valve actuators for installation in nuclear power plants since the late 1960s. Rotork has been a participant member of the sub-committees of the US Standards Committee responsible for drafting various standard IEEE 382 since the 1970s.

Generally the categories of safety related duty valve applications are as designated as Class 1E in standard IEEE 323 and defines as equipment and systems that are essential to emergency reactor shutdown, containment isolation, reactor core cooling and containment and reactor heat removal, or otherwise essential in preventing significant release of radioactive material to the environment:

a Inside containment -active b

Inside containment - passive c

Outside containment - active d

Outside containment - passive Where 'active' refers to valves which have to operate during and after reactor emergency and 'passive' refers to valves which do not have to operate but must maintain their structural integrity during and immediately after an emergency. Conditions associated with the outside containment valve are far less severe than for the inside containment active units, Rotork has designed the following specification for the NA ranges of nuclear actuators intended to suit these applications as follows:

Specification NAIE Type - For inside containment active or passive duty Specification NASE Type - For outside containment active duty Different reactor designs give rise to different environmental conditions and the final choice of actuator specification must be based on the requirements of the particular application.

1.1 What Rotork Type N means The prefix designation N is only applied by Rotork to an actuator or gearbox design which has been qualified for safety related duties in nuclear power plants, and is manufactured under strict quality control conditions which ensure that:

The design standard qualified generically by type test Is maintained during manufacture, and:

The specific requirements of the application are met.

1.2 Design qualification basis The basis of qualification of Rotork type NA actuators is the IEEE 382 - 1996 - 'IEEE Standard for the Qualification of Actuators for Power-Operated Valves Assemblies with Safety-Related Functions for Nuclear Power Plants" which specifies procedures and test methods for the environmental qualification of valve actuators.

The levels of qualification for the actuators are given In Section 3.

1.3 Quality assurance All Rotork type NA actuators are manufactured to a quality assurance programme which meets the requirements of the relevant sections of the following Standards as detailed in Rotork quality system manual:

10 CFR SO Appendix B ASME NQA-1 CSA Z299.1 QA 42.1 ISO 9000-2000 1.4 Non-safety related actuators Where motorised valves are not designated as safety related, normally standard Rotork A Range SyncroPak and SyncroSet or IQ or IQT actuators remain the most obvious choice for installed economy and reliability.

AL (D

Iot~on Controls

2 Design Specification The design of the NA range is a development of the Rotork standard A' Range SyncroSet generally described in Publications E210E and E262E. Each actuator comprises an oil bath worm gearbox with Integral three phase squirrel cage motor, torque and limit switches and a separate terminal compartment to which all electrical components are wired. These specification notes refer to those features which are special for nuclear duty or important for other reasons. While these design qualifications are based on conditions postulated for pressure containments of PWR and BWR plants, their use can be extended to other reactor designs wherein normal and abnormal conditions fall within the limits specified.

Type NA1E and NASE actuators are designed for use with leadscrew operated valves where the stem thrust has to be taken in the actuator, which is type 'AN as per standard ISO 5210. The actuators are however also suitable for non thrust applications. Alternative systems of mounting dimensions are available with NAlE, and NA5E actuators as follows:

IS05210 -

Mulit-turn IS05211 -

Part-turn (IWN Gearbox)

MSS SP-101 -

Part-turn (IWN Gearbox)

MSS SP-102 -

Multi-turn Type NAB1E and NAB5E actuators are for non-thrust taking applications and are designed to meet the requirements for type 'B' couplings to ISO5210. It is assumed that the valve manufacturer will supply any coupling adaptors necessary to achieve a drive from the type 'B' actuator output bore to his valve stem.

Rotork NA actuators can also be assembled to second stage gearboxes. These have the designations IWN for quarter turn gearboxes, IBN for bevel gearboxes and ISN for spur gearboxes. All have the same qualification levels as the actuators.

1 Design life The actuators are designed for a working life of 40 years based on the following total number of operating cycles:

NA1E type - 4,000 NA5E type - 4,000 IWN, IBN, ISN gearboxes - 4000 An operating cycle is defined as moving the valve from the open position to the dose position and back to the open position. The actuator is set to torque operation in the close position and limit operation in the open position.

The torque setting at the close position is actuator rated (maximum) torque. During travel, an average load of 33%

of the rated torque is applied.

2 Design environment Normal conditions All NA actuators are capable of operation for 15 minutes In any one hour (unless otherwise specified) at average valve load under the following conditions:

Ambient pressure Humidity Temperature Standard radiation life accumulated dose with no change of components Plant induced vibration 8 psig to 18 psig 100% RH 60 'C (148 'F) 1.50E+05 Gy 1.50E+07 Rad 0.75g all frequencies Accident conditions NA1E type and NASE type actuators are capable of a minimum of 20 operations during and following exposure to the following conditions (see LOCA temperature and pressure

- time test profiles in Qualification Test Summary).

Actuator Type NAIE NA1EDC NA5E, NA5EDC Ambient Pressme 87 pu.6.Obarg 1 Spsig, 1.Obarg 10 psig, 0.lbarg

(-)

Atopo:

Yes INo VNo Saturated air and steam mbxture with chemical spray consating of (topk.a*

0.28 molar 43B03 1

(6,200 ppm boron),

0.064 molar N2S203 I and NaOH to make a pH of 10.5 at 25*C (77n (about 0.59%).

Seimi acelraton 8g in any drection Seismic frequency O.-4Hz range Radiation Rfe 2,006+06 Gy accumulated dose I2.00E408 Rad

-8g 8g 101-34Hz 0.2-3414z

.0.6 y -

12.00[+07 Rad 3100E+05 Gy 3.0%4+7 Red 2.1 Passive duty Type NAl E actuators are used for Class 1 E passive duty inside containment.

Standard A Range actuators are suitable for passive duty outside containment areas where seismic acceleration levels are 6g or below.

Type IQ and IQT are also suitable for passive duties outside the containment areas where the seismic acceleration levels are 6g or below, Established Leaders in Actuation Technology G

2 Design Specification 2.2 Reliability considerations Electric valve actuators are normally inactive. Even in conventional plant applications where the valve is in regular use, most actuators are idle 99.99% of the time. In safety related systems, the operating frequency and duration is even lower, being dictated almost entirely by the plant periodic test programme. It is therefore obvious that the ultimate reliability of electric actuators depends fundamentally on how well the electrical components are sealed from the external environment.

While this applies generally, the importance of proper sealing cannot be over-emphasized for safety related actuators installed within a nuclear containment In these applications, the ambient temperature, pressure and humidity will rise to extreme levels during a Design Basis Event (DBE) during which the motorised valves must perform their safety related function.

2.2.1 Environmental sealing of Type NA actuators All Rotork electric actuators feature '0' ring sealed sleeve jointed water-tight and dust-tight enclosures as standard. With the 'O' ring sealed covers in place, the motor, limit and torque switches and any other electrical components are housed within a pressure tight enclosure, which not only excludes dirt and moisture, but also prevents breathing due to expansion and contraction of the internal air with temperature changes.

This eliminates the problems of condensation build-up arising with traditional flange-jointed electrical enclosures. The only condensation which can occur is of the moisture in the original air content which is insignificant.

2.2.2 External cable connections Even with an enclosure of such a high standard, a significant reliability problem remains if the design allows the customary direct entry of external wiring conduits into the enclosure, which must then be opened for wiring on site. This is a major source of subsequent unreliability due to ingress of moisture and dirt during adverse installation conditions. Even If the work is completed and covers replaced under Ideal conditions, the long term environmental protection then depends entirely on the quality of sealing of the conduit entries by the installation contractor. Obtaining good sealing is difficult enough with normal environments; the exceptionally high temperature and pressure steam ambient within the containment during a DBE will test the best conduit sealing to the utmost.

The use of plug and socket cable terminations at the actuator increases the risk of circuit continuity failure. This type of cable termination was not included in the Rotork nuclear actuator qualification test program.

2.2.3 Separate terminal box All Rotork Type NA actuators feature a separate terminal compartment in which the substantial cylindrical terminal block is itself a pressure retaining wall, with 'O' ring seal to its housing. Thus the electrical components within remain sealed from the environment during wiring on site, with the conduit sealed in place, spare entries plugged and sealed and the terminal cover and '0' ring fitted, the enclosure Is 'Double Sealed', so that leakage through conduit seals can only affect the terminal compartment itself (Figure 2.2).

During environmental qualification testing (

Reference:

NU QR-29001-2) conduit entry leakage was simulated during the Loss of Coolant Accident test. The actuator continued to operate during and after the test demonstrating the effectiveness of the 'Double Sealing' feature.

Figure 2.1 Nudear terminal block showing sealing system.

FoToI Al 0 Figure 2.2 Rotork Double Sealing Solution Q

Mot",

Controls

3 Design Qualification The object of nuclear environmental qualification is to provide auditable evidence that the actuators are capable of meeting their performance specifications under normal environments and under those conditions experienced during a Design Basis Event (DBE).

3.1 Qualification basis 3.1.1 Type NAIE actuators 3.1.1.1 Qualification tests Rotork NA1 E nuclear specification actuators have been environmentally qualified in accordance with IEEE-Std-382.

The basis of this qualification is a series of comprehensive tests conducted by Wyle Laboratories, Nuclear Logistics Inc, Trentec Inc USA and Kinectrics, Canada.

The applicable qualification test reports are: -

frequency band widths spaced one-third octave apart over the frequency range of 1 Hz to 10OHz as necessary to envelope the required response spectra (see Figure 3.1). Five OBE level tests (three-fourths of SSE level) and one SSE level test in each orientation.

h) Safety Relief Valve duty aging test - Test specimen was subjected to a minimum of 8400 stress cycles.

I) Upset and Faulted Loading aging test - A series of multi-frequency tests upset followed by faulted tests of 30 second duration in accordance with IEEE-std-344. 20 upset seismic fatigue test runs were performed followed by 4 faulted test runs. In all more than 5 stress cycles were carried out.

j) DBE Radiation - 130.OOE+04 Gy (130.OOE+06 RAD).

k) DBE Environmental test - A steam exposure profile (see Figure 3.2) for a LOCA simulation representing PWR and BWR in-containment service.

I) Seismic - RIM test - Two OBE tests with a sinusoidal sweep from 2 to 35 to 2Hz in each axis at a rate of one octave per minute and a level of two-thirds of the required input motion. One SSE in each axis consisting of a continuous series of single frequency since beat tests at the one-third octave interval test frequencies and test levels indicated in IEEE 382 1980 (see Figure 3.3).

Note: No significant change was found in the results of the baseline function. Tests were performed after each portion of the type test.

Wyle Laboratories, Huntsville, Alabama. USA Nuclear Logistics Inc; Dallas, USA Kinectrics Inc; Toronto, Canada Thermodyne Laboratories Inc; Toronto, Canada Trentec Inc; Cincinnati, USA 43979-1 43979-3 58364 QR-029001-2 QR-029001-3 QR-029001-5 QR-029001 -6 QR-029001-7 3550 01 R-02-02 0Q020.0 2Q0O2.0 0Q018.0 OQ007.0 See Publication E257E for details of the test laboratories and the summary of the environmental qualification test done.

See Publication E251 E for copies of test certificates.

3.1.1.2 NAIE actuator qualification test parameters a) Normal Radiation aging - 70.OOE+04 Gy (70.OOE+06 RAD).

b) Mechanical wear aging - 4,000 cycles (environmental aging).

c) Thermal Aging (Parameters derived using Arrhenius Law 125 °C (257 OF) for 16 days).

d) Pressurisation aging - 15 cycles of 3-minute duration at 65 psig.

e) Resonant search - A low-level (0.2g) resonant search from 1 to 100Hz and at one octave per minute.

f) Plant Induced vibration aging - Biaxial sinusoidal motion of 0.75g with a frequency of 10 to 100 to 10Hz at a rate of two octaves per minute. Ninety minutes of vibration in each orthogonal axis.

g) Seismic - RMF test - A random multifrequency test with a 30-second duration simultaneous horizontal and vertical phase - incoherent inputs of random motion consisting of FRE0 PJr*V, 1, Fig. 3, Seismic qualification, required response spectrum (IEEE 382 1996).

Established Leaders in Actuation Technology

3 Design Qualification 0

I0 C 146013

( 385 O

468p5i12 121 START SPRY EAT 12 MINPM99' (IFr I P l'I RMD SPRAY -

0 1040 2 4 10 3 S 6 1040 2 4 10 12 9

MWN gearboxes have been subjected to full environmental qualification testing. The IBN and ISN gearboxes and actuator assemblies have been seismically tested. The IBN and ISN gearboxes con)tain identical non-metallic materials as the IWN gearboxes and are therefore environmentally qualified by simliarity analysis (see Publication E253E for a summary of the environmental qualification performed).

The qualification testing conducted on type NA1 E actuators and IWN, IBN & ISN gearboxes provides the basis for the highest level of confidence because of the following features:

a) Representative test specimens of the actuator and gearbox generic groups were selected using the Method of Selection of 12

034 20 30 Representative Actuators for Type Testing" outlined In Annex A of IEEE-Std-382.

b) The environmental qualification tests were performed by independent 1 OCFR50 Appendix B accredited laboratories.

c) Uve hot steam was used during DBE simulation.

d) Actuators and gearboxes were tested.

e) The seismic testing performed on the actuator/gearbox combinations resulted in the worst-case conditions for the actuator due to its centre of gravity being further from the test rig mounting flange.

f) Safety Relief Valve tests were conducted at 8g ZPA In addition to the seismic test requirements of IEEE-Std-382.

g) Upset and Faulted loading tests were conducted at 8g ZPA in addition to the seismic test requirements of IEEE-Std-382.

h) Hydrodynamic Chugging tests were conducted at 8g ZPA In addition to the seismic test requirements of IEEE-Std-382.

I) A separate main steam line break simulation was performed after the DBE test had been completed.

1) Baseline functional testing was performed after each phase of the test programme verifying that the actuator performed as it did during the receipt inspection.

3.1.2 Type NABME, NAB5E These actuator designs are qualified on the basis of the Nuclear Qualification Reports for the Type NA1 E actuators referenced in Section 3.1.1.1 above and through extrapolation, analysis and/or testing.

3.2 Equipment qualified Design qualification is established for the range of actuator sizes with output speeds and rated torques up to the values given in Section 2.2 and with the electrical and mechanical features described in sections 4 and 5. Qualified actuator and gearbox combinations and performance are shown In Publication E252E.

08 Controls

4 Mechanical Construction 4.1 Housings All actuators are produced in watertight form, enclosure dassification IP67 to IEC 529 (NEMA 6, BS5490 and DIN 40050 equivalents). The motor and switch enclosure is completely sealed from outside environments and also from the terminal compartment. The gearcase is oil filled and suitable for operation with the valve at any mounting orientation, oil retention being by dynamic lip seals and static

'0' ring seals. A breather is fitted to the gearcase of NA1E type actuators to effect pressure equalisation across the seals and prevent lubricant displacement under high ambient pressure or temperature conditions.

4.2 Manual operation The emergency handwheel drive, engaged by de-clutch lever and disengaged automatically when the motor starts, is mechanically independent of motor drive and gearing.

it is direct-acting for maximum efficiency and speed in top-handwheel form (standard for 7NA through 40NA). 70NA and 90NA have geared side handwheels as standard. Geared side-handwheels are available as an optional extra for 14NA through 40NA.

Note: To avoid overgearing of handwheels, the motor gearing Is not used.

4.3 Principal materials The materials used in the construction of the actuators are given in table 1.

The main differences in materials used for N type nuclear specification actuators as compared with those used for standard 'A' type are as follows:

Established Leaders in Actuation Technology

4 Mechanical Construction Table 1 - Nuclear product material specification Component Gearcase Dynamic oil seals Static 'O' ring Paint system Lubricant Motor housing SyncroSet housing Handwheel Drive bush (1)

Drive bush retainer (1)

Motor insulation Overload protection SwitchiMech switches AOP switches Cable Insulation Potentiometer Local position Indicator Heater NAIE Grey cast iron and/or malleable Viton with pressure backup rings Viton Carbozinc 11 Undercoat Phenoline 305 topcoat (Publication E258E)

Radiation resistant oil Grey cast iron Grey cast Iron Hot rolled steel Aluminium bronze Zinc plated high-duty wrought steel Class H Customers relay Burgess V-12 Burgess V-12 Nuclear qualified Ohmite nuclear Not available 12 Watt NASE Grey cast iron and/or malleable Viton with pressure backup rings Viton As 'A' Range SAE 80 EP oil Grey cast iron Grey cast iron Hot rolled steel AMuminium bronze Zinc plated high-duty wrought steel Class H Customers relay Burgess V-12 Burgess V-12 Nuclear qualified Ohmite nuclear Not available 12 Watt

'A' Range Grey cast iron and/or malleable Medium nitrile Nitile Chromatic primer Acrylic reinforced Synthetic alkyd topcoat SAE 80 EP oil Aluminium with alchrome coating Aluminium with alchrome coating Hot rolled steel Aluminium bronze Zinc plated high-duty wrought steel Class B Thermostat Burgess TK-5 Honeywell (std)

High temp. PVC (2)

Cotverr (std)

Standard pointer and dial 12 Watt I -lype NAB actuators as standard are not provided with a drive bush, 2 -Cross link Polymeric wire is available as an option.

G row**

Controls

5 Electrical Construction 5.1 Motor Integral three-phase squirrel cage stator - rotor unit specially designed and rated for valve operation, wound as standard for one of the following voltages:

60Hz 460 or 575 volts 50Hz 380, 415 or 500 volts NA1E and NABME motors are sized to permit torque switch operation at maximum design torque allowing for performance variations due to voltage drop and high temperature operation (See Publication E252E for guide to sizing for safety related duty). Overload protection: by customer's thermal relay.

5.2 End position switches Torque and limit switches have self-wiping contacts of half-hard brass plated with.01" thick fine silver. Torque switch setting adjusters have 10-position 'lock and block' feature with numbered setting label to provide recorded tamper-proof settings.

The switch case material used on type NA1E, NASE is DAP (Diallyl lsophthalate) plastic.

5.3 Cable Stranded tinned copper conductor of 18 AWG (33/0.19mm) on 7/11NA motor and 12 AWG (11 10/1. 1 9mm) on 14-90 NA motors, 18 AWG (33/.19mm) for control on all actuator sizes.

Cables used on type NA1E, NA5E have class H, radiation resistant sheaths.

5.4 Heater 12 Watt ceramic resistor wound for either 125 volts or 240 volts.

5.5 Terminals Angled studs through cylindrical moulded block of thermo setting DAP (Daillyl Isophathalate) with '0' ring seal to housing providing water and steam tight barrier, maintaining integrity of electrical component sealing regardless of conduit entry sealing (see para. 2.4.2). Power terminals are 10-24 UNC, and control terminals are 6-32 UNC. All terminals are stainless steel and are provided with locking hardware and power terminals screened by insulating cover.

5.6 Position indication 5.6.1 Local position Indicator dial Not available (use stemrod if required).

5.6.2 Remote position Indication Basic switch mechanism provides two auxiliary switches at each end of travel for remote position indication, in addition to the switches, which provide torque and/or position limitation to suit the type of valve (6 switch total). Since safety related valves are normally associated with isolating duty, for which fully open/dosed position indication only is usually adequate, potentiometer transmitters for continuous position indication are usually not required but are available as indicated below.

Inside Containment accident temperatures and radiation levels are too severe for the electronic resistance/current transducers necessary to provide analogue current position signals and, when these are required therefore, Rotork assumes the transducers will be supplied by others for mounting outside containment.

5.6.3 Six switch Add-on-Pak 1 Six switch Add-on-Pak 1, providing two additional sets of three high accuracy microswitches tripped by cams at any two Independently adjustable valve positions (12 switches in total) and wire wound potentiometer position transmitter for operation at 3 watt maximum.

The switch case material used on type NA1E, NASE is DAP (Diallyl lsophthaiate) plastic.

The Potentiometer has a maximum rating at 25 Watt 20 OC (70 OF) to allow 3 watt usage at maximum ambient.

5.6.4 12-Switch Add-on-Pak 1 This provides four independently adjustable positlon-setting cams, two operating two switches each and two operating four switches each giving 18 switches in total. Materials and specification as for six switch:

5.6.5 Customer's cable connections Three tapped conduit entries are provided, 2 x 1114" ASA and 1 x 11/2" ASA NPT 11h tpi, supplied with threaded plugs. These should not be removed from unused entries.

5.6.6 Thread adaptors (optional extra)

Conduit Thread Adaptors are available to order, supplied separately bagged leaving ASA entries sealed by threaded plugs until required.

Cable connections may be made by conduit, mineral insulated cable or flexible cable using glands or adaptors supplied by others. The threads must be property sealed by the wiring contractor who should also make off wire ends with appropriate ring tongue terminations to suit the terminal studs.

5.6.7 Standard wiring diagrams Wiring diagram numbers for standard versions of NA1 actuators are as follows:

Type NAIE Type NASE Type NAIEC 'Typ NASEDC l ~

~ ~ ~~~~ ~~~~

J Bask Actuatos: 2020VN0 12220VNO 4020VNO 4220VNO Add-on-Pak 1:! 2021VN0 2221VNO 14021VNO 4221VNO with 6 switch Add-on-Pak 1: 2029VNO 2229VNO with 12 switch 4029VNO 4229VNO Established Leaders in Actuation Technology 0

6 Specific qualification of manufactured actuators Design qualification shows that the generic design basis is suitable for the intended purpose, exemplified by type tests of particular units.

Rotork quality systems ensure that each NA type actuator is manufactured to the qualification design standard.

a) The actuators are sized and chosen to meet the specific application.

b) The components used in the manufacture have traceable and auditable links to the qualified design standard.

c) Every Rotork actuator is performance tested to ensure it meets the specified requirements. In the case of NA type actuators, this includes tests to demonstrate that it will perform at the DBE levels of high temperature and reduce voltage.

6.1 Quality Assurance program for type NA actuators The Rotork quality system details all the procedures and documentation utilised for both standard and nuclear actuators. The program for type NA actuators has been evolved in co-operation with utilities and architect-engineers responsible for construction and operation of nuclear power stations.

The Rotork quality assurance program is designed to meet the requirements of 10CFRSO Appendix B, ASME NQA-1, CSA 2299.1, and QA 42-1 to insure that:

I Type NA actuator components are only supplied by vendors whose own quality systems and performance are under the surveillance of and approved by Rotork quality manager.

2 Safety related components are manufactured from certified materials.

3 Safety related components are kept in a separate bonded store.

4 Design qualification is maintained during manufacture and unqualified modification Is forbidden.

5 Specific application requirements and sizing data for each actuator are recorded.

6 Assembly of each type NA actuator is carried out under specific procedures and the work is traceable.

7 Specific actuator performance is tested and recorded.

8 Safety related components are traceable through the supply chain and to installed actuators.

9 A certificate of compliance Is signed by the quality manager or designee only when he has auditable evidence that all these requirements have been satisfied.

6.2 Procurement of commercial grade components for safety related application When possible, Rotork purchases safety related components from suppliers certified to I OCFRSO Appendix B quality systems. Where this Is not possible, Rotork purchases commercial grade items to the guidelines specified In Electric Power Research Institute (EPRI) document NP-5652 -

'Guidelines for the Utilisation of Commercial Grade Items in Nuclear Safety Related Applications".

6.3 Lot control and material traceability of safety related components All safety related components are lot controlled and are traceable to the actuators to which they are fitted.

Records are maintained via the manufacturing system and are available for the life of the plant.

All safety related components are stored in a bonded store insuring that material traceability is maintained.

J 0

Controls

7 Valve Protection 8 Exeeco nuclear safety related gearboxes 7

Valve Protection An actuator sized to perform under DBE conditions will produce very high torque at normal ambient conditions and nominal voltage. The valvemaker is notified of the approximate stall torque to which the valve may be subjected under these conditions. In situations where as a result of this the valve safety margins are reduced the valvemaker should consider the use of a torque limiting brake (as described in Publication E254E) or a thrust compensator (as described in Publication E255E) for the protection of the valve when volt-drops of more than 10% are specified even if fast operation of the valve does not apply.

The IWN gearbox range comprises 7 sizes with ratios of 40:1 and 70:1 and a torque range of up to 30487 Nm (22500 lbsft).

Pg. 8.1 Exeeco MWN quarter-turn gearbox 8.2 IBN multi-turn bevel gearboxes A range of nuclear safety related heavy-duty cast iron multi turn bevel gearboxes suited for the most demanding linear valve applications.

The IBN gearbox range comprises 6 sizes with ratios of 2:1 to 8:1 and a torque range up to 5528Nm (4080 lbsft) and a thrust range up to 1,557KN (350,000 lbs).

Fig. Z I Torque limiting brake Fig. 8.2 Exeeco IBN bevel gearbox 8.3 ISN multi-turn spur gearboxes A range of nudear safety related heavy-duty cast iron multi turn spur gearboxes suited for the most demanding linear valve applications as an alternative to the IBN gearboxes where higher torque and thrusts and larger stem acceptance is required. The ISN gearbox range comprises 3 sizes with ratios of 8:1 to 24:1 and a torque range up to 36721 Nm (27100 lbsft) and a thrust range up to 1,557KN (750,000 libs).

Fig. Z2 Thrust compensator 8

Exeeco nuclear safety related gearboxes Rotork NAIE and NASE actuators can be offered in combination with Exeeco gearboxes qualified for nuclear safety related duty. Designation of Exeeco safety related gearboxes are suffixed with 'N'. Publication E252E contains the sizing guides for IWN, IBN and ISN gearboxes.

8.1 IWN quarter-turn gearboxes A range of nuclear safety related heavy-duty cast and ductile iron, quarter-turn worm gearboxes. Suited for plug, ball and butterfly valves.

ig, 8.3 Exeeco ISN spur gearbox Established Leaders in Actuation Technology

(;9

9 Documentation 10 Maintenance of qualified actuators 9

Documentation Documentation is supplied as standard for each NA actuator as follows:

a) Performance Test certificate (QC1) b) Certificate of Compliance (QC2/K) c) Installation drawing giving C of G data d) Wiring diagram.

e) Paint certification 9.1 Additional documentation All customer specific documentation requirements in addition to the above can be supplied at extra cost.

10 Maintenance of qualified actuators Rotork is responsible for the generic and specific qualification of safety related actuators up to the expiry of the warranty period. Any modifications required as a result of changes in customer specification may necessitate retesting of the actuators by qualified personnel and test equipment for the qualification documentation to be maintained. Similarly, repairs arising from transit or site damage to components likely to affect performance may also involve retesting to enable qualification to be maintained.

Any repairs under warranty will be carried out by Rotork using only qualified personnel with the appropriate documentation and certificate of compliance; where retesting is required to maintain this qualification, Rotork will undertake this.

From expiry of the warranty period, responsibility for the equipment, including maintenance of the qualification if required, passes to the owner. Rotork can provide qualified service engineers for site work, and can also provide training courses for customer personnel.

See also:

Publication E260E - Maintenance manual for Rotork NA1 electric actuators for nuclear power plants.

11 Actuators for non-safety related duties outside containment 11 Actuators for non-safety related duties outside containment Seismic class motor operated valves for which actuator function is not required during accident conditions do not need type NA actuators if they are outside the containment and under normal ambient conditions.

Because the stressed components of the actuator for part of the valve structure, however, seismic qualification of the valve incorporating the actuator is required, and the appropriate data is available for standard SyncroSet actuators, which may be used up to vibration limits of 0.75g, 0.2-34Hz applied at the mounting flange.

1 Controls

12 Conventional valve duties 12 Conventional valve duties The majority of motorized valves in nuclear power stations come under this category, and attention is drawn to the very considerable advantages in terms of simplicity and economy in engineering, procurement, installation and wiring afforded by Rotork SyncroPak actuators with their environmentally sealed integral starter package (Figure 12.1). In addition, SyncroPak diagrams provide every facility for supervisory and computer control (Figure 12.2) - see Publication E262E.

13 Ordering Information The following information must be given to Rotork to enable a bid to be made and an order to be processed for Nuclear actuators.

1 1

2 3

General Project details (title, utility, NSSS supplier, contractor).

Reactor type.

Supply voltage and frequency.

4 Reduced voltage and frequency operating condition, if any, and for how long.

5 Environmental conditions, normal and abnormal (ambient temperature and pressure, radiation, seismic).

6 Actuator - general specification details and paint finish.

7 Approximate delivery required.

8 Documentation requirements.

2 For each Valve/Actuator 1

Type of Valve.

2 Valve stem details (diameter and lead).

3 Valve Stroke or Turns for full travel.

4 Valve Torque and Thrust requirements.

5 Location in Plant (inside or Outside reactor Containment).

6 Is valve on Safety Related duty. If so, is it active or passive (passive) or is it non-Safety Related.

7 Seismic Category (active or passive).

8 Operating time.

9 Safety function.

Fig. 12.1 Comparison of motorised valve installations with SyncroPak and separate starter Valve motorized with Rotork IQ/A Range SyncroPak Summary of Fault diagnosis and Supervisory facilities of SyncroPak

1.

Befoe anvoo o fln YS A

isft3phasepo~wer JR15"?

Is the rotation correct?

iAvailable bishe contiol suPpl avo&"?

for is fti Locorn~t Item tesich sat to Rernote2l Rtemote I B s h vaheWO Inlthepolinete control by rorote control?

12.

Dor"w aiag e uw op enadtof YU c ArepowerwWcontrolsuprples Motor not oorehaatin 0

Hame contactors responded to cor~o ;nar?

G Has valwreadied mted and of teral.

with mat"r wc off?

Miller ennaeft.0a..es?

Remote control

  • Smotern control Systan Is phase rotation cottetd?

Is the control supply available?

Is the LocaMtemote swich set to Rmnote?

s val e

stitle intposl on set by remocte control?

Availble for Remont corrtrol See also:

Publication E21 OE -'A' Range valve actuators.

Publication E11 OE - 'IQ and IQT' Range valve actuators.

Figure 12.2 5ummary of supervisory facilities of SyncroPak.

Established Leaders in Actuation Technology C>

rotorn Electric Actuators and Control Systems Fluid Power Actuators and Control Systems Gearboxes and Gear Operators Projects, Services and Retrofit rotor*

Controls www. rotork.com Formerly E250F, As pant of a process of ongorng product development, Rotorfk raservas the right to amiand nd chanlge specifications without prior nrotice. Published data may PU8O4~O1

~he subject to change.

PU B04-00 -00The na~me Rotork is aregistered trademrkor.

Rotork recognouse all registord trademarks Issue 05/08 published and produced in thre UK by Mttork Controls Limited. KOWTGO910

CIRCUIT IS DRAWN FOR A VALVE IN THE FULLY CLOSED POSITION WARNING DO NOT RUN ACTUATOR TO LIMITS WITH INCORRECT PHASE ROTATION.

WHERE DISTANCES ARE GREAT BETWEEN ACTUATOR AND CONTROL GEAR, CABLE CAPACITANCE HAY CAUSE CONTACTORS TO STICK ON A.C. CIRCUITS CIRCUIT DIAGRAM No -

REV 2021 VNO-06 0 - OPEN 3 PHASE I SUPPLY 1C - CLOSE CONNECT OT/LS IN SERIES WITH OPEN CONTACTOR CONNECT CT/LS IN SERIES WITH CLOSE CONTACTOR FOR APPLICATIONS WHERE HIGH UNSEATING LOADS EXIST CONNECT APPROPRIATE AUX. SWITCH TO BY-PASS TORQUE SWITCH TO ACHIEVE SATISFACTORY UNSEATING WITHOUT TRIPPING TORQUE SWITCH.

OPEN & CLOSE TORQUE SWITCHES HAY SELF-RESET.

THE ANTI-HAMMER CIRCUIT SHOWN BELOW CAN BE USED WHERE A SUSTAINED CONTROL SIGNAL IS UTILISED. SHOWN TYPICALLY FOR ONE DIRECTION ONLY.

N.B. VALVES SHOULD NOT BE POWER BACK-SEATED WITHOUT VALVE MAKERS APPROVAL.

SEE NOTE HEATER SUPPLY OPEN OAS2 OAS1 Ei CASI 26 OT/LS 17 CT/LS ADD-ON-PAK 10

[AS1 I 1AS23 o20 IAS4 1ASS 021 I

ASS6d IT/LS - TORQUE/LIMIT SWITCHES I

ASI AUXILIARY LIMIT SWITCHES HAKE CONTACT AT END OF TRAVEL A52 -

AUXILIARY LIMIT SWITCHES BREAK CONTACT AT END OF TRAVEL

ýj LINK SUPPLIED BY ROTORK IWIRES ARE IDENTIFIED AT EACH END BY TERPINAL NUMBERS OR BY WIRE NUMBERS SHOWN.

IAS1/2/3 -

ADJUSTABLE TO OPERATE TOGETHER AT ANY POSITION (DRAWN AS FOR EXTRA OPEN AUXILIARY) 1IA54/5/6 -

ADJUSTABLE TO OPERATE TOGETHER AT ANY POSITION (DRAWN AS FOR EXTRA CLOSE AUXILIARY)

I

[AS 1 TO S INTERMEDIATE AUXILIARY

SWITCHES, CONTACT FUNCTIONS MAY BE REVERSED BY SETTING CAM TO RELEASE INSTEAD OF DEPRESS SWITCH AS IILLUSTRATED 112W (MAX) HEATER FITTED AS STANDARD.

IUNLESS OTHERWISE REQUESTED, HEATERS FITTED WILL BE.

1120V (2K OHM) FOR 60HZ SUPPLIES,OR 1240V (5.6K OHM) FOR 5OHZ SUPPLIES.

IPOTENTOMETER SUPPLY MUST BE FUSED

'AT 1 AMP MAX.

OPEN 32 SW ITCH IOPEN IINTR ISHUT OT/LS CT/LS Immm-CASI CAS2 m

SOA S 2 I

A I

INDICATES SWITCH MADE No DATE REVISION ROTORK CONTROLS LTD SYNCROSET WITH 6 SW AOPI 05 190700 ISSUE BOX CORRECTED BATH ENGLAND, BAl 3JQ.

DRAWN BY P.J.W NC LET R.

DATE 050698

+- POT NUCLEAR.

ARP CHECKED BY K.S.

(Phone 01225-733200)

CHECKED T.W CIRCUIT DIAGRAM No -REV ROTORK CONTROLS INC SIMILAR TO ROCHESTER, NY 14624.

JOB No -

2021 VNO-06 teL (716) 328-1550 M.I.No

CIRCUIT IS DRAWN FOR A VALVE IN THE FULLY CLOSED POSITION WARNING O0 NOT RUN ACTUATOR TO LIMITS WITH INCORRECT PHASE ROTATION.

WHERE DISTANCES ARE GREAT BETWEEN ACTUATOR AND CONTROL GEAR, CABLE CAPACITANCE MAY CAUSE CONTACTORS TO STICK ON A.C. CIRCUITS CONNECT OT/LS IN SERIES WITH OPEN CONTACTOR CONNECT CT/LS IN SERIES WITH CLOSE CONTACTOR FOR APPLICATIONS WHERE HIGH UNSEATING LOADS EXIST CONNECT APPROPRIATE AUX. SWITCH TO BY-PASS TORQUE SWITCH TO ACHIEVE SATISFACTORY UNSEATING WITHOUT TRIPPING IORQUE SWITCH.

OPEN & CLOSE TORQUE SWITCHES MAY SELF-RESET.

THE ANTI-HAMM1ER CIRCUIT SHOWN BELOW CAN BE USED WHERE A SUSTAINED CONTROL SIGNAL IS UTILISED. SHOWN TYPICALLY FOR ONE DIRECTION ONLY.

N.B. VALVES SHOULD NOT BE POWER BACK-SEATED WITHOUT VALVE MAKERS APPROVAL.

M Wi (CI)

Vi (BI) 2 UI (Al) 3 SEE NOTE 4

CIRCUIT DIAGRAM No -

REV 2023 VNO-06 0 - OPEN 3 PHASE I SUPPLY IC - CLOSE I

IT/LS - TORQUE/&'IMIT SWITCHES I

OPEN OAS2 OAS1 OT/LS IASI I

AS2 I

A53 I

AS4 ADD-ON-PAK 10 13 12O) 19 22Y ASI -

AUXILIARY LIMIT SWITCHES MAKE CONTACT AT END OF TRAVEL A52 -

AUXILIARY LIMIT SWITCHES BREAK CONTACT AT END OF TRAVEL

'ATER LINK SUPPLIED BY ROTORK JPPLY IWIRES ARE IDENTIFIED AT EACH END IBY TERMINAL NUMBERS OR BY WIRE NUMBERS SHOWN.

IIAS1/2/3/4 - ADJUSTABLE TO OPERATE TOGETHER AT ANY POSITION (DRAWN AS FOR EXTRA OPEN AUXILIARY)

IASS/6 -

ADJUSTABLE TO OPERATE TOGETHER AT ANY POSITION (DRAWN AS FOR EXTRA CLOSED AUXILIARY)

I IAS7/8 -

ADJUSTABLE TO OPERATE TOGETHER AT ANY POSITION (DRAWN IAS FOR EXTRA CLOSE AUXILIARY)

IIAS9/10/11/12 - ADJUSTABLE TO OPERATE TOGETHER AT ANY POSITION (DRAWN AS FOR EXTRA OPEN AUXILIARY)

IIAS I TO 12 INTERMEDIATE AUXILIARY

SWITCHES, CONTACT FUNCTIONS MAY BE REVERSED BY SETTING CAM TO RELEASE INSTEAD OF DEPRESS SWITCH AS IILLUSTRATED I

(12W MAX) HEATER FITTED AS STANDARD.

UNLESS OTHERWISE REQUESTED, HEATERS IFITTED WILL BE,

1I20V (2K OHM) FOR 60HZ SUPPLIES, OR 1240V (5.6K OHM) FOR 50HZ SUPPLIES.

IPOTENTOMETER SUPPLY MUST BE FUSED IAT 1 AMP MAX.

29 I AS 5 3) dAS6 30 I AS7 3

34 I

AS873 SIC OPENI NT SHUT T/LS/,m OA31 D

_ATSTC_

MD 2AI I I

ýINDICATES SWITCH MADE SWITCH IOPEN I INTER ISHUTI IASI I A52 IAS3 1A512 IASS m

IAS6 lA57 I

IAS8 IAS91m IASIO IA511 I AS9 IAS1O lAS11 IAS12 EN

.... TT

ý---

2@3 OP SHUT 32 104 No DATE REVISION ROTORK CONTROLS LTD SYNCROSET WITH 12 SW AOP1 05 REDRAWN ON CAD BATH ENGLAND, BAl 3JQ.

DAWN BY P.J.W NCRT O ATE 2511i97

+ POT NUCLEAR.

06 D7059" SWITCH LOAD NOTE REMOVED r r

(Phone 01225-733200)

CHECKED T.W 0 A ROTORK CONTROLS INC SIMILAR TO ---