ML19325D594 | 17 October 1989 | Informs of Completion of Plant Mods Associated W/Sser 8, Confirmatory Issues 56,58 & 60 | |
ML19325E461 | 30 October 1989 | Forwards Rev 1 to Inservice Test Program for Review & Approval.Program Changes Resulted from Design Change Being Implemented Adding Four New Check Valves at Containment Bldg Sys/Rhr Sys Interfaces & Repairs Made on Eight Sys Valves | |
ML19325E586 | 1 November 1989 | Responds to Generic Ltr 88-20,Suppl 1, Individual Plant Exam for Severe Accident Vulnerabilities. Licensee Will Submit Rept Describing Plant Exam by Mar 1991 & Will Include cross-ref to Sections of Rept Defined in NUREG-1335 | Probabilistic Risk Assessment |
ML19325F077 | 31 October 1989 | Responds to NRC Request for Clarification of Startup Feedwater Pump Loading Sequence on to Emergency Bus E5,per 890630 Amend 62 to Fsar.Listed Procedures Revised to Ensure That Operators Verify Generator a Load Carrying Capability | |
ML19327B019 | 20 October 1989 | Forwards Listed Annual Financial Repts for 1988 for Listed Utils,Including Public Svc Co of New Hampshire,United Illuminating Co,Eastern Utils Assoc & 1988 Rept to Rural Electrification Admin,Per 10CFR50.71(b) | Incorporated by reference |
ML19327B076 | 19 October 1989 | Forwards Amend 3 to Indemnity Agreement B-106.Definition of Public Liability in Paragraph 7,Article I Deleted & Substituted by Listed Paragraph.Opinion Ltr from Ropes & Gray Dtd 890530 Also Encl | |
ML19327B875 | 1 November 1989 | Provides Addl Info on TMI Item II.F.1 Re Sampling & Analysis of Plant Effluents in Response to Science Applications Intl Corp | |
ML19327C067 | 6 November 1989 | Forwards Revs to Chapter 14 of FSAR Re Power Ascension Test Program | Earthquake |
ML19327C201 | 13 November 1989 | Advises That Util Will Provide Descriptive Enhancements to FSAR 13.2 for NRC Concurrence by 900330.Changes Will Be Formally Included in Next Amend to FSAR Following Receipt of Concurrence | |
ML19330C701 | 4 August 1980 | Forwards Preliminary Evacuation Clear Time Estimates for Areas Near Seabrook Station. Time Estimates Available in Central Files Only | |
ML19332A949 | 27 June 1980 | Responds to NRC 800523 Ltr Re Violations Noted in IE Insp Repts 50-443/80-04 & 50-444/80-04.Corrective Actions:Weld Repair Process Sheets Revised to Include Sequences for Visual Examination | |
ML19332B631 | 6 November 1989 | Submits Response to Generic Ltr 89-07, Power Reactor Safeguards Contigency Planning for Surface Vehicle Bombs. Util Will Implement Procedure Specifying Measures to Protect Against Attempted Radiological Sabotage at Facility | |
ML19332C293 | 21 November 1989 | Forwards Rev 8 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) | |
ML19332C609 | 22 November 1989 | Advises That License OP-10290-2 for Hg Kast No Longer Used & Considered Expired | |
ML19332C785 | 17 November 1989 | Responds to Violations Noted in Insp Rept 50-443/89-82. Corrective Action:Startup Test Program Description Revised to Become Power Ascension Test Program & to Include Requirement to Review Open Work Requests | Condition Adverse to Quality |
ML19332D306 | 22 November 1989 | Responds to NRC 890821 Ltr Re Unresolved Items 50-443/89-07-01 & 50-443/89-07-02 Noted in Insp Rept 50-443/89-07.Isolation Valves MS-V393 & V394 Specified W/Lowest Achievable Seat Leakage Criteria Available | Stroke time |
ML19332E751 | 31 October 1989 | Responds to Four Areas That Merit Addl Attention & Discussion,Per SALP Rept 50-443/87-77.Licensee Response to Confirmatory Action Ltr CAL 89-11 Provided Comprehensive Corrective Action Plan Which Addressed 890622 Test Event | Systematic Assessment of Licensee Performance |
ML19332F039 | 29 November 1989 | Provides Update on Program Implemented in Response to NRC Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valves Completed Baseline Testing & Operable | |
ML19332F117 | 7 December 1989 | Forwards Corrected Page 6 to Util 891117 Response to Violations Noted in Insp Rept 50-443/89-82 | Condition Adverse to Quality |
ML19332F176 | 5 December 1989 | Clarifies Info Re Proposed Elimination of MSIV Closure Test (ST-47).Unit Trip from 100% Power Test Will Be Performed to Demonstrate Effects of Secondary Sys Transient. Util Proposed That Test Satisfy Reg Guide 1.68,Rev 2,App a | |
ML19332F235 | 30 November 1989 | Forwards Quarterly Rept of Safety Evaluations for Seabrook Station Unit 1 for Jul-Sept 1989.Temporary Mod Made to Main Control Board Fire Alarm Module & Procedure Developed for Charging Pump Operations W/Alternate Min Flow Protection | Temporary Modification Fire Watch |
ML19332F730 | 11 December 1989 | Responds to Generic Ltr 89-21 Re Status of Implementation of USI Requirements at Facility.Action on USI A-17 Re Sys Interactions in Nuclear Power Plants Incomplete Pending Submittal of Individual Plant Exam Rept by 910331 | Exemption Request Control of Heavy Loads Backfit |
ML19332G591 | 30 June 1989 | Informs of 1989 Annual Exercise of Seabrook Station Radiological Emergency Plan Scheduled for 890927,per 890502 Telcon Agreement Between Region I & E Fox & C Conklin. Objectives & Extent of Play for Subj Exercise Encl | Health Physics Network |
ML19332G592 | 27 July 1989 | Informs of 1989 Annual Graded Exercise of Seabrook Station Radiological Emergency Plan Scheduled for 890927 & Submits Exercise Scenario Per Federal Guidelines | |
ML19332G596 | 18 September 1989 | Forwards Objectives & Extent of Play for 1989 Annual Graded Exercise of Seabrook Station Radiological Emergency Plan Scheduled for 890927.Subj Document Revised to Include Participation of Media Ctr & Joint Telephone Info Ctr | Health Physics Network |
ML19337B320 | 21 August 1980 | Responds to IE Bulletin 80-16.No Rosemount Model 1151 or 1152 Pressure Transmitters in Use in safety-related Applications | |
ML19338C469 | 11 August 1980 | Submits Info Re Scheduled Fuel Load Target Date Per 800711 Request.Fuel Loading Scheduled for 830101.Const of Unit 2 Stopped.Tendering of Application Scheduled for 810101 | |
ML19338C594 | 23 July 1980 | Submits Response to IE Bulletin 79-03A.Reviewed SA-312 & A-312 Type 304 Fusion Welded Stainless Steel Pipes & Performed Pipe Wall Thickness Calculations.Results of Review Indicate Sufficient Min Pipe Wall Thickness | |
ML19338E674 | 22 August 1980 | Responds to IE Bulletin 80-20.No Westinghouse Type W-2 Control Switches Used in safety-related Applications | |
ML19340B806 | 5 November 1980 | Responds to NRC 801001 Ltr Re Environ Qualification of safety-related Equipment.Majority of safety-related Equipment Has Been Tested Exclusive of Vibration Testing. All Tests Should Be Completed by Feb 1981.Summary Encl | |
ML19340E310 | 6 January 1981 | Submits Info Re New Applications to Be Submitted,Per NRC 801205 Request | |
ML19341B763 | 2 December 1980 | Responds to NRC 801029 Ltr Re Violations Noted in IE Insp Rept 50-443/80-10 & 50-444/80-10.Corrective Actions: Personnel Instructed Re Proper Pipe Support Weld Installation & Inspect of Incoming Structural Steel | |
ML19344E281 | 9 July 1980 | Responds to NRC Ltr Re Violations Noted in IE Insp Repts 50-443/80-05 & 50-444/80-05.Corrective Actions:Haybales Have Been Placed or Replaced to Control Turbid Runoff Water at Site Perimeter | |
ML19344E796 | 4 August 1980 | Responds to IE Bulletin 79-03A.Results of Review of SA-312, Type 304 fusion-welded Stainless Steel Pipe Indicate Sufficient Min Pipe Wall Thickness | |
ML19345E785 | 6 January 1981 | Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No Valve Yokes Supplied by Malcolm Foundry Are Used at Facility | |
ML19345F662 | 23 December 1980 | Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Specified Valves Are Not Planned for Use in safety-related Sys at Facilities | |
ML19347B154 | 27 August 1980 | Responds to IE Bulletin 80-19 & 80-19,Revision 1. Mercury-wetted Relays Are Used in Protection Sys Equipment. Relays Are Hermetically Sealed,Not Used in Matrix Logic Applications & Not Used in Scram Circuits | |
ML19347D756 | 23 January 1981 | Responds to NRC 801230 Ltr Re Violations Noted in IE Insp Repts 50-443/80-12 & 50-444/80-12.Corrective Actions:Dual Repair Process Sheet Sys Developed,Dictating More Controls During Excavation & Welding Processes | Liquid penetrant |
ML19353B134 | 29 November 1989 | Requests Withdrawal of 890921 Application for Amend to License NPF-67 Re Plant Instrument Air cross-connect to Containment Air Sys | |
ML19353B214 | 6 December 1989 | Forwards Rev 2 to Seabrook Station Evacuation Time Estimate Study & Rev 0 to Seabrook Station Evacuation Time Study Handbook, to Facilitate Review | |
ML19354D705 | 15 December 1989 | Withdraws 891122 Request for Amend to License NPF-67 Re Mod to Station Atmospheric Steam Dump Valves.Implementation of Performance Monitoring Program for Subj Valves More Prudent Course of Action at Present | |
ML19354E736 | 19 January 1990 | Submits Info Requested by Chairman Carr Re Facility Maint Backlog | |
ML19354E828 | 23 January 1990 | Submits Addl Info Re FSAR Chapter 14 Revs,Per NRC Request. Control Room Operators Believed to Be Appropriately Trained Re Natural Circulation Testing | |
ML20002A952 | 9 October 1980 | Responds to NRC 800904 Ltr Re Violations Noted in IE Insp Repts 50-443/80-07 & 50-444/80-07.Corrective Actions:Reinsp of Stud Welds & Issuance of Nonconformance Repts Performed. Increased Surveillance & Personnel Reinstruction Emphasized | |
ML20002B436 | 8 December 1980 | Requests Authorization to Use Code Case N-279 Use of Torquing as Locking Device for Section 3,Div 1,Class 1,2 & 3 & Mc Component Supports. Case N-279 Not Covered in Reg Guides 1.84 & 1.84 | |
ML20003A536 | 17 November 1980 | Responds to NRC 801016 Ltr Re Violations Noted in IE Insp Repts 50-443/80-11 & 50-444/80-11.Corrective Actions:Repair Welds Radiographed & Show Acceptable Results,Records Reviewed,Repair Welds Identified & Visually Inspected | |
ML20003B519 | 8 January 1981 | Responds to NRC 801222 Immediate Action Ltr (Ial) 80-55 Re Welding Repairs.Corrective Actions:All safety-related Repair Welding Halted,Job Specs Revised & Lesson Plans Developed.Requests Removal of Operations Stop Work Order | |
ML20003G128 | 6 March 1981 | Clarifies Misunderstanding of Corrective Action Taken Re Structural Steel Connections & Justification for Actions Taken Per Violations Noted in IE Insp Repts 50-443/80-10 & 50-444/80-10 | |
ML20003G261 | 17 March 1981 | Responds to NRC 810227 Ltr Re Violations Noted in IE Insp Repts 50-443/81 & 50-444/81-01.Corrective Actions:Inspector Who Accepted Deficient Weld Size & Welder Who Accomplished Joint Retrained | |
ML20003H604 | 10 April 1981 | Responds to NRC 810318 Ltr Re Violations Noted in IE Insp Repts 50-443/81-02 & 50-444/81-02.Corrective Actions:Vendor Surveillance Check Plan Modified & Specs Revised to Clarify Ambiguous Terms |