Responds to IE Bulletin 79-03A.Results of Review of SA-312, Type 304 fusion-welded Stainless Steel Pipe Indicate Sufficient Min Pipe Wall Thickness
ML19344E796
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 08/04/1980
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IEB-79-03A, IEB-79-3A, SBN-130, NUDOCS 8009110478
Download: ML19344E796 (1)


Text

T&s-AUBLIC SERVICE Companyof New Hampshere SEAsROOK STATION Engineering Office:

20 Turnpike Road Wootborough, MA 01541 August 4, 1980 SBN-130 Ref SBU-37748 SBU-38001 T.F. B 4.2.5 U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement

Reference:

1. Docket.No. 50-443 and 50-444
2. NRC letter dated April 4, 1980
3. IE Bulletin No.79-03A

Subject:

Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe

Dear Sir:

We have reviewed all of the SA-312 Type 304 fusion welded stainless steel pipe specified for use in safety related system for the Seabrook Project, and have performed pipe wall thickness calculations using the 85% of the maximum allowable stress criteria defined in IE Bulletin 79-03A. Results of our review indicate that we have sufficient minimum pipe wall thickness.

W6 contacted the Commission for clarification of the IE Bulletin 79-03A criteria. We were informed that if the 85% of maximum allowable stress criteria is met, examination of the piping in the field by etching is not required.

I If you require further information, please do not hesitate to contact us.

l ery truly yours, John DeVincentis Project Manager k HEWatan cc: NRC Office of Inspection and Enforcement Divisien of Reactor Construction Inspection Washindton,D.C. 20555