Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
HNP-17-006, Submittal of Cycle 20 Activity Report30 January 2017Submittal of Cycle 20 Activity ReportThrough Wall Leak
HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2 May 2018Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment ChangesFuel cladding
Overspeed trip
IR 05000261/202100525 August 2021Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005)Fitness for Duty
Cyber Security
Exemption Request
COVID-19
ML0206502434 March 2002Inspection / Activity Plan 03/01/2002 - 03/31/2003
ML03007017225 October 2002Summary Report - Ncrs Initiated Since 10/18/2002
ML03007017423 September 2002Summary Report - Ncrs Initiated Since 09/16/2002
ML03007018011 September 2002Summary Report - Ncrs Initiated Since 09/10/2002
ML03007018523 August 2002Summary Report - Ncrs Initiated Since 08/17/2002
ML0300701882 March 2002Facility, Summary Report - Ncrs Initiated Since 05/27/2002
ML0300701946 June 2002Summary Report - Ncrs Initiated Since 05/30/2002
ML03007019630 May 2002Summary Report - Ncrs Initiated Since 05/23/2002
ML03007019820 May 2002Summary Report - Ncrs Initiated Since 05/13/2002
ML03007020013 May 2002Summary Report - Ncrs Initiated Since 05/06/2002
ML03007020415 April 2002Summary Report - Ncrs Initiated Since 04/08/2002
ML0300702083 April 2002Summary Report - Ncrs Initiated Since 03/27/2002
ML03007021420 March 2002Summary Report - Ncrs Initiated Since 03/19/2002
ML0300702176 March 2002Summary Report - Ncrs Initiated Since 02/27/2002
ML03007022020 February 2002Summary Report - Ncrs Initiated Since 02/13/2002
ML0317000276 June 2003Submittal of 10-O ReportBoric Acid
Power Uprate
ML03189093610 July 2003Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Brunswick, CrysEnforcement Discretion
ML03247163222 August 2003Submittal of 10-Q ReportBoric Acid
ML04146024619 May 2004Q Report for Period Ending 03/31/2004
ML04343013330 November 2004Submital of 10-Q Report
ML05053016817 February 2005Background Discussion Material for February 24-25, 2005 NRC Meeting Relating to Replacement for BAW-2374, Revision 1, Evaluation of OTSG Thermal Loads During Hot Leg Loca.Nondestructive Examination
Fuel cladding
Operability Assessment
ML05152044527 May 2005Significant Adverse Condition Investigation ReportHot Short
Safe Shutdown
Unanalyzed Condition
Fire Barrier
Coatings
Exemption Request
Continuous fire watch
Fire Protection Program
Manual Operator Action
ML05159033331 May 2005Submittal of 10-Q ReportLicense Renewal
Exemption Request
ML05244019010 August 2005Attachment E, Crystal River Unit 3 - License Amendment Request #290, Revision 1 Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack
ML0535300699 May 2005Operational Safety Review Team (Osart) Mission to Brunswick Nuclear Plant 9-25 May 2005Safe Shutdown
Fitness for Duty
Fire Barrier
Water Inventory Control
Coatings
Temporary Modification
Aging Management
Foreign Material Exclusion
Flow Accelerated Corrosion
Large early release frequency
Stress corrosion cracking
Severe Accident Management Guideline
License Renewal
Earthquake
Fire Watch
Power change
Siren
Power Uprate
Thermography
ML06081071122 March 2006for the Record: Summary of Nrc'S Review of the Recent Security Issues at the Shearon Harris Nuclear PlantInattentive
ML0613806751 December 2005Report of Independent Auditors
ML06138067830 September 2005Financial Highlights
ML06144048718 May 2006Submittal of 10-O Report for Quarterly Period Ending March 31, 2006
ML06320016830 October 2006G20060793 - Progress Energy Paper Anti-Nuclear Groups Files Petition to Shut Down Harris PlantSafe Shutdown
Fire Barrier
Operator Manual Action
Hemyc
Fire Protection Program
Fire Watch
ML0711000068 December 2006Operational Safety Review Team (Osart) Mission and Follow-up Visit ReportSafe Shutdown
Fitness for Duty
Fire Barrier
Water Inventory Control
Coatings
Temporary Modification
Aging Management
Foreign Material Exclusion
Flow Accelerated Corrosion
Large early release frequency
Stress corrosion cracking
Severe Accident Management Guideline
License Renewal
Earthquake
Fire Watch
Power change
Siren
Power Uprate
Thermography
ML0712701834 May 2007Audit and Review Plan for Plant Aging Managment Programs, Aging Management Reviews, and Time-Limited Aging Analyses for the Harris Nuclear Plant.Boric Acid
Incorporated by reference
Aging Management
License Renewal
Fire Protection Program
Backfit
Power Uprate
ML07198019530 July 2007Environmental Impact Statement Scoping Process Summary Report Shearon Harris Nuclear Power Plant - July 2007Aging Management
License Renewal
Environmental Justice
Fire Watch
ML07205021419 July 2007Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 06-0008, Revision 5Safe Shutdown
Fire Barrier
Fire Protection Program
ML07242025530 August 2007NRC Allegation Report RII-2005-A-0165
ML07270084931 January 2005Caldon Experience in Nuclear Feedwater Flow MeasurementPower change
ML07311038121 May 2007Progress Energy Florida, Inc. Proposed Florida Nuclear Site Transmission Planning Study, Final Report, Attachments Dand F IncludedMeasurement Uncertainty Recapture
Affidavit
ML0800705319 January 2008Review of the Fire Probabilistic Risk Assessment Model to Support Implementation of National Fire Protection Association (NFPA) Standard NFPA-805Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Multiple Spurious Operation
Incorporated by reference
Large early release frequency
Fire Protection Program
ML10075042612 October 2009Summary ReportCyber Security
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
ML1019304176 May 2010Tritium Database ReportOffsite Dose Calculation Manual
Hydrostatic
ML10193055314 December 2009NEI 07-07 NEI Groundwater Protection Initiative NEI Peer Assessment Report for Brunswick
ML1019400968 July 2009Nrc/Harris Split Sample Results
ML10203016030 April 2009Cooling Tower Blowdown Line Assessment Report, Shearon Harris Nuclear Power Plant
ML10203016231 December 2009Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report, Shearon Harris Nuclear Power Plant
ML1028702746 February 20106.4 Rigid and Flexible SleevesHydrostatic
Liquid penetrant
ML10287089216 January 2010Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com' Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:10 PM Subject: Failure Mode 5.1 for Review and CommentCoatings