HNP-17-006, Submittal of Cycle 20 Activity Report | 30 January 2017 | Submittal of Cycle 20 Activity Report | Through Wall Leak |
HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes | 2 May 2018 | Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes | Fuel cladding Overspeed trip |
IR 05000261/2021005 | 25 August 2021 | Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) | Fitness for Duty Cyber Security Exemption Request COVID-19 |
ML020650243 | 4 March 2002 | Inspection / Activity Plan 03/01/2002 - 03/31/2003 | |
ML030070172 | 25 October 2002 | Summary Report - Ncrs Initiated Since 10/18/2002 | |
ML030070174 | 23 September 2002 | Summary Report - Ncrs Initiated Since 09/16/2002 | |
ML030070180 | 11 September 2002 | Summary Report - Ncrs Initiated Since 09/10/2002 | |
ML030070185 | 23 August 2002 | Summary Report - Ncrs Initiated Since 08/17/2002 | |
ML030070188 | 2 March 2002 | Facility, Summary Report - Ncrs Initiated Since 05/27/2002 | |
ML030070194 | 6 June 2002 | Summary Report - Ncrs Initiated Since 05/30/2002 | |
ML030070196 | 30 May 2002 | Summary Report - Ncrs Initiated Since 05/23/2002 | |
ML030070198 | 20 May 2002 | Summary Report - Ncrs Initiated Since 05/13/2002 | |
ML030070200 | 13 May 2002 | Summary Report - Ncrs Initiated Since 05/06/2002 | |
ML030070204 | 15 April 2002 | Summary Report - Ncrs Initiated Since 04/08/2002 | |
ML030070208 | 3 April 2002 | Summary Report - Ncrs Initiated Since 03/27/2002 | |
ML030070214 | 20 March 2002 | Summary Report - Ncrs Initiated Since 03/19/2002 | |
ML030070217 | 6 March 2002 | Summary Report - Ncrs Initiated Since 02/27/2002 | |
ML030070220 | 20 February 2002 | Summary Report - Ncrs Initiated Since 02/13/2002 | |
ML031700027 | 6 June 2003 | Submittal of 10-O Report | Boric Acid Power Uprate |
ML031890936 | 10 July 2003 | Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for Brunswick, Crys | Enforcement Discretion |
ML032471632 | 22 August 2003 | Submittal of 10-Q Report | Boric Acid |
ML041460246 | 19 May 2004 | Q Report for Period Ending 03/31/2004 | |
ML043430133 | 30 November 2004 | Submital of 10-Q Report | |
ML050530168 | 17 February 2005 | Background Discussion Material for February 24-25, 2005 NRC Meeting Relating to Replacement for BAW-2374, Revision 1, Evaluation of OTSG Thermal Loads During Hot Leg Loca. | Nondestructive Examination Fuel cladding Operability Assessment |
ML051520445 | 27 May 2005 | Significant Adverse Condition Investigation Report | Hot Short Safe Shutdown Unanalyzed Condition Fire Barrier Coatings Exemption Request Continuous fire watch Fire Protection Program Manual Operator Action |
ML051590333 | 31 May 2005 | Submittal of 10-Q Report | License Renewal Exemption Request |
ML052440190 | 10 August 2005 | Attachment E, Crystal River Unit 3 - License Amendment Request #290, Revision 1 Probabilistic Methodology to Determine the Contribution to Main Steam Line Break Leakage Rates for the Once-Through Steam Generator from the Tube End Crack | |
ML053530069 | 9 May 2005 | Operational Safety Review Team (Osart) Mission to Brunswick Nuclear Plant 9-25 May 2005 | Safe Shutdown Fitness for Duty Fire Barrier Water Inventory Control Coatings Temporary Modification Aging Management Foreign Material Exclusion Flow Accelerated Corrosion Large early release frequency Stress corrosion cracking Severe Accident Management Guideline License Renewal Earthquake Fire Watch Power change Siren Power Uprate Thermography |
ML060810711 | 22 March 2006 | for the Record: Summary of Nrc'S Review of the Recent Security Issues at the Shearon Harris Nuclear Plant | Inattentive |
ML061380675 | 1 December 2005 | Report of Independent Auditors | |
ML061380678 | 30 September 2005 | Financial Highlights | |
ML061440487 | 18 May 2006 | Submittal of 10-O Report for Quarterly Period Ending March 31, 2006 | |
ML063200168 | 30 October 2006 | G20060793 - Progress Energy Paper Anti-Nuclear Groups Files Petition to Shut Down Harris Plant | Safe Shutdown Fire Barrier Operator Manual Action Hemyc Fire Protection Program Fire Watch |
ML071100006 | 8 December 2006 | Operational Safety Review Team (Osart) Mission and Follow-up Visit Report | Safe Shutdown Fitness for Duty Fire Barrier Water Inventory Control Coatings Temporary Modification Aging Management Foreign Material Exclusion Flow Accelerated Corrosion Large early release frequency Stress corrosion cracking Severe Accident Management Guideline License Renewal Earthquake Fire Watch Power change Siren Power Uprate Thermography |
ML071270183 | 4 May 2007 | Audit and Review Plan for Plant Aging Managment Programs, Aging Management Reviews, and Time-Limited Aging Analyses for the Harris Nuclear Plant. | Boric Acid Incorporated by reference Aging Management License Renewal Fire Protection Program Backfit Power Uprate |
ML071980195 | 30 July 2007 | Environmental Impact Statement Scoping Process Summary Report Shearon Harris Nuclear Power Plant - July 2007 | Aging Management License Renewal Environmental Justice Fire Watch |
ML072050214 | 19 July 2007 | Afpb Staff Response to NFPA 805 Transition Pilot Plant FAQ 06-0008, Revision 5 | Safe Shutdown Fire Barrier Fire Protection Program |
ML072420255 | 30 August 2007 | NRC Allegation Report RII-2005-A-0165 | |
ML072700849 | 31 January 2005 | Caldon Experience in Nuclear Feedwater Flow Measurement | Power change |
ML073110381 | 21 May 2007 | Progress Energy Florida, Inc. Proposed Florida Nuclear Site Transmission Planning Study, Final Report, Attachments Dand F Included | Measurement Uncertainty Recapture Affidavit |
ML080070531 | 9 January 2008 | Review of the Fire Probabilistic Risk Assessment Model to Support Implementation of National Fire Protection Association (NFPA) Standard NFPA-805 | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Multiple Spurious Operation Incorporated by reference Large early release frequency Fire Protection Program |
ML100750426 | 12 October 2009 | Summary Report | Cyber Security |
ML101270439 | 5 May 2010 | Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants | |
ML101930417 | 6 May 2010 | Tritium Database Report | Offsite Dose Calculation Manual Hydrostatic |
ML101930553 | 14 December 2009 | NEI 07-07 NEI Groundwater Protection Initiative NEI Peer Assessment Report for Brunswick | |
ML101940096 | 8 July 2009 | Nrc/Harris Split Sample Results | |
ML102030160 | 30 April 2009 | Cooling Tower Blowdown Line Assessment Report, Shearon Harris Nuclear Power Plant | |
ML102030162 | 31 December 2009 | Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report, Shearon Harris Nuclear Power Plant | |
ML102870274 | 6 February 2010 | 6.4 Rigid and Flexible Sleeves | Hydrostatic Liquid penetrant |
ML102870892 | 16 January 2010 | Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com' Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:10 PM Subject: Failure Mode 5.1 for Review and Comment | Coatings |