Summary Report - NCRs Initiated Since 05/30/2002
ML030070194
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/06/2002
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0059
Download: ML030070194 (1)


Text

For Information Only.

CR3 Crystal River Nuclear Facility F

Summary Report - NCRs Initiated Since 5/30/02 Sorted by Origination Date, Ar Number, Prionty Selection Criteria: AR Type = NCR and AR Status not = Canceled with Attribute of 1A POTL OPER/REPORT AR#

Originator AR Subject Orig. Date AR Status Priority Potential OperlReport NCR Owner 00061475 LGUY MCCALLUM-1 LIVE TURTLE RESCUE FROM CR3 20020530 APPROVED I

Y CR3 E&RC RADIATION INTAKE CONTROL UNIT EVAL GRP A LIVE SEA TURTLE HAS BEEN RECOVERED FROM THE CR3 INTAKE AR EA AND TRANSPORTED TO THE MARICULTURE CENTER BY SITE SECURI TY PERSONNEL.

THE FLORIDA POWER NATURAL RESOURCES BIOLOGI STS HAS IDENTIFED THE TURTLE AS A KEMPS RIDLEY, WHICH REQUI RES THAT A 4 HOUR NOTIFICATION TO THE NRC BE MADE.

00061478 GEORGE WILSON -

TIMELINESS OF HANDLING SIGNIFICANT CORRESPONDENCE 20020530 APPROVED 2

N CR3 ASSESSMENT UNIT EVALUATOR GROUP ABB INC.

POWER TECHNOLOGY DIVISION, SENT A REGESTERED LETTE R TO FLORIDA POWER, DATED MAY 13 TH, FROM FLORENCE SC.

CONT AINING INFORMATION ASSOCIATED WITH A POTENTIAL 10CFR21 NOTI FICATION.

2THIS LETTER AND INFORMATION WAS RECEIVED ON SIT E THROUGH THE NORMAL MAIL PROCESS, AND REQUIRED A RECEIPT S IGNATURE.

THE LETTER WAS THEN ROUTED TO THE ADDRESSED RECIE PIENT.

2THIS PART 21 INFORMATION WAS NOT INPUT TO THE CORRE CTIVE ACTION PROGRAM, TO BEGIN THE REVIEW PROCESS, UNTIL MA Y 28.

THIS CONSTITUTES A LOSS OF TWELVE TO FOURTEEN DAYS I

N A PROCESS THAT REQUIRES AN NRC RESPONSE WITHIN 60 DAYS, P ER 10CFR21.21.

00061482 JERONE LOWE LOST TEST 20020530 COMPLETE 2

N CR3 ENGINEERING EQUIPMENT TECH SERVIUNIT EVAL GRP DIGITAL THERMOMETER (TI 3359)

WAS NOT RETURNED TO THE CALIB RATION LAB AFTER USE ON WORK REQUEST 368416.

EQUIPMENT COUL D NOT BE FOUND AFTER SEARCHING JOB SITE.

00061503 VIRGIL GUNTER ELEVATED VIBRATION LEVELS FSP-20020530 APPROVED 2

N CR3 ENGINEERING 2A TECH SERV/UNIT EVAL GRP ON 05/27/02 VIBRATION DATA WAS COLLECTED DURING THE PERFORM ANCE OF SP-365B FOR FSP-2A.

A REVIEW OF THE VIBRATION DATA INDICATES AN INCREASE IN VIBRAION LEVELS ON THE INBOARD PU MP BEARING.

THE VIBRATIONLEVELS BEING EXPERIENCED DO NOT AF FECT THE OPERABILITY OF THE PUMP HOWEVER, ADDITIONAL VIBRAT ION ANALYSIS WILL BE PERFORMED DURING THE NEXT PERFORMANCE OF SP-365B.

RECOMMENDATIONS FOR CORRECTIVE ACTION WIL BE BA SED ON THIS ANALYSIS.

00061539 RONNIE SURBERJR SCBA CYLINDER IN EMERGENCY KIT WITH 20020530 COMPLETE 2

LOW PRESSURE N

RADSUPV3 DURING A FIRE BRIGADE DRILL AN EMERGENCY SCBA KIT WAS OPENE D ON THE FIRE CART THAT HAD A CYLINDER WITH LOW PRESSURE (4

000 PSIG).

ADDITIONALLY, AT THE END OF THE DRILL WHILE RE PLACING CYLINDERS USED DURING THE DRILL ANOTHER CYLINDER IN THE SPARE RACK WAS FOUND TO BE LOW (4000).

ALL EMERGENCY KITS WERE RESTORED WITH FULL CYLINDERS.

Run Date/lime:

6/6102 3:33:27 AM Page 1 of 15 Report Name: RpLAT..NCRslnitLast7aCR3. Created from SrceTbLATNCRsinitLast7a