COOLING TOWER BLOWDOWN LINE SUPPLEMENTAL GROUNDWATER ASSESSMENT REPORT SHEARON HARRIS NUCLEAR POWER PLANT NEW HILL, NORTH CAROLINA PREPARED FOR:
PROGRESS ENERGY CAROLINAS PREPARED BY:
ss.
SILAR SERVICES, INC.
983 BUTLER PIKE BLUE BELL, PA 19422 December 2009
Cooling Tower Blowdown Line s s.
Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 TABLE OF CONTENTS I
INTRODUCTION.............................................................................
1-1 1.1 Purpose of R eport.......................................................................
1-1 1.2 Project Background.....................................................................
1-1 1.2.1 Project L ocation...........................................................................
1-1 1.2.2 Project B ackground......................................................................
1-1 1.3 Scope and Objectives..................................................................
1-3 1.4 Report Organization...................................................................
1-3 2
PHYSICAL CHARACTERISTICS OF THE STUDY AREA..... 2-1 2.1 Surface Features..........................................................................
2-1 2.2 G eology...........................................
............................................ 2-1 2.3 Groundwater Hydrology.............................................................
2-2 3
ASSESSMENT ACTIVITIES AND FINDINGS........................... 3-1 3.1 Assessment Activities.................................................................
3-2 3.1.1 Groundwater Monitoring Well Installation..................................
3-2 3.1.2 Existing Monitoring Well Completion and Abandonment.......... 3-4 3.1.2 Monitoring Well Surveying and Mapping................................... 3-4 3.1.3 Groundwater Elevation Measurements........................................
3-5 3.2 Groundwater Analytical Results.................................................
3-6 3.2.1 O ctober 2009................................................................................
3-6 3.2.2 N ovem ber 2009............................................................................
3-7 3.3 Survey and Groundwater Elevation Data...................................
3-8 4
SUMMARY
AND CONCLUSIONS................................................
4-1 4.1 Summary of Groundwater Conditions........................................
4-1 TOC-1
SS.
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 4.2 C onclusions.................................................................................
4-2 4.3 R ecom m endations.......................................................................
4-2 LIST OF FIGURES Figure 1 Site Location Map Figure 2 Site Layout Map Figure 3 Geologic Cross Section A-A' Figure 4 Geologic Cross Section B-B' Figure 5 Sample Results, October 2009 Figure 6 Sample Results, November 2009 LIST OF TABLES Table 1 Monitoring Well Construction Summary Table 2 Analytical Results Water Samples Table 3 Survey Data and Water Level Measurements Table 4 Survey Data and Water Level Elevations - MW-1 through MW-9 LIST OF APPENDICES Appendix A Appendix B Appendix C Boring Logs NCDENR Well Construction Records Sample Log Forms TOC-2
Cooling Tower Blowdown Line 8 8.
Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 1
INTRODUCTION 1.1 Purpose of Report Silar Services Incorporated (SSi) has prepared this Cooling Tower Blowdown Line (CTBL) Supplemental Groundwater Assessment Report to document the results of investigation activities performed along the CTBL at the Shearon Harris Nuclear Power Plant (SHNPP), located in New Hill, North Carolina. The purpose of this assessment is to further investigate the potential presence and extent of radiological materials in groundwater within the vicinity of the line with respect to the integrity of the line.
1.2 Project Background This section includes information on the location, description and history of the Site.
1.2.1 Project Location The Shearon Harris Nuclear Power Plant is located approximately 1.6-miles east of the Town of New Hill, North Carolina, and is situated on approximately 10,700 acres. The Site location is depicted on Figure 1.
The CTBL, which is buried several feet below the ground surface, runs for approximately 2 miles from the cooling tower south to the edge of Harris Lake and thence, approximately 2 additional miles to its discharge point beneath the lake. The CTBL is also depicted on Figure 1.
1.2.2 Project Background On December 15, 2008, Progress Energy personnel discovered the presence of water in Air Release System Manhole ARS#2. The manhole was investigated by purging the water from the manhole and evaluating conditions. It was observed that subsequent to purging the manhole dry, water continued to enter the bottom of the manhole through a 2-inch pipe designed to drain the manhole. A water sample was collected and analyzed 1-1
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 for tritium. Tritium was detected at an approximate concentration of 800 picocuries per liter (pCi/L). Based on these observations, Progress Energy determined that additional evaluation was warranted.
Initial assessment activities were conducted at the Site from January 21, 2009 through March 4, 2009. An Assessment Report, issued on April 1, 2009, provided an analysis of groundwater conditions as determined through the installation of nine (9) monitoring wells installed within a limited study area along the length of the pipeline between ARS#1 and ARS#2.
This assessment identified tritium in groundwater in the immediate area of ARS#2 at concentrations up to 1,450 pCi/L.
Tritium was also identified at 1,060 pCi/L in a groundwater well located along the pipeline approximately 655 feet north of ARS#2 (approximately 460 feet south of ARS#1).
Tritium was also detected in groundwater at 372 pCi/L near ARS#1 and approximately 335 feet south of ARS#1 at 373pCi/L. The report also presented a fate and transport evaluation for tritium identified at ARS#2, estimating that groundwater flow was generally trending east-northeast from the vicinity of ARS#2 at a rate of 1.14 foot/day or 208 feet/year. Further evaluation of the pipeline and the surrounding groundwater was recommended as a result of these findings.
A pipeline inspection was performed in April 2009. Approximately 5,600 feet of the targeted 8,800 feet of pipeline were able to be accessed and manually inspected. The inspection revealed that the pipeline exhibits deformation, cracking and buckling throughout the entire length.
One repair of note was successfully conducted at a leaking joint in the pipeline located approximately 200 feet south of ARS#2.
Additional leaks that were not amenable to repair were also identified.
SITNPP is currently planning pipeline replacement alternatives 1-2
Cooling Tower Blowdown Line s s.
Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 1.3 Scope and Objectives As a result of an evaluation of the abovementioned studies, the installation of seven (7) additional monitoring wells along the CTBL was approved. The objectives of the installation of these wells include:
- Evaluate groundwater quality near locations along the pipeline that could not be manually inspected.
- Evaluate groundwater quality at locations identified during the inspection as likely points of leakage from the pipeline.
- Further characterize the hydrogeology and geology along the length of the pipeline.
- Provide groundwater monitoring and elevation measuring points along the length of the pipeline.
The scope of the assessment included the collection of data as close as reasonably possible to the Cooling Tower Blowdown Line while not compromising the integrity of the line.
1.4 Report Organization The organization and content of the remainder of this report are described below.
Section 2.0 - Physical Characteristics of the Study Area A description of the study area including surface features, geology and soils, surface water hydrology, and groundwater hydrology is provided in Section 3.
Section 3.0 - Investigation Activities and Findings A summary of the activities completed during planning and implementation of the assessment is provided.
The methods, locations, and results of the sampling and analysis program are presented in detail.
1-3
SS.
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 Section 4.0 - Summary and Conclusions A summary of the relevant environmental conditions to satisfy the objectives of the investigation is provided in Section 4.
1-4
Cooling Tower Blowdown Line s s.
Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 2
PHYSICAL CHARACTERISTICS OF THE STUDY AREA This section presents the physical characteristics of the Site including surface features, geology, surface water hydrology, and groundwater hydrology.
2.1 Surface Features The SHNPP is located approximately 1.6 miles east of the Town of New Hill, North Carolina. Access to the SHNPP is from Shearon Harris Road. The owner controlled area encompasses approximately 10,700 acres.
As previously discussed, the Cooling Tower Blowdown Line runs underground for approximately 2 miles from the Cooling Tower south to the edge of Harris Lake. The assessment area is on a peninsula which is surrounded by Harris Lake to the south, east, and west and bounded to the north by SHNPP. The most significant surface feature in the assessment area is the topographic low area/wetlands, situated along the blowdown line approximately midway between ARS#1 and ARS#2. There is an approximately 30-foot elevation change between ARS#1 and the topographic low to the south. In addition, a portion of Harris Lake is located east of manhole ARS#2.
The Site location is shown on Figure 1, and the Site Layout is depicted on Figure 2.
2.2 Geology Regional and site-specific geology have been extensively evaluated by others during the safety analyses for Unit 1 and more recently for proposed Units 2 and 3. These reports indicate that the plant is underlain by the Upper Triassic Age Newark Supergroup. The group is characterized by siltstone and sandstone with subordinate amounts of claystone and conglomerated and igneous diabase intrusions. Additional information on regional and local geology can be found in the Final Safety Analysis Report (FSAR).
Site-specific geology observed in the area of the blowdown line is consistent with the regional geology.
Soil borings encountered a thin layer of unconsolidated material 2-1
Cooling Tower Blowdown Line s s.
Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 (overburden), underlain by a reddish-brown weathered siltstone bedrock (regolith) underlain by reddish-brown siltstone. A site-specific interpretation of the geology in the area has been developed by using boring logs from the previous and current assessment activities and is presented in cross-sections on Figures 3 and 4.
2.3 Groundwater Hydrology Regional and site-specific groundwater hydrology have been extensively evaluated by others during the safety analyses for Unit 1 and more recently for proposed Units 2 and
- 3.
These reports indicate that the groundwater hydrology within the plant area is relatively complex as a result of the influence of the main and auxiliary reservoirs and the nature of the parent rock. The previous groundwater studies have focused on the plant area, located to the north of this assessment area. The nearest previously existing monitoring well is MWA-12, which is located approximately 1,000 feet northeast of ARS#1.
Historic groundwater elevation at this location was approximately 235 ft.
MSL.
Two rounds of water level measurements were collected from the newly installed monitoring wells in October and November 2009 as discussed later in Section 3 of this report.
The water level measurements collected in October 2009 and resulting elevations from both the newly installed monitoring wells and the existing monitoring wells are shown on the cross-sections presented as Figures 3 and 4.
General observations regarding the assessment area groundwater are as follows:
The water table aquifer is variable and is influenced by several factors including the the reservoirs (Harris Lake), topography and the slope of the bedrock.
- Shallow groundwater is influenced by the bedrock surface as shown in the cross-sections. Groundwater generally flows from to the south and east along the pipeline from the plant and is influenced by the finger of Harris Lake near monitoring well BDL-MW-9 and the Lake at BDL-MW-16 and Drop Structure B.
2-2
88.
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 The pipeline is below the water table for a significant length between BDL-MW-3 and ARS#4 and likely ARS#5.
" A deeper flow zone is present in the bedrock as evidenced by the observed water levels in BDL-MW-7 and BDL-MW-14.
2-3
Objective 1.3a -
S well locations 1.3b-installation of welIs Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 3
ASSESSMENT ACTIVITIESAND FINDINGS.3 The planning of the assessment activities included conference calls and meetings with Progress Energy representatives and appropriate plant personnel. A scope of work to complete the assessment objectives was prepared by SSi and submitted to Progress Energy on May 4, 2009. Based on a review of the previous studies and planning meetings with Progress Energy personnel, the scope of work was finalized to include the installation of seven (7) permanent monitoring wells along the pipeline and to add the installation of three monitoring wells located within the vicinity of the plant to provide additional groundwater monitoring points not specifically related to the CTBL.
It should be noted that two of the three wells installed at the plant area were installed in the general vicinity of the pipeline, and these results have been included in the pipeline assessment for that area.
The specifi objective 'of each~ well is as follows:
- InstalledWefll*
Rlationale)
.BDL-MWP.
I.nstalled sou.th ofthe.fornmer plant-related settling basin.
Installed approximately 500 feet south' 4'ofARS#1 to evaluate and BDL-M:l I monitor groundwater near a low point in the pipelinie that vwas not, visually inspected.
Itnsolled approximately 200 feet north of APM#
to evaluate and&
BDL-MW1 monitor groundwater quality near a leaking Jintf in,the 'pipeline that 2
was enepaired dring the pipeline ispection in April 2009.
Installed,approximately 200 ft south of ARS#4. to evaluate
- and-BDL-MWI3 monitor groundwater quality near a portion of the pipeline that was;
,not visually inspected. !
Installed approximately' 100 feet north ofl Drop Structure A to
.BDL-MW1i4
- evaluate.and *monitor? groundwater quality. !near a portion of*the' pipeline' wlhere stress cracksand a' 15% deflection were noted..f, Installed approximatelyV'1,800 'feet south of,Dro'p' Structure A to
- BDMW 1"5:'-evalua and monitor groundwater quality where stress, cracks and,
_deflections were ¬ed.
- 3-,1
Cooling Tower Blowdown Line s s.
Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 Installed approximately 200 feet north of Drop Strectre B2 to evaluate d mong ito l
groundwaterLqualityhwhere stress cracks and dcefleted its were noted.
GW-74o Ind staed near thes plant', In the vicinitr of a i
buried 3" radwaste wel.
W7itru that drains into e
thes CTBL.2iea GW-75d Installed in th vicinity of the plnsteals of thendseurity building.
GW-76h Installed within the protectled area of the plant.
Monitoring well installation was conducted from September 21, 2009 through October 2, 2009. Monitoring wells BDL-MWIO through BDL-MW16 were completed with above-ground protective casings and protective bollards were installed surrounding the wells. GW-74 through GW-76 were completed as flush mounts. These activities are described in detail below. The locations of the installed groundwater monitoring wells are shown on Figure 2.
g The activities and findings are summarized in the following subsections. The analytical results are presented and, where concentrations of radiological materials were observed, the results are also presented on figures. Throughout this section, groundwater data are discussed with respect to the USEPA drinking water standard of 20,000 pCi/L.
3.1 Assessment Activities To accomplish the objectives of the assessment, several investigation activities were completed including: monitoring well installation, groundwater elevation measurements and groundwater sampling. The assessment methods and results are discussed in the following subsections.
- 3. 1.1 Groundwater Monitoring Well Installation The primary objective of the monitoring well installation was to further evaluate subsurface conditions and establish a network of monitoring wells along the CTBL to evaluate geology, hydrogeology and groundwater quality. To accomplish this objective monitoring wells were installed using air rotary drilling methods at the locations 3-2
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 illustrated on Figure 2.
Cuttings were observed and boreholes were logged from cuttings. The screened interval for each monitoring well was selected to intersect the depth intervals where groundwater was observed. In cases where no groundwater was observed during drilling, the drilling was discontinued for a period and the open borehole was monitored for water infiltration. If no water infiltration was observed, the borehole was advanced further.
During the investigation, ten (10) groundwater monitoring wells were installed as shown on Figure 2.
The general monitoring well installation procedures are summarized below.
- The depth for each of the wells was selected based on presence and depth of groundwater at each well location.
- The boreholes were advanced using a 6-inch rotary-air hammer.
In the vicinity of the plant, an air-knife was used to open the borehole prior to drilling to avoid utilities.
- With the exception of GW-76, based on the observations during drilling, fifteen (15) or twenty (20) feet of 2-inch-ID, Schedule 40 PVC, machine cut, well screen with 0.010-inch slot size was set at the bottom of each well. A sufficient length of 2-inch ID, Schedule 40 PVC riser pipe was coupled to the screen to allow the PVC riser pipe to extend a minimum of two feet above the ground surface. Well screens were fitted with a nominal 2-inch solid (unslotted) bottom sediment trap. GW-76 was installed with five feet of 0.010-inch screen due to the immediate presence of water.
The annular space around the well screens was backfilled with clean uniform sand (filter pack sieve #2). The filter pack was placed from the bottom of the well to a minimum of 2 feet above the top of the well screen.
A minimum 2-foot-thick bentonite seal was placed above the sand and allowed to hydrate.
" Monitoring wells BDL-MW-10 through BDL-MW-16 were completed as stick-up wells, with lockable expansion plugs.
3-3
Cooling Tower Blowdown Line s s.
Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 Monitoring wells GW-74, GW-75, and GW-76 were completed as flush mounts, with lockable expansion plugs.
- A concrete pad was installed around each well, and protective bollards were installed around the well stick-ups.
- Boring logs were prepared for each monitoring well.
A summary of the monitoring well construction details is provided in Table 1 and depicted in the Boring/Well Construction Logs included in Appendix A. NCDENR Well Construction Records are included in Appendix B.
3.1.2 Existing Monitoring Well Completion and Abandonment During the field activities associated with the assessment, SSi reconstructed existing temporary monitoring wells to be permanent monitoring wells. Monitoring wells BDL-MW-1 through BDL-MW-3 and BDL-MW-5 through BDL-MW-9 were completed as stick-up wells by installing a locking protective outer casing and a concrete pad at ground surface. Protective bollards were also installed around the well stick-up.
Monitoring well BDL-MW-4 was abandoned.
3.1.2 Monitoring Well Surveying and Mapping The monitoring well casings and ground elevations were surveyed and certified by a North Carolina Registered Land Surveyor (Smith and Smith).
The survey was completed on October 20. Monitoring wells MW-i through MW-9 were resurveyed because the top of the wells were modified to allow for the installation of the protective outer casing.
A survey map was produced that includes scale, benchmarks, North arrow, and the locations of monitoring wells. The survey map provided the information required to produce a site base map for this Assessment Report.
3-4
Cooling Tower Blowdown Line s s.
Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 3.1.3 Groundwater Elevation Measurements Groundwater elevation measurements were collected from the monitoring wells and used to provide data to interpret the potentiometric surface of the aquifer. Depth-to-water measurements were obtained from the ten monitoring wells prior to sampling on October 13 and November 9, 2009. Measurements were collected using a Solinst Level Indicator Probe capable of measuring depth to water within 0.01-foot accuracy.
3.1.3 Groundwater Sampling Groundwater samples were obtained from the monitoring wells in October and November 2009. In addition, during the November sampling effort, a surface water sample was collected directly from Harris Lake at the shoreline near Drop Structure B (DS-B). Water samples were analyzed for tritium at Progress Energy's Harris Energy and Environmental Center Radiochemistry Laboratory to the same lower limit of detection as the NC Division of Radiation Protection (NCDRP) laboratory.
Prior to sampling, each monitoring well was purged in accordance with low-flow groundwater sampling procedures to assure collection of a representative groundwater sample. Groundwater purging and sampling was completed using a peristaltic pump (except as noted below), dedicated pump (flex) tubing, and dedicated down-hole polyethylene tubing at each monitoring well to eliminate the potential for cross-contamination between sampling points.
Water quality measurements (temperature, conductivity, pH, and dissolved oxygen) were collected during the purging activities and recorded in the field logbook. Sample log forms are included as Appendix C. The procedure for monitoring well purging and sampling is generally as follows:
The security cap was removed, and the depth to water in the well was determined with a water level meter. The depth to water was recorded in the field logbook.
- The dedicated down-hole tubing was lowered into the monitoring well, cut to the desired length, attached to the pre-cut flex tubing on the peristaltic pump, a 3-5
Cooling Tower Blowdown Line s s.
Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 new section of poly tubing was inserted on the effluent side of the pump. The sample line was connected from the pump to the in-line water quality instrument (YSI MP556 with flow through cell), the effluent line from the flow-through cell was inserted into a purge water container to capture purge water, the peristaltic pump was started, and purging of groundwater at the well was commenced.
- An optimum low-flow pumping rate was established at each well to minimize drawdown.
The groundwater quality parameters and depth to water were monitored and recorded at prescribed time intervals to determine when the water quality parameters had stabilized to within 10%.
- Following the stabilization of the groundwater quality parameters, groundwater samples were collected from the wells and delivered to the radiological analytical laboratory.
- Purge water was collected and transported to the designated disposal point.
It should be noted that for both the October and November sample rounds wells BDL-MW-14 and GW-74 were sampled using a dedicated disposable bailer. During the October sampling event, low-flow sampling was attempted at both wells using a low-flow submersible pump; however, the wells produced a significant amount of silt and the pump failed.
3.2 Groundwater Analytical Results 3.2.1 October 2009 SSi collected groundwater samples from the newly installed monitoring wells (BDL-MW-10 though BDL-MW-16 and GW-74 through GW-76) on October 13-15, 2009.
All water samples from the wells (10 samples) were analyzed for tritium at the on-site radiological analytical laboratory. SHNPP personnel collected groundwater from the existing monitoring wells (BDL-MW-1 through BDL-MW-3 and BDL-MW-5 through 3-6
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 BDL-MW-9) on October 15, 2009.
Analytical results are summarized in Table 2.
Figure 5 depicts the analytical results for tritium in the water samples.
Tritium was detected in groundwater from one (1) of the ten (10) newly installed monitoring wells. The lower limit of detection (LLD) for the analyses ranged from 235 pCi/L to 241 pCi/L. Tritium was detected in the groundwater sample from BDL-MW-16 at 5,870 pCi/L. Tritium was also detected in five (5) of the existing CTBL monitoring wells (BDL-MW-2, BDL-MW-3, BDL-MW-5, BDL-MW-6 and BDL-MW-
- 7) at concentrations ranging from 326 pCi/L in BDL-MW-7 to 1,070 pCi/L in BDL-MW-5.
3.2.2 November 2009 SSi collected groundwater samples from the newly installed monitoring wells and a surface water sample from Harris Lake on November 9 and 10, 2009. All eleven (11) samples were analyzed for tritium at the on-site radiological analytical laboratory.
SHNPP personnel collected groundwater from the existing monitoring wells (BDL-MW-1 through BDL-MW-3 and BDL-MW-5 through BDL-MW-9) on November 23, 2009. Analytical results are summarized in Table 2. Figure 6 depicts the analytical results for tritium in the water samples.
Tritium was detected in groundwater from one (1) of the ten (10) newly installed monitoring wells sampled. The LLD ranged from 235 pCi/L to 241 pCi/L. Tritium was detected in the groundwater sample from BDL-MW-16 at 3,410 pCi/L. Tritium was detected in surface water sample from Harris Lake at 3,550 pCi/L. Tritium was also detected in five (5) of the existing CTBL monitoring wells (BDL-MW-2, BDL-MW-3, BDL-MW-5, BDL-MW-6 and BDL-MW-7) at concentrations ranging from 361 pCi/L in BDL-MW-6 to 1,180 pCi/L in BDL-MW-5.
Conclusions and recommendations are presented in Section 4.
3-7
Cooling Tower Blowdown Line s s.
Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 3.3 Survey and Groundwater Elevation Data The monitoring well casings and ground elevations were surveyed and certified by a North Carolina Registered Land Surveyor (Smith and Smith).
The survey was completed on October 20.
Survey data and groundwater elevation measurements for the newly installed monitoring wells are presented in Table 3.
Survey data and groundwater elevation measurements (as measured by SHNPP personnel) for existing monitoring wells are presented in Table 4.
3-8
No Cooling Tower Blowdown Line S,
O Supplemental Groundwater Assessment Report Of Shearon Harris Nuclear Power Plant December 2009 4
SUMMARY
AND CONCLUSIONS The Coogin-Tower Blowdown ine runs undergowind for apprximately 2 miles fromni the cooling tower siouth to the edge o!fHarris Lake.
A total of ten (10) new groundwater oitoring wells were installed as pato hssoeo ok ee (7) of the locations are situated along thelength oof the pipeline located betweenthel plant andi Drp trctreB at Ha.ris ake. Of these seven (7 oainfu 4 monitoring, wells were installed at locations where theApri 20099pipeline inspection had identified&
deet nteppln and leakage frmtepplnewscniee likely; and, hree, (3)montonngwels were instaledat ocations where inspection of the pipelinie could~
not be accomplished. *The remaining three (3) groundwater monito ringiwellsgwere, intald nthe vicinity of the plant to prvd diina rudae monitoringpoints, not directl relatey *otethe pipeline; :however, two(2),of those wthree.(3)wells.
were installed in the ~general vicinity of the pipeline.
4.1 Summary of Groundwater Conditions Two rounds of groundwater samples were collected from the newly installed monitoring wells (10 samples) and the existing monitoring wells (8 samples) and one sample was obtained from Harris Lake during the second sampling round.
All groundwater samples were submitted to the on-site radiological analytical laboratory for tritium analysis. Tritium results for the existing CTBL monitoring wells were consistent with those from the initial investigation in early 2009 and the ongoing monthly sampling effort. These results indicate the presence of a current and/or historic leak in the pipeline in the vicinity of ARS#2. Investigations. have demonstrated that this area is a low point in the pipeline where leaked water from the pipeline might accumulate. With respect to the newly installed monitoring wells, tritium was detected in the groundwater samples from BDL-MW-16 at 5,870 pCi/L (October 2009) and 3,410 pCi/L (November 2009). None of the groundwater samples from the other newly installed monitoring wells exhibited tritium above the LLD. Because MW-16 was installed less than 800 feet from Harris Lake, a sample was obtained from the lake 4-1
Cooling Tower Blowdown Line 8 8.
Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 during the second sampling round conducted in November.
This sample exhibited tritium at 3,550 pCi/L.
Defects in the CTBL were identified in the vicinity of Drop Structure B during the April 2009 pipeline inspection and leakage from the pipeline may be a source of tritium impacts in this area; however, the similarity in results from this well and the lake imply a possible connection between the lake and shallow groundwater in the vicinity of Drop Structure B.
As Harris Lake is manmade, it is possible that the lake discharges to groundwater in areas. Harris Lake elevations as recorded at the plant intake structure were provided by plant personnel for the time periods of both sampling rounds. These data indicate that the elevation of Harris Lake where measured was lower than the water table at MW-16 for both sampling rounds.
4.2 Conclusions Based on the occurrence and distribution of tritium in the data presented above, it is concluded that groundwater in the vicinity of MW-16 has been impacted by tritium.
This may be a result of leakage from the CTBL defects previously identified or discharge from Harris Lake. Groundwater impacts previously identified in the local area between ARS#1 and ARS#2 identified in the April 2009 Groundwater Assessment Report persist. No other areas of tritium-impacted groundwater have been identified as a result of this scope of work.
4.3 Recommendations SSi recommends that the newly installed monitoring wells be added to the monthly sampling protocol as part of the site Groundwater Monitoring Program so that sufficient data can be accumulated to evaluate trends and seasonal effects.
In addition, an evaluation of the hydrologic connection between Harris Lake and shallow groundwater should be performed to determine if impacted lake water is migrating to and impacting groundwater in the vicinity of MW-16 or elsewhere.
4-2
ss.
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 FIGURES
N Shearon Harris Nuclear Power Plant d91 New Hill, NC Quadrangle Location Figure 1 0
2000 4000 Feet 4
Site Location Map Source: U.S.G.S. Topographic Map (7.5 minute)
S New Hill & Cokesbury, NC quadrangles-S Silar Services Inc.
Shearon Harris Nuclear Power Plant New Hill, NC Figure 2 Site Layout Map Silar Services Inc.
CROSS SECTION LOCATION 100 0 50 100 200 (Scale in Feet)
I 240 230 220 210 200 190 180 4k SDL-MV, SDI,-t
'-B'Dt -M' W8Al MANHOt
~-:
E~t-AIW
- fAA'52/
EqDL MW
-- 210 200 190 180 HORIZONTAL SCALE:
?
Feet LEGEND VERTICAL SCALE:
l Feet OVERBURDEN WEATHERED SILTS TONE 7 7 BEDROCK (REGOLITH)
J SIL TS TONE BEDROCK SCREENED IN TER VA L V
GROUNDWA TER ELEVATION October 2009 COOLING TOWER BLOWDOWN LINE Shearon Harris Nuclear Power Plant New Hill, NC Figure 3 Geologic Cross Section A-A' Silar Services Inc.
N S
ii*
S~~
CO x
n a
m m m
m cac i
m 0
-J 0n Bill 0*
260 -
240 -
220 -
200 -
180 -
160 -
140 -
, V
_____LAKE A-A A-V-CROSS SECTION LOCATION B -14_/4
/
a NOTE:
APPROXIMATELY 3-4 FEET OF UNCONSOLIDATED OVERBURDEN IS PRESENT THROUGHOUT THE AREA BUT NOT SHOWN HORIZONTAL SCALE: 9 --
- 1. 00 Feet VERTICAL SCALE:
0 Feet LEGEND WKEA THERED SIL TS TONE BEDROCK (REGOLITH)
SIL TSTONE BEDROCK SCREENED INTERVAL V
GROUNDWA TER ELEVA 77ON October 2009 Shearon Harris Nuclear Power Plant New Hill, NC Figure 4 Geologic Cross Section B-B'
§,5 Silar Services Inc.
GW-75 4LLD GW-76 4LLD BDL-MW-10
<aD BDL-MW-6 473 NOTES:
A/B - DENOTES DUPLICATE SAMPLE LLD - LOWER LIMIT OF DETECTION TRITIUM RESULTS - pCi/Liter
- GW-74
'LLD BDL0-MW-I
'110 BDL-MW-2 529 BDL-MW-3 588 BDL-MW-9
<LD ODt.-MW-8 EDL-NMW-7 326
.B01-MW-6 1070 BDL-MW.12
<LD BDI-MW-13
'LD BDL-MW-14 IWS1)
LLD/<LLD BOL-MW-t5
<LLD BDL-MW-16 5870 Shearon Harris Nuclear Power Plant New Hill, NC Figure 5 Sample Results October 2009 ISi-Silar Services Inc.
I
GW-75
-LLD GW-76
<LLD 8DA-MW-10
<LLD BDL4l-11
<LLD BDL-MW-6 361 GW-74
-LLD NOTES:
NB - DENOTES DUPLICATE SAMPLE LLD - LOWER LIMIT OF DETECTION TRITIUM RESULTS - pCi/Liter BDL-MW-I 403 BDL-MW-2 679 0DL-MW-3 814 BDL-MW-9
-LLD BDL-MW-8
<LLD BDL-MW-7 462 BDL-MW-5 1180 BDL-MW-12
-LLD BDL-MW-13 BDL.-MW-14 (A/B)
LLDI<LLD BDL-MW-15
<LLD BDL-MW-16 3410 LAKE DS-8 3550 Shearon Harris Nuclear Power Plant New Hill, NC Figure 6 Sample Results November 2009 IlsS"d Silar Services Inc.
ss.
LcXý Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 TABLES
ss.
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 Table 1 Monitoring Well Construction Summary Cooling Tower Blowdown Line Assessment Shearon Harris Nuclear Power Plant, New Hill, North Carolina Annular Fill Material Well ID.
Well Depth TOC Ground Surface Screen Sand Interval Seal Interval Concrete (bgs)
(MSL)
Elevation (MSL) Interval (feet (feet bgs)
(feet bgs)
Interval I
I bgs)
I (feet bgs)
BDL-MWIO 60 263.13 260.41 60-40 60-20 20-17 17-0 BDL-MW 11 27 225.05 222.12 27-7 27-5 5-1 1-0 BDL-MW12 60 249.36 246.24 60-40 60-25 25-20 20-0 BDL-MW13 60 240.93 238.1 60-40 60-25 25-22 22-0 BDL-MW14 98 256.21 253.06 98-78 98-73 73-65 65-0 BDL-MW15 30 234.41 231.47 30-15 30-13 13-10 10-0 BDL-MW16 40 236.9 234.05 40-25 40-23 23-20 20-0 GW-74 60 260.39 260.62 60-40 60-25 25-20 20-0 GW-75 50 259.86 260.1 50-30 50-25 25-20 20-0 GW-76 11 258.84 259.25 11-6 11-4 4-1 1-0 Notes:
bgs - Below Ground Surface TOC - Top of Well Casing MSL - Mean Sea Level NA - Not Applicable Survey data provided by Smith and Smith, accurate to 0.01 feet MSL
ss.
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 Table 2 Analytical Results - Water Samples Cooling Tower Blowdown Line Assessment Shearon Harris Nuclear Power Plant, New Hill, North Carolina F
October 2009 Tri-November 2009 Tritium Result Tritium LLD Tritium Result Tritium LLD Sample Location Sample Date (pCi/liter)
(pCi/liter)
Sample Date (pCi/liter)
(pCi/liter)
BDL-MW1 15-Oct-09
< LLD 241 23-Nov-09 403+/-146 NR BDL-MW2 15-Oct-09 529+/--151 NR 23-Nov-09 679+/-146 NR BDL-MW3 15-Oct-09 588+/-151 NR 23-Nov-09 814+/-146 NR BDL-MW5 15-Oct-09 1070+/-156 NR 23-Nov-09 1180+/-154 NR BDL-MW6 15-Oct-09 473+/-151 NR 23-Nov-09 361+/-146 NR BDL-MW7 15-Oct-09 326+/-151 NR 23-Nov-09 462+/-146 NR BDL-MW8 15-Oct-09
<LLD 241 23-Nov-09
< LLD 234 BDL-MW9 15-Oct-09
< LLD 241 23-Nov-09
< LLD 234 BDL-MWIO 14-Oct-09
< LLD 241 9-Nov-09
< LLD 238 BDL-MW I I 13-Oct-09
< LLD 236 9-Nov-09
< LLD 239 BDL-MW12 15-Oct-09
< LLD 236 9-Nov-09
< LLD 238 BDL-MW13 13-Oct-09
< LLD 236 9-Nov-09
< LLD 239 BDL-MW14(A/B)*
15-Oct-09
< LLD/<LLD 235/236 10-Nov-09
< LLD 239 BDL-MW15 15-Oct-09
< LLD 237 9-Nov-09
< LLD 239 BDL-MW16 15-Oct-09 5870 NR 9-Nov-09 3410+/-175 239 GW-74 15-Oct-09
< LLD 240 10-Nov-09
< LLD 238 GW-75 14-Oct-09
< LLD 241 9-Nov-09
< LLD 238 GW-76 14-Oct-09
< LLD 241 9-Nov-09
< LLD 238 Lake DS-B Not Sampled 9-Nov-09 3550+/-176 238
- A/B denotes duplicate sample LLD - Lower Limit of Detection NR - Not Reported
ss.
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 Table 3 Survey Data and Water Level Measurements Cooling Tower Blowdown Line Assessment Shearon Harris Nuclear Power Plant, New Hill, North Carolina 13-Oct-09 9-Nov-09 Location ID Well Depth TOC Ground Surface Depth to Water Depth to Water Northing Easting Latitude Longitude (bgs)
(MSL)
Elevation (MSL)
Water Elevation Water Elevation (MSL)
(MSL)
BDL-MWIO 684,269.59 2,012,868.37 3537'48" 78.57'24" 60 263.13 260.41 17.66 245.47 18.76 244.37 BDL-MWII 682,710.12 2,013,116.92 35137'33" 78.57'21" 27 225.05 222.12 3.33 221.72 3.82 221.23 BDL-MW12 682,116.79 2,012,906.66 35'37'27" 78.57'23" 60 249.36 246.24 9.73 239.63 7.70 241.66 BDL-MWI3 681,211.86 2,012,607.59 35o37'18" 78°57'27' 60 240.93 238.10 11.62 229.31 3.75 237.18 BDL-MW14 680,308.08 2,012,303.74 35"37'09" 78'57'30" 98 256.21 253.06 82.10 174.11 82.00 174.21 BDL-MW15 678,518.03 2,011,785.51 35036'51
78"57'37" 30 234.41 231.47 15.91 218.50 16.25 218.16 BDL-MW16 677,258.60 2,011,502.38 3536'39" 78057'40" 40 236.9 234.05 15.00 221.90 15.72 221.18 GW-74 684,706.48 2,013,633.67 35037'52
78'57'14" 60 260.39 260.62 50.45 209.94 26.12 234.27 GW-75 685,295.07 2,013,757.03 35037'58"'
78o57'13" 50 259.86 260.10 11.87 247.99 11.02 248.84 GW-76 685,054.67 2,013,091.91 35037-56
78-57'21" 11 258.84 259.25 6.65 252.19 7.18 251.66 Notes:
bgs - Below Ground Surface TOC - Top of Well Casing MSL - Mean Sea Level NA - Not Applicable Survey data provided by Smith and Smith
ss.
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 Table 4 Survey Data and Water Level Measurements Monitoring Wells MW-I Through MW-9 Cooling Tower Blowdown Line Assessment Shearon Harris Nuclear Power Plant, New Hill, North Carolina 15-Oct-09 23-Nov-09 Location ID Well Depth TOC Ground Surface Depth to Water Depth to Water Northing Easting Latitude Longitude (bgs)
(MSL)
Elevation (MSL)
Water Elevation Water Elevation I
(NMSL)
(MSL)
BDL-MWI 683,346.18 2,013,326.48 35.37393387 78057'19' 30.01 255.70 252.17 23.56 232.14 23.93 231.77 BDL-MW2 683,128.19 2,013,248.84 35.37371829 78057'19" 19.34 239.30 236.69 14.02 225.28 13.98 225.32 BDL-MW3 682,926.54 2,013,180.17 35.37351887 78057'20" 14.72 225.16 223.00 7.15 218.01 5.52 219.64 BDL-MW5 682,300.10 2,012,967.12 35.37289937 78°57'23"\\
16.64 248.93 245.67 10.52 238.41 10.66 238.27 BDL-MW6 682,308.04 2,012,948.07 35.37290723 78057'23" 14.02 249.76 246.34 10.71 239.05 8.00 241.76 BDL-MW7 682,308.69 2,012,970.56 35.37290787 78057'23" 60.94 248.79 245.23 49.30 199.49 46.92 201.87 BDL-MW8 682,370.88 2,013,154.32 35.3729693 78057'21" 20.33 235.91 233.24 6.00 229.91 3.70 232.21 BDL-MW9 682,417.63 2,013,249.71 35.37301549 78057'19" 17.87 226.78 223.14 13.48 213.30 10.40 216.38 Notes:
bgs - Below Ground Surface TOC - Top of Well Casing MSL - Mean Sea Level NA - Not Applicable Survey data provided by Smith and Smith
ss.
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 Appendix A Boring Logs
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/28/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW10 M Snyder Blow Completion Depth Lithology Description ME_
Counts Feet
<a
<a a
- <a
- 'a a
- a a
a a
a Fa ra Fa
- a a
- a ta Rd-brown silt 5
10 15 3] -I 71Y.sil 20 Red Si11stone Completion Notes:
Site:
Ground Elevation 260.41 Casing Elevation 263.13 SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 1
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/28/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW10 M Snyder Blow Completion Depth Lithology Description E
Counts Feet U) 25 30 35 40
-LMM M M-7-M-M Completion Notes:
Site:
Ground Elevation 260.41 Casing Elevation 263.13 SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 2
BORING LOG S
Drill Rig:
Rotary Air Date Drilled:
9/28/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW10 M Snyder Blow Copein Depth E_
B owpl e
pth Lithology Description M
Counts Feet U)0 45 50 55 60 65 Completion Notes:
Site:
Ground Elevation 260.41 Casing Elevation 263.13 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 3
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/28/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW10 M Snyder Blow Completion Depth Lithology Description E
Counts Feet 0) 70 75 80 85 Completion Notes:
Site:
Ground Elevation 260.41 Casing Elevation 263.13 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 4
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/30/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW1 1 J Magee Blow Completion Depth Lithology Description ccE Counts Feet
_U)
I..-
Rd-brown silt II ii 5-10 15 20 M-M-M-M-M.,
r-7z,--
M= M Rd Siltstone Completion Notes:
Site:
Ground Elevation 222.12 Casing Elevation 225.05 SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 1
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/30/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW1 1 J Magee S
Blow Completion Depth Lithology Description E
Counts Feet C,,
25 30 35 40 Completion Notes:
Site:
Ground Elevation 222.12 Casing Elevation 225.05 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 2
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/24/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW12 M Snyder S
Blow Completion Depth Lithology Description
_E Counts Feet
_U)
',.4 a*.a.
E-C ae, a.
'a Rd-brown silt 5
10
~
Red siltstone 15 20 Completion Notes:
Ground Elevation 246.12 Casing Elevation 249.36 Site:
SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 PPage 1
BORING LOG Drill Rig:
Rotary-Air Date Drilled:
9/24/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW12 M Snyder E
o0 Blow Clout Comple Counts tion Depth Feet Lithology I.
25 30 35 40 i
Description Completion Notes:
Site:
Ground Elevation 246.12 Casing Elevation 249.36 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 2
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/24/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW12 M Snyder lo Completion Depth Lithology Description E
Counts Feet HE
=Z-Z Z"
45 50 55 60 M-1:= M-MIM-MI-M.-I 65 Completion Notes:
Site:
Ground Elevation 246.12 Casing Elevation 249.36 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 3
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/23/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW13 M Snyder
'a Blow Completion Depth Lithology Description ME Counts Feet
_U) 7_a is to' im 11 1'a 0
- 7. *'a 0a Rd-brown silt We t
I-5 10 15 20 r1L1.__t_1=_t_
=Mr-M.M.,
Ked SltStolne Completion Notes:
Site:
Ground Elevation 238.10 Casing Elevation 240.93 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 1
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/23/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW13 M Snyder E
(I, Blow lout Complet Counts tion Depth Feet Lithology 25 30 35 40
=M1.=1--= %-=M--%*.1U Description Completion Notes:
Site:
Ground Elevation 238.10 Casing Elevation 240.93 SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 2
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/23/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW13 M Snyder
'a Blow Completion Depth Lilthology Description E
Counts Feet o..........
a 45 50 55 60 65 Completion Notes:
Site:
Ground Elevation 238.10 Casing Elevation 240.93 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 3
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/24/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW14 M Snyder Blow Completion Depth Lithology Description CE Counts Feet a
a a
a a
a a
a
-a
- a a
a
, J Rd-brown silt I-5-
10 15 20
- 7. 7 Z.
I-ea siiSione Completion Notes:
Site:
Ground Elevation 253.06 Casing Elevation 256.21 SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 1
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/24/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW14 M Snyder l
Completion Depth Lithology Description U
Counts Feet I af 7,ai
,Ai w
a-aM 741 M-M =T:1-:--=L-LM-7-:7-7-:7 =-=71:7
=M-M-7 zr.
7-7z'.;
Completion Notes:
Site:
Ground Elevation 253.06 Casing Elevation 256.21 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 2
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/24/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW14 M Snyder S
Blow Completion Depth Lithology Description E
Counts Feet M '-
a4 aM M
,e'
..'a
...'.i a'-;
,',a
.ia 45 50 55 60 65
..:7.Z-7-Z-------------
Completion Notes:
Ground Elevation 253.06 Casing Elevation 256.21 Site:
SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 3
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/24/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW14 M Snyder E
C')
Blow Counts Complettion Feet I Lithology Description Depth 70 75 80 85 Completion Notes:
Site:
Ground Elevation 253.06 Casing Elevation 256.21 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 4
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/24/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW14 M Snyder
--a Blow Copein Depth Bo Depth Lithology Description U
Counts Feet 09(V 90 95 100 105
- Z1:11-:1L-=1==M Completion Notes:
Site:
Ground Elevation 253.06 Casing Elevation 256.21 SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 5
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/24/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW14 M Snyder
'a Blow Completion Depth Lithology Description Counts Feet 115 120 125 130 Completion Notes:
Site:
Ground Elevation 253.06 Casing Elevation 256.21 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 6
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/24/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW14 M Snyder
'a Blow Completion Depth Lithology Description E
Counts Feet Mj 135 140 145 150 Completion Notes:
Site:
Ground Elevation 253.06 Casing Elevation 256.21 SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 7
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/22/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW15 M Snyder
'a Blow Completion Depth Lithology Description caE Counts Feet o0)I a
a a
a a
a a
a
- a a
Rd-brown silt
~
~
5 10 15 20 Red siltstone Completion Notes:
Site:
Ground Elevation 231.47 Casing Elevation 234.41 SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 1
BORING LOG S
Drill Rig:
Rotary Air Date Drilled:
9/22/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW15 M Snyder D
Blow Depth
-a Completion Lithology Description E
Counts Feet (I,
25 30 35 40 Completion Notes:
Site:
Ground Elevation 231.47 Casing Elevation 234.41 SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 2
BORING LOG SS Drill Rig:
Rotary Air Date Drilled:
9/22/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW16 M Snyder Blow Depth
-a Cou Completion Feet Lithology Description E
Counts Feet a
a a
a a
a a
a a
- a aI a'.
[46 10 15 20 II- --- -- -
Rd-brown silt Red siltstone Completion Notes:
Ground Elevation 234.05 Casing Elevation 236.90 Site:
SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 PPage 1
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/22/09 Logged By:
Boring Dia:
6 Inches Boring Number: BDL-MW16 M Snyder E
Blow Counts Completion Depth Feet Lithology Description
------- -- j LL Completion Notes:
Site:
Ground Elevation 234.05 Casing Elevation 236.90 SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 2
BORING LOG Drill Rig:
Rotary Air Date Drilled:
10/2/09 Logged By:
Boring Dia:
6 Inches Boring Number:
GW-74 J Magee low Completion Depth Lithology Description
_E Counts Feet
_U) a aD.
ai-t a..
Ira-a a
a a
a a
a a
a a
a a-a a
a a
a a
a a
5 HI Rd-brown silt - (Air Knife to 15 ft.)
10 15 20 -1
~
- d-br silt w/clay Rd Siltstone Completion Notes:
Ground Elevation 260.62 Casing Elevation 260.39 Site:
SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 PPage 1
BORING LOG Drill Rig:
Rotary Air Date Drilled:
10/2/09 Logged By:
Boring Dia:
6 Inches Boring Number:
GW-74 J Magee
-a Blow Completion Depth Lithology Description E
Counts Feet
-U)
I 25 30 35 40 Completion Notes:
Site:
Ground Elevation 260.62 Casing Elevation 260.39 SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 Page 2
BORING LOG Drill Rig:
Rotary Air Date Drilled:
10/2/09 Logged By:
Boring Dia:
6 Inches Boring Number:
GW-74 J Magee Blow Completion Depth Lithology Description E
Counts Feet 71-- -7 45 50 55 60 65
-4 Completion Notes:
Site:
Ground Elevation 260.62 Casing Elevation 260.39 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 3
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/30/09 Logged By:
Boring Dia:
6 Inches Boring Number:
GW-75 J Magee Blow Completion Depth Lithology Description E
Counts Feet
-a:.
7,16 aW a
a a
a a
a Rd-brown silt - (Air knife to 11 ft.)
5 10 15 20 6:=1-
'__1=1..i:-6A Weathered rd Siltstone Completion Notes:
Ground Elevation 260.10 Casing Elevation 259.86 Site:
SHNPP Cooling Tower Blowdown Line New Hill, NC Project No.:
SHNPP-1 PPage 1
BORING LOG Drill Rig:
Rotary Air Date Drilled:
9/30/09 Logged By:
Boring Dia:
6 Inches Boring Number:
GW-75 J Magee
()
0.*
E ca Blow Counts Connpletion Depth Feet Lithology Description 25 30 35 40 T-" ---
Completion Notes:
Site:
Ground Elevation 260.10 Casing Elevation 259.86 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 2
BORING LOG
" Drill Rig:
Rotary Air Date Drilled:
9/30/09 Logged By:
Boring Dia:
6 Inches Boring Number:
GW-75 J Magee Blow Completion Depth Lithology Description E
Counts Feet 45 50 55 60 65
. 1 -
4 Completion Notes:
Site:
Ground Elevation 260.10 Casing Elevation 259.86 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 3
AW q
BORING LOG Drill Rig:
Rotary Air Date Drilled:
10/1/09 Logged By:
Boring Dia:
6 Inches Boring Number:
GW-76 J Magee S
Blow Completion Depth Lithology Description
_UE Counts Feet I I Rd-brown silt - (Air knife to 6 ft.)
5 j
T Weathered rd SiltlBroken Rock
-I~I 10 15 20 Completion Notes:
Site:
Ground Elevation 259.25 Casing Elevation 2258.84 SHNPP Cooling Tower Blowdown LinE New Hill, NC Project No.:
SHNPP-1 Page 1
SS.
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 Appendix B NCDENR Well Construction Records
NONRESIDENTIAL WELL CONSTRUCTION RECORD Norli Carolina Department of Environment and Natural Resources-Division of Water Quality WELL CONTRACTOR CERTIFICATION # 2452
- 1. WELL CONTRACTOR:
JERRY WATKINS Well Contractor (Individual) Name GEOLOGIC EXPLORATION, INC.
Well Contractor Company Name STREET ADDRESS 176 COMMERCE BLVD STATESVILLE NC 28625 City or Town State Zip Code (704
- 872-7686 Area code-Phone number
- 2. WELL INFORMATION:
SITE WELL ID #(if applicable)
MW-10 STATE WELL PERMIT#(if applicable)_
DWQ or OTHER PERMIT #(if applicable)_
WELL USE (Check Applicable Box) Monitoring fD Municipal/Public 0 Industrial/Commercial E Agricultural C1 Recovery 0 Injection D Inigationo-Other C] (list use)
DATE DRILLED 09128109 TIME COMPLETED AM O PM O
- 3. WELL LOCATION:
CITY: NEW HILL COUNTY WAKE SHEARON HARRIS ROAD 27562 (Street Name, Numbers, Community, Subdivsion, Lot No., Parcel, Zip Code)
TOPOGRAPHIC / LAND SETTING:
OSlope [Valley []Flat DRidge El Other (check appropriate box)
LATITUDE
-May be in degrees, minutes, seconds or LONGITUDE in a decimal format Latitude/longitude source: CGPS oTopographic map (location of well must be shown on a USGS topo map and attached to this form if not using GPS)
- 4. FACILITY-is the name of the business where the well is located.
FACILITY ID #(if applicable)
NAME OF FACILITY SHEARON HARRIS NUCLEAR PLANT STREET ADDRESS SHEARON HARRIS ROAD NEW HILL NC 27562 City or Town State Zip Code CONTACT PERSON PROGRESS ENERGY MAILING ADDRESS PO BOX 165 NEW HILL NC 27562
- d. TOP OF CASING IS 2.5 FT. Above Land Surface*
- Top of casing terminated at/or below land surface may require a variance in accordance with 15A NCAC 2C.0118.
- e. YIELD (gpm): N/A METHOD OF TEST N/A
- f. DISINFECTION: Type N/A Amount N/A
- g. WATER ZONES (depth):
Fromn To_
From_
To From_
To_
From_
To From To_
From_
To
- 6. CASING:
Thickness/
Depth Diamleer Weliht Material From 0.0 To 40.0 Ft._2 INCH SCr 40 PVC From To_
_ Ft._
From To_
Ft._
- 7. GROUT:
Depth Material Method From 0.0 To 17.0 Ft. Portland Sentonite SLURRY From_____ To
_ Ft.
From_
To_
Ft.
- 8. SCREEN:
Depth Diameter Slot Size Material From 40.0 To 60.0 Ft. 2.0 in..010 in. PVC From _
To _
Ft.
in.
in.
From__
_ To Ft.
in.
in.
- 9. SANDIGRAVEL PACK:
Depth Size Material From 20.0 To 60.0 Ft. 20-40 FINE SILICA SAND From To_
Ft.
From To_
Ft.
- 10. DRILLING LOG From To Formation Description 0.0 18.0 RED SILT 18.0 20.0 YELLOW/ORANGE CLAY 20.0 80.0 RED MUDSTONE 11, REMARKS:
BENTONITE SEAL FROM 17.0 TO 20.0 FEET COty or Town State Zip Code Area code - Phone number
- 5. WELL DETAILS:
- a. TOTAL DEPTH:
60.0 FEET
- b. DOES WELL REPLACE EXISTING WELL? YES C NO MJ
- c. WATER LEVEL Below Top of Casing:
25.0 FT.
(Use "+" if Above Top of Casing)
I DO HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCOROANCE WITH I*syCAC 2C. WELL C TRUCIoICsrOA, STDA I HAT A COPY OF THIS RMRI BEN P Q1ED TO/2 W6/0
":*10/26/09 SIGNATURE OF CERTIFIED WELL CONTRACTOR JERRY WATKINS DATE PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days. Attn: Information Mgt.,
1617 Mail Service Center-Raleigh, NC 27699-1617 Phone No. (919) 733-7015 ext 568.
Form GW-1 b Rev. 7/05
NoN RESIDENTIAL WELL CONSTRUCTION RECORD North Carolina Department of Environment and Natural Resources-Division of Water Quality WELL CONTRACTOR CERTIFICATION # 2452
- 1. WELL CONTRACTOR:
JERRY WATKINS Well Contractor (Individual) Name GEOLOGIC EXPLORATION, INC.
Well Contractor Company Name STREET ADDRESS 176 COMMERCE BLVD STATESVILLE NC 28625 City or Town State Zip Code 704
-. 872-7686 Area code-Phone number
- 2. WELL INFORMATION:
SITE WELL ID #(if applicable)_ MW-11 STATE WELL PERMIT#(if applicable)_
DWQ or OTHER PERMIT #(if applicable)
WELL USE (Check Applicable Box) Monitoring El Municipal/Public D Industrial/Commercial 0 Agricultural 0 Recovery D Injection 0 Irrigationo Other 0 (list use)
DATE DRILLED 09/30/09 TIME COMPLETED AMD PM D
- 3. WELL LOCATION:
CITY: NEW HILL COUNTY WAKE SHEARON HARRIS ROAD 27562
- d. TOP OF CASING IS 2.5 FT. Above Land Surface*
- Top of casing terminated al/or below land surface may require a variance in accordance with 15A NCAC 2C.0118.
- e. YIELD (gpm): N/A METHOD OF TEST N/A
- f.
DISINFECTION: Type N/A Amount N/A
- g. WATER ZONES (depth):
From To_
From_
To From_
To_
From To From To____
From_
To
- 6. CASING:
Thickness/
Depth Diam eter Weiah&
Material From 0.0 To 7.0 Ft._2 INCA SC-4o PVC From To_
Ft._
From_
To_
Ft._
- 7. GROUT:
Depth Material Method From 0.0 To 1.0 Ft. Portland Benlonile SLURRY From____
To Ft.
From_
To_
Ft.
- 8. SCREEN:
Depth Diameter Slot Size Material From 7.0 To 27.0 Ft. 2.0 in..010 in. PVC From _
o o Ft.
in.
in.
From_
To Ft.
in.
In.
- 9. SAND/GRAVEL PACK:
Depth Size Material From 5.0 To 27.0 Ft. 20-40 FINE SILICA SAND From To_
Ft.
From To_
Ft.
- 10. DRILLING LOG From To Formation Description 0.0 8.0 RED SILT 8.0 27.0 RED MUDSTONE
- 11. REMARKS:
BENTONITE SEAL FROM 1.0 TO 5.0 FEET (Street Name, Numbers, Community, Subdivision, Lot No., Parcel. Zip Code)
TOPOGRAPHIC / LAND SETTING:
OSIope OValley OFlat ORidge 0 Other (check appropilate box)
LATITUDE May be in degrees, minutes, seconds or LONGITUDE in a decimal fonmat Latitude/longitude source: o GPS DTopographic map (location of well must be shown on a USGS topo map and attached to this form if not using GPS)
- 4. FACILITY-is Ithe name of the business where the well is located.
FACILITY ID #(if applicable)
NAME OF FACILITY SHEARON HARRIS NUCLEAR PLANT STREET ADDRESS SHEARON HARRIS ROAD NEW HILL NC 27562 City or Town Slate Zip Code CONTACT PERSON PROGRESS ENERGY MAILING ADDRESS P0 BOX 165 NEW HILL NC 27562 City or Town State Zip Code Area code - Phone number
- 5. WELL DETAILS:
- a. TOTAL DEPTH: 27.0 FEET
- b. DOES WELL REPLACE EXISTING WELL? YES 0 NO gi
- c. WATER LEVEL BelowTop of Casing:
3.0 FT.
(Use "+" if Above Top of Casing) 1 00 HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 15A NCAC 2C. WELL CONSTRUCTION STANDARDS, AND THAT A COPY OF THIS REC D HAS BEEN PROVIoED TO THE WELL OWNER-4 AA.
R.
10126/09~
SIGNATUREPtF CERTIFIED WELL CONTRACTOR JERRY WATKINS DATE PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days. Attn: Information Mgt.,
1617 Mail Service Center-Raleigh, NC 27699-1617 Phone No. (919) 733-7015 ext 568.
Form GW-lb Rev. 7/05
NON RESIDENTIAL WELL CONSTRUCTION RECORD North Carolina Department of Environment and Natural Resources-Division of Water Quality WELL CONTRACTOR CERTIFICATION # 2452
- 1. WELL CONTRACTOR:
JERRY WATKINS Well Contractor (Individual) Name GEOLOGIC EXPLORATION, INC, Well Contractor Company Name STREET ADDRESS 176 COMMERCE BLVD STATESVILLE NC 28625 City or Town State Zip Code 704
- 872-7686 Area code-Phone number
- 2. WELL INFORMATION:
SITE WELL ID #(if applicable)
MW-12 STATE WELL PERMIT#(if applicable)_
DWQ or OTHER PERMIT #(if applicable)_
WELL USE (Check Applicable Box) Monitoring 91 Municipal/Public Dl Industrial/Commercial 0 Agricultural DI Recovery [I Injection 0 IrrigationD Other 0 (list use)
DATE DRILLED 09124109 TIME COMPLETED AM D PM O
- 3. WELL LOCATION:
CITY: NEW HILL COUNTY WAKE SHEARON HARRIS ROAD 27562 (Street Name, Numbers, Community, Subdivision, Lot No., Parcel, Zip Code)
TOPOGRAPHIC / LAND SETTING:
DSIope oValley DFlat ORidge El Other (check appropriate box)
LATITUDE May be in degrees, minutes, seconds or LONGITUDE in a decimal format Latitude/longitude source: DGPS oTopographic map (location of well must be shown on a USGS t opo map and attached to this form if not using GPS)
- 4. FACILITY-is the name of the business where the well is located.
FACILITY ID #(if applicable)
NAME OF FACILITY SHEARON HARRIS NUCLEAR PLANT STREETADDRESS SHEARON HARRIS ROAD NEW HILL NC 27562 City or Town State Zip Code CONTACT PERSON PROGRESS ENERGY MAILING ADDRESS P0 BOX 165 NEW HILL NC 27562 City or Town State Zip Code Area code - Phone number
- 5. WELL DETAILS:
- a. TOTAL DEPTH:
60.0 FEET
- b. DOES WELL REPLACE EXISTING WELL? YES El NO El
- c. WATER LEVEL Below Top of Casing:
29.0 FT.
(Use "+" if Above Top of Casing)
- d. TOP OF CASING IS 2.5 FT. Above Land Surface*
- Top of casing terminated at/or below land surface may require a variance in accordance with 15A NCAC 2C.0118.
- e. YIELD (gpm): N/A METHOD OF TEST N/A
- f.
DISINFECTION: Type N/A Amount N/A
- g. WATER ZONES (depth):
From_
To_
From_
To From_
To_
From_
To From_
To_
From_
To
- 6. CASING:
Thickness/
Depth 2Dimeter Weioh' Material From 0.0 To 40.0 Ft.2 SC0'4 PVC From_
To_
Ft._
From_
To_
Ft._
- 7. GROUT:
Depth Material Method From 0.0 To 20.0 Ft. Portland Bentonite SLURRY From To Ft.
From_
To_
Ft.
- 8. SCREEN:
Depth Diameter Slot Size Material From 40.0 To 60.0 Ft. 2.0 in.
.010 in.
PVC From__
_ To_
Ft.
in.
_in.
From_
To_
Ft.
in.
in.
- 9. SANDIGRAVEL PACK:
Depth Size Material From 25.0 To 60.0 Ft. 20-40 FINE SILICA SAND From To Ft.
From To_
Ft.
- 10. DRILLING LOG From To Formation Description 0.0 6.0 YELLOW SANDY CLAY 6.0 60.0 RED MUDSTONE
- 11. REMARKS:
BENTONITE SEAL FROM 20.0 TO 25.0 FEET tO HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 15 NCAC 2C. WELL CONSTRUCTION STANDARDS, AND THAT A COPY OF THIS ORD HAS BEEN W9VIOEDT0,THE WELL 0 NER.
SIGNATURE OF CERTIFIED WELL CONTRACTOR JERRY WATKINS DATE PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days. Attn: Information Mgt.,
1617 Mail Service Center-Raleigh, NC 27699-1617 Phone No. (919) 733-7015 ext 568.
Form GW-lb Rev. 7/05
NON RESIDENTIAL WELL CONSTRUCTION RECORD North Carolina Department of Environment and Natural Resources-Division of Water Quality WELL CONTRACTOR CERTIFICATION # 2452
- 1. WELL CONTRACTOR:
JERRY WATKINS Well Contractor (Individual) Name GEOLOGIC EXPLORATION, INC.
Well Contractor Company Name STREET ADDRESS 176 COMMERCE BLVD STATESVILLE NC 28625 City or Town State Zip Code (704
-.. 872-7686 Area code-Phone number
- 2. WELL INFORMATION:
SITE WELL ID #(if applicable)_ MW-13 STATE WELL PERMIT#(lt applicable)
DWQ or OTHER PERMIT #(if applicable)
WELL USE (Check Applicable Box) Monitoring 9) Municipal/Public C]
Industrial/Commercial 0 Agricultural 0 Recovery [] Injection I]
IrrigationO Other 0 (list use)
DATE DRILLED 09/23/09 TIME COMPLETED AM 0 PM 0
- 3. WELL LOCATION:
CITY: NEW HILL COUNTY WAKE SHEARON HARRIS ROAD 27562 (Street Name, Numbers, Community, Subdivision, Lot No., Parcel, Zip Code)
TOPOGRAPHIC / LAND SETTING:
0Slope oValley DFlat ORidge 0 Other (check appropriate box)
LATITUDE May be in degrees, minutes, seconds or LONGITUDE in a decimal format Latitude/longitude source: oGPS oTopographic map (location of well must be shown on a USGS topo map and attached to this form if not using GPS)
- 4. FACILITY-is the name of the business where the well is located.
FACILITY ID #(if applicable)
NAME OF FACILITY SHEARON HARRIS NUCLEAR PLANT STREET ADDRESS SHEARON HARRIS ROAD NEW HILL NC 27562 City or Town State Zip Code CONTACT PERSON PROGRESS ENERGY MAILING ADDRESS P0 BOX 165 NEW HILL NC 27562 City or Town State Zip Code Area code - Phone number
- 5. WELL DETAILS:
- a. TOTAL DEPTH:
60.0 FEET
- b. DOES WELL REPLACE EXISTING WELL? YES E]
NO El
- c. WATER LEVEL Below Top of Casing:
29.0 FT.
(Use "+" if Above Top of Casing)
- d. TOP OF CASING IS 2.5 FT. Above Land Surface*
- Top of casing terminated al/or below land surface may require a variance in accordance with 15A NCAC 2C.0118.
- e. YIELD (gpm): N/A METHOD OF TEST N/A
- f.
DISINFECTION: Type N/A Amount N/A
- g. WATER ZONES (depth):
From_
_ To From To From_
To_ _
From_
To From_
To_
From To
- 6. CASING:
Thickness/
Depth Diameter We'.ht Material From 0.0 To 40.0 Ft._2 CH 041 PVC From _
To__
Ft._
From__
To Ft._
- 7. GROUT:
Depth Material Method From 0.0 To 22.0 Ft. Portland Bentonite SLURRY From__
_ To_
Ft.
From_
To_
Ft.
- 8. SCREEN:
Depth Diameter Slot Size Material From 40.0 To 60.0 Ft. 2.0 in..010 in. PVC From To_
Ft.
in.
_in.
From_
To_
Ft.
in.
_in.
- 9. SANDIGRAVEL PACK:
Depth Size Material From 25.0 To 60.0 Ft. 20-40 FINE SILICA SAND From To_______ Ft._
From To_
Ft.
- 10. DRILLING LOG From To Formation Description 0.0 2.0 ORANGE SANDY CLAY 2.0 60.0 RED MUDSTONE
- 11. REMARKS:
BENTONITE SEAL FROM 22.0 TO 25.0 FEET I DO HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 15A NCAC 2C. WELL CONSTRUCTION STANDARDS, AND THAT A COPY OF THIS R-RD HAS BEEN PR0 tOED TO THE WELL OWNER.
(A10/26/09 SIGNATURE OF CERTIFIED WELE"CONI-ACTOR JERRY WATKINS DATE PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days. Attn: Information Mgt.,
1617 Mail Service Center-Raleigh, NC 27699-1617 Phone No. (919) 733-7015 ext 568.
Form GW-lb Rev. 7105
NONRESIDENTIAL WELL CONSTRUCTION RECORD North Carolina Department of Environment and Natural Resources-Division otWater Quality WELL CONTRACTOR CERTIFICATION # 2452
- 1. WELL CONTRACTOR:
JERRY WATKINS Well Contractor (Individual) Name GEOLOGIC EXPLORATION, INC.
Well Contractor Company Name STREET ADDRESS 176 COMMERCE BLVD STATESVILLE NC 28625 City or Town State Zip Code (704 872-7686 Area code-Phone number
- 2. WELL INFORMATION:
SITE WELL ID #(if applicable)
MW-14 STATE WELL PERMIT#(if applicable)
DWQ or OTHER PERMIT #(if applicable)
WELL USE (Check Applicable Box) Monitoring 91 Municipal/Public 0 Industrial/Commercial 0 Agricultural [1 Recovery 0 Injection uj IrrigationO Other 0 (list use)
DATE DRILLED 09/24/09 TIME COMPLETED AM []
PM 0
- 3. WELL LOCATION:
CITY: NEW HILL COUNTY WAKE SHEARON HARRIS ROAD 27562 (Street Name, Numbers, Community, Subdivision, Lot No., Parcel, Zip Code)
TOPOGRAPHIC / LAND SETTING:
0Slope OValley OFlat DRidge 0 Other (check appropriate box)
LATITUDE May be in degrees, minutes, seconds or LONGITUDE in a decimal formnat Latitude/longitude source:
EIGPS E]Topographic map (location of well must be shown on a USGS topo map and attached to this form if not using GPS)
- 4. FACILITY-is the name of the business where the well is located.
FACILITY ID #(if applicable)
NAME OF FACILITY SHEARON HARRIS NUCLEAR PLANT STREET ADDRESS SHEARON HARRIS ROAD NEW HILL NC 27562
- d. TOP OF CASING IS 2.5 FT. Above Land Surface*
- Top of casing terminated at/or below land surface may require a variance in accordance with 15A NCAC 2C.0118.
- e. YIELD (gpm): N/A METHOD OF TEST N/A
- f.
DISINFECTION: Type N/A Amount N/A
- g. WATER ZONES (depth):
From To_
From_
To From_
To_
From_
To From To_
From_
To
- 6. CASING:
Thickness/
Depth Diameter Weirlht Material From 0.0 To 78.0 Ft. 2 INC1H S-40 PVC From_
To_
Ft._
From To Ft.
- 7. GROUT:
Depth Material Method From 0.0 To 65.0 Ft. Portland Bentonite SLURRY From____ To_
Ft.
From_
To_
Ft.
- 8. SCREEN:
Depth Diameter Slot Size Material From 78.0 To 98.0 Ft. 2.0 in..010 in. PVC From___
To Ft.
in.
_in.
From_
To_
Ft.
in.
in.
- 9. SAND/GRAVEL PACK:
Depth Size Material From 73.0 To 98.0 Ft. 20-40 FINE SILICA SAND From To_
Ft._
From To_
Ft.
- 10. DRILLING LOG From To Formation Description 0.0 2.0 ORANGE SANDY CLAY 2.0 150.0 RED MUDSTONE
- 11. REMARKS:
BENTONITE SEAL FROM 65.0 TO 73.0 FEET City or Town State Zip Code CONTACT PERSON PROGRESS ENERGY MAILING ADDRESS PO BOX 165 NEW HILL NC 27562 City or Town State Zip Code Area code - Phone number
- 5. WELL DETAILS:
- a. TOTAL DEPTH:
98.0 FEET
- b. DOES WELL REPLACE EXISTING WELL? YES 0 NO EI
- c. WATER LEVEL Below Top of Casing:
80.0 FT.
(Use "+" if Above Top of Casing)
I 00 HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 15A NCAC 2C, WELL CONSTRUCTION STANDARDS, AND THAT A COPY OF THIS REC.UD HAS BEEN PROVIDED TO THE WELL OWNER.
'4 6k4 P.
( A-I t 9 10/26/09 SIGNATURE' OF CERTIFIED WEL'r_%ý"ffTDR JERRY WATKINS DATE PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days. Attn: Information Mgt.,
1617 Mail Service Center-Raleigh, NC 27699-1617 Phone No. (919) 733-7015 ext 568.
Form GW-lb Rev. 7/05
NONRESIDENTIAL WELL CONSTRUCTION RECORD North Carolina Department of Environment and Natural Resources-Division of Water Quality WELL CONTRACTOR CERTIFICATION # 2452
- 1. WELL CONTRACTOR:
JERRY WATKINS Well Contractor (Individual) Name GEOLOGIC EXPLORATION, INC.
Well Contractor Company Name STREET ADDRESS 176 COMMERCE BLVD STATESVILLE NC 28625 City or Town State Zip Code (704
- 872-7686 Area code-Phone number
- 2. WELL INFORMATION:
SITE WELL ID #(it applicable)
MW-15 STATE WELL PERMIT#(if applicable)_
DWQ or OTHER PERMIT #(if applicable)
WELL USE (Check Applicable Box) Monitoring [] Municipal/Public 0 Industrial/Commerciatl 0 Agricultural 0 Recovery 0 Injection 0 IrrigationO-Other 0 (list use)
DATE DRILLED 09/22/09 TIME COMPLETED AM 0 PM 0
- 3. WELL LOCATION:
CITY: NEW HILL COUNTY WAKE SHEARON HARRIS ROAD 27562
- d. TOP OF CASING IS 2.5 FT. Above Land Surface-
- Top of casing terminated atlor below land surface may require a variance in accordance with 15A NCAC 2C.0118.
- e. YIELD (gpm): N/A METHOD OF TEST N/A
- f.
DISINFECTION: Type N/A Amount N/A
- g. WATER ZONES (depth):
From _
To _
From To From__
To_
From_
To From_
To_
From To
- 6. CASING:
Thickness/
Depth Diamer Weiaht Material From 0.0 To 15.0 Ft._2 INCH SC-r40 PVC From _
To Ft._
From_____
To Ft.
- 7. GROUT:
Depth Material Method From 0.0 To 10.0 Ft. Portland Bentonile SLURRY From_
To_
Ft.
From_
To_
Ft.
- 8. SCREEN:
Depth Diameter Slot Size Material From 15.0 To 30.0 Ft. 2.0 in..010 in. PVC From_
To_
Ft.
in.
in.
From_
To Ft.
in.
_in.
- 9. SANDIGRAVEL PACK:
Depth Size Material From 13.0 To 30.0 Ft, 20-40 FINE SILICA SAND From To_
Ft._
From To_
Ft._
- 10. DRILLING LOG From To Formation Description 0.0 3.0 RED SILT 3.0 30.0 RED MUDSTONE
- 11. REMARKS:
BENTONITE SEAL FROM 10.0 TO 13.0 FEET (Street Name, Numbers, Community, Subdivision, Lot No.. Parcel, Zip Code)
TOPOGRAPHIC / LAND SETTING:
[:Slope OValley []Flat ORidge 0 Other (check appropriate box)
LATITUDE May be in degrees, minutes, seconds or LONGITUDE in a decimal format Latitude/longitude source: QGPS 0 Topographic map (location of we/I must be shown on a USGS topo map and attached to this form if not using GPS)
- 4. FACILITY-is the name of the business where the well is located.
FACILITY ID #(if applicable)_
NAME OF FACILITY SHEARON HARRIS NUCLEAR PLANT STREET ADDRESS SHEARON HARRIS ROAD NEW HILL NC 27562 City or Town State Zip Code CONTACT PERSON PROGRESS ENERGY MAILING ADDRESS PO BOX 165 NEW HILL NC 27562 City or Town Stale Zip Code Area code - Phone number
- 5. WELL DETAILS:
- a. TOTAL DEPTH:
30.0 FEET
- b. DOES WELL REPLACE EXISTING WELL? YES 0 NO El
- c. WATER LEVEL Below Top of Casing:
19.0 FT.
(Use "+" if Above Top of Casing) tOO HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 15A AC 2C, WELL CONSTRUCTION STANDARDS. AND THAT A COPY OF THIS RE*
D HAS BEEN PRIWjDEO TO T iE WELL OWNER.
1-t" K -10126109 SIGNATURE OF CERTIFIED WELL CONTRA*Cr"-R JERRY WATKINS DATE PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days. Attn: Information Mgt.,
1617 Mail Service Center-Raleigh, NC 27699-1617 Phone No. (919) 733-7015 ext 568.
Form GW-lb Rev. 7105
NONRESIDENTIAL WELL CONSTRUCTION RECORD North Carolina Department of Environment and Natural Resources-Division of Water Quality WELL CONTRACTOR CERTIFICATION # 2452
- 1. WELL CONTRACTOR:
JERRY WATKINS Well Contractor (Individual) Narne GEOLOGIC EXPLORATION, INC.
Well Contractor Company Name STREET ADDRESS 176 COMMERCE BLVD STATESVILLE NC 28625 City or Town State Zip Code 704
- 872-7686 Area code-Phone number
- 2. WELL INFORMATION:
SITE WELL ID #(if applicable)_ MW-16 STATE WELL PERMIT#Qf applicable)_
DWQ or OTHER PERMIT #(if applicable)_
WELL USE (Check Applicable Box) Monitoring M Municipal/Public 0 Industrial/Commercial 0 Agricultural r] Recovery - Injection E]
Irrigation[
Other 0 (list use)
DATE DRILLED 09/22/09 TIME COMPLETED AM 0 PM 0
- 3. WELL LOCATION:
CITY: NEW HILL COUNTY WAKE SHEARON HARRIS ROAD 27562
- d. TOP OF CASING IS 2.5 FT. Above Land Surface*
- Top of casing terminated at/or below land surface may require a variance in accordance with 15A NCAC 2C.0118.
- e. YIELD (gpm): N/A METHOD OF TESTN/A
- f.
DISINFECTION: Type N/A Amount N/A
- g. WATER ZONES (depth):
From_
To_
From_
To From_
To_
From_
To From_
To_
From_
to
- 6. CASING:
Thickness/
Depth Diaieter W'eiht Material From 0.0 To 25.0 Ft. 2 INCqH Sc-i4o PVC From_
To Ft._
Fromr To_
Ft._
- 7. GROUT:
Depth Material Method From 0.0 To 20.0 Ft. Portland Bentonite SLURRY From____ To_
_ Ft.
From To_
Ft.
- 8. SCREEN:
Depth Diameter Slot Size Material From 25.0 To 40.0 Ft. 2.0 in..010 in. PVC From____
To Ft.
in.
in.
From_
To Ft.
in.
in.
- 9. SAND/GRAVEL PACK:
Depth Size Material From 23.0 To 40.0 Ft. 20-40 FINE SILICA SAND From To_
Ft._
From To_
Ft.
- 10. DRILLING LOG From To Formation Description 0.0 6.0 ORANGE CLAY 6.0 40.0 RED MUDSTONE
- 11. REMARKS:
BENTONITE SEAL FROM 20.0 TO 23.0 FEET (Street Name, Numbers, Community, Subdivision, Lot No., Parcel, Zip Code)
TOPOGRAPHIC / LAND SETTING:
OISIope OValley OFlat ORidge 0 Other (check appropriate box)
LATITUDE M
May be in degrees, minutes, seconds or LONGITUDE in a decimal format Latitude/longitude source: oGPS C Topographic map (location of well must be shown on a USGS topo map and attached to this form if not using GPS)
- 4. FACILITY-is the name of the business where the well is located.
FACILITY ID #(if applicable)_
NAME OF FACILITY SHEARON HARRIS NUCLEAR PLANT STREET ADDRESS SHEARON HARRIS ROAD NEW HILL NC 27562 City or Town State Zip Code CONTACT PERSON PROGRESS ENERGY MAILING ADDRESS PO BOX 165 NEW HILL NC 27562 City or Town State Zip Code Area code - Phone number
- 5. WELL DETAILS:
- a. TOTAL DEPTH:
40.0 FEET
- b. DOES WELL REPLACE EXISTING WELL? YES 0 NO K]
- c. WATER LEVEL Below Top of Casing:
19.0 FT.
(Use "+" if Above Top of Casing) 1 00 HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 1SA NCAC 2C, WELL CONSTRUCTION STANDARDS, AND THATA COPY OF THIS RECOA HAS 13EEN PRO'Vp&D TO THE WELL OWNER.
SIGNATURE OF CERTIFIED WEL
- 1'1* R JERRY WATKINS DATE PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days. Attn: Information Mgt.,
1617 Mail Service Center-Raleigh, NC 27699-1617 Phone No. (919) 733-7015 ext 568.
Form GW-lb Rev 7/5S
NON RESIDENTIAL WELL CONSTRUCTION RECORD North Carolina Department of Environment and Natural Resources-Division of Water Quality WELL CONTRACTOR CERTIFICATION # 2452
- 1. WELL CONTRACTOR:
JERRY WATKINS Well Contractor (Individual) Name GEOLOGIC EXPLORATION, INC.
Well Contractor Company Name STREET ADDRESS 176 COMMERCE BLVD STATESVILLE NC 28625 City or Town State Zip Code 704
- 872-7686 Area code-Phone number
- 2. WELL INFORMATION:
SITE WELL ID#(if applicable)_ GW-74 STATE WELL PERMIT#(it applicable)
DWQ or OTHER PERMIT #(if applicable)_
WELL USE (Check Applicable Box) Monitoring Q Municipal/Public 0 Industrial/Commercial 0 Agricultural 0 Recovery 0 Injection D Irrigationo Other 0 (list use)
DATE DRILLED 10/02/09 TIME COMPLETED AM D PM D
- 3. WELL LOCATION:
CITY: NEW HILL COUNTY WAKE SHEARON HARRIS ROAD 27562 (Street Name, Numbers, Community, Subdivision, Lot No., Parcel, Zip Code)
TOPOGRAPHIC / LAND SETTING:
DSIope 0Valley OFlat
-Ridge D Other (check appropriate box)
LATITUDE May be in degrees, minutes, seconds or LONGITUDE in a decimal format Latitude/longitudesource: DGPS oTopographic map (location of well must be shown on a USGS topo map and attached to this form if not using GPS)
- 4. FACILITY-is the name of the business where the well is located.
FACILITY ID #(if applicable)
NAME OF FACILITY SHEARON HARRIS NUCLEAR PLANT STREET ADDRESS SHEARON HARRIS ROAD NEW HILL NC 27562 City or Town State Zip Code CONTACT PERSON PROGRESS ENERGY MAILING ADDRESS PO BOX 165 NEW HILL NC 27562 City or Town State Zip Code Area code - Phone number
- 5. WELL DETAILS:
- a. TOTAL DEPTH:
60.0 FEET
- b. DOES WELL REPLACE EXISTING WELL? YES D NO M
- c. WATER LEVEL Below Top of Casing:
25.0 FT.
(Use "+" if Above Top of Casing)
- d. TOP OF CASING IS 0.0 FT. Above Land Surface*
'Top of casing terminated al/or below land surface may require a variance in accordance with 15A NCAC 2C.0118.
- e. YIELD (gpml: N/A METHOD OF TEST N/A
- f. DISINFECTION: Type N/A Amount N/A
- g. WATER ZONES (depth):
From_
To_
From_
To From_
To_
From_
To From_
To From To
- 6. CASING:
Thickness/
Depth Di.mer Welohl Material From 0.0 To 40.0 FI,. 2sI CI411 PVC From _
To _
Ft._
From_
_ To Ft._
- 7. GROUT:
Depth Material Method From 0.0 To 20.0 Ft. Portland Bentonite SLURRY Fromn To_
Ft.
From To_
Ft.
- 8. SCREEN:
Depth Diameter Slot Size Material From 40.0 To 60.0 Ft. 2.0 in..010 in.
PVC From_
To Ft.
in.
in.
From To_
Ft.
in.
in.
- 9.
SAND/GRAVEL PACK:
Depth Size Material From 25.0 To 60.0 Ft. 20-40 FINE SILICA SAND From To_
Ft.____
From To Ft.
- 10. DRILLING LOG From To Formation Description 0.0 15.0 AIR KNIFE 15.0 18.0 RED SILT 18.0 20.0 ORANGE CLAY 20.0 60.0 RED MUDSTONE
- 11. REMARKS:
BENTONITE SEAL FROM 20.0 TO 25.0 FEET I 00 HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 15AdAC 2C. WELL COI&TRUCTION STANDARDS, AND THAT A COPY OF THIS RE.D HAS BEEN PlOEDED TO T1E WELL 0 WilER.
10(26109 SIGNATURE OF CERTIFIED WELL CONTRACTOR DATE JERRY WATKINS PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days. Attn: Information Mgt.,
1617 MalI Service Center-Raleigh, NC 27699-1617 Phone No. (919) 733-7015 ext 568.
Form GW-lb Rev. 7/05
NON RESIDENTIAL WELL CONSTRUCTION RECORD North Carolina Department of Environment and Natural Resources-Division of Water Quality WELL CONTRACTOR CERTIFICATION # 2452
- 1. WELL CONTRACTOR:
JERRY WATKINS Well Contractor (Individual) Name GEOLOGIC EXPLORATION, INC.
Well Contractor Company Name STREET ADDRESS 176 COMMERCE BLVD STATESVILLE NC 28625 City or Town State Zip Code (704
- 872-7686 Area code-Phone number
- 2. WELL INFORMATION:
SITE WELL ID #(if applicable)
GW-75 STATE WELL PERMIT#(if applicable).
DWQ or OTHER PERMIT #(if applicable)_
WELL USE (Check Applicable Box) Monitoring 9-Municipal/Public c Industrial/Commercial ]
Agricultural LI Recovery [] Injection 0 Irigation] Other 0 (list use)
DATE DRILLED 09130109 TIME COMPLETED AM E]
PM E]
- 3. WELL LOCATION:
CITY: NEW HILL COUNTY WAKE SHEARON HARRIS ROAD 27562 (Street Name, Numbers, Community, Subdivision, Lot No., Parcel. Zip Code)
TOPOGRAPHIC / LAND SETTING:
LISlope []Valley DFlat LIRidge [] Other (check appropriate box)
LATITUDE May be in degrees, minutes, seconds or LONGITUDE in a decimal format Latitude/longitude source: ciGPS oTopographicmap (location of well must be shown on a USGS topo map and attached to this form ff not using GPS)
- 4. FACILITY-is the name of the business where the well is located.
FACILITY ID #(if applicable)_
NAME OF FACILITY SHEARON HARRIS NUCLEAR PLANT STREET ADDRESS SHEARON HARRIS ROAD NEW HILL NC 27562 City or Town State Zip Code CONTACT PERSON PROGRESS ENERGY MAILING ADDRESS PO BOX 165 NEW HILL NC 27562 City or Town State Zip Code
(._____
Area code - Phone number
- 5. WELL DETAILS:
- a. TOTAL DEPTH:
50.0 FEET
- b. DOES WELL REPLACE EXISTING WELL? YES LI NO M
- c. WATER LEVEL Below Top of Casing:
25.0 FT.
(Use "+" if Above Top of Casing)
- d. TOP OF CASING IS 0.0 FT. Above Land Surface'
- Top of casing terminated at/or below land surface may require a variance in accordance with 15A NCAC 2C.0118.
- e. YIELD (gpm): N/A METHOD OF TEST N/A
- f.
DISINFECTION: Type N/A Amount N/A
- g. WATER ZONES (depth):
From_
To-From_
To From To From_
To From_
To_
From_
To
- 6. CASING:
Thickness/
Depth Diameter Weioht Material From 0.0 To 30.0 Ft. 2 INCH scM40 PVC From To Ft._
From_
To_
Ft._
- 7. GROUT:
Depth Material Method From 0.0 To 20.0 Ft. Portland Bentonile SLURRY From To_
Ft.
From To_
Ft.
- 8. SCREEN:
Depth Diameter Slot Size Material From 30.0 To 50.0 Ft. 2.0 in..010 in. PVC From To_
Ft.
in.
_in.
From_
To_
Ft.
in.
in.
- 9. SAND/GRAVEL PACK:
Depth Size Material From 25.0 To 50.0 Ft. 20-40 FINE SILICA SAND From To_
Ft.
From To_
Ft._
- 10. DRILLING LOG From To Formation Description 0.0 11.0 AIR KNIFE 11.0 50.0 RED SILT
- 11. REMARKS:
BENTONITE SEAL FROM 20.0 TO 25.0 FEET I DO HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 15A NCAC 2C. WELL CONSTRUCTION STANDARDS. AND THAT A COPY OF THIS RECOFSAHAS BEEN PROVIEkFD TO THE WELL OWNER.
,,,k
(&I A
10/26/09 SIGNATURE OF CERTIFIED WELL CONTRACTOR JERRY WATKINS DATE PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days. Attn: Information Mgt.,
1617 Mail Service Center-Raleigh, NC 27699-1617 Phone No. (919) 733-7015 ext 568.
Form GW-1b Rev. 7/05
NON RESIDENTIAL WELL CONSTRUCTION RECORD North Carolina Department of Environment and Natural Resources-Division of'Water Quality WELL CONTRACTOR CERTIFICATION # 2452
- 1. WELL CONTRACTOR:
JERRY WATKINS Well Contractor (Individual) Name GEOLOGIC EXPLORATION, INC, Well Contractor Company Name STREET ADDRESS 176 COMMERCE BLVD STATESVILLE NC 28625 City or Town State Zip Code 704
-_. 872-7686 Area code-Phone number
- 2. WELL INFORMATION:
SITE WELL ID#t(if applicable)
GW-76 STATE WELL PERMIT#(if applicable)_
DWQ or OTHER PERMIT #(if applicable)_
WELL USE (Check Applicable Box) Monitoring Ql Municipal/Public 3 Industrial/Commercial [I Agricultural 0 Recovery [3 Injection El IrrigationO3 Other 0 (list use)
DATE DRILLED 10/02/09 TIME COMPLETED AM 0 PM O
- 3. WELL LOCATION:
CITY: NEW HILL COUNTY WAKE SHEARON HARRIS ROAD 27562 (Street Name, Numbers, Community, Subdivision, Lot No., Parcel, Zip Code)
TOPOGRAPHIC ? LAND SETTING:
O-ISlope OValley O]Flat
- Ridge C] Other (check appropriate box)
LATITUDE May be in degrees, minutes, seconds or LONGITUDE in a decimal format Latitude/longitude source: oGPS c Topographic map (location of well must be shown on a USGS topo map and attached to this form if not using GPS)
- 4. FACILITY-is the name of the business where the well is located.
FACILITY ID #(if applicable)_
NAME OF FACILITY SHEARON HARRIS NUCLEAR PLANT STREET ADDRESS SHEARON HARRIS ROAD NEW HILL NC 27562 City or Town State Zip Code CONTACT PERSON PROGRESS ENERGY MAILING ADDRESS PO BOX 165 NEW HILL NC 27562 City or Town State Zip Code Area code - Phone number
- 5. WELL DETAILS:
- a. TOTAL DEPTH:
11.0
- b. DOES WELL REPLACE EXISTING WELL? YES 0 NO Dl
- c. WATER LEVEL Below Top of Casing:
6.0 FT.
(Use "+" if Above Top of Casing)
- d. TOP OF CASING IS 0.0 FT. Above Land Surface*
- Top of casing terminated at/or below land surface may require a variance in accordance with 15A NCAC 2C.0118.
- e. YIELD (gpm): N/A METHOD OF TEST N/A I.
DISINFECTION: Type N/A Amount N/A
- g. WATER ZONES (depth):
From_
To From_
To From_
To_
From_
To From_
To From To
- 6. CASING:
Thickness/
Depth DiAmeter Weirtht Malerial From 0.0 To 6.0 Ft._2 I PVC From_
To_
Ft._
From_
To_
Ft._
- 7. GROUT:
Depth Material Method From 0.0 To 1.0 Ft. Portland Bentonite SLURRY Fromm_
To_
_ Ft.
From To Ft.
- 8. SCREEN:
Depth Diameter Slot Size Material From 6.0 To 11.0 Ft. 2.0 in..010 in. PVC From _
To _
Ft.
in.
in.
From_
To Ft.
in.
_in.
- 9.
SAND/GRAVEL PACK:
Depth Size Material From 4.0 To 11.0 Ft. 20-40 FINE SILICA SAND From To Ft.
From To_
Ft._
- 10. DRILLING LOG From To Formation Description 0.0 6.0 AIR KNIFE 6.0 11.0 RED SILT/BROKEN UP ROCK
- 11. REMARKS:
BENTONITE SEAL FROM 1.0 TO 4.0 FEET I 00 HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 15A NCAC 2C. WELL CONSTRUCTION STANDARDS, AND THAT A COPY OF THIS RECOF HAS BEEN PROVIDED TO THE WELL OWNER.
1
- JLA 1
F..
a 10/26/09 SIGNA.TURE O CERTIFIED R
JERRY WATKINS DATE PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days. Attn: Information Mgt.,
1617 Mail Service Center-Raleigh, NC 27699-1617 Phone No. (919) 733-7015 ext 568.
Form GW-lb Rev. 7/05
ss.
Cooling Tower Blowdown Line Supplemental Groundwater Assessment Report Shearon Harris Nuclear Power Plant December 2009 Appendix C Sample Log Forms
Groundwater Monitoring Log Groundwater Sample Identification:
Sample Date:
Io-13 o0i Sample Analysis:
Tr;-'T,*.
Sampled by: D
/
3O-> [,,
Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (0C)
(pS/cm)
(pH units)
Water (ft)
(ml/min)
O.F -773
-iLO
_2 St"573
'7. L4i -,
Sample Time:
IG ;'2_0 Initial water level:
Operability Check (Indication in ft) _
a-Final Depth to Water:
,_5 b-Depth to Water (at time of 1st reading):
3.),3 a-b=Drawdown (D):
)2.,2q-Bladder Pump Settinqs Discharge Time:-
J*.
Fill Time:
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
i 360SO j 4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (GVP)
Final Flow Rate (ml/min) x Purge Time (minutes between I1' reading and sample tim e):
C, -7 5 " Q A-'
/.;.
- 0
- t =
GVP > CVP:
NO)
Comments:
Gamma Result (pici/ml):
Tritium Result (.tci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
C T 5 D - M U 12, Sample Date:
Sample Analysis:
- ti:.
D-~ is- 0'1 Sampled by:.io y4c5'.
ýel 4-0V Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (0C)
(pS/cm)
(pH units)
Water (ft)
(ml/min)
S T
'5, i
_*ri a
v 0___
Ltj 0 lo0',OL
_5___4_,:-_
_T___
Thq I (3,.fý(
-5 Sample Time:
L'
[initial water level:
C-. 1 Operability Check (Indication in ft) a-Final Depth to Water:
(I__,__ k b-Depth to Water (at time of 1st reading): 9,76 a-b=Drawdown (D): _
_t_0_
Bladder Pump Settinas Discharge Time:
Fill Time:
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (G VP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1st reading and sample time):
GVP > C'VP:(YEýSjI NO!,
.)
(.
)*
Comments:
NO--
-4 c t Gamma Result (pci/ml):
Tritium Result (pci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
T OD M W) V'3 Sample Date:
10-~ 13-01 Sample Analysis:
iT-t ;
Sampled by: DJ &J,/
4, SrD-Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (OC)
(PS/cm)
(pH units)
Water (ft)
(ml/min) 7,2G2 2-0,07 2-_36-/
- 9. 00-___
17J9T 0 ac), 0
_-_t_
(,'7 5-
-7L7-Sample Time:
1 -2:" /'tO Initial water level:
Ii 6 '3 Operability Check (Indication in ft) a-Final Depth to Water:
t6,7 b-Depth to Water (at time of Ist reading):
.1,6 3 a-b=Drawdown (D):
I, (
Bladder Pump Settings Discharge Time:,
Fill Time:
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
-3 1 "
4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (GVP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1St reading and sample time):
55,-0 = G L'P GVP > CVP: (E/ I NO)
Comments:
""ou
)'t 6.
oqo) +(,10t)t059 -
_f r?'50 't I Ozov
--ý- 'ýiý t
~S~j6)
Gamma Result (pci/ml):
Tritium Result (Xci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
W 14 A T E ID Vt) i q-13 Sample Date:
Sample Analysis:_
1 ý3 -
0 ý Sampled by:.
- -,,9
/ ('-.
Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading
(°C)
(pS/cm)
(pH units)
Water (ft)
(ml/min)
Sample Time:
9f<,tL(u()
I-1t *)
Initial water level:
Operability Check (Indication in ft) a-Final Depth to Water:
+-
b-Depth to Water (at time of 1st reading):
a-b=Drawdown (D):
Bladder Pump Settinas Discharge Time:
Fill Time:
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
4" Well: D x (2468 mllft):
Groundwater Volume Purged (GVP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1st reading and sample time):
GVP > CVP: (YES / NO)
Comments:
0*
6-e,*-. 6de, d e Gamma Result (ptci/ml):
Tritium Result (pici/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
(L,2 tt,) -
MV\\A-1[3 Sample Date:
t 0- (,- -1 Sample Analysis:
Sampled by:,.
0,Eck w&k
/,M.
Oct 2:1 1i Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (0C)
(pS/cm)
(pH units)
Water (ft)
(ml/min) 1-)
Sample Time:
I(:oo Initial water level:
Operability Check (Indication in ft)
Bladder Pump Settings, a-Final Depth to Water:
t Discharge Time:
b-Depth to Water (at time of 1st reading)PK, C
Fill Time:
a-b=Drawdown (D):___
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (GVP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1 st reading and sample time):
GVP > CVP: (YES l NO) g Comments:
I2).
q 3' 0Q V r Gamma Result (ptci/ml):
Tritium Result (pci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
CT D 2 ' lvkt4) (
Sample Date:
Sample Analysis:
c~
Sampled by: a C tr
/
- ,ii fq" Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (OC)
(pS/cm)
(pH units)
Water (ift)
(ml/min)
______V 3
'7 Saompl Tim7,:
5-Iiq ti-a we v6 1Sample Time:
('OW Initial water level:
."--f Operability Check (Indication in ft) a-Final Depth to Water:
I 6
b-Depth to Water (at time of 1t reading):
L-, ý1 a-b=Drawdown (D):_
Bladder Pump Settinqs Discharge Time:
Fill Time:
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
'7_____
4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (G VP)
Final Flow Rate (ml/min) x Purge Time (minutes between I" reading and sample time):
GNVP > C VP7E I NO)
Comments: y/ýý 7~iN (JO+/-,
A
'i I'i'9-(
4j
%(10 )
(~
2JLc?
50
-(
2 (,-
4
-t f It S
- 4.
-L70ýd t'ý 317-5 ::
r-ý, VP Gamma Result (pci/ml):
Tritium Result (jaci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
MWl b 0
(0 GW-73)
Sample Date:
(0 _ _31 0C(
Sample Analysis:
I,
Sampled by:) )
J-
/
'k'
- ,*" ?OAP-Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading
(°C)
(pS/cm)
(pH units)
Water (ft)
(ml/min) t J__-_
j6-3 k 7 5-OCq 4?
- v. k
- 40__-_
76)
(3'i3) 1(i-2, 7i SmlTm 16.*t n*itial w Le
,-t 7 -
7,0 Sample Time:
OqOInitial water level:
j-7,-70 Operability Check (Indication in ft)
-2.,7-7 a-Final Depth to Water:
b-Depth to Water (at time of 1st reading):
?. 70 a-b=Drawdown (D):
3, 07 Bladder Pump Settings Discharge Time:
Fill Time:
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (G VP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1t reading and sample time):
GVP > CVP: (*'ESS/ NO)
Comments:.'
Z.,)
- (*?
ý 73)
Z~((YO 5,Lo z(&t/
Gamma Result (pci/ml):
Tritium Result (pci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
Sample Date:
Sample Analysis:
\\ V_ " lt_ý V.11 Sampled by: T*
Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading
(°C)
(pS/cm)
(pH units)
Water (ft)
(ml/min)
Sample Time:
6-: LtC Initial water level:
i"-O, t Operability Check (Indication in ft) a-Final Depth to Water:
b-Depth to Water (at time of 1sL reading):
a-b=Drawdown (D):
Bladder Pump Settings Discharge Time:
Fill Time:
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (G VP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1st reading and sample time):
GVP > CVP: (YES / NO)
Comments:
e V js(L1/2'C o-e
'7,l,-'-
Gamma Result (pci/ml):
Tritium Result (pci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
GW~75 Sample Date to - (,-t - 06t Sample Analysis:
Sampled by:
C waJV (x-. S
-,c-
ý,,Y "
(,( ltl.4 Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (0C)
(pS/cm)
(pH units)
Water (ft)
(ml/min)
C2.*- 0 -O, ot io --112
'7, o O '
( ' _, 0.
1 7 - -
- 7.
7.
i 1-40 z'7,-
1-
-7, 0
-7_
Sample Time:
(Z.t*tO Initial water level:
Operability Check (Indication in ft) a-Final Depth to Water:
(__..____
b-Depth to Water (at time of Ist reading): lit a-b=Drawdown (D):
C9. 7-Bladder Pump Settincas Discharge Time:
Fill Time:
Casing Volume Purged (C VP) 2" Well: D x (613 ml/ft):
4" Well: D x (2468 ml/ft):_
Groundwater Volume Purged (G VP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1st reading and sample time):
GVP > CVP. (V E§S,,{! NO)
Commnts
ýip 7*
2';
- ?'<"-;g tz Gamma Result (ýtci/ml):
Tritium Result (pci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
Sample Date:
to - iLý-10 C(
Sample Analysis:
IV-,T,d*
Sampled by: 0.6,-LJ!5 /MI S.,7 1 34ý 0,)4 Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (0C)
(pS/cm)
(pH units)
Water (ft)
(ml/min) t61t O
6t.75-I
_T 1b:
I____
C.,
__H43_
GjII
.6 Sample Time:
1, Initial water level:
Operability Check (Indication in ft)
Bladder Pump Settings a-Final Depth to Water:
,6 /
Discharge Time-b-Depth to Water (at time of 1 st reading):
C' k(
Fill Time:
a-b=Drawdown (D):__
Casing Volume Purged (CVP) 2 2" Well: D x (613 ml/ft):
_D 4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (G VP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1 st reading and sample time):
GVP > cvP: E NO)
Comments:
Y.--
- )4 (Z-+9_-
4 L 0
-C U V Gamma Result (.tci/ml):
Tritium Result (pci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:_
Groundwater Monitoring Log Groundwater.Sample Identification:
(YI[A) t0 Sample Date:
il o
cQ
___c Sample Analysis:
1 tr i
__Sampled by:_,
Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (0C)
(pS/cm)
(pH units)
Water (ft)
(mI/min)
/3/40 530__
6,7 S t (I
_l______(!;
7
/W V
T Uo, 5÷---+7 Sample Time:
Initial water level:
Operability Check (Indication in ft) a-Final Depth to Water:
L' 0, b-Depth to Water (at time of Is' reading): 14.6.T a-b=Drawdown (D):.....
__7 Bladder Pump Settings Discharge Time:_
Fill Time:
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
- -ct 4" Well: D x (2468 ml/ft):_....
Groundwater Volume Purged (G VP)
Final Flow Rate (ml/min) x Purge Time (minutes between Ist reading and sample time):
(
-25 GVP > CVP: YL NO)
Comments:
Gamma Result (ptci/ml):
Tritium Result (pci/ml):_
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
MyI W) t Sample Date:
N) 0 0 1, 2,0)
Sample Analysis:
Or'-T:,_-
-Sampled by:.*
td Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (0C)
(pS/cm)
(pH units)
Water (ft)
(mi/min) 0-7__
t13 7
-L-7
?74#
_6_171*
1__*_
- O_4, 1__
_7_
O iO....... 1776
- 0.
16_7____
i 7
9 -7 0a e,
5_'_%
1 0
Sample Time:
01 I1
ýnitial water level:
.9.
Operability Check (Indication in ft) a-Final Depth to Water:
ft),
C6 b-Depth to Water (at time of 1st reading):
6, K a-b=Drawdown (D):
1 Bladder Pump Settinas Discharge Time:
Fill Time:
Casing Volume Purged (CVP) 2": Well:. D x (613 ml/ft):
F0_If 4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (G VP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1st reading and sample time):
20 7 GVP > CVP: (YE9// NO)
Comments:
+(
hf~ 4 t 6 Gamma Result (ýtci/ml):
Tritium Result (lici/ml):_..
Reviewed by:
Environmental Supervisor or Designee Count Room No.:_
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
YV\\k,) [. L-Sample Date-q - ! - 0 cf Sample Analysis:
\\
_ Sampled by:,
Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (0C)
(pS/cm)
(pH units)
Water (ft)
(ml/min) 11 Y1 t, t*1'
",q,,o tap
[0. 9 Sapl1Tme t719 "
Iia too Sample Time:
1 2Initial water level:
77 Operability Check (Indication in ft) a-Final Depth to Water:
tollI b-Depth to Water (at time of 1" reading):
1i5*S a-b=Drawdown (D):
Bladder Pump Settings Discharge Time:.
Fill Time:
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
,I CV--
4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (GVP)
Final Flow Rate (ml/min) x Purge Time (minutes between Is' reading and sample q(G O,ýVPdYE
,NO)
"-omment's: \\J Gamma Result (ptci/ml):_
Tritium Result (pci/ml):__________________
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
Sample Date______
v_
_O___
MW xvt Sampled b y:
tlASS t*_L*___
Sample Analysis:
______Sampled by:,
Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (OC)
(pS/cm)
(pH units)
Water (ft)
(ml/min)
______~C L(1(p6 0~5 qQ.V!;
(),. 733 j
O Sample Time:
Initial water level:
Operability Check (Indication in ft) a-Final Depth to Water:
rg,"3 "
b-Depth to Water (at time of 1st reading):
fr,,9 a-b=Drawdown (D):
- 0. 6 e2, Bladder Pump Settings Discharge Time:
/
Fill Time:
__LLL Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
__3__70 4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (GVP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1st reading and sample time): &Y74
)
GVP.>CVP: -ES NO)
Comments:
Gamma Result (pci/ml):
Tritium Result (ltci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
Sample Date:
I 0
0 (C(,
3 0 Sample Analysis-
ý-TE*
~JA
.Sampled by:_..**4ýi.
Groundwater Quality Parameters Time of Reading Temperature
(°C)
Conductivity (pS/cm)
Flow Rate (ml/min) pH (pH units)
Depth to Water (ft)
-~
Sample Time.
Initial water level:
Operability Check (Indication in ft) a-Final Depth to W ater:
b-Depth to Water (at time of 1st reading):
a-b=Drawdown (D):.....
Bladder Pump, Settings Discharge Time:......
Fill Time-Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
4" Well: D x (2468 ml/ft):
Groundwater Volume Purged (G VP)
Final Flow Rate (mltmin) x Purge Time (minutes between 1s reading and sample time):
G VP > CVP: (YES / NO)
Comments:
Gamma Result (ptci/ml):
Tritium Result (pci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
[A W t b" Sample Date:
Sample Analysis 1i / 91/oc
... - -S a m p le d b y : - L.
P t Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (00)
(pS/cm)
(pH units)
Water (ft)
(mli/min)
,,0 <q*
Z o (,
,...ti
- 4.
(
1 "r, Li3*2
_0 Sample Time:
10"3!5-Initial water level:
I Operability Check (Indication in ft) a-Final Depth to Water:
b-Depth to Water (at time of 1st reading):
16.7 a-b=Drawdown (D): Bladder Pump Settings Discharge Time:
Fill Time:
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft): 4" Well: D x (2468 ml/ft):.
Groundwater Volume Purged (GVP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1 St reading and sample time):
e GVP>CVP:
ES t NO)
Comments:
Gamma Result (ptci/ml):
Tritium Result (tAci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
MW t6 Sample Date:
U3 J "1 Sample Analysis:
I v,4 V Sampled by:
o....
Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (0C)
(pS/cm)
(pH units)
Water (ft)
(mllmin)/m o..__
.. 7,%
17
,167
(?
0Ctotf o7f q,6 7
-7 3 O
Sample Time:
0 9?*7-Initial water level:
i Operability Check (Indication in ft) a-Final Depth to Water.:
6.6 b-Depth to Water (at time of 1st reading): /&1,'3 a-b=Drawdown (D):
c0,4?
Bladder Pump Settings Discharge Time:-
Fill Tim e:
1-jA -"
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
4" Well: D x (2468 mi/ft):
Groundwater Volume Purged (G VP)
Final Flow Rate (ml/min) x Purge Time (minutes between 15t reading and sample time):
4750 GVP>CVP7.z"Ej NO)
Comments: ____
Gamma Result (ýtci/ml):
Tritium Result (pici/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification.
G C
ý Sample Date:
l, (-
0
-_O Sample Analysis:
A2-L j ^--
Sampled by:
I&
Groundwater Quality Parameters Time of Reading Temperature
(°C)
Conductivity (PS/cm) pH (pH units)
Depth to Water (ft)
Flow Rate (ml/min)
-.4
-4
___i K__I______
Sample Time:
.Initial water level:
Operabilitv Check (Indication in ft) a-Final Depth to Water:
b-Depth to Water (at time of Ist reading):
a-b=Drawdown (D):,__
Bladder Pump Settings Discharge Time:_
Fill Time:
Casing Volume Purged (CVP) 2" Well: D x (613 ml/ft):
4" Well: D x (2468 mltft):
Groundwater Volume Purged (G VP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1St reading and sample time):
GVP> CVP: (YES I NO)
Comments:-.
J s 42e o'/"
po")
Gamma Result (pci/ml):_
Tritium Result (tici/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
Sample Date:
If-Li? 1, Sample Analysis:
... _i, Sampled by-1-
Groundwater Quality Parameters T
Time of Temperature Conductivity pH Depth to I Flow Rate Reading (OC)
(pS/cm)
I (pH units)
Water (ft)
(mI/min)
_____2:
_T"_ )733 0,ý
- 9___,
Samp le LT,1 0
(ý'
q'
- 1wr, Sample Time:
t6,, 0 Initial water level:
fo'~
Operability Check (Indication in ft) a-Final Depth to Water:
12 '.L, b-Depth to Water (at time of 16t reading): 1z, or&
a-b=Drawdown (D):
0..
O Bladder Pump Settings Discharge Time:
I Fill Time:
L) I_-
Casing Volume Purged (CVP) 2" Well: D x (613. ml/ft):
0 4" Well: D x (2468 mlI/ft):
Groundwater Volume Purged (G VP)
Final Flow Rate (ml/min) x Purge Time (minutes between 1st reading and sample time):
GVP> CVP:
NO)
Comments:
Gamma Result (ýtci/ml):_
Tritium Result (pci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:
Review Date:
Groundwater Monitoring Log Groundwater Sample Identification:
\\,
Sample Date:
0I-C?
Sample Analysis:__ -1
___________Sampled by:.
t1,5 Groundwater Quality Parameters Time of Temperature Conductivity pH Depth to Flow Rate Reading (0C)
(pSicm)
(pH units)
Water (ft)
(ml/min) 13 1,090 7, 11 T
E-3,(ý-
...... (., '
..G *7,/*
Sample Time:
i Initial water level:
-'7.1 OQerability Check (Indication in ft)
Bladder Pump Settings a-Final Depth to Water:
', f Discharge Time:
1 4 b-Depth to Water (at time of 1t reading): 7, I Fill Time:
k/
T a-b=Drawdown (D):
Casing Volume Purged (CVP) 2" Well: D x (613 mlt/ft)
-0 4" Well: D x (2468 ml/ft):_
Groundwater Volume Purged (GVP)
Final Flow Rate (ml/min) x Purge Time (minutes between I reading and sample time):
_e6,
GVP > CVP:.2, I-_
NO)
Comments:
Gamma Result (ptci/ml):
Tritium Result (I.ci/ml):
Reviewed by:
Environmental Supervisor or Designee Count Room No.:_
Review Date:_